SPRAY FOAM INSULATION BOTTOM OF

DECK; ICYNENE DESIGN BASIS


Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job. OB+Architecture Inc. must be notified immediately in writing of any variation from the dimensions and conditions shown on these drawings. Field verify all conditions prior to laying out or fabricating associated work. Bring to the architect's attention any deviation from designed conditions and field conditions prior to ordering
materials and installing work, and cooperate with architect to modify such conditions at no additional cost to the owner, architect or architect's consultants. Shop details must be submitted to the architect's office and reviewed by the architect prior to ordering materials, fabrication and delivery to the job site, unless otherwise provided for under the specific contractual agreement between the architect and client. OB+Architecture Inc. expressly reserves its common law copyright and other

2"
1
PRE-ENGINEERED LIGHT-GAUGE STEEL
TRUSSES @ 4'-0" O.C. 12
ALL TOP COURSES EXCEPT FRONT
SECOND THRU GROUND

CMU WALL
STANDING SEAM METAL ROOFING OVER 1-1/2" 6 SEPARATION BLOCK TO BE SOLID
COURSES TO BE STANDARD
22-GAUGE TYPE B STEEL DECKING BLOCK
4"x16" BLOCK 1 2
DENSGLAS BLOCKING FOR SPRAY-FOAM INSULATION

7
8", 25 GAUGE HAT CHANNELS
MTSM16 TRUSS STRAP; SEE @ 24" O.C. STEEL POST THRU CENTER OF 8"x8" STEEL POST THRU CENTER OF 8"x8"
DETAILS 2/A3.5 AND 11/S3.1 BLOCK TO SLAB BLOCK TO SLAB

COURSES TO BE STANDARD
property rights in these documents. These documents are not to be reproduced, changed, or copied in any form or manner whatsoever, nor are they to be assigned to a third party without first obtaining the written permission and written consent of OB+Architecture Inc. In the event of unauthorized use of these documents by a third party, the third party shall hold OB+Architecture Inc. harmless and agrees to remunerate OB+Architecture Inc.

GROUT SOLID GROUT SOLID CUT KERF 12" DOWN AND 3 4 OF PLACE ASPHALTIC BOARD
10'-8" 10'-8" ALONGSIDE CMU WALL PRIOR TO

SECOND THRU GROUND


THE WAY THRU ASPHALTIC
TOP OF MASONRY TOP OF MASONRY EXPANSION BOARD POUR
1
2" SAG-RESISTANT GYP BOARD:
PROVIDES THERMAL BARRIER

4"x16" BLOCK
1
4" THREADED ROD &
PER FBC 2603.4
1
UNISTRUT HANGAR
DISCARD

SEE MECHANICAL PLANS FOR 8'-6"


ACTUAL DUCT SIZING BOTTOM OF ACT ALL TOP COURSES EXCEPT FRONT SECOND THRU GROUND
SEPARATION BLOCK TO BE SOLID COURSES TO BE STANDARD

CMU WALL

CMU WALL
SLAB POUR

SLAB POUR
BLOCK 4"x16" BLOCK
LIGHT-GAUGE METAL STUD
• PRE-PUNCHED
3 4
• 3-5/8"
• 25-GAUGE
• C-TYPE
• 24" O.C.
• OVER 5 8" GYP BOARD @ SOFFITS

6'-0" 6'-0" A B POUR SLAB AFTER CONCRETE POUR, TEAR


TOP ASPHALTIC STRIP OFF & FILL
BOTTOM OF SOFFITS BOTTOM OF SOFFITS WITH SEALANT

DETAIL AT HVAC DUCT ENTRY THROUGH NORTH WALL CORNER KENNEL WALL T-INTERSECTION DETAIL EXPANSION JOINT DETAIL issued: ADVANCE REVIEW 21 JULY 2008

1 SCALE: 3/4" = 1'-0" 2 SCALE: 1 1/2" = 1'-0" 3 SCALE: 6" = 1'-0" revised:

1 17 OCT 2008
BLDG DEPT COMMENTS
SPRAY FOAM INSULATION BOTTOM OF
DECK; ICYNENE DESIGN BASIS
SPRAY FOAM INSULATION BOTTOM OF
DECK; ICYNENE DESIGN BASIS
12
PRE-ENGINEERED LIGHT-GAUGE STEEL PRE-ENGINEERED LIGHT-GAUGE STEEL
TRUSSES @ 4'-0" O.C. 12 TRUSSES @ 4'-0" O.C. 6
STANDING SEAM METAL ROOFING OVER 1-1/2" 6 STANDING SEAM METAL ROOFING OVER 1-1/2"
22-GAUGE TYPE B STEEL DECKING 22-GAUGE TYPE B STEEL DECKING

DENSGLAS BLOCKING FOR SPRAY-FOAM INSULATION DENSGLAS BLOCKING FOR SPRAY-FOAM INSULATION 7
8", 25 GAUGE HAT CHANNELS
@ 24" O.C.
7
8", 25 GAUGE HAT CHANNELS

CENTRAL
MTSM16 TRUSS STRAP; SEE @ 24" O.C. MTSM16 TRUSS STRAP AT EACH
DETAILS 2/A3.5 AND 11/S3.1 TRUSS; SEE DETAILS 11/S3.1 & 2/A3.5

FLORIDA
10'-8" 10'-8" 10'-8"
TOP OF MASONRY TOP OF MASONRY TOP OF MASONRY /
TRUSS BEARING 1
CAULK ALL JOINTS 1 2" SAG-RESISTANT GYP BOARD:
2"
SAG-RESISTANT GYP BOARD: PROVIDES THERMAL BARRIER
PROVIDES THERMAL BARRIER PER FBC 2603.4 1
PER FBC 2603.4 1
ALUMINUM GUTTERS & ALUMINUM GUTTERS & CONTINUE GYP BRD & INSULATION
VINYL-FACED ACOUSTIC TILE TO BOTTOM OF DECK
DOWNSPOUTS DOWNSPOUTS
CEILING (SEE FINISH SCHEDULE) ACOUSTIC TILE CEILING
HARDIETRIM XLD 8" FASCIA HARDIETRIM XLD 8" FASCIA (SEE FINISH SCHEDULE)

8'-6"

ANIMAL
HARDIE SOFFIT VENTED PANEL BOTTOM OF ACT HARDIE SOFFIT VENTED PANEL
6"

3'-0" 3'-0"

8" CMU
SEE STRUCTURAL FOR
STUCCO ON METAL LATH
OVER MOISTURE BARRIER
OVER 12" DENSGLAS OVER
LT GAUGE METAL FRAMING 8" CMU
HOSPITAL
VERTICAL & HORIZONTAL SEE STRUCTURAL FOR
REINFORCING, TYP VERTICAL & HORIZONTAL address: 1201 ALAFAYA TRAIL
CHAIN LINK FENCE SHOWN REINFORCING, TYP
ABOVE/BEYOND 4" CMU
4'-0"

OVIEDO, FLORIDA

• HARDIEBOARD HORIZONTAL LAP SIDING 32765


10'-8"

• 6.25" SIZE, 5" EXPOSED 5


8" GYP BOARD OVER
• APPLIED TO 2x4 PTL SLEEPERS
112" METAL FURRING CHANNELS
• NON-TEXTURED, SMOOTH FINISH @ 24" OC
• APPLY OVER CARLISLE CCW-525 project
number: 2007-12
3
LIQUID-APPLIED WATERPROOF 4" STUCCO FINISH OVER 8" CMU
8'-6"

8'-6"
MEMBRANE BARRIER (NOT SHOWN FOR
CLARITY)
1.5" (R-10) SPRAY FOAM INSULATION;
SOLID MASONRY UNITS EXCEPT AT ICYNENE DESIGN BASIS
INTERSECTIONS. SEE DETAIL 2A/A3.4
for such use in an amount equal to the original fee for the original documents, plus legal fees, court costs, collection fees and other costs.

FILL ALL NON-GROUTED CELLS WITH & 2B/A3.4 FILL ALL NON-GROUTED CELLS WITH
'CORE-FILL 500' TAILORED-FOAM 'CORE-FILL 500' TAILORED-FOAM
4" CMU, APPLY SEALANT AND
TWO COATS EPOXY PAINT.
PARTITION TYPE P5 (A3.6)
4'-0"

EXPANSION JOINT
• 1
2" WIDE, CONTINUOUS ALONG CMU WALL

4" Ø TRENCH DRAIN, • FILL WITH EXPANSION MATERIAL


SEE DETAIL 2/A3.3 SLOPE TO SUMP 18" / FT • DEPRESS MATERIAL 1 4" BELOW FINISHED
FLOOR
6" 4" 6" EPOXY SEALED CONCRETE • CAULK WITH SILICONE SEALANT AGAINST
1
SLOPE DOWN WATER
SLOPE DOWN 2" title:
FINISH FLOOR FINISH FLOOR FINISH FLOOR
0'-0" (REFERENCE) 0'-0" (REFERENCE) 0'-0" (REFERENCE)
MIN. 6" BETW. TOP OF GRADE & START OF SIDING
WALL SECTIONS
GRADE; VARIES
-1'-4" -1'-4"
drawn:
TOP OF FOOTING 6 MM POLY VAPOR BARRIER TOP OF FOOTING JLP
TERMITE-TREATED FILL reviewed:
OB / RG
SEE 8/S3.1 FOR TDE DETAILS
6 MM POLY VAPOR BARRIER
FOOTING VARIES WITH SLOPE date:
OF TRENCH 21 JULY 2008
TERMITE-TREATED FILL
SEE DETAIL 1/A3.3 FOR SUMP lman:
BEYOND NONE
SMOOTH DOWEL DETAIL, SEE CONCRETE SLAB sheet setup:
1/S3.1
MOJA-SECTIONS

WS1 WALL SECTION WS2 WALL SECTION AT STAFF ENTRY sheet


number:

A3.4
SCALE: 3/4" = 1'-0" SCALE: 3/4" = 1'-0"