You are on page 1of 1

Operating Instructions

863 Valley View Road, Eighty Four, PA 15330 Tel: 724-941-9701 Fax: 724-941-1369 e-mail: skctech@skcinc.com

Cyclone Calibration Chamber Catalog No. 225-01-03


The calibration chamber is for monitoring the ow through a lter/cyclone. It is designed to t cyclones Cat. No. 225-01-01 and 225-01-02. Assemble the lter/cyclone assembly in the normal way and connect to the sample pump. Moisten the O-ring inside the large end of the chamber and push onto the enlarged section of the cyclone extension. Connect the small end to a owmeter or other calibration instrument such as the Defender 717 Series. Use 1/4 in ID tubing to make the connection and maintain as short as possible. (See illustration on reverse side.) Turn on pump and read ow from the calibrator.
AIRCHEK

SAMPLER

U L
SAMPLE PERIOD MINUTES START HOLD
FLOW AND BATTERY CHECK

LISTED 124U

5 4 3 2 1

SKC Limited Warranty and Return Policy


SKC products are subject to the SKC Limited Warranty and Return Policy, which provides SKCs sole liability and the buyers exclusive remedy. To view the complete SKC Limited Warranty and Return Policy, go to http://www. skcinc.com/warranty.asp.
Form #37370 Rev 1102

SET-UP

MODE

AIRCHEK SAMPLER MODEL 224-PCXR8

DIGIT SELECT TOTAL ELAPSED TIME

DIGIT SET PUMP RUN TIME ON FLOW

ADJ

You might also like