BTS3902E V200R014 & V200R015

Quick Installation Guide

Issue: 01 Date: 2012-4-30

HUAWEI TECHNOLOGIES CO., LTD.

BTS3902E Exterior and Dimensions


Dimensions without a housing Dimensions with a housing

BTS3902E Installation Options


On a Metal Pole with the Diameter Ranging from 60 mm to 114 mm On a Metal Pole with the Diameter Ranging from 114 mm to 400 mm

On a Wall

On a Wood Pole with the Diameter Ranging from 200 mm to 400 mm

Copyright Huawei Technologies Co., Ltd. 2013. All rights reserved.

BTS3902E Installation Clearance Requ uirements


Recommended clearance for installing a single BTS3902 Minimum clearance for installing a single BTS3902E

Recommended clearance for installing two BTS3902E side by side

Minimum clearance for installing two BTS3902E side by side

Recommended clearance for installing two BTS3902E in a vertical line

Minimum clearance for installing two BTS3902E in a vertical line

Dimensions and Installation Clearance e Requirements of AC Surge (Optional) Protection Box Exterior and Dimensions Recommend ded installation Minimum installation
clearance clearance

On a Metal Pole with the Diameter Ranging from 60 mm to 114 mm On a Metal Pole with the Diameter Ranging from 114 mm to 400 mm

On a Wall

On a Wood Pole with the Diameter Ranging from 200 mm to 400 mm

Installing on a Pole with the e Diameter of 60 mm to 114 mm


1 Installing the angle-adjustable mount ting kits
The composing of angle-adjustable mounting kits
Attachment plate Lifting eye Auxiliary mounting g bracket Main mounting bracket Long bolt doubled h headed nut

1. Installing the main mounting bracket


Double-headed nut Rubber washer

Traction eye

2. Installing the auxiliary mounting bra ackets


Double headed nut Hoist clamp

Ensure that the arrow on the auxiliary bracket points up. Tighten the two double-headed nuts synchronously and so o that the distances between the two sides of the main and auxiliary brackets are the same.

2 Installing the BTS3902E


Positioning screw Upper positioning pin

Lower positioning pin a plate and the lower positioning pin through the Put the upper positioning pin through the hole on the attachment hole on the main mounting bracket.

3 Adjusting the installation angle of th he BTS3902E


The procedures of adjusting the installation angle e, see the page 8.

Installing on a Pole with the e Diameter of 114 mm to 400 mm


1 Installing the mounting brackets
Adapting plate
( ) Mounting (1) g hole g group pA (2) Mounting hole group B (3) Mounting hole group C (4) Adapting plate

1. Inst talling the adapting plate assembly


Adapting Ada ti plate l t Screw

Ma ain mounting bra acket

2. Installing the Hose clamp

Mounting hole group B

Hose clamp

Le evel

Hose clamp

2 Installing the BTS3902E


Upper positioning pin Positioning screw

Lower positioning pin

Put the upper positioning pin through the hole on the attachment a plate and the lower positioning pin through the hole on the main mounting bracket.

3 Adjusting the installation angle of th he BTS3902E


The procedures of adjusting the installation angle e, see the page 8.

Installing a BTS3902E on a Wall


1 Installing the adapting plate assembl ly
Adapting plate
( ) Mounting (1) g hole g group pA (2) Mounting hole group B (3) Mounting hole group C (4) Adapting plate Ada apting plate Screw

Ma ain mounting bra acket

2 Installing the mounting brackets on the t Wall 1. Drilling holes and install 2. Fitting the mounting piece p bolt assemblies p bolts expansion onto the expansion
(1) M10x80 bolt b (2) Nut (3) Spring wa asher (4) Flat wash her (5) Expansion tube (1) Insulation washer (2) ( ) Flat washer (3) Spring washer (4) Nut

3 Installing the BTS3902E


Upper positioning pin Positioning screw

Lower positioning pin Put the upper pp p positioning gp pin through g the hole on the attac chment p plate and the lower p positioning gp pin through g the hole on the main mounting bracket.

6 4 Adjusting the installation angle of the BTS3902E


The procedures of adjusting the installation angle e, see the page 8.

Installing on a Wood Pole with w the Diameter of 200 mm to 400 mm


1 Installing the adapting plate assembl ly
Adapting plate
( ) Mounting (1) g hole g group pA (2) Mounting hole group B (3) Mounting hole group C (4) Adapting plate Ada apting plate Screw

Ma ain mounting bra acket

2 Installing the mounting piece

Mounting hole group C Bolt Spacer C Mounting g hole grou up C

Spacer Nut

3 Installing the BTS3902E


Upper positioning pin p Positioning screw

Lower positioning pin

Put the upper positioning pin through the hole on the attac chment plate and the lower positioning pin through the hole on the main mounting bracket.

4 Adjusting the installation angle of the BTS3902E


The procedures of adjusting the installation angle e, see the page 8.

Adjusting the installation an ngle of the BTS3902E


Horizontal angle 30, vertical angle 10. on angle cannot be adjusted. In this case, loosen the If the positioning pin is tightened too hard, the installatio positioning screw first first. The horizontal angle and vertical angle can be adjusted simultaneously. The vertical angle can be determined either from the plan or elevation view. Ensure that the positioning screws both in the vertical direction and horizontal direction have been secured.

1 Adjusting the horizontal angle


P iti i screw Positioning

2 Adjusting the vertical angle


Positioning screw

(Optional) Installing the AC Surge Protection Box


1 Install an AC surge protection box on n a pole

When the dia ameter of the pole ranges from 60 mm to 114 mm (2.36 in. to 4.49 in.) ), the hose clamps delivered with the AC surge protection box x is used. When the dia ameter of the pole ranges from 114 mm to 400 mm (4.49 in. to 15 5.75 in.), the hose clamps purchased locally is used. If the diamete er of the pole around which the clamp is installed is small, cut the extra part of the clamp.

2 Install an AC surge protection box on n a wall. 1. Marking g the anchor points 2. Installing g an n expansion p bolt 3. Installing g the AC Surge Protection Box

(1) M10x65 bolt (2) Spring washer 10 (3) Plastic tube (4) Flat washer 10 (5) Expansion tube

3 Install an AC surge protection box on n a wood pole 1. Drilling holes 2. Installing the AC surge protection box on od pole the woo

Installing a PGND Cable


1 Installing a PGND Cable without AC Surge S Protection Box

Installing an OT O terminal in the correct manner

PGND cable

External ground ba ar

2 Installing g a PGND Cable and Equipoten q p ntial Cable with AC Surge g Protection Box

Installing an OT terminal in the correct manner

Equipotential cable PGND cable External ground bar

10

Installing the Power Cable of o BTS3902E


1 Installing a Power Cable without AC Surge S Protection Box

Power Cable

2 Installing a Power Cable with AC Sur rge Protection Box 1.Installing the AC Power Cable

Insulation layer Clip PG connector Thread-lock sealing nu ut of the PG connector Waterproof block BTS390 02E Power Cable Blue----Nout Brown----Lout Yellow/ /Green ----GND

External Power Cable Brown----Lin Biue Nin Biue----Nin Yellow/Green----GND

2. Installing the BTS3902E Power Cable e

External Power Cable BTS3902E Power Cable

11

Installing the signal Cable


1 Installing an FE/GE Fiber Optic Cable e
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiber optic cable must be installed for BTS3902E as required.

1. Installing the optical module

1. R Remove the dustproof cap of the optical module and st tore it properly for future use. 2 Turn the puller of an optical module outwards and insert 2. th he optical module into the OPT0 port on the BTS3902E.

2.Preparing the FE/GE Optic Cable

DLC connector

Traction cables

Inner gasket

3 Installing 3. I t lli FE/GE Optic O ti Cable C bl

Clamping jaw

Socket

1. Sort the optical fibers, remove the dustproof cap from the optical fiber connector, and insert the DLC connector into the optical module. 2. Align the clamping jaw on the inner gasket with the socket of the OPT0 port on the BTS3902E. Insert and fit the clamping jaw into the socket. 3. Push the outer gasket of the round connector upwards and tighten the outer gasket until you hear a click sound.

12

Installing the signal Cable


2 Installing an FE/GE Cable
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fiber optic cable must be installed for BTS3902E as required.

3 (Optional) Installing the Alarm Cable

MON Port

DB15 male connector

13

(Optional) Installing a BTS3 3902E RF Jumper


You must install a radio frequency (RF) jumper when a BTS3902E B uses an external antenna.

1 Installing the BTS3902E RF jumper 1.

Type N connector

2. Wrap the connector of the BTS3902E E RF jumper

PVC insulation tape

Waterproof tape

PVC insulation tape

a. Wrap a layer of PVC insulation tape around the connector from bottom up. nd the connector, with the first layer from bottom b. Tightly wrap three layers of waterproof tape aroun up, the second layer from top down, and the third layer from bottom up. c. Tightly g y wrap p three layers y of PVC insulation tape p around a the connector with the first layer y from bottom up, the second layer from top down, and the t third layer from bottom up. d. Bundle cable ties 3 mm to 5 mm away from the end of insulating tape.

When wrapping waterproof tape, stretch the tape evenly until it is twice of the original length. When wrapping insulating tape , do not stretch it. y and neatly, neatly and ensure that each layer of tape Wrap each layer of tape around the connector tightly overlaps more than 50% of the preceding layer. Ensure that the side with adhesive tape is covered on o the wrapped tape. When cutting off the cable tie, reserve a surplus leng gth of 3 mm to 5 mm.

14

(Optional) Installing a Camo ouflage Shell


1. Moving the upper housing

Up pper housing

2. Installing the camouflage shell

(1) Camoufla age shell (2) Slots (3) Tabs

3. Installing the upper housing

HU UAWEI TECHNOLOGIES CO., LTD.


Huawei Industrial Base Bantian Longgang Sh Shenzhen h 518129 Peoples Republic of China www.huawei.com 15