S10

Pgina

Presupuesto

Cliente
Lugar

0103001
Cerco Perimetrico
CERCO PERIMETRICO
001
Quispe De Sumi, Ofelia
AREQUIPA - AREQUIPA - YURA

Item

Descripcin

01

OBRAS PRELIMINARES

01.01

TRAZO Y REPLANTEO INICAL

m2

1,000.00

2.67

2,670.00

01.02

LIMPIEZA DEL TERRENO MANUAL

m2

1,000.00

2.29

2,290.00

02

OBRAS PROVISIONALES

02.01

ALMACEN (CONTAINER Y ESTRUCTURAS LIVIANAS)

glb

1.00

1,000.00

1,000.00

03

MOVIMIENTO DE TIERRAS

03.01

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS

m3

94.20

22.02

2,074.28

03.02

REFINE DEL TERRENO EXCAVADO

m2

157.00

2.53

04

CONCRETO SIMPLE

04.01

ENCOFRADO DE SOBRECIMIENTO h=0.60 m

m2

157.00

31.68

4,973.76

04.02

CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0.05 m.

m2

157.00

10.91

1,712.87

04.03

COLUMNAS

04.03.01

ENCOFRADO COLUMNAS 0.25x0.25x3.00 m.AISLADA CON ALAMBRE # 8 CADA 3 HILADAS m2


DE COL. A COL.

04.03.02

DESENCOFRADO COLUMNAS

m2

5.00

4.14

20.70

04.03.03

CONCRETO COLUMNAS f'c=175 kg/cm2

m3

15.60

310.08

4,837.25

05

ALBAILERIA

05.01

MURO LADRILLO K.K DE ARCILLA 18H ( 09x013x0.24) AMARRE DE CABEZA, JUNTA 1.5 cm. m2
MORTERO 1:1:5

443.00

51.56

22,841.08

06

VARIOS

06.01

PUERTA METALICA

m2

1.00

700.00

700.00

06.02

LIMPIEZA DEL TERRENO MANUAL

m2

1.00

2.29

Presupuesto
Subpresupuesto

Costo al

Und.

Metrado

Precio S/.

Parcial S/.
4,960.00

1,000.00

2,471.49

397.21
11,707.18

5,020.55
5.00

32.52

162.60

22,841.08

702.29

2.29
43,682.04

COSTO DIRECTO

3,057.74

GASTOS GENERALES (7%)

3,494.56

UTILIDAD (8%)

50,234.34

SUB TOTAL

9,042.18

IGV (18%)

59,276.52

TOTAL PRESUPUESTO
SON :

26/05/2012

CINCUENTINUEVE MIL DOSCIENTOS SETENTISEIS Y 52/100 NUEVOS SOLES

Fecha :

26/05/2012 08:30:27p.m.