VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK Created NO. 1 FLOW CHECK WHILE ON BOTTOM 03/05/1996 STEP ACTIVE PIT INCREASE HAZARD INFLUX INTO WELL BORE FLOW CHECK TASK NO Review Date ADQ05 PAGE 1 OF 2 03/05/1996 CONTROL

PICK UP KELLY OFF BOTTOM. SHUT PUMPS DOWN. CHECK WELL FOR FLOW

INFLUX INTO WELL BORE

FLOW CHECK

WELL IS FLOWING

BLOW OUT

SHUT WELL IN

SHUT WELL IN

BLOW OUT

OPEN THE `HCR, CLOSE `HYDRILL, CLOSE CHOKE

TASK

FLOW CHECK WHILE ON BOTTOM

TASK NO

ADQ05

PAGE 2 OF 2

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
Created NO. 5 03/05/1996 STEP NOTIFY TOOLPUSHER AND COMPANY MAN HAZARD MIGRATION OF GAS TO SURFACE Review Date 03/05/1996 CONTROL MONITOR SHUT IN DRILL PIPE PRESSURE AND CASING PRESSURE AND RECORD PRESSURES

FLOORMEN TO REMAIN ON RIG FLOOR DERRICKMAN TO STAND BY ON CHOKE MANIFOLD AND ROUSTABOUTS TO STAND BY AT MUD MIXING STATION

MIGRATION OF GAS TO SURFACE

CIRCULATE KILL MUD AFTER KILL SHEET HAS BEEN DONE AND VERIFICATION OF CORRECT KILL MUD WEIGHT IN MUD PITS

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED