You are on page 1of 2

VICO INDONESIA

JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created BPV RETRIEVAL USING DRY ROD METHOD 9 / 9 / 1996 TASK NO ADQ08 Review Date PAGE 1 OF 2 / / 19..

NO. 1.

STEP PRE JOB MEETING INCLUDE 5.0 15.

HAZARD PRESSURE UNDER PBV. POOR COMMUNICATION.

CONTROL ALL NON ESSENTIAL PERSONNEL CLEAR OF AREA. HOLD DETAILED PRE-JOB MEETING WITH CAMERON PERSONNEL. STEP THROUGH PROCEDURES TO FOLLOW UNDERSTAND THEM, ASK IF UNSURE. SET UP MEASURES TO ENSURE PERSONS DO NOT ENTER AREA.

2.

CLEAR NON ESSENTIAL PERSONNEL AND TAKE STEPS TO ENSURE PERSONS DO NOT ENTER AREA. BRING BPV RUNNING TOOL TO RIG FLOOR WITH TUGGER. 3RD PARTY TO HOOK UP TO BPV.

PRESSURE.

3.

LENGTH OF TOOL. HANG UP AT TOOL.

KEEP AN EYE ON RUNNING TOOL. TEAM WORK. COMMUNICATION. COMMUNICATION TO TUGGER. STAY CLEAR.

UI4.

LOWERING RUNNING TOOL TOO QUICKLY.

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

VICO INDONESIA
JOB SAFETY ANALYSIS.

RIG 453
TASK NO Created NO. 5. BPV RETRIEVAL USING DRY ROD METHOD 9 / 9 / 1996 STEP REMOVE BPV AND RUNNING TOOL HAZARD CATCH UP ON WAY OUT PRESSURE RELEASE. AS ABOVE (4). TASK NO ADQ08 Review Date CONTROL PAGE 2 OF 2 / / 19..

APPROPRIATE SAFETY CLOTHING AND EQUIPMENT MUST BE WORN AND USED

You might also like