CRONOGRAMA DE ADQUISICION DE MATERIALES

Proyecto:
Propietario:
Ubicacin:
Consultor:

ESTUDIOS DEFINITIVOS DE INGENIERIA PARA LA CONSTRUCCIN DEL PUENTE CARROZABLE QUIRISHARI


GOBIERNO REGIONAL PASCO
Plazo: 140 Dias Calendarios
1,183,384.41
Rio Quirishari, Dist. Puerto Bermudez, Prov. Oxapampa, Dpto. Pasco
Costo Directo : S/.
1,734,472.30
CONSORCIO ANDREICO - E. RIVERA
Total Presupuesto : S/.

ITEM

PARTIDA

PARCIAL

DIAS CALENDARIOS
60
90

30

1.00

CEMENTO PORTLAND

BLS

S/.

115,044.52

46,017.81
40.00%

2.00

ACERO DE REFUERZO GRADO 60

KG

S/.

103,369.83

62,021.90
60.00%

3.00

AGREGADOS

M3

S/.

132,689.64

4.00

SOLDADURA

KG

S/.

33,738.75

4.00

MADERA

P2

S/.

30,841.36

6.00

PINTURA

GLN

S/.

14,790.23

7.00

ACERO ESTRUCTURAL

KG

S/.

92,550.08

92,550.08
100.00%

8.00

ADITIVOS

GLN

S/.

8,549.96

8,549.96
100.00%

9.00

LAMINA REFELCTIVA

P2

S/.

471.43

10.00

VARIOS

S/.

4,085.15

69,026.71
60.00%

120

140

41,347.93
40.00%

132,689.64
100.00%

33,738.75
100.00%

30,841.36
100.00%

4,085.15
100.00%

14,790.23
100.00%

471.43
100.00%
-

20105
20409
20464
20552
21091
21092
21402
21403
25180
25182
26202
26203
28401
29702
30204
510406
511604
528702
560250
560280
650202
650203
651706
300814

CLAVOS PARA MADERA C/C 3"


ALAMBRE NEGRO N16
DISTANCIADORES (ALAMBRE)
PERNOS PARA ENCOFRADO
CLAVOS
PERNO 5/8" x 10" CON TUERCA
PERNO 5/8" x 16"
PERNO 5/16" x 10"
PERNOS ASTM A 325 1"x65mm
PERNOS DE ANCLAJE 1/2" x 8"
LAMINA DE ACERO 0.90 x 1.80 x 2MM
LAMINA DE ACERO 0.90 x 1.80 x 3MM
ARANDELA 5/8"
ACERO DE REFUERZO FY=4200 GRADO 60
ACERO
PLATINA DE FIERRO 1/8" x 2" x 6m
PLATINAS DE 3/16"
PERFIL LAMINADO T 1" X 1" X 1/8" X 20"
PLANCHA ACERO 9.5mm x1.22m x2.40m SIDER.
PLANCHA ACERO 16.0mm x1.22m x2.40m SIDER
TUBERIA DE FIERRO NEGRO 2
TUBERIA DE FIERRO NEGRO 3
TUB. FIERRO NEGRO DE 3" x 6.4m
CABLES DE ACERO DE 1"

31103 LAMINA REFELCTIVA GRADO INGEN.

KG
KG
%IN
KG
KG
UND
UND
UND
UND
KG
UND
UND
UN
KG
KG
PZA
M
M
PLN
PLN
M
M
UND
ML

2.3
2.49
2.24 1857.37
0
0
4.59
525.81
2.24
421.14
5.83
10
6.46
16
3.86
6
16.89
306.93
7.3
97.8
14.12
0.67
14.12
3.24
1.27
10
2
65.49
1.73 47526.41
19.38
0.85
21.04
11.76
14.69
8.26
580.96
0.54
1031.2
0.69
9.07
195.6
13.66
97.8
35.57
30.01
17.93
36.98

5.73
4160.51
0
2413.47
943.35
58.3
103.36
23.16
5184.05
713.94
9.46
45.75
12.7
130.98
82220.69
16.47
247.43
121.34
313.72
711.53
1774.09
1335.95
1067.46
663.05

5.72
4297.14
947.62
2418.69
947.57
58.3
103.36
23.16
5184.23
713.94
9.42
45.75
12.7
130.97
82220.7
16.47
247.35
121.37
310.86
713.44
1774.09
1335.95
1067.61
663.42

P2

6.92

68.13

471.46

471.43

M3
M3.
M3
M3
M3
M3
M3
M3
M3
M3
M3

23.53
23.53
32.05
32.05
32.05
15.28
32.05
6.76
7.45
1.48
23.53

4.89
309.41
1.59
492.4
1.7
1643.6
708.8
8663.81
113.45
1213.45
15.85

115.06
7280.42
50.96
15781.42
54.49
25114.21
22717.04
58567.36
845.2
1795.91
372.95

115.4
7283.65
50.91
15781.43
54.51
25119.75
22717.04
58539.74
844.6
1809.56
373.05

210000 CEMENTO PORTLAND TIPO I (42.5KG)

BLS

22.29

5161.26 115044.49 115044.52

302205 ADITIVOS
302603 LACA DESMOLDEADORA

GLN
GLN

46.18
128.08

430103
431401
435161
440331
450102

MADERA TORNILLO
LIJA PARA MADERA
ESTACA DE MADERA
TRIPLAY LUPUNA 9 mm x 4x 8
TRIPLAY LUPUNA 19mm. x 4 x 8

P2
UND
P2
UND
PLN

530327
540600
541190
542205
542209
544010

THINER
PINTURA ANTICORROSIVA
PINTURA ESMALTE
PINTURA ESMALTE EPOXICA
PINTURA ANTICORROSIVA EPOXICA
BARNIZ SELLADOR PARA MADERA

GLN
GLN
GLN
GLN
GLN
GLN

40000
40006
50011
50031
50352
53202
53204
53205
55601
55604
380000

ARENA FINA
ARENA GRUESA
PIEDRA MEDIANA (MAX. 6")
PIEDRA CHANCADA DE 1/2" Y 3/4"
PIEDRA CHANCADA
AFIRMADO
MATERIAL RELLENO
MATERIAL TERRAPLEN
AGUA
RIEGO
HORMIGON

73.86
40.13

3410.85
5139.85

3409.88
5140.08

2 10087.47
1.85
3
2.12
10
41.22
3
83.3
126.19

20174.94
5.55
21.2
123.66
10511.63

20174.95
5.55
21.2
123.66
10516

2.38
157.86
232.52
6955.11
6388.24
20.42

2.39
157.84
232.58
6955.76
6388.68
20.42

23.77
27.55
27.55
84.54
154.38
51.06

0.1
5.73
8.44
82.27
41.38
0.4

544402 DISOLVENTE EPOXICO

GLN

560101 ACERO ESTRUCTURAL A-36


560110 ACERO ESTRUCTURAL GRADO 50

KG
KG

721310
740194
290304
531003
306522
309901

M
M
BOL
GLN
DM3
GLB

8.39
5.31
16.71
11.03
49.1
400

KG
M3
M3

8.58
15.46
36.57

TUB. PVC SAL P/DESAGUE DE 3"


TUBO PVC 3/8"
YESO
PETROLEO
NEOPRENO
PINTURA, ALAMBRE, FOTOS, FICHAS TECNICAS

309908 SOLDADURA
309923 OXIGENO
309924 ACETILENO

35.96

28.72

1032.77

1032.56

2 2712.85
2.35 37074.17

5425.7
87124.3

5425.72
87124.36

13.5
1.8
0.5
207.18
25.8
1

113.27
9.56
8.36
2285.2
1266.78
400

113.22
9.57
8.36
2287.22
1266.78
400

3837.6
29.34
9.78

32926.61
453.6
357.65

32927.01
453.79
357.95

103369.83

471.43
132689.64

115044.52
8549.96

30841.36

14790.23

92550.08

4085.15

33738.75