You are on page 1of 1

Department of Computer Engineering

Sir Syed University of Engineering &


Technology, Karachi-Pakistan

Monthly Progress Sheet of Final Year Project (FYP) 2009


Project Number: ____Project Title: __________________________________________ _
Category: ______________________________Internal Advisor: __________________________
Roll Numbers: ________________________________________ Month: __ _____________

1. Objectives/Functionalities of the Project:

Completion Grading
S. No Project Objectives
Date A, B, C, D
Fill all the objectives and completion dates which were mentioned in the
1.
project proposal form (The same objectives mentioned in the proposal)
Do not change or alter the objectives or dates without FYPC Incharge
2. permission (do not change the objectives otherwise the monthly sheet will be
cancelled)
3. Changes may results in the rejection of Project
4. Grading will be filled by the Internal Advisor only
A = 75% to 100% complete objective B = 50% to 75% complete objective
5.
C = 25% to 50% complete objective D = 0% to 25% complete objective

2. Methodology:
Software Hardware
Programming Language The same Methodology mentioned before
Operating System In the Proposal any change can be made
Database By the approval of Incharge FYPC
Others

3. Internal Advisor Remarks: ______Filled by the Internal Advisor___________________________________

Contains progress report of group members and any other remarks__________________________________________

Complains about a group or any group member can be mentioned here by the Internal Advisor_________________

_____________________________________________________________________________________________________

______________________________________________ ____________________________________________
Name & Dated Signature of Internal Advisor Name & Dated Signature of Group Leader