Professional Documents
Culture Documents
com 'is one of the most popular and useful ways of showing activities (tasks or events) displayed against time. On the left of the chart is a list of the activities and along the top is a suitable time scale. Each activity is represented by a bar; the position and length of the bar reflects the start date, duration and end date of the activity'. Gnatt Chart for baking a cake by Power Rangers Time in Minutes 3 3
Activities Read and understand the recipe Gather cake pan, measuring cups and ingredients Grease and flour a cake pan Sift the dry ingredients together Stir in liquid ingredients proportionately and well Heat oven at 350 degrees F. Pour the mixture into the greased and floured cake pan Place pan in oven and allow to bake for 30 minutes Remove pan from oven and allow to cool for 5 minutes Remove cake from pan, frost/past ice-ing and enjoy
10
31
Total time for baking a cake is 63 mins (1 hour 3mins) Sources: http://www.gantt.com/ http://www.wikihow.com/Make-a-Chocolate-Cake http://www.ehow.com/how_2078343_bake-perfect-cake.html http://office.microsoft.com/en-us/excel-help/create-a-gantt-chart-in-excel-HA001034605.aspx http://www.ehow.com/how_5058996_create-gantt-chart.html