You are on page 1of 2

VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK Created NO. 1 RIG UP WIRELINE SHEAVES / / 199 STEP ENSURE LOGGING COMPANY REPRESENTATIVE IS PRESENT ON RIG FLOOR DURING THIS OPERATION HAZARD TASK NO Review Date ADQ03 PAGE 1 OF 2 / CONTROL / 19..

USING THE SHEAVE HANGING NUBBIN SUSPEND THE TOP SHEAVE FROM 5 PIPE ELEVATORS. USE TUGGER TO LIFT. ENSURE SAFETY SLING TO BAILS IS SECURE AND TIE ELEVATOR HORNS SECURELY TOGETHER WITH ROPE SECURE LOWER SHEAVE TO CHAIN IN FLOOR AT VEE-DOOR AND SUSPEND SHEAVE ON SLING PROVIDED ABOVE VEE-DOOR

STRUCK BY, CAUGHT BETWEEN PINCH POINTS.

STAY ALERT TO LOADS ON AIR WINCH, KEEP HANDS OFF NUBBIN WHEN LATCHING ELEVATORS

STRUCK BY, PINCH POINTS

STAY ALERT TO LOADS ON AIR WINCH

TASK

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
RIG UP WIRELINE SHEAVES Created NO. 4 / / 199 STEP THREAD WIRE LINE CABLE THROUGH LOWER SHEAVE THEN THROUGH SHEAVE IN ELEVATORS AND DOWN THE VEE-DOOR PINCH POINTS HAZARD TASK NO Review Date ADQ03 PAGE 2 OF 2 / CONTROL WHEN THREADING WIRELINE HEAD THROUGH SHEAVES, WATCH FINGERS FROM PINCH/JAM POINTS / 19..

RAISE BLOCKS TO THE REQUIRED HEIGHT BY LOGGING COMPANY REP.

WIRELINE TANGLING OR HANGING UP

WATCH BLOCKS AND WIRELINE AS BLOCKS BEING RAISED

ALL ABOVE STEPS MUST BE DONE WITH THE LOGGING COMPANY REPRESENTATIVE PRESENT ON THE RIG FLOOR

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

You might also like