JAULA TREPADORA ALIMAK

I. COSTOS HORARIO DE PROPIEDAD


1.1 DEPRECIACION (D)
- PRECIO F.O.B. PUERTO COLON (ALIMAK) 130,000.00 $
- FLETE MARITIMO E IMPUESTOS IMPORTACION 36,000.00 $
TOTAL PRECIO C.I.F. EN EL PUERTO CALLAO (P) 30 % 166,000.00 $
- VIDA UTIL EQUIPO 5 AOS
- HORAS DE OPERACIN POR AO (300d*16h) 4,800 Hr
TOTAL VIDA UTIL A DEPRECIAR 24,000.00 Hr
COSTOS DE DEPRECIACIN 6.92 $/Hr
1.2 AMORTIZACION ( a )
Tasa de interes ( i ) 10%
n n
Amortizacin (a ) = P ((1+i) x i) / ((1+i) -1) = 26734.47
5 5 0.611
a = 202,469.59((1+0.15) x0.15) / ((1+0.15) -1) = 43,790.38 $
Amortizacin (a) = 1.82 $/Hr
TOTAL COSTO DE PROPIEDAD ( a + D) = 8.74 $ / Hr
II. COSTOS OPERACIN
2.1 COSTO DE CARRILES Y ACCESORIOS
-Precio del carril y accesorios (200m) = 100 rieles 50,000.00 $
-Periodo de Reparaciones y Cambio = 2 Aos
-Vida til del carril = 9,600 Hrs.
COSTO REPOSICION DEL CARRIL 5.21 $/Hr
2.2 COSTO DE MANTENIMIENTO MAQUINA ALIMAK
- 30% del costo de depreciacin de la trepadora 2.08 $/Hr
- 30% del costo de depreciacin del carril 1.56
-Precio del cable (m) : 55$/m X (160mx2+30m cola) 19,250.00 $
-Vida til del cable electrico = 8 meses x 14 hrs x 80m 8,960.00 Hrs 2.15
2.3 SEGUROS DEL EQUIPO 1,500.00 0.31
TOTAL COSTO DE OPERACIN 11.31 $ / Hr
COSTOS DE PROPIEDAD - OPERACIN
TOTAL COSTO HORARIO DE PROPIEDAD - OPERACION 20.05 $ / Hr
JAULA TREPADORA ALIMAK STH - 5E CON MOTOR ELECTRICO
DESCRIPCION / EQUIPO
DATOS $/HORA
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
T Anual : 365.00
D.NORMALES 272.00 22.67
DOMINGOS 52.00
Basico 25.97 1,500.00 DESC.MEDICO 4.00
Asig. Fam. 1.367 41.00 FERIADOS 12.00
27.34 1,541.00 VACAC. 25.00
INGRESO: MENSUAL ANUAL
Obreros Empleados Obreros Empleados Obreros Empleados Conceptos Conceptos
% % Obreros Empleados
Mensual: 619.64 1,541.00 7,435.66 18,492.00
CTS 80.54 0.00 966.48 0.00 13.00% 14/12/12*365/273 14/12/12*365/273
1 VACACIONES 68.09 0.00 817.08 0.00 10.99% (30/272) (30/272)
2 GRATIFICACIONES 136.18 0.00 1,634.16 0.00 21.98% (60/272) (60/272)
3 DOMINGOS & FERIADOS-DESC.MEDICO 140.72 0.00 1,688.64 0.00 22.71% (62/272) (62/272)
DESCANSO MEDICO 9.08 0.00 108.96 0.00 1.47% (4/272) (4/272)
ESSALUD 55.77 0.00 669.21 0.00 9.00% A A
JUBILACION ANTICIPADA 12.39 0.00 148.71 0.00 2.00% B B
SCTR-SALUD 6.01 0.00 72.13 0.00 0.97% C C
SCTR-PENSIONES(interior Mina) 25.10 0.00 301.14 0.00 4.05% D D
VIDA LEY 2.23 0.00 26.77 0.00 0.36% E E
APORTES REM. PRINCIPAL 16.38%
ESSALUD 6.13 0.00 73.54 0.00 0.99% 1*A 1*A
IES 1.36 0.00 16.34 0.00 0.22% 1*B 1*B
SCTR-SALUD 0.66 0.00 7.93 0.00 0.11% 1*C 1*C
SCTR-PENSIONES 2.76 0.00 33.09 0.00 0.45% 1*D 1*D
VIDA LEY 0.25 0.00 2.94 0.00 0.04% 1*E 1*E
IMPUESTOS VACACIONES 1.80%
ESSALUD 12.26 0.00 147.08 0.00 1.98% 2*A 2*A
IES 2.72 0.00 32.68 0.00 0.44% 2*B 2*B
SCTR-SALUD 1.32 0.00 15.85 0.00 0.21% 2*C 2*C
SCTR-PENSIONES 5.52 0.00 66.19 0.00 0.89% 2*D 2*D
VIDA LEY 0.49 0.00 5.88 0.00 0.08% 2*E 2*E
IMPUESTO GRATIFICACIONES 3.60%
ESSALUD 12.67 0.00 151.98 0.00 2.04% 3*A 3*A
IES 2.81 0.00 33.77 0.00 0.45% 3*B 3*B
SCTR-SALUD 1.37 0.00 16.38 0.00 0.22% 3*C 3*C
SCTR-PENSIONES 5.70 0.00 68.39 0.00 0.92% 3*D 3*D
VIDA LEY 0.51 0.00 6.08 0.00 0.08% 3*E 3*E
IMPUESTO DOM Y FER.DES.MED. 3.72%
TOTAL: 1,212.28 1,541.00 14,547.06 18,492.00 95.64%
1.96 1.00
DIAS UTILES DOMINGOS FERIADOS DES.MEDICO VACACIONES
ENERO'2006 0.00 5.00 1.00 25.00
FEBRERO 24.00 4.00 0.00
MARZO 27.00 4.00 0.00
ABRIL 24.00 4.00 2.00
MAYO 25.00 5.00 1.00
JUNIO 25.00 4.00 1.00
JULIO 25.00 4.00 2.00
AGOSTO 25.00 5.00 1.00
SEPTIEMBRE 26.00 4.00 0.00
OCTUBRE 25.00 5.00 1.00
NOVIEMBRE 25.00 4.00 1.00
DICIEMBRE 21.00 4.00 2.00 4.00
272.00 52.00 12.00 4.00 25.00
ACUMULADO 272.00 324.00 336.00 340.00 365.00
TIPO DE CAMBIO: 2.854
CATEG CATEGORIA JORNAL S/. JORNAL U.S.$ L.SOCIALES TOTAL
M2/M3 MAESTRO PERFORISTA S/.XJORNAL 50.00 17.52 16.76 34.27
VALVULERO S/.XJORNAL 45.00 15.77 15.08 30.85
S2 BODEGUERO S/.XJORNAL 35.00 12.26 11.73 23.99
MECANICO ELECTRICISTA S/.XJORNAL 55.00 19.27 18.43 37.70
LEYES SOCIALES DE CTTA CON GRATIFICACION SUBSUELO
Clculo de Leyes Sociales
ESTRUCTURA DE COSTOS MANO DE OBRA TODO COSTO
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
DESCRIPCION UNIDAD
PRECIO U.S.$
2010
PRECIO S/.
2010
Aceite de Perforacin Almo U.S.$/Galn 7.40
Acetileno U.S.$/Botella 97.13
Petroleo U.S.$/Galon 3.17 9.05
ACELERANTE LIQUIDO U.S.$/Kg 0.91
Alambre # 16 U.S.$/Kg 1.08
ALCAYATA 3/4" U.S.$/Pza 2.10
BARRA DE EXTENSION PORTA BROCA CONICA 2', U.S.$/Pza 52.80
BARRA DE EXTENSION PORTA BROCA CONICA 4', 7876-6112-11 U.S.$/Pza 56.10
BARRA DE EXTENSION PORTA BROCA CONICA 6', 7876-6118-11 U.S.$/Pza 67.10
BARRA DE EXTENSION PORTA BROCA CONICA 8', 7876-1124-11 U.S.$/Pza 82.50
BROCA DE 40 MM U.S.$/Pza 22.00
BROCA DE 38 MM U.S.$/Pza 21.45
Calibradores U.S.$/Pza 0.11
Mininel (2.10 mt) U.S.$/Pza 1.05
Mininel (2.80 mt) U.S.$/Pza 1.10
EXSANEL 2.1 mts U.S.$/Pza 1.05
EXSANEL 2.4 mts U.S.$/Pza 1.10
EXSANEL 4.2 mts U.S.$/Pza 1.31
CEMENTO U.S.$/Bolza 10.30 29.41
CORDON DETONANTE 3P (PENTACORD)(CAJA X 1500 U.S.$/Mt 0.21
DINAMITA 65% DE 7/8" X 7" U.S.$/Cart 0.15
Emulsin 65(1"x8") U.S.$/Cart 0.20
Emulex 45% 1" x 7" (276 cartuchos) U.S.$/Cart 0.20
Exsablock 7/8"x7" U.S.$/Cart 0.17
Exadit 45% 7/8" X 7" U.S.$/Cart 0.150
FANEL BLANCO 1 AL 10 (CAJA X 150) U.S.$/Pza 1.29
Fulminante Electrico de 4 mts U.S.$/Pza 3.30
Carmex 6' U.S.$/Pza 0.63
Igneter Cordd U.S.$/Mt 0.41
Cable de acero de 3/8" (Blindada) U.S.$/Mt 0.81
Rollo de cinta aislante y vulcanizante. U.S.$/Mt 1.93
Manguera de Agua 1/2" U.S.$/Mt 1.21
Manguera de Aire 1" U.S.$/Mt 2.48
Malla Electrosoldad de 4"x4" U.S.$/Mt2 2.59
Grampa de Fe corrugado 3/8" U.S.$/Pza 1.14
Adaptador de perno PZA 88.00
Dramix Kg 1.65
PERNO HELICOHIDAL DE 6'+TUERCA+PLACA PZA 7.03
PERNO HELICOHIDAL DE 7'+TUERCA+PLACA PZA 7.59
PERNO HELICOHIDAL DE 8'+TUERCA+PLACA PZA 8.16
SPLIT SET 5' PZA 5.28
Resina Unidad 0.83
Cartucho Cemento PZA 0.26
Grapas y Accesorios U.S.$/Pza 4.75
COMBA DE ACERO DE 6 LBS U.S.$/Pza 6.16
LAMPA TIPO CUCHARA U.S.$/Pza 8.20
LLAVE STILLSON DE 14" U.S.$/Pza 8.26
Llave Francesa de 8" U.S.$/Pza 4.13
PICO MINERO U.S.$/Pza 9.28
Corvina U.S.$/Pza 52.80
Clinometro U.S.$/Pza 143.00
Cizalla U.S.$/Pza 21.34
Adaptador Integral de Perno Helicoidal U.S.$/Pza 88.00
LLave Francesa 14" U.S.$/Pza 12.00
Azuela U.S.$/Pza 11.00
Chotana U.S.$/Pza 12.00
Botas U.S.$/Pza 15.29
Protector U.S.$/Pza 11.32
Barbiquejo U.S.$/Pza 0.64
Respirador U.S.$/Pza 26.18
Filtro U.S.$/Pza 3.52
Cartucho U.S.$/Pza 4.52
Retenedor U.S.$/Pza 2.63
Guantes de Cuero U.S.$/Pza 3.30
Correa Portalampara U.S.$/Pza 3.39
Tapon de oido U.S.$/Pza 0.59
Mameluco U.S.$/Pza 16.94
Pantalon de Jebe U.S.$/Pza 8.01
Casaca de jebe U.S.$/Pza 8.01
Anteojo U.S.$/Pza 5.20
Tafilete U.S.$/Pza 4.21
Cordn Sujetador de Anteojos U.S.$/Pza 2.28
Arnes (Linea de Vida) U.S.$/Pza 108.57
Linea de Vida U.S.$/Pza 27.00
LISTADO DE PRECIOS DE MATERIALES
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
P. UNIT TOTAL
US$ US$
1.00 TRABAJOS VARIOS
1.01 Movilizacin de equipos, materiales y personal (Lima
- Mina Horizonte)
1.02 Induccion Personal en Mina (9 personas) Glb 9 0.00
1.03 Montaje del equipo trepador Alimak ( Avance
Promedio Mensual: 90 m. )
ml 9.43
9.43
1.04 Desmontaje del equipo trepador Alimak ml 14.15 14.15
1.05 Montaje Alimak y Alicab en la Cmara de Estacin (
1.06 Desmovilizacin de equipos, materiales y personal
(Mina Horizonte - Lima)
1.07 Movilizacin Personal Empleados (Das Libres)
MOVILIZACION OBREROS CANT VIAJES
COSTO
MONTO $-
AO
$/MES
OBREROS (Pasaje Huamchuco) 9.00 6.00 S/. 80.00 $1,440.00 $120.00
BODEGUERO-ADMINISTRADOR (Pasaje a Huamachuco) 1.00 6.00 S/. 80.00 $160.00 $13.33
RESIDENTE , ADMINISTRADOR (Pasaje a Trujillo : $106*2+30$=242$) 2.00 9.00 $242.00 4,356.00 $363.00
GERENTE OPERACIONES (Pasaje :7 viajes x ao Lima-Mina = 141$ x 2) 1.00 7.00 $282.00 1,974.00 $164.50
Comida (G.Operaciones) 1.00 35.00 6.00 210.00 $17.50
COMIDA (Para 2, el residente, Administrador :
365dias x 0.75=273.75 dias x S/15.00(5$)=2,737.5$) 2.00 273.75 $5.00 $2,737.50 $228.13
HABITACION INGS+TALLERES+OFICINA $366.67
COSTO FIJO U.S.$/MES $1,273.13
CUADRO RESUMEN
ITEM DESCRIPCION UNID CANTIDAD
CUENTA CIA.
TAREAS ADMINISTRATIVAS
CUENTA CIA.
PASAJES EN VUELO - CUANTA CIA.
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
: 2 x 2 m.
: 150.00 m.
: II Semidura
: 30
: 27
: 8 pies
: 226 pies
: 2.00 m. T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) U.S.$/Mt
50 4 526 2,102.31
45 2 473 946.04
35 2 368 735.81
55 1 578 578.14
95.64% 4,172.16
8,534.46
80 Sub Total 106.68
1 1,828.00 1,828.00
1 600.00 600.00
1 600.00 600.00
1 350.00 350.00
59.94% 2,024.85
5,402.85
80 Sub Total 67.54
6 2.78 16.67
3 1.42 4.25
Sub Total 20.92 10.46
Gbl 2.04
Sub Total 1.02
U.S.$/Mes 1,800.00
Gal/Mes 100.00 3.17 317.1
U.S.$/Mes 2,117.10
Sub Total 26.46
Und 9 2.63
Sub Total 11.83
Mts 150
M 5 2.48 12.40
M 5 1.21 6.05
EA 8 4.75 38.00
56.45
Sub Total 0.38
Gl 50% 7.40 3.70
Kg 25% 0.93
Sub Total 2.31
Pies 240.00 0.10 24.00
Sub Total 12.00
1,820
Fts 60 52.80 1.74
Fts 60 56.10 1.85
Fts 60 67.10 2.21
Fts 60 82.50 2.72
350 8.52
Fts 240 22.00 15.09
15.09
23.61
Sub Total 11.80
26.49
140 0.170 23.80
90 0.150 13.50
37.30
Sub Total 18.65
25 0.21 5.25
Sub Total 2.63
2 3.30 6.60
Sub Total 3.30
27 1.29 34.83
Sub Total 17.42
Mts 2 0.81 1.62
Pzas 1 1.93 1.93
3.55
Sub Total 1.78
43.77
SUBTOTAL TOTAL
106.68
67.54
10.46
1.02
26.46
11.83
26.49
0.38
2.31
12.00
11.80
43.77
18.65
2.63
3.30
17.42
1.78
70.17
364.41
10% 36.44
10% 36.44
437.29 448
UNIDAD CANTIDAD P/UNIT. (US$) US$ TOTAL
Hr 20.05
7
140.34
70.17
DESCRIPCION
EQUIPO ALIMAK Y ACCESORIOS
Costo Horario
Horas / Disparo
Costo total / Disparo
Costo por metro (168.92 /2)
8.2. Cordn detonante
8.3. Fulminante elctrico
8.4. Fanel
SUB TOTAL
8.5. Alambre de disparo
9.0. PLATAFORMA TREPADORA
COSTO POR METRO - EQUIPO ALIMAK
COSTO TOTAL METRO DE AVANCE
6.4. Aceros de Perforacin
8.0. VOLADURA
8.1. Explosivos
7.0. PERFORACION
6.1. Mangueras y conexiones
6.2. Lubricantes
6.3. Equipo de Perforacin
5.0. MOVILIDAD + PETROLEO
6.0. ALIMENTACION
1.0. MANO DE OBRA
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
( En US$ )
4.0. HERRAMIENTAS
COSTO POR METRO DE AVANCE CHIMENEA METODO ALIMAK
Rollo de cinta aislante y vulcanizante.
Costo por metro de avance
TOTAL
RESUMEN DE COSTOS
DESCRIPCION
Cantidad por disparo
8.4. FANEL
Costo por metro de avance
8.3. FULMINANTE ELECTRICO
Costo por fulminante Electrico/Mt
Cantidad
Costo /Mt
8.5. CABLE ELECTRICO
Cable blindada
8.2. CORDON DETONANTE
Barreno conica de 4'
Costo por disparo
8.1. EXPLOSIVOS
Exadit 45% , 7/8" x 7"
Costo por metro de avance
Grasa 25%
Explosivo por Disparo
Costo por metro de avance
7.3. EQUIPO DE PERFORACIN
7.4. ACEROS DE PERFORACION
Vida til en pies
Barreno conica de 2'
Costo por metro de avance ( 1.58/2 )
7.2. LUBRICANTES
Aceite 1/2 galn
Manguera de 1"
Grampas y Accesorios
Manguera de 1/2
Sub Total
SUB TOTAL
7.0. PERFORACION
7.1. MANGUERAS Y CONEXIONES
Disparos
Costo Total / Metro
6.0. ALIMENTACION
Costo - alimentacin
Implementos Seguridad Perforista
Implementos Seguridad Ayudantes
Camioneta (mes)
Petroleo
4.0. HERRAMIENTAS
5.0. MOVILIDAD MINA
Herramientas
Costo por metro de avance
3.0. IMPLEMENTOS DE SEGURIDAD
Costo metro avance
Ingeniero Residente
Capataz
Administrador
Almacenero
Bodeguero
Mecnico - Electricista
Leyes sociales
Costo mensual
1.0. MANO DE OBRA ESPECIALIZADA
10.0. GASTOS GENERALES
Costo por metro de avance
DESCRIPCION
Leyes sociales
Costo mensual
Costo metro avance
2.0. DIRECCION TECNICA Y ADMINISTRACION
Perforista
Valvulero
AVANCE EFEC. POR DISPARO
TALADROS CARGADOS
TIPO DE ROCA
TALADROS POR FRENTE
LONGITUD DE TALADRO
PERFORACION TOTAL
PU DE AVANCE CHIMENEA METODO ALIMAK SECCION 2M X 2M
SECCION DE CHIMENEA
LONGITUD DE CHIMENEA
11.0. UTILIDAD
Barreno conica de 6'
Barreno conica de 8'
Vida til en pies
Brocas de 40 mm.
Costo por metro de avance
8.0. VOLADURA
TOTAL
Emulsin Semexa 65% , 1" x 8"( Exsablock 7/8"x7")
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
: 2.5 x 2.5 m.
: 150.00 m.
: II Semidura
: 36
TALADROS CARGADOS 33
: 8 pies
: 263 pies
: 2.00 m. T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) U.S.$/Mt
50 4 526 2,102.31
45 2 473 946.04
35 2 368 735.81
55 1 578 578.14
95.64% 4,172.16
8,534.46
80 Sub Total 106.68
1 1,828.00 1,828.00
1 600.00 600.00
1 600.00 600.00
1 350.00 350.00
59.94% 2,024.85
5,402.85
80 Sub Total 67.54
6 2.78 16.67
3 1.42 4.25
Sub Total 20.92 10.46
Herramientas Gbl 2.04
Sub Total 1.02
U.S.$/Mes 1,800.00
Gal/Mes 100.00 3.17 317.1
U.S.$/Mes 2,117.10
Sub Total 26.46
Und 9 2.63
Sub Total 11.83
Mts 150
M 5 2.48 12.40
M 5 1.21 6.05
EA 8 4.75 38.00
56.45
Sub Total 0.38
Gl 50% 7.40 3.70
Kg 25% 0.93
Sub Total 2.31
Fts 288.00 0.10 28.80
Ft Sub Total 14.40
1,820
Fts 72.00 52.80 2.09
Fts 72.00 56.10 2.22
Fts 72.00 67.10 2.65
Fts 72.00 82.50 3.26
350 10.23
Fts 288.00 22.00 18.10
18.10
28.33
14.16
31.25
170 0.170 28.90
110 0.150 16.50
45.40
Sub Total 22.70
33 0.21 6.93
Sub Total 3.47
EA 2 2.10 4.20
Sub Total 2.10
Pzas 33 1.29 42.57
Sub Total 21.29
Mts 2 0.81 1.62
Pzas 1 1.93 1.93
3.55
Sub Total 1.78
51.33
SUBTOTAL TOTAL
106.68
67.54
10.46
1.02
26.46
11.83
31.25
0.38
2.31
14.40
14.16
51.33
22.70
3.47
2.10
21.29
1.78
85.20
391.77
10% 39.18
10% 39.18
470.12 497
9.0. PLATAFORMA TREPADORA 496
COSTO POR METRO - EQUIPO ALIMAK
DESCRIPCION UNIDAD CANTIDAD P/UNIT. (US$) US$ TOTAL
Hr
EQUIPO ALIMAK Y ACCESORIOS 20.05
8.5
170.41
85.20
11.0. UTILIDAD
COSTO TOTAL METRO DE AVANCE
Costo total / Disparo
Costo por metro (168.92 /2)
Costo Horario
Horas / Disparo
8.2. Cordn detonante
8.3. Fulminante elctrico
8.4. Fanel
6.3. Equipo de Perforacin
6.4. Aceros de Perforacin
8.0. VOLADURA
8.1. Explosivos
9.0. PLATAFORMA TREPADORA
SUB TOTAL
8.5. Cable Electrico
10.0. GASTOS GENERALES
5.0. MOVILIDAD + PETROLEO
7.0. PERFORACION
6.1. Mangueras y conexiones
4.0. HERRAMIENTAS
6.0. ALIMENTACION
6.2. Lubricantes
Costo por metro de avance
TOTAL
RESUMEN DE COSTOS
COSTO POR METRO DE AVANCE CHIMENEA METODO ALIMAK
( En US$ )
DESCRIPCION
1.0. MANO DE OBRA
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
Cantidad por disparo
Costo por metro de avance
8.4. FANEL
Cantidad
Costo por metro de avance
8.5. CABLE ELECTRICO
Cable blindada
Rollo de cinta aislante y vulcanizante
Brocas de 40 mm.
Costo por metro de avance
8.3. FULMINANTE ELECTRICO
8.2. CORDON DETONANTE
Cantidad por disparo
Emulsin Semexa 65% , 1" x 8"( Exsablock 7/8"x7")
Exadit 45% , 7/8" x 7"
Explosivo por Disparo
Costo por metro de avance
8.0. VOLADURA
8.1. EXPLOSIVOS
Costo por metro de avance
TOTAL
Barreno conica de 2'
Barreno conica de 4'
Vida til en pies
7.4. ACEROS DE PERFORACION
Vida til en pies
Barreno conica de 6'
Barreno conica de 8'
Sub Total
Costo por metro de avance ( 1.58/2 )
7.2. LUBRICANTES
Aceite 1/2 galn
Grasa 25%
Costo por metro de avance
7.3. EQUIPO DE PERFORACIN
7.0. PERFORACION
7.1. MANGUERAS Y CONEXIONES
5.0. MOVILIDAD MINA
4.0. HERRAMIENTAS
6.0. ALIMENTACION
Costo - alimentacin
Costo Total / Metro
Vida Economica
Manguera de 1"
Manguera de 1/2
Grampas y Accesorios
TIPO DE ROCA
TALADROS POR FRENTE
Leyes sociales
Costo mensual
Bodeguero
Mecnico - Electricista
Perforista
Valvulero
Implementos Seguridad Perforista
LONGITUD DE TALADRO
PERFORACION TOTAL
AVANCE EFEC. POR DISPARO
Costo metro avance
2.0. DIRECCION TECNICA Y ADMINISTRACION
Capataz
Administrador
Leyes sociales
Costo mensual
PU DE AVANCE CHIMENEA METODO ALIMAK SECCION : 2.5 x 2.5 m.
SECCION DE CHIMENEA
LONGITUD DE CHIMENEA
Implementos Seguridad Ayudantes
Costo por metro de avance
Camioneta (mes)
SUB TOTAL
Petroleo
Costo por metro de avance
Ingeniero Residente
3.0. IMPLEMENTOS DE SEGURIDAD
DESCRIPCION
1.0. MANO DE OBRA ESPECIALIZADA
Costo metro avance
Almacenero
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
Rendimiento / Gdia. 8.00 M3/Gdia T.Cambio 2.854
1. MANO DE OBRA
Operario tarea 2 50.00 47.63 $68.41
Oficial tarea 2 45.00 42.86 $61.57
Peon tarea 4 35.00 33.34 $95.78
8
Leyes Sociales 95.25% $225.76 28.22
2. DIRECCION TECNICA Y ADMINISTRACION U.S.$
Ingeniero Residente 1.00 $1,828 $1,828
Administrador 1.00 $600 $600
$2,428
Leyes sociales 59.94% $1,455
Costo mensual U.S.$/Mes $3,883 16.18
3. IMPLEMENTOS SEGURIDAD U.S.$
Implementos Seguridad Maestro Unid. 4.00 $2.78 11.12
Implementos Seguridad ayudantes Unid. 4.00 $1.42 5.66
SUB TOTAL 16.78 2.10
4. HERRAMIENTAS
Herramientas Glb 1.00 2.04 2.04
SUB TOTAL 2.04 0.25
5. MATERIALES Und U.S.$
Cemento porthand tipo I (8 Bolzas x M3) Bol 64.00 10.30 659.51
SUB TOTAL 659.51 82.44
6. EQUIPOS Und Cantid-(h.m.) U.S.$ U.S.$/Gdia
Mezcladora Unid. 5.00 6.00 30.00
Scooptram (incluye operador) Unid. 0.00 0.00
SUB TOTAL 30.00 3.75
7. MOVILIDAD MINA U.S.$
Camioneta (mes) U.S.$/Mes 1 1,800.00
Petroleo Gal/Mes 100 3.17 317.10
Costo mensual U.S.$/Mes 2,117.10 8.82
8. ALIMENTACION U.S.$
Costo - alimentacin Und 10 2.63 26.28
Costo x M3 3.28
5.01
COSTOS DIRECTOS 150.06
Gastos Generales 10% 15.01
Utilidad 10% 15.01
COSTO TOTAL ( U.S.$/M3.) $180.07
189.46
Nota: Agregado, materiales , cemento y otros CMHSA coloca en la labor, SCOOP a costo de CMHSA.
UNIDAD CANTIDAD P/UNIT. (US$) US$ TOTAL
Hr 20.05
2
40.10
5.01
CONCRETO f`c = 175 kg/cm2
DESCRIPCIN Unid. Cant.
Costo
Unit.S/.
Costo Leyes
Soc. S/.
Costo x
U.S.$
Costo
U.S.$/M3.
Costo por metro (168.92 /2)
9.0. PLATAFORMA TREPADORA
EQUIPO ALIMAK Y ACCESORIOS
Costo Horario
Horas / Disparo
Costo total / Disparo
COSTO POR METRO - EQUIPO ALIMAK
DESCRIPCION
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
22.38 M3 en dias 4.50 149.20 M3xmes
0-50 m
: 16
: 6 pies
: 96 pies
2.00 T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) US$ /M3
50.00 4 1,761 616.95
45 2 792 277.63
35 2 616 215.93
95.64% 1,110.51
49.62
1 $1,828 $1,828
1 $600 $600
0 $600 0
59.94% 1,455.40
3,883.40
Costo de 4.5 dias 582.51
26.03
8 2.78 4.50 100.05
100.05 4.47
Gbl 3.00 2.04 6.11
Saco Polipropileno Unidad 60.00 1342.8 0.27 362.56
368.67 16.47
U.S.$/Mes 1,800.00
Gal/Mes 100 3.17 317.1
U.S.$/Mes 2,117.10
14.19
Und 45 2.63 118.26
5.28
dias
M. 5 4 20.05 400.96 17.92
129.51
SUBTOTAL TOTAL
49.62
26.03
4.47
16.47
14.19
5.28
17.92
133.98
10% 13.40
10% 13.40
160.78
Los estandares de rendiiento se evaluarn en funcin al levantamiento de datos actualizado.
Ayudante
COSTO COLOCADO BOLSAS CRET EN CH. METODO ALIMAK (Toda Seccin)
Rendimiento (M3 para 9 Cimbras)
LONGITUD DE CHIMENEA
TALADROS POR FRENTE
LONGITUD DE TALADRO
Administrador
Leyes sociales
PERFORACION TOTAL
Bodeguero
Leyes sociales
DESCRIPCION
1.0. MANO DE OBRA ESPECIALIZADA
Perforista
Costo $/M3
2.0. DIRECCION TECNICA Y ADMINISTRACION
Ingeniero Residente
Capataz
Costo mensual
Costo por metro de avance
4.0. HERRAMIENTAS y MATERIALES
Herramientas
Costo M3
3.0. IMPLEMENTOS DE SEGURIDAD
Implementos Seguridad Perforista
SUB TOTAL
Costo Total / Metro
6.0. ALIMENTACION
Costo por metro de avance
5.0. MOVILIDAD MINA
Camioneta (mes)
Petroleo
Hras Efectivas
TOTAL
RESUMEN DE COSTOS
Costo - alimentacin
7.0. PERFORACION
8.5. PLATAFORMA ALIMACK
COSTO BOLSAS CRET EN CHIMENEA METODO ALIMAK
( En US$ )
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
DESCRIPCION
1.0. MANO DE OBRA
4.0. HERRAMIENTAS
5.0. MOVILIDAD + PETROLEO
COSTO COLOCADO BOLSAS CRET $/M3
6.0. ALIMENTACION
9.0. PLATAFORMA TREPADORA
SUB TOTAL
10.0. GASTOS GENERALES
11.0. UTILIDAD
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
60 Dias x mes= 30.00
0-50 m
: 8
: 6 pies
: 48 pies
2.00 T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) US$ TOTAL
50.00 4 11,738 4,112.99
45 2 5,282 1,850.85
35 2 4,108 1,439.55
95.64% 7,403.39
123.39
1 $1,828 $1,828
Capataz 1 $600 $600
1 $600 $600
59.94% 1815.048
4,843.05
80.72
VIDA UTIL
6 2.78 16.67
2 1.42 2.83
19.51 9.75
Gbl 1 2.04 2.04
1.02
U.S.$/Mes 1,800.00
Gal/Mes 100 3.17 317.10
U.S.$/Mes 2,117.10
35.28
Und 10 2.63 26.28
13.14
Vida Util Manguera 200
Pies 48 0.11 5.28
M 5 2.48 0.06
M 5 1.21 0.03
5.37 2.69
Gl 0.25 7.40 1.85
Kg 25% 0.46
2.31 1.16
1,820
EA 48.00 67.10 1.77
350
EA 48.00 22.00 3.02
4.79 2.39
6.24
5.21
M. 5 20.05 100.24
374.99
SUBTOTAL TOTAL
123.39
80.72
9.75
1.02
35.28
13.14
6.24
2.69
1.16
2.39
5.21
100.24
374.99
10% 37.50
10% 37.50
$449.99
Los estandares de rendiiento se evaluarn en funcin al levantamiento de datos actualizado. 569.00
TALADROS POR FRENTE
LONGITUD DE TALADRO
PU CUADRO METALICO TIPO L + PERNOS DE ANCLAJE EN CH. METODO ALIMAK (SECC.2.5mX2.5m)
Rendimiento (Cimbras/Mes)
LONGITUD DE CHIMENEA
PERFORACION TOTAL
Bodeguero
Leyes sociales
DESCRIPCION
1.0. MANO DE OBRA ESPECIALIZADA
Perforista
Valvulero
Administrador
Leyes sociales
Costo mensual
Costo Cimbra
2.0. DIRECCION TECNICA Y ADMINISTRACION
Ingeniero Residente
Costo por metro de avance
4.0. HERRAMIENTAS
Herramientas
Costo Cimbra
3.0. IMPLEMENTOS DE SEGURIDAD
Implementos Seguridad Perforista
Implementos Seguridad Ayudantes
SUB TOTAL
Costo Total / Cimbra
6.0. ALIMENTACION
Costo por metro de avance
5.0. MOVILIDAD MINA
Camioneta (mes)
Petroleo
Grasa
Costo por Cimbra
Costo - alimentacin
Costo x Cimbra
7.0. PERFORACION
7.1. MANGUERAS Y PERFORACION
Disparos
Manguera de 1"
Manguera de 1/2
Costo por Cimbra
7.2. LUBRICANTES
Aceite 1/2 galn
Hras Efectivas
7.4. ACEROS DE PERFORACION
Vida til en pies
Barreno conica de 6'
Vida til en pies
Brocas de 40 mm.
Costo por Cimbra
SUB TOTAL X CIMBRA
8.4. EQUIPO OXICORTE-MAQUINA SOLDAR
Costo por Cimbra
8.5. PLATAFORMA ALIMACK
DESCRIPCION
1.0. MANO DE OBRA
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
TOTAL
RESUMEN DE COSTOS
COSTO CAUDRO METALICO EN L+PERNOS DE ANCALJE EN CHIMENEA METODO ALIMAK
( En US$ )
COSTO CUADRO METALICOS EN L + PERNOS ANCLAJE EN CH ALIMACK
9.0. PLATAFORMA TREPADORA
SUB TOTAL
10.0. GASTOS GENERALES
11.0. UTILIDAD
6.4. Aceros de Perforacin
8.0. EQUIPO OXICORTE
4.0. HERRAMIENTAS
5.0. MOVILIDAD + PETROLEO
6.1. Mangueras y Perforacion
6.2. Lubricantes
6.0. ALIMENTACION
7.0. PERFORACION
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
45 Dias x mes= 30.00
0-50 m
: 8
: 6 pies
: 48 pies
2.00 T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) US$ TOTAL
50.00 4 11,738 4,112.99
45 2 5,282 1,850.85
35 2 4,108 1,439.55
95.64% 7,403.39
164.52
1 $1,828 $1,828
Capataz 1 $600 600
1 $600 $600
59.94% 1,815.05
4,843.05
107.62
VIDA UTIL
6 2.78 16.67
2 1.42 2.83
19.51 9.75
Gbl 2.04
1.02
U.S.$/Mes 1,800.00
Gal/Mes 100 3.17 317.10
U.S.$/Mes 2,117.10
47.05
Und 10 2.63 26.28
13.14
Vida Util Manguera 200
Pies 48 0.11 5.28
M 5 2.48 0.06
M 5 1.21 0.03
5.37 2.69
Gl 0.25 7.40 1.85
Kg 25% 0.46
2.31 1.16
1,820
EA 48.00 67.10 1.77
350
EA 48.00 22.00 3.02
4.79 2.39
6.24
5.21
M. 5 20.05 100.24
445.03
SUBTOTAL TOTAL
164.52
107.62
9.75
1.02
47.05
13.14
6.24
2.69
1.16
2.39
5.21
100.24
454.79
10% 45.48
10% 45.48
$545.74
Los estandares de rendiiento se evaluarn en funcin al levantamiento de datos actualizado. 659.40
TALADROS POR FRENTE
LONGITUD DE TALADRO
PERFORACION TOTAL
COSTO INST. CUADRO METALICO TIPO L + PERNOS DE ANCLAJE EN CH. METODO ALIMAK (SECC.3mX3m)
Rendimiento (Cimbras/Mes)
LONGITUD DE CHIMENEA
DESCRIPCION
1.0. MANO DE OBRA ESPECIALIZADA
Bodeguero
Perforista
Ayudante Perforista
Leyes sociales
Costo mensual
Costo Cimbra
2.0. DIRECCION TECNICA Y ADMINISTRACION
Ingeniero Residente
Administrador
Leyes sociales
Herramientas
Costo Cimbra
3.0. IMPLEMENTOS DE SEGURIDAD
Implementos Seguridad Perforista
Implementos Seguridad Ayudantes
Costo por metro de avance ( 13.60 / 2 )
4.0. HERRAMIENTAS
Costo Total / Metro
6.0. ALIMENTACION
Costo por metro de avance
5.0. MOVILIDAD MINA
Camioneta (mes)
Petroleo
SUB TOTAL
Grasa
Costo por Cimbra
Costo - alimentacin
Costo x Cimbra
7.0. PERFORACION
7.1. MANGUERAS Y PERFORACION
Disparos
Manguera de 1"
Manguera de 1/2
Costo por Cimbra
7.2. LUBRICANTES
Aceite 1/2 galn
Hras Efectivas
7.4. ACEROS DE PERFORACION
Vida til en pies
Barreno conica de 6'
Vida til en pies
Brocas de 40 mm.
Costo por Cimbra
SUB TOTAL X CIMBRA
8.4. EQUIPO OXICORTE-MAQUINA SOLDAR
Costo por Cimbra
8.5. PLATAFORMA ALIMACK
DESCRIPCION
1.0. MANO DE OBRA
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
TOTAL
RESUMEN DE COSTOS
COSTO CAUDRO METALICO EN L+PERNOS DE ANCALJE EN CHIMENEA METODO ALIMAK
( En US$ )
COSTO CUADRO METALICOS EN L + PERNOS ANCLAJE EN CH ALIMACK
9.0. PLATAFORMA TREPADORA
SUB TOTAL
10.0. GASTOS GENERALES
11.0. UTILIDAD
6.4. Aceros de Perforacin
8.0. EQUIPO OXICORTE
4.0. HERRAMIENTAS
5.0. MOVILIDAD + PETROLEO
6.1. Mangueras y Perforacion
6.2. Lubricantes
6.0. ALIMENTACION
7.0. PERFORACION
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
25 Dias x mes= 30.00
165-200 m
: 8
: 6 pies
: 48 pies
2.00 T.C. 2.854
UNIDAD P/UNIT.(S/.) CANTIDAD P/UNIT. (US$) US$ TOTAL
50.00 4 11,738 4,112.99
45 2 5,282 1,850.85
35 2 4,108 1,439.55
95.64% 7,403.39
296.14
1 $1,828 $1,828
Capataz 1 $600 $600
1 $600 $600
59.94% 1815.04804
4,843.05
193.72
6 2.78 16.67
2 1.42 2.83
19.51 9.75
8
Gbl 2.04
1.02
U.S.$/Mes 1,800.00
Gal/Mes 100 3.17 317.10
U.S.$/Mes 2,117.10
84.68
Und 8 2.63 21.02
10.51
14.61
Equipo Perforacion Fts 48 0.11 5.28
200
M 5 2.48 0.06
M 5 1.21 0.03
EA 8 4.75 0.19
5.56
5.56
Gl 50% 7.40 3.70
Kg 25% 0.93
4.63
4.63
4.42
1,820
EA 16.00 52.80 0.46
EA 16.00 56.10 0.49
EA 16.00 67.10 0.59
1.55
350
EA 24.00 22.00 1.51
EA 24.00 19.96 1.37
2.88
610.44
SUBTOTAL TOTAL
296.14 8,857
193.72 6,429
9.75 746
1.02 70
84.68 2,153
10.51 1,120
14.61 1,786
5.56
4.63
4.42
200.48 6,369
810.92
10% 81.09 3,182
10% 81.09 4,773
$973.10
Los estandares de rendiiento se evaluarn en funcin al levantamiento de datos actualizado. 1,080.87
9.0. PLATAFORMA TREPADORA
COSTO POR METRO - EQUIPO ALIMAK
UNIDAD CANTIDAD
DESCRIPCION P/UNIT. (US$) US$ TOTAL
Hr
EQUIPO ALIMAK Y ACCESORIOS 20.05
10
200.48
200.48
TALADROS POR FRENTE
LONGITUD DE TALADRO
PU CUADRO METALICO TIPO L + PERNOS DE ANCLAJE EN CH. METODO ALIMAK (150-200 MTS: 3X3Mt)
Rendimiento (Cimbras/Mes)
LONGITUD DE CHIMENEA
PERFORACION TOTAL
Bodeguero
Leyes sociales
DESCRIPCION
1.0. MANO DE OBRA ESPECIALIZADA
Perforista
Ayudante Perforista
Administrador
Leyes sociales
Costo mensual
Costo Cimbra ( 154.28 /0.5 m. )
2.0. DIRECCION TECNICA Y ADMINISTRACION
Ingeniero Residente
Costo metro avance ( 6,573.34 / 30 cimbras. )
3.0. IMPLEMENTOS DE SEGURIDAD
Implementos Seguridad Perforista
Implementos Seguridad Ayudantes
SUB TOTAL
Costo Total / Metro
Costo por metro de avance
4.0. HERRAMIENTAS
Herramientas
Costo por metro de avance
5.0. MOVILIDAD MINA
Camioneta (mes)
Petroleo
Aceite 1/2 galn
Grasa 25%
6.0. ALIMENTACION
Costo - alimentacin
7.0. PERFORACION
7.1. MANGUERAS Y CONEXIONES
Disparos
Vida til en pies
Manguera de 1"
Manguera de 1/2
Grampas y Accesorios
Costo por disparo
7.4. ACEROS DE PERFORACION
Costo por metro de avance
Costo por metro de avance
7.2. LUBRICANTES
Vida til en pies
Barreno conica de 2'
Barreno conica de 4'
Barreno conica de 6'
2.0. DIRECC. TECNICA Y ADMINIST.
3.0. IMPLEMENTOS DE SEGURIDAD
Brocas de 40 mm.
Brocas de 38 mm.
Costo por disparo
Costo por metro de avance
TOTAL
RESUMEN DE COSTOS
COSTO CUADRO METALICO EN L + PERNOS ANCLAJE EN CHIMENEA METODO ALIMAK
( En US$ )
DESCRIPCION
1.0. MANO DE OBRA
10.0. GASTOS GENERALES
11.0. UTILIDAD
4.0. HERRAMIENTAS
5.0. MOVILIDAD + PETROLEO
6.0. ALIMENTACION
7.0. PERFORACION
6.1. Mangueras y conexiones
6.2. Lubricantes
6.3. Equipo de Perforacin
9.0. PLATAFORMA TREPADORA
SUB TOTAL
Costo por metro (168.92 /2)
COSTO CUAD.METALICO EN L + PERNOS ANCLAJE CH ALIMACK
Costo Horario
Horas / Disparo
Costo total / Disparo
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
M / Disparo: 14.00
Taladros perforados 26.00
Pies perforados/Taladro 6.00
DESCRIPCION UNIDAD CANTID.
HORAS /
HOMBRE
TOTAL
HRS
U.S.$/HORA U.S.$/HORA U.S.$/M3
MANO DE OBRA
Maestro Perforista Tarea 1 8.00 8.00 4.28 34.27
Ayudante Perforista Tarea 1 8.00 8.00 3.86 30.85
Peon(Servicios) Tarea 1 4.00 4.00 3.00 12.00
SUB-TOTAL 77.12 5.51
IMPLEMENTOS SEGURIDAD
Tareas con ropa de agua Tarea 3 1.42 4.25 0.30
MATERIALES Y HERRAMIENTAS UNIDAD CANT PRECIO VIDA UTIL U.S.$/Disp
Barra 6 Fts 156 67.10 1,820 5.75
Broca 40 mm Fts 156 22.00 350 9.81
Herramientas Glb 2 2.04 4.08
19.63 1.40
VOLADURA UNIDAD CANT PRECIO U.S.$/Disp
Emulsin Semexa 65 1"x 7" Cart 104 0.200 20.80
Mininel Pzas 26 1.050 27.30
Pentacord Mts 10 0.210 2.10
Carmex Pzas 2 0.630 1.26
Ignite Cord Pies 8 0.410 3.28
54.74 3.91
EQUIPO DE PERFORACION UNIDAD CANT PRECIO VIDA UTIL U.S.$/Disp
Perforacin Fts 156 0.11 17.16
Manguera Jebe 1" Mts 30 2.48 150 0.50
Manguera Jebe 1/2" Mts 60 1.21 150 0.48
18.14 1.30
SUB-TOTAL COSTOS DIRECTOS 12.42
COSTOS INDIRECTOS
GASTOS GENERALES 10% 1.24
UTILIDAD 10% 1.24
SUB TOTAL INDIRECTOS 2.48
COSTO TOTAL $/./m
3
14.90
DESQUINCHE CON ALIMAK
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
Rendimiento (m2) : 35.0
Guardia : 8.0
Taladros : 35.0
1. MANO DE OBRA
Mestro perforista Tar 1.0 34.27 34.27
Ayudante perforista Tar 1.0 30.85 30.85
Valvulero Tar 1.0 30.85 30.85
Peon (Traslado Materiales, almacen
mina, izaje material x Alimack) Tar
1.5 23.99 35.99
131.96 3.77
2. IMPLEMENTOS SEGURIDAD
Implementos de seguridad Tar 4.5 1.42 6.37 0.18
3. MATERIALES Y HERRAMIENTAS
Malla Electrosoldada 4'x4' M2 35.0 2.59 90.65
Cemento Bolsa 1 10.30 10.30
Alambre No16 Kgs 3 1.08 3.24
Grampa de Fe Corrugado 3/8" Pzas 35.0 1.14 40.00
Herramientas Global 2.04
146.23 4.18
4. EQUIPO PERFORACIN-LIMPIEZA
Perforadora P.P. 35.0 0.11 3.85
Barra de 4 P.P. 35.0 56.1 1,820 1.08
Broca de 40 mm P.P. 35 22 350 2.20
Manguera aire 1" Mts. 30 2.48 200 0.37
Manguera agua 1/2" Mts. 30 1.21 200 0.18
Plataforma trepadora hrs. 3.0 20.05 60.14
67.83 1.94
SUB TOTAL COSTO DIRECTO 10.07
Gastos Generales 10% 1.01
Utilidad 10% 1.01
SUB TOTAL COSTO INDIRECTO 2.01
3. COSTO UNITARIO TOTAL 12.08
TOTAL COSTO POR M2 INSTALADO EN DOLARES (US$ / M2) 12.08
P.U. INSTALACION DE MALLA ELECTROSOLDADA DE 4" x 4" CON ALIMAK
Actividad Cant Costo Unit $ Costo $/Tar
Costo
($/m2)
Vida Util
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
Rendimiento: 5.0
Pies Perforados 5.0
1. MANO DE OBRA
Perforista Tar 0.06 34.27 2.14
Ayudant.Perforista Tar 0.06 30.85 1.93
Vlvulero Tar 0.06 30.85 1.93
Peon (Traslado Materiales, almacen mina, izaje
material x Alimack) Tar
0.06 23.99 1.50
SUB TOTAL
7.50 1.50
2. IMPLEMENTOS SEGURIDAD
Implementos de seguridad 0.3 1.42 0.35 0.07
3. MATERIALES Y HERRAMIENTAS
BARRA P.P.
25 67.10
1,820
0.92
Broca 40 mm Pza 25 22.00 350 1.57
Aceite Perforacin Gln. 0.5 7.40 3.70
Split Set 5 fts Pza. 5.0 5.28 26.40
Resina 5 0.00 0.00
Cembolt 30 0.00 0.00
Adaptador para inst perno 5.0 88.00 200 2.20
Herramientas de mina 2.04
36.83 7.37
4. EQUIPO PERFORACIN-LIMPIEZA
Perforadora - Jack Leg P.P. 25 0.11 2.75
Plataforma Trepadora Hrs 0.50 20.05 10.02
Manguera 1" Mts. 30 2.48 150.0 0.50
Manguera 1/2" Mts. 30 1.21 150.0 0.24
13.51 2.70
COSTO DIRECTO 11.64
COSTO INDIRECTO
Gastos Generales 10% 1.16
Utilidad 10% 1.16
COSTO INDIRECTO
COSTO UNITARIO TOTAL 13.97
13.97
Unidad
Costo
Unit $
TOTAL COSTO POR UNIDAD INSTALADA EN DOLARES (US$ / C.U.)
INSTALACION SPLIT SET DE 5' CON ALIMAK
Actividad Cant Vida Util
Costo
$/Tar
Costo
($/Pza)
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
Rendimiento: 18.0
Guardia: 8.0
1. MANO DE OBRA
Perforista Tar 1.0 34.27 34.27
Ayudant.Perforista Tar 1.0 30.85 30.85
Vlvulero Tar 1.0 30.85 30.85
Peon (Traslado Materiales, almacen mina, izaje
material x Alimack) Tar
1.0 23.99 23.99
120 6.66
2. IMPLEMENTOS SEGURIDAD
Implementos de seguridad 4.0 1.15 4.62 0.26
3. MATERIALES Y HERRAMIENTAS
CONICA P.P.
108 59.40
1,820
3.52
Broca 40 mm Pza 108 20.46 350 6.31
Aceite Perforacin Gln. 0.5 5.68 2.84
Perno Helicohidal de 6',tuerca,placa Pza. 18.0 6.07 109.26
Resina 18 0.83 14.94
Cembolt 108 0.26 28.08
Adaptador para inst perno 18.0 26.40 200 2.38
Herramientas de mina 1.91
169.25 9.40
4. EQUIPO PERFORACIN-LIMPIEZA
Perforadora - Jack Leg P.P. 108 0.11 11.88
Plataforma Trepadora Hrs 4 20.05 80.19
Manguera 1" Mts. 30 4.95 150.0 0.99
Manguera 1/2" Mts. 30 2.26 150.0 0.45
93.51 5.20
COSTO DIRECTO 21.52
COSTO INDIRECTO
Gastos Generales 10% 2.15
Utilidad 10% 2.15
COSTO INDIRECTO
COSTO UNITARIO TOTAL 25.82
25.82 TOTAL COSTO POR UNIDAD INSTALADA EN DOLARES (US$ / C.U.)
P U POR INSTALACION DE PERNO HELICOIDAL DE 6'/SPLIT SET CON ALIMAK
Actividad Unidad Cant
Costo
Unit $
Vida Util
Costo
$/Tar
Costo
($/Pza)
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
Rendimiento : 15.0
Guardia : 8.0
1. MANO DE OBRA
Mestro perforista Tar 1.0 34.27 34.27
Ayudante perforista Tar 1.0 30.85 30.85
Valvulero Tar 1.0 30.85 30.85
Peon (Traslado Materiales, almacen
mina, izaje material x Alimack) Tar
1.0 23.99 23.99
119.96 8.00
2. IMPLEMENTOS SEGURIDAD
Implementos de seguridad Tar 4.0 1.42 5.66 0.38
3. MATERIALES Y HERRAMIENTAS
BARRA DE EXTENSION PORTA BROCA CONICA P.P. 90 82.50 1,820.00 4.08
Broca 40 mm Pza 90 22.00 350.00 5.66
Aceite Perforacin Gln. 0.5 7.40 3.7
Perno Helicohidal de 8',tuerca,placa Pza. 15.0 8.16 122.4
Resina Cart 15 0.83 12.45
Cembol Cart 120 0.26 31.2
Adaptador para inst perno Pza. 15.0 88.00 200 6.60
Herramientas de mina Global 2.04
188.13 12.54
4. EQUIPO PERFORACIN-LIMPIEZA
Manguera 1" Mts. 30 2.48 150.0 0.50
Manguera 1/2" Mts. 30 1.21 150.0 0.24
Perforadora - Jack Leg P.P. 112.5 0.11 12.38
Plataforma Trepadora Hrs 4 20.05 80.19
93.31 6.22
COSTO DIRECTO 27.14
COSTO INDIRECTO
Gastos Generales 10% 2.71
Utilidad 10% 2.71
COSTO INDIRECTO 5.43
3. COSTO UNITARIO TOTAL 32.56
TOTAL COSTO POR UNIDAD INSTALADA EN DOLARES (US$ / C.U.) 32.56
Costo
($/Pza)
P. U. POR INSTALACION DE PERNO HELICOIDAL DE 8' CON ALIMAK
Actividad Unidad Cant
Costo Unit
$
Vida Util
Costo
$/Tar
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
SHOTCRETE TODO COSTO 2" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla.................: Rendimiento: 56.1 m2 Rendimiento(M3/Gdia): 6.00
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 34.27 34.27
Ayudantes Prep. Mezcla Tarea 2.00 30.85 61.69
Maestro Shotcretero Tarea 1.00 34.27 34.27
Ayudantes Prep. Shotcre. Tarea 3.00 30.85 92.54
Ayud1 Tarea 1.00 30.85 30.85
8.38 253.63 4.52
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 8.38 1.42 11.86
11.86 0.21
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 2.04
Cemento Bolsas 60.00 10.30 618.29
Acelerante Kg 76.50 0.91 69.62
Dramix Kg 240.00 1.65 396.00
Calibradores Pza 56.10 0.11 6.17
1,092.11 19.47
EQUIPO DE PERFORACION
Shotcretera y accesorios Hrs. 7.00 3.63 25.40
Plataforma 8.00 20.05 160.38
185.78 3.31
SUB-TOTAL COSTOS DIRECTOS 27.51
Contingencias 10% 2.75
Utilidad 10% 2.75
COSTO TOTAL U.S.$/M2. 33.01
Nota: La arena lo proporciona la Ca. en zona de trabajo
DRAMIX (0 KGS/M3) U.S.$/M2 24.54
DRAMIX (10 KGS/M3) U.S.$/M2 26.66
DRAMIX (20 KGS/M3) U.S.$/M2 28.78
DRAMIX (30 KGS/M3) U.S.$/M2 30.90
DRAMIX (40 KGS/M3) U.S.$/M2 33.01
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
FORMATO DE PRECIOS UNITARIOS SHOTCRETE CON EQUIPO ALIMACK
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
SHOTCRETE TODO COSTO 3" (DRAMIX: 0 Kgs/M3,10 Kgs/M3, 20 kgs/M3, 30 kgs/M3, 40 kgs/M3)
Avance Mts 2/Cuadrilla.................: Rendimiento: 37.4 m2 Rendimiento(M3/Gdia): 6.00
DESCRIPCION UNIDAD CANTID. COST./UNIT. FACTOR U.S.$ U.S.$/Gdia
MANO DE OBRA
Maestro Prepar. Mezcla Tarea 1.00 34.27 34.27
Ayudantes Prep. Mezcla Tarea 2.00 30.85 61.69
Maestro Shotcretero Tarea 1.00 34.27 34.27
Ayudantes Prep. Shotcre. Tarea 3.00 30.85 92.54
Ayud1 Tarea 1.00 30.85 30.85
8.38 253.63 6.78
IMPLEMENTOS SEGURIDAD N Tars.
Tareas sin ropa de agua 8.38 1.42 11.86
11.86 0.32
MATERIAL Y HERRAMIENTAS
Otras Herramientas Global 2.04
Cemento Bolsas 60.00 10.30 618.29
Acelerante Kg 76.50 0.91 69.62
Dramix Kg 240.00 1.65 396.00
Calibradores Pza 37.40 0.11 4.11
1,090.06 29.15
EQUIPO DE PERFORACION
Shotcretera y accesorios Hrs. 7.00 3.63 25.40
Plataforma 8.00 20.05 160.38
185.78 4.97
SUB-TOTAL COSTOS DIRECTOS 41.21
Contingencias 10% 4.12
Utilidad 10% 4.12
COSTO TOTAL U.S.$/M2. 49.45
Nota: La arena lo proporciona la Ca. en zona de trabajo
DRAMIX (0 KGS/M3) U.S.$/M2 36.75
DRAMIX (10 KGS/M3) U.S.$/M2 39.93
DRAMIX (20 KGS/M3) U.S.$/M2 43.10
DRAMIX (30 KGS/M3) U.S.$/M2 46.28
DRAMIX (40 KGS/M3) U.S.$/M2 49.45
VARIACION DE PRECIOS SEGN GRADO DE MEZCLA DE DRAMIX
FORMATO DE PRECIOS UNITARIOS SHOTCRETE CON ALIMAK
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
S/./Tarea U.S.$/Tarea 59.43% U.S.$/Tarea
Perforista 50.0 16.0 9.52 25.55
Vlvulero 45.0 14.4 8.57 22.99
Mecanico 55.0 17.6 10.48 28.10
Bodeguero
35.0 11.2 6.67 17.88
PROMEDIO
23.63
* Cta Administracin es para una parada de dia completo por problema de CMHSA, solo
personal no se reconoce Equipo Alimak
TAREAS ADMINISTRATIVAS
Actividad BASICO L.SOCIALES TOTAL
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
UNI DAD CANTI DAD P/UNI T. (US$) TOTAL (U.S.$)
Dias Gdias Personas U.S.$/Tarea Jornal $. U.S.$
Movilizacin a Interior Mina de una labor a otra labor Gdia. 0.50 1.00 8.00 23.63 189.07
Movilizacion a Cmara de extraccin Gdia. 1.00 2.00 8.00 23.63 378.13
Izaje de Cmara de extraccin Gdia. 2.00 4.00 8.00 23.63 756.27
I nstalacin y Montaje de Alimack Gdia. 2.00 4.00 8.00 23.63 756.27
5.50 11.00 $2,079.74
U.S.$/Da 180.09 5.50 990.52
Costo Global Adicional por Movilizaciones Global 3,070.26
PROMEDIO 23.63
MOVILIZACION -TRASLADO E INSTALACION DE EQUIPO ALIMACK INTERIOR MINA
SUPERVI SI ON
DESCRI PCI ON
Carga y descarga Alimack de Pias-Tunel
TOTAL GUARDI AS ADI CI ONALES
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
ITEM DESCRIPCION Unidad
COSTO HORARIO
EQUIPO ALIMAK
(U.S. $/Hr.)
HORAS /
GUARDIA
P.U.
(U.S. $ / Gdia.)
1 Plataforma Trepadora - Alimak HM 8.74 0.00 0.00
Nota: El Stand By es basicamente por paralizaciones Imputables a Consorcio Minero Horizonte S.A.
PRECIO UNITARIO ADICIONAL - STAND BY EQUIPO ALIMAK
POR PARALIZACIONES IMPUTABLES A CIA.
SOLO SE RECONOCERA LA PLANILLA DE EMPLEADOS Y OBREROS X DIA
NO HABRA PAGO DE EQUIPOS EN STAND BY
NO HABRA PAGO DE EQUIPOS, CARRILES Y ACCESORIOS POR ACCIDENTES DE TRABAJO EN OBRA
POR CUANTO ESTA CONSIDERADO EN LA DEPRECIACION COMO PAGO POR SEGURO DE ACCIDENTES
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO DIPSARO COSTO DIPSARO
US$/UNIDAD (Disparos) PERFORISTA APOYOS-EMPLE
Botas de Jebe Punta Acero Par 1 15.29 183 0.08 0.08
Casco Tipo Sombrero Portalmpara Pza 1 11.32 1,095 0.01 0.01
Barbiquejo Elstico Uni 1 0.64 90 0.01 0.01
Arnes con Linea de Vida Uni 1 108.57 120 0.90 0.00
Linea de Vida Uni 1 27.00 120 0.23 0.00
Respirador Pza 1 26.18 365 0.07 0.07
Filtro Par 1 3.52 60 0.06 0.06
Cartucho para gases y vap. Par 1 4.52 365 0.01 0.01
Retenedor (Abierto) Respirador Par 1 2.63 365 0.01 0.01
Guante de cuero Par 1 3.30 7 0.47 0.47
Correa Portalmpara Faja Plana 1 1/2" Uni 1 3.39 365 0.01 0.01
Tapn de Oido Par 1 0.59 45 0.01 0.01
Mameluco Jean Uni 1 16.94 183 0.09 0.09
Pantaln de Jebe Uni 1 8.01 90 0.09 0.00
Casaca de Jebe Uni 1 8.01 90 0.09 0.00
Lmpara (Alquiler) Uni 1 17.00 30 0.57 0.57
Anteojos de cristal endurecido Uni 1 5.20 120 0.04 0.00
Cordn Sujetador de Anteojos Uni 1 2.28 183 0.01 0.00
Tafilete de 4 Puntas Uni 1 4.21 365 0.01 0.01
TOTAL 2.78 1.42
IMPLEMENTOS DE SEGURIDAD
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
HERRAMIENTAS
DESCRIPCION UNID. CANTIDAD PRECIO VIDA ECON. COSTO UNITARIO
$/UNID (Disparos) POR DISPARO
Corvina Pzas 1.00 52.80 150.00 0.35
Clinometro Pzas 1.00 143.00 720.00 0.20
Cizalla Pzas 1.00 21.34 180.00 0.12
Presionador Perno Helicoidal Pzas 1.00 88.00 180.00 0.49
Lampa Pzas 1.00 8.20 50.00 0.16
Pico Pzas 1.00 9.28 50.00 0.19
Combo 6 Lbs Pzas 1.00 6.16 75.00 0.08
Llave Stilson de 14" Pzas 1.00 8.26 150.00 0.06
LLave Francesa 14" Pzas 1.00 12.00 150.00 0.08
Azuela Pzas 1.00 11.00 150.00 0.07
Chotana Pzas 2.00 12.00 100.00 0.24
2.04
PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com
OBREROS EMPLEADOS
9.00% 9.00%
2.00% 2.00%
0.97% 0.97%
4.05% 4.05%
0.00% 0.00%
0.36% 0.30%
16.38% 16.32%
JORNAL 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 29 31 30 31 30 31 31 30 31 31 31 365
VAC GRAT GRAT
REMUNERACION 1,085.00 1,015.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,050.00 1,085.00 1,085.00 1,085.00 11,795.00
VACACIONES 1,050.00 1,050.00
GRATIFICACIONES Factor 1,050.00 1,050.00 2,100.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 12 4.00 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 11.67 140.00
Hrs Extras 1.25 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CTS 9.72% 105.49 98.68 105.49 102.08 105.49 102.08 105.49 105.49 102.08 105.49 105.49 105.49 1,248.82
SUB TOTAL 1,202.15 1,125.35 1,202.15 1,163.75 1,202.15 1,163.75 2,252.15 1,202.15 1,163.75 1,202.15 1,202.15 2,252.15 16,333.82
Gravado(Afecto al Impuesto) 1,096.67 1,026.67 1,096.67 1,061.67 1,096.67 1,061.67 2,146.67 1,096.67 1,061.67 1,096.67 1,096.67 2,146.67 15,085.00
APOR REM.PRINC 16.38% 179.63 168.17 179.63 0.00 179.63 173.90 351.62 179.63 173.90 179.63 179.63 351.62 2,297.02
APOR GRAT. 16.38% 0.00 0.00
APOR VAC. 16.38% 173.90 173.90
TOTAL: 1,381.79 1,293.52 1,381.79 1,337.65 1,381.79 1,337.65 2,603.78 1,381.79 1,337.65 1,381.79 1,381.79 2,603.78 18,804.74
59.43%
JORNAL 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
CONCEPTOS % ENE. FEB. MAR. ABR. MAY. JUN. JUL. AGO. SET. OCT. NOV. DIC TOTAL
dias 31 29 31 30 31 30 31 31 30 31 31 31 365
VAC GRAT GRAT
REMUNERACION 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 16,500.00
VACACIONES 1,500.00 1,500.00
GRATIFICACIONES Factor 1,500.00 1,500.00 3,000.00
ASIG.FAMILIAR 55 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Descanso Medico 360 4.00 16.67 16.67 16.67 0.00 16.67 16.67 16.67 16.67 16.67 16.67 16.67 16.67 183.33
CTS 9.72% 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 145.83 1,750.00
SUB TOTAL 1,662.50 1,662.50 1,662.50 1,645.83 1,662.50 1,662.50 3,162.50 1,662.50 1,662.50 1,662.50 1,662.50 3,162.50 22,933.33
Gravado(Afecto al Impuesto) 1,516.67 1,516.67 1,516.67 1,500.00 1,516.67 1,516.67 3,016.67 1,516.67 1,516.67 1,516.67 1,516.67 3,016.67 21,183.33
APOR REM.PRINC 16.32% 247.52 247.52 247.52 0.00 247.52 247.52 492.32 247.52 247.52 247.52 247.52 492.32 3,212.32
APOR GRAT. 16.32% 0.00 0.00
APOR VAC. 16.32% 244.80 244.80
TOTAL: 1,910.02 1,910.02 1,910.02 1,890.63 1,910.02 1,910.02 3,654.82 1,910.02 1,910.02 1,910.02 1,910.02 3,654.82 26,390.45
59.94%
PLANILLA DE OBREROS SUBSUELO Y OOCC INTERIOR MINA
LEYES SOCIALES
SCTR-PENSIONES(interior Mina)
SCTR Pension Prima
VIDA LEY
PLANILLA DE EMPLEADOS SUBSUELO A TODO COSTO
ESSALUD
JUBILACION ANTICIPADA
SCTR-SALUD
TOTAL