DAFTAR ANALISA UPAH & BAHAN

ANALISA BIAYA PEKERJAAN ACIAN PLESTER / M2 No. 1 2 3 4 Mandor Kepala Tukang Tukang Batu Pekerja Pekerja Volume 0.0100 0.0100 0.0500 0.1000 3.2500 Hari O.H O.H O.H O.H KG Kode Upah Rp./org/hari Material Jumlah ANALISA BIAYA PEKERJAAN BENANGAN / M1 No. 1 Tukang Batu 1 Semen PC 50 kg 2 Pasir Pasang Pekerja Volume 0.1200 0.0030 0.0090 Hari O.H Zak m3 Kode Upah Rp./org/hari Material Jumlah ANALISA BIAYA PEKERJAAN PELAPISAN WATER PROOFING No. 1 2 3 4 Mandor Kepala Tukang Tukang Pekerja Pekerja Volume 0.0025 0.0075 0.0750 0.0500 1.0000 Hari O.H O.H O.H O.H m2 Kode Upah Rp./org/hari Material Jumlah Biaya (Rp.) Pekerja 1 Water proofing Coating (Ex. Fosroc/Sika/setara) Biaya (Rp.) Pekerja Biaya (Rp.) Pekerja 1 Semen PC 50 kg -

KODE SNI DT 91-10-07 6.27 - hal 9/11 Sub. Jumlah (Rp.)

KODE

Sub. Jumlah (Rp.) -

KODE SNI-2007 Sub. Jumlah (Rp.)

PEKERJAAN
ANALISA BIAYA PEKERJAAN PEMASANGAN KUSEN ALLUMINIUM No. 1 2 3 4 Mandor Kepala Tukang Tukang Kayu Pekerja Pekerja Volume

: KUSEN, PINTU ALLUMINIUM DAN PLAFOND


KODE

Hari O.H O.H O.H O.H m1 bh

Kode

0.0150 0.0220 0.2500 0.1500 1.0500 5.0000

Upah Rp./org/hari -

Biaya (Rp.) Pekerja

Sub. Jumlah (Rp.)

1 Alluminium 4" siver ( ex INDAL ) 2 Sekrup / Ripet

Material Jumlah

ANALISA ARS 2010 Hal 1 dari 12

DAFTAR ANALISA UPAH & BAHAN


PEKERJAAN : PENGECATAN & PICTURE TOILET
ANALISA BIAYA PEKERJAAN PENGECATAN / PLAMIR TEMBOK. INTERIOR Pekerja Volume Mandor Kepala Tukang Cat Tukang Cat Pekerja 0.0025 0.0075 0.0750 0.0500 0.3000 0.1200 0.1000 KODE

No. 1 2 3 4

Hari O.H O.H O.H O.H kg kg lbr

Kode

Upah Rp./org/hari -

Biaya (Rp.) Pekerja

Sub. Jumlah (Rp.)

1 Cat Tembok interior 2 Plamur Tembok 3 Kertas Gosok no. 150

Material Jumlah

No. 1 2 3 4

ANALISA BIAYA PEKERJAAN PENGECATAN / PLAMIR TEMBOK. EXTERIOR Pekerja Volume Mandor Kepala Tukang Cat Tukang Cat Pekerja 0.0025 0.0075 0.0750 0.0500 0.300 0.120 0.100

KODE

Hari O.H O.H O.H O.H kg kg lbr

Kode

Upah Rp./org/hari -

Biaya (Rp.) Pekerja

Sub. Jumlah (Rp.)

1 Cat Tembok Dulux wethersheild 2 Plamur Tembok 3 Kertas Gosok no. 150

Material Jumlah ANALISA BIAYA PEKERJAAN PASANG KERAMIK LANTAI 30 X 30 No. 1 2 3 4 1 2 3 4 Pekerja Mandor KepalaTukang batu Tukang Batu Pekerja Semen PC 50 kg Semen Berwarna Pasir Pasang Keramik 30 x 30 Volume 0.035 0.035 0.350 0.700 10.000 0.500 0.045 1.050 Hari O.H O.H O.H O.H kg kg m3 m2 Kode Upah Rp./org/hari 0.00 Material Jumlah ANALISA BIAYA PEKERJAAN PASANG KERAMIK LANTAI 40 X 40 No. 1 2 3 4 1 2 3 4 Pekerja Mandor KepalaTukang batu Tukang Batu Pekerja Semen PC 50 kg Semen Berwarna Pasir Pasang Keramik 40 x 40 Volume 0.035 0.035 0.350 0.700 10.000 0.500 0.045 1.050 Hari O.H O.H O.H O.H kg kg m3 m2 Kode Upah Rp./org/hari 0.00 Material Jumlah ANALISA BIAYA PEKERJAAN PASANG KRAMIK LANTAI 20 X 20 ( KM ) No. 1 2 3 4 1 2 3 4 Pekerja Mandor KepalaTukang batu Tukang Batu Pekerja Semen PC 50 kg Semen Berwarna Pasir Pasang Kramik 20 x 20 Volume 0.035 0.035 0.350 0.700 10.400 0.500 0.045 1.060 Hari O.H O.H O.H O.H kg kg m3 m2 Kode Upah Rp./org/hari 0.00 Material Jumlah Biaya (Rp.) Pekerja Biaya (Rp.) Pekerja Biaya (Rp.) Pekerja KODE

Sub. Jumlah (Rp.)

KODE SNI DT 91-13-07 6,35-hal.12/20 Sub. Jumlah (Rp.)

KODE SNI DT 91-13-07 6,36-hal.12/20 Sub. Jumlah (Rp.)

ANALISA ARS 2010 Hal 2 dari 12

DAFTAR ANALISA UPAH & BAHAN

ANALISA ARS 2010 Hal 3 dari 12

RENCANA ANALISA PEKERJAAN


I. PEKERJAAN PERSIAPAN
1. 1 m2 PEMBERSIHAN LOKASI Upah : 0.100 oh Pekerja 0.050 oh Mandor 2. 1 m1 PASANG BOWPLANK 0.007 m3 Usuk Meranti 0.004 m3 Papan Meranti 0.020 kg Paku Upah : 0.100 oh Pekerja 0.100 oh Tukang kayu 0.010 oh Kepala tukang 0.005 oh Mandor

@ Rp. @ Rp.

0.00 0.00 Jumlah 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

II. PEKERJAAN TANAH


1. 1 m3 GALIAN UNTUK TANAH BIASA SEDALAM 1 m Upah : 0.750 oh Pekerja gali tanah 0.025 oh Mandor 2 1 m3 GALIAN UNTUK TANAH KERAS SEDALAM 1 m Upah : 1.000 oh Pekerja gali tanah 0.032 oh Mandor 1 m3 MENGURUG DENGAN PASIR Bahan : 1.200 m3 Pasir Pasang ( Jawa ) Upah : 0.300 oh Pekerja 0.010 oh Mandor 1 m3 MENGURUG DENGAN PUDEL PUTIH Bahan : 1.200 m3 Pudel putih 1.000 m2 Sewa alat + Pemadatan Upah : 0.250 oh pekerja 0.025 oh mandor 1 m3 MENGURUG DENGAN TANAH ( lokal ) Bahan : 1.200 m3 Tanah urug 1.000 m2 Sewa alat + Pemadatan Upah : 0.250 oh pekerja 0.025 oh mandor

@ Rp. @ Rp.

0.00 0.00 Jumlah

= Rp. = Rp. = Rp.

@ Rp. @ Rp.

0.00 0.00 Jumlah

= Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

0.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 0.00 Jumlah

@ Rp. @ Rp. @ Rp. @ Rp.

0.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 0.00 Jumlah

RENCANA ANALISA PEKERJAAN


III. PEKERJAAN PASANGAN BATA & BATU KALI
1 1 m3 PASANGAN BATU KOSONG ( Anstampeng ) Bahan : 1.200 m3 Batu Belah 15/20 (lokal) 0.432 m3 Pasir Urug Upah : 0.780 oh Pekerja 0.390 oh Tukang Batu 0.039 oh Kepala Tukang Batu 0.039 oh Mandor 1 m3 PASANGAN BATU GUNUNG 1Pc : 4 Ps Bahan : 1.200 m3 Batu Belah 15/20 (lokal) 163.000 kg Semen (PC) 0.520 m3 Pasir Pasang ( Jawa ) Upah : 1.500 oh Pekerja 0.750 oh Tukang Batu 0.075 oh Kepala Tukang Batu 0.075 oh Mandor 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA 1Pc : 4Ps Bahan : 140.000 bh Batu merah 26.550 kg Semen (PC) 0.093 m3 Pasir Pasang ( Jawa ) Upah : 0.600 oh Pekerja 0.200 oh Tukang Batu 0.020 oh Kepala Tukang 0.030 oh mandor 1 m2 PASANGAN ROOLAG TEBAL 1 BATA Bahan : 140.000 bh Bata merah ( jawa ) 26.550 kg Semen ( PC ) 0.093 m3 Pasir Pasang ( Jawa ) Upah : 0.640 oh pekerja 0.200 oh Tukang Batu 0.020 oh Kepala Tukang Batu 0.030 oh mandor 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1Pc : 3Ps Bahan : 70.000 bh Bata merah ( jawa ) 14.370 kg Semen ( PC ) 0.040 m3 Pasir Pasang ( Jawa ) Upah : 0.300 oh pekerja 0.100 oh Tukang Batu 0.010 oh Kepala Tukang 0.015 oh mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

RENCANA ANALISA PEKERJAAN


6 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1Pc : 4Ps Bahan : 70.000 11.500 0.043 Upah : 0.320 0.100 0.010 0.015 7 bh Bata merah ( jawa ) kg Semen ( PC ) m3 Pasir Pasang ( Jawa ) oh oh oh oh pekerja Tukang Batu Kepala Tukang mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. -

1 m2 PLESTERAN 1Pc : 3Ps Tebal 15 mm Bahan : 7.776 kg Semen ( PC ) 0.023 m3 Pasir Pasang ( Jawa ) Upah : 0.300 oh pekerja 0.150 oh Tukang Batu 0.015 oh Kepala Tukang 0.010 oh mandor 1 m2 PLESTERAN 1Pc : 4Ps Tebal 15 mm Bahan : 6.240 kg Semen ( PC ) 0.024 m3 Pasir Pasang ( Jawa ) Upah : 0.300 oh pekerja 0.150 oh Tukang Batu 0.015 oh Kepala Tukang 0.010 oh mandor 1 M' PLESTERAN SKONING / BENANGAN 1 Pc : 2 Psr Bahan : 0.500 kg Semen ( PC ) 0.013 m3 Pasir Pasang ( Jawa ) Upah : 0.080 oh Pekerja 0.400 oh Tukang Batu 0.040 oh Kepala Tukang 0.004 oh Mandor 1 m2 PLESTERAN BETON 1 Pc : 2 Psr Bahan : 9.300 kg Semen ( PC ) 0.018 m3 Pasir Pasang ( Jawa ) Upah : 0.260 oh Pekerja 0.200 oh Tukang Batu 0.020 oh Kepala Tukang 0.013 oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

RENCANA ANALISA PEKERJAAN


VI. PEKERJAAN BETON
1 1 m3 PEKERJAAN BETON ( K 250 ) Bahan : 384.000 kg Semen PC 0.494 m3 Pasir Cor ( Jawa ) 0.770 m3 Batu Pecah 2/3 ( jawa ) Upah : 2.000 oh Pekerja 0.350 oh Tukang Batu 0.035 oh Kepala Tukang Batu 1.000 oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1 m3 PEKERJAAN BETON CAMPURAN 1Pc : 3Psr : 5Krl Bahan : 218.000 kg Semen PC 0.520 m3 Pasir Cor ( Jawa ) 0.870 m3 Batu Pecah 2/3 ( jawa ) Upah : 1.650 oh Pekerja 0.250 oh Tukang Batu 0.025 oh Kepala Tukang Batu 0.080 oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 0.00 0.00 0.00 0.00 0.00 0.00 Jumlah lantai kerja 5 cm

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,00 Kg Pekerjaan Pembesian ( Polos ) Bahan : 1.050 Kg Besi Beton Polos 0.015 Kg kawat bendrat Upah : 0.007 Oh Pekerja 0.007 Oh Tukang Besi 0.001 Oh Kepala Tukang Besi 0.000 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,00 Kg Pekerjaan Pembesian ( Ulir ) Bahan : 1.050 Kg Besi Beton Ulir 0.015 Kg kawat bendrat Upah : 0.007 Oh Pekerja 0.007 Oh Tukang Besi 0.001 Oh Kepala Tukang Besi 0.000 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

RENCANA ANALISA PEKERJAAN


5 1,00 m2 Pekerjaan Begisting Pondasi Bahan : 0.020 m3 Kayu Papan Begisting 0.150 Kg Paku 0.050 Ltr Minyak Begisting Upah : 0.520 Oh Pekerja 0.260 Oh Tukang Kayu 0.026 Oh Kepala Tukang Kayu 0.026 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

0.000 0.000 0.000 0.000 Jumlah

1,00 m2 Pekerjaan Begisting Sloof Bahan : 0.023 m3 Kayu Papan Begisting 0.150 Kg Paku 0.050 Ltr Minyak Begisting Upah : 0.520 Oh Pekerja 0.260 Oh Tukang Kayu 0.026 Oh Kepala Tukang Kayu 0.026 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,00 m2 Pekerjaan Begisting Kolom Bahan : 0.008 m3 Kayu Balok 0.020 m3 Kayu Begisting 0.200 Kg Paku 0.175 Lbr Multiplek tebal 9 Mm 1.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M 0.100 Ltr Minyak Begisting Upah : 0.660 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,00 m2 Pekerjaan Begisting Balok Bahan : 0.009 m3 Kayu Balok 0.020 m3 Kayu Begisting 0.200 Kg Paku 0.175 Lbr Multiplek tebal 9 Mm 1.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M 0.100 Ltr Minyak Begisting Upah : 0.660 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

RENCANA ANALISA PEKERJAAN


9 1,00 m2 Pekerjaan Begisting Plat Bahan : 0.015 m3 Kayu Balok 0.040 m3 Kayu Begisting 0.400 Kg Paku 0.350 Lbr Multiplek tebal 9 Mm 6.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M 0.200 Ltr Minyak Begisting Upah : 0.660 Oh Pekerja 0.330 Oh Tukang Kayu 0.033 Oh Kepala Tukang Kayu 0.033 Oh Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Jumlah

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

Pek. Beton Balok 25/50 Plat Atap 1.000 m3 Pekerjaan Beton ( K 250 ) 222.090 kg Pekerjaan Pembesian 6.490 m2 Pekerjaan Bekisting Balok

@ Rp. @ Rp. @ Rp.

0.00 Jumlah

= Rp. = Rp. = Rp. = Rp.

Pek. Beton Balok 20/35 Plat Atap 1.000 m3 Pekerjaan Beton ( K 250 ) 200.800 kg Pekerjaan Pembesian 6.490 m2 Pekerjaan Bekisting Balok

@ Rp. @ Rp. @ Rp.

0.00 Jumlah

= Rp. = Rp. = Rp. = Rp.

Pek. Beton Plat Atap 1.000 m3 Pekerjaan Beton ( K 250 ) 115.000 kg Pekerjaan Pembesian 10.000 m2 Pekerjaan Bekisting Plat

@ Rp. @ Rp. @ Rp.

0.00 Jumlah

= Rp. = Rp. = Rp. = Rp.

DAFTAR HARGA BAHAN & UPAH PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA BANGKALAN - MADURA No I 1 2 3 4 5 6 7 8 9 II 1 2 3 4 5 6 7 8 9 III 1 2 3 IV 1 2 3 4 5 V. 1 2 3 4 5 VI. 1 2 3 4 5 6 7 8 9 16 16 17 18 19 20 VII. 1 2 3 4 5 6 7 8 9 10 NAMA BAHAN BAHAN PASIR Pasir urug ( lokal ) Pasir pasang ( lokal ) Pasir pasang ( jawa ) Sirtu ( jawa ) Pasir cor ( jawa ) Tanah urug ( lokal ) Pudel putih ( lokal ) Pudel kuning ( lokal ) Abu batu BAHAN BATU Batu gunung belah 15/20 ( lokal ) Batu gunung belah 10/15 ( lokal ) Batu gunung pecah 5/7 ( lokal ) Batu gunung pecah 4/6 ( lokal ) Batu gunung pecah 3/5 ( lokal ) Batu gunung pecah 2/3 ( lokal ) Batu kali pecah 5/7 ( jawa ) Batu kali pecah 3/5 ( jawa ) Batu pecah tempel/hiasan ( jawa ) BAHAN KORAL/KERIKIL Batu koral bulat 2/3 ( jawa ) Batu pecah mesin 1/2 ( jawa ) Batu pecah mesin 2/3 ( jawa ) BAHAN BATU BATA Batu bata merah ( jawa ) Batu putih ( lokal ) Batu merah ( lokal ) Bataco Koral sikat PORTLAND CEMENT ( PC ) Semen Gresik 40 Kg Semen Warna Semen Putih ( Azona / Tiga Roda ) 50 Kg Semen Putih ( Gresik ) 40 Kg Semen AM/Epoxy BAHAN BESI/LOGAM & KACA Besi Beton Polos Besi Beton Ulir Besi Siku 5.50.50 x 6.00 m Pipa air Galvanis Medium 1/2" x 6,00 m' Pipa air Galvanis Medium 3/4" x 6,00 m' Pipa Air Galvanis Medium 1" Kawat Beton / Kawat Bendrat Kawat BWG ( Penggantung Rangka Plafond ) Kawat Suspention Root ( Rangka Plafond ) Alluminium 4" anodized Sunscreen Aluminium Sealent Karet Skrup Fixer U Climb Wall Angle BAHAN KAYU Kayu Kamper Balok 8/12, 6/12, 8/15 Klas I Kayu Kamper Papan 3/20, 3/30 x 4,00 m' Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas I Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas II Kayu Bangkirai Papan 2/20, 3/20 x 4,00 m' Kayu Meranti Balok 3/15, 8/12, 6/12 Klas I Kayu Meranti Balok 5/7, 4/6, 6/12 Klas II Kayu Meranti Papan 2/20, 3/20 x 4,00 m' Kayu Papan Begesting 2/20 x 4,00 m' Kayu Kelapa SAT. HARGA ( Rp. )

m m m m m m m m m m m m m m m m m m m m m bh bh bh bh m Kg Kg Zak Zak Kg Kg Kg Kg Ljr Ljr Ljr Kg Kg M' M' M2 tube Bh Bh Bh M M M M M M M M M Btg

DAFTAR HARGA BAHAN & UPAH PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA BANGKALAN - MADURA No 11 VIII. 1 2 3 4 5 6 IX. 1 2 3 4 X. 1 2 3 4 5 6 7 8 9 NAMA BAHAN Kayu Untuk Perancah BAHAN TRIPLEK/KAYU LAPIS Triplek 1,22 x 2,44 x 4 mm Triplek 1,10 x 2,10 x 4 mm Multiplek 1,22 x 2,44 x 6 mm Multiplek 1,22 x 2,44 x 9 mm Teakwood 1,22 x 2,44 x 4 mm Teakwood 1,10 x 2,10 x 4 mm BAHAN PAKU Paku Reng Paku Usuk Paku Triplek Paku 12 cm BAHAN PENGECATAN Cat kayu /besi mowilex Cat meni Cat tembok interior mowilex ( setara ) Cat tembok exterior Dulux Weathersheild Minyak Cat/afduner Plamur tembok Lem kayu Water proofing Coating (Ex. Fosroc/Sika/setara) Ampelas SAT. M Lbr Lbr Lbr Lbr Lbr Lbr Kg Kg Kg Bh Kg Kg Kg Kg Lt Kg Kg m2 Lbr HARGA ( Rp. )

DAFTAR HARGA BAHAN & UPAH PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA BANGKALAN - MADURA No XI. 1 2 3 4 5 6 7 8 9 XII. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 NAMA BAHAN BAHAN UNTUK LANTAI keramik lantai 20 x 20 keramik dinding 20 x 25 keramik 30 x 30 keramik 40 x 40 ( Motif / warna terang ) Roman kw 1 keramik 40 x 40 ( Motif / warna gelap ) Roman kw 1 Roster Kramik 20 x 20 Parquet Batu Ampiang kecil-kecil ( 30/30 cm ) Batu alam tempel ( batu piring ) UPAH KERJA Mandor Kepala Tukang Gali Tanah Kepala Tukang Batu Kepala Tukang Kayu Kepala Tukang Besi Kepala Tukang Cat Kepala Tukang Listrik Tukang Gali Tanah Tukang Batu Tukang Kayu Tukang Besi Tukang Cat Tukang Listrik Tukang Pipa Pekerja Sewa Welding set SAT. HARGA ( Rp. )

M2 M2 M2 M2 M2 bh M2 bh M3 Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Jam