ANALISA BIAYA PEKERJAAN KODE

ACIAN PLESTER / M2 SNI DT 91-10-07


6.27 - hal 9/11
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.0100 O.H - -
2 Kepala Tukang 0.0100 O.H - -
3 Tukang Batu 0.0500 O.H - -
4 Pekerja 0.1000 O.H - -
Pekerja -
1 Semen PC 50 kg 3.2500 KG - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
BENANGAN / M1
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Tukang Batu 0.1200 O.H - -
Pekerja -
1 Semen PC 50 kg 0.0030 Zak - -
2 Pasir Pasang 0.0090 m3 - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PELAPISAN WATER PROOFING SNI-2007
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.0025 O.H - -
2 Kepala Tukang 0.0075 O.H - -
3 Tukang 0.0750 O.H - -
4 Pekerja 0.0500 O.H - -
Pekerja -
1 Water proofing Coating 1.0000 m2 - -
(Ex. Fosroc/Sika/setara) -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PEMASANGAN KUSEN ALLUMINIUM
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.0150 O.H - -
2 Kepala Tukang 0.0220 O.H - -
3 Tukang Kayu 0.2500 O.H - -
4 Pekerja 0.1500 O.H - -
Pekerja -
1 Alluminium 4" siver ( ex INDAL ) 1.0500 m1 - -
2 Sekrup / Ripet 5.0000 bh - -
Material -
Jumlah -
PEKERJAAN : KUSEN, PINTU ALLUMINIUM DAN PLAFOND
DAFTAR ANALISA UPAH & BAHAN
ANALISA ARS 2010
Hal 1 dari 12
DAFTAR ANALISA UPAH & BAHAN
ANALISA BIAYA PEKERJAAN KODE
PENGECATAN / PLAMIR TEMBOK.
INTERIOR
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.0025 O.H - -
2 Kepala Tukang Cat 0.0075 O.H - -
3 Tukang Cat 0.0750 O.H - -
4 Pekerja 0.0500 O.H - -
Pekerja -
1 Cat Tembok interior 0.3000 kg - -
2 Plamur Tembok 0.1200 kg - -
3 Kertas Gosok no. 150 0.1000 lbr - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PENGECATAN / PLAMIR TEMBOK.
EXTERIOR
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.0025 O.H - -
2 Kepala Tukang Cat 0.0075 O.H - -
3 Tukang Cat 0.0750 O.H - -
4 Pekerja 0.0500 O.H - -
Pekerja -
1 Cat Tembok Dulux wethersheild 0.300 kg - -
2 Plamur Tembok 0.120 kg - -
3 Kertas Gosok no. 150 0.100 lbr - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PASANG KERAMIK LANTAI 30 X 30
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.035 O.H - -
2 KepalaTukang batu 0.035 O.H 0.00 -
3 Tukang Batu 0.350 O.H - -
4 Pekerja 0.700 O.H - -
Pekerja -
1 Semen PC 50 kg 10.000 kg - -
2 Semen Berwarna 0.500 kg - -
3 Pasir Pasang 0.045 m3 - -
4 Keramik 30 x 30 1.050 m2 - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PASANG KERAMIK LANTAI 40 X 40 SNI DT 91-13-07
6,35-hal.12/20
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.035 O.H - -
2 KepalaTukang batu 0.035 O.H 0.00 -
3 Tukang Batu 0.350 O.H - -
4 Pekerja 0.700 O.H - -
Pekerja -
1 Semen PC 50 kg 10.000 kg - -
2 Semen Berwarna 0.500 kg - -
3 Pasir Pasang 0.045 m3 - -
4 Keramik 40 x 40 1.050 m2 - -
Material -
Jumlah -
ANALISA BIAYA PEKERJAAN KODE
PASANG KRAMIK LANTAI 20 X 20 ( KM ) SNI DT 91-13-07
6,36-hal.12/20
No. Pekerja Volume Hari Kode Upah Biaya Sub. Jumlah
Rp./org/hari (Rp.) (Rp.)
1 Mandor 0.035 O.H - -
2 KepalaTukang batu 0.035 O.H 0.00 -
3 Tukang Batu 0.350 O.H - -
4 Pekerja 0.700 O.H - -
Pekerja -
1 Semen PC 50 kg 10.400 kg - -
2 Semen Berwarna 0.500 kg - -
3 Pasir Pasang 0.045 m3 - -
4 Kramik 20 x 20 1.060 m2 -
Material -
Jumlah -
PEKERJAAN : PENGECATAN & PICTURE TOILET
ANALISA ARS 2010
Hal 2 dari 12
DAFTAR ANALISA UPAH & BAHAN
ANALISA ARS 2010
Hal 3 dari 12
1. 1 m2 PEMBERSIHAN LOKASI
Upah :
0.100 oh Pekerja @ Rp. 0.00 = Rp. -
0.050 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
2. 1 m1 PASANG BOWPLANK
0.007 m3 Usuk Meranti @ Rp. 0.00 = Rp. -
0.004 m3 Papan Meranti @ Rp. 0.00 = Rp. -
0.020 kg Paku @ Rp. 0.00 = Rp. -
Upah :
0.100 oh Pekerja @ Rp. 0.00 = Rp. -
0.100 oh Tukang kayu @ Rp. 0.00 = Rp. -
0.010 oh Kepala tukang @ Rp. 0.00 = Rp. -
0.005 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
1. 1 m3 GALIAN UNTUK TANAH BIASA SEDALAM 1 m
Upah :
0.750 oh Pekerja gali tanah @ Rp. 0.00 = Rp. -
0.025 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
2 1 m3 GALIAN UNTUK TANAH KERAS SEDALAM 1 m
Upah :
1.000 oh Pekerja gali tanah @ Rp. 0.00 = Rp. -
0.032 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
3 1 m3 MENGURUG DENGAN PASIR
Bahan :
1.200 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.300 oh Pekerja @ Rp. 0.00 = Rp. -
0.010 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
4 1 m3 MENGURUG DENGAN PUDEL PUTIH
Bahan :
1.200 m3 Pudel putih @ Rp. 0.00 = Rp. -
1.000 m2 Sewa alat + Pemadatan @ Rp. = Rp. -
Upah :
0.250 oh pekerja @ Rp. 0.00 = Rp. -
0.025 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
5 1 m3 MENGURUG DENGAN TANAH ( lokal )
Bahan :
1.200 m3 Tanah urug @ Rp. 0.00 = Rp. -
1.000 m2 Sewa alat + Pemadatan @ Rp. = Rp. -
Upah :
0.250 oh pekerja @ Rp. 0.00 = Rp. -
0.025 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
RENCANA ANALISA PEKERJAAN
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
RENCANA ANALISA PEKERJAAN
1 1 m3 PASANGAN BATU KOSONG ( Anstampeng )
Bahan :
1.200 m3 Batu Belah 15/20 (lokal) @ Rp. 0.00 = Rp. -
0.432 m3 Pasir Urug @ Rp. 0.00 = Rp. -
Upah :
0.780 oh Pekerja @ Rp. 0.00 = Rp. -
0.390 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.039 oh Kepala Tukang Batu @ Rp. 0.00 = Rp. -
0.039 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
2 1 m3 PASANGAN BATU GUNUNG 1Pc : 4 Ps
Bahan :
1.200 m3 Batu Belah 15/20 (lokal) @ Rp. 0.00 = Rp. -
163.000 kg Semen (PC) @ Rp. 0.00 = Rp. -
0.520 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
1.500 oh Pekerja @ Rp. 0.00 = Rp. -
0.750 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.075 oh Kepala Tukang Batu @ Rp. 0.00 = Rp. -
0.075 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
3 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA 1Pc : 4Ps
Bahan :
140.000 bh Batu merah @ Rp. 0.00 = Rp. -
26.550 kg Semen (PC) @ Rp. 0.00 = Rp. -
0.093 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.600 oh Pekerja @ Rp. 0.00 = Rp. -
0.200 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.020 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.030 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
4 1 m2 PASANGAN ROOLAG TEBAL 1 BATA
Bahan :
140.000 bh Bata merah ( jawa ) @ Rp. 0.00 = Rp. -
26.550 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.093 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.640 oh pekerja @ Rp. 0.00 = Rp. -
0.200 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.020 oh Kepala Tukang Batu @ Rp. 0.00 = Rp. -
0.030 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
5 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1Pc : 3Ps
Bahan :
70.000 bh Bata merah ( jawa ) @ Rp. 0.00 = Rp. -
14.370 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.040 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.300 oh pekerja @ Rp. 0.00 = Rp. -
0.100 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.010 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.015 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
III. PEKERJAAN PASANGAN BATA & BATU KALI
RENCANA ANALISA PEKERJAAN
6 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA 1Pc : 4Ps
Bahan :
70.000 bh Bata merah ( jawa ) @ Rp. 0.00 = Rp. -
11.500 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.043 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.320 oh pekerja @ Rp. 0.00 = Rp. -
0.100 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.010 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.015 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
7 1 m2 PLESTERAN 1Pc : 3Ps Tebal 15 mm
Bahan :
7.776 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.023 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.300 oh pekerja @ Rp. 0.00 = Rp. -
0.150 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.015 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.010 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
8 1 m2 PLESTERAN 1Pc : 4Ps Tebal 15 mm
Bahan :
6.240 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.024 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.300 oh pekerja @ Rp. 0.00 = Rp. -
0.150 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.015 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.010 oh mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
9 1 M' PLESTERAN SKONING / BENANGAN 1 Pc : 2 Psr
Bahan :
0.500 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.013 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.080 oh Pekerja @ Rp. 0.00 = Rp. -
0.400 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.040 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.004 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
4 1 m2 PLESTERAN BETON 1 Pc : 2 Psr
Bahan :
9.300 kg Semen ( PC ) @ Rp. 0.00 = Rp. -
0.018 m3 Pasir Pasang ( Jawa ) @ Rp. 0.00 = Rp. -
Upah :
0.260 oh Pekerja @ Rp. 0.00 = Rp. -
0.200 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.020 oh Kepala Tukang @ Rp. 0.00 = Rp. -
0.013 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
RENCANA ANALISA PEKERJAAN
1 1 m3 PEKERJAAN BETON ( K 250 )
Bahan :
384.000 kg Semen PC @ Rp. 0.00 = Rp. -
0.494 m3 Pasir Cor ( Jawa ) @ Rp. 0.00 = Rp. -
0.770 m3 Batu Pecah 2/3 ( jawa ) @ Rp. 0.00 = Rp. -
Upah :
2.000 oh Pekerja @ Rp. 0.00 = Rp. -
0.350 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.035 oh Kepala Tukang Batu @ Rp. 0.00 = Rp. -
1.000 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
2 1 m3 PEKERJAAN BETON CAMPURAN 1Pc : 3Psr : 5Krl
Bahan :
218.000 kg Semen PC @ Rp. 0.00 = Rp. -
0.520 m3 Pasir Cor ( Jawa ) @ Rp. 0.00 = Rp. -
0.870 m3 Batu Pecah 2/3 ( jawa ) @ Rp. 0.00 = Rp. -
Upah :
1.650 oh Pekerja @ Rp. 0.00 = Rp. -
0.250 oh Tukang Batu @ Rp. 0.00 = Rp. -
0.025 oh Kepala Tukang Batu @ Rp. 0.00 = Rp. -
0.080 oh Mandor @ Rp. 0.00 = Rp. -
J umlah = Rp. -
lantai kerja 5 cm = Rp. -
3 1,00 Kg Pekerjaan Pembesian ( Polos )
Bahan :
1.050 Kg Besi Beton Polos @ Rp. 0.000 = Rp. -
0.015 Kg kawat bendrat @ Rp. 0.000 = Rp. -
Upah :
0.007 Oh Pekerja @ Rp. 0.000 = Rp. -
0.007 Oh Tukang Besi @ Rp. 0.000 = Rp. -
0.001 Oh Kepala Tukang Besi @ Rp. 0.000 = Rp. -
0.000 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
4 1,00 Kg Pekerjaan Pembesian ( Ulir )
Bahan :
1.050 Kg Besi Beton Ulir @ Rp. 0.000 = Rp. -
0.015 Kg kawat bendrat @ Rp. 0.000 = Rp. -
Upah :
0.007 Oh Pekerja @ Rp. 0.000 = Rp. -
0.007 Oh Tukang Besi @ Rp. 0.000 = Rp. -
0.001 Oh Kepala Tukang Besi @ Rp. 0.000 = Rp. -
0.000 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
VI. PEKERJAAN BETON
RENCANA ANALISA PEKERJAAN
5 1,00 m2 Pekerjaan Begisting Pondasi
Bahan :
0.020 m3 Kayu Papan Begisting @ Rp. 0.000 = Rp. -
0.150 Kg Paku @ Rp. 0.000 = Rp. -
0.050 Ltr Minyak Begisting @ Rp. = Rp. -
Upah :
0.520 Oh Pekerja @ Rp. 0.000 = Rp. -
0.260 Oh Tukang Kayu @ Rp. 0.000 = Rp. -
0.026 Oh Kepala Tukang Kayu @ Rp. 0.000 = Rp. -
0.026 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
6 1,00 m2 Pekerjaan Begisting Sloof
Bahan :
0.023 m3 Kayu Papan Begisting @ Rp. 0.000 = Rp. -
0.150 Kg Paku @ Rp. 0.000 = Rp. -
0.050 Ltr Minyak Begisting @ Rp. 0.000 = Rp. -
Upah :
0.520 Oh Pekerja @ Rp. 0.000 = Rp. -
0.260 Oh Tukang Kayu @ Rp. 0.000 = Rp. -
0.026 Oh Kepala Tukang Kayu @ Rp. 0.000 = Rp. -
0.026 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
7 1,00 m2 Pekerjaan Begisting Kolom
Bahan :
0.008 m3 Kayu Balok @ Rp. 0.000 = Rp. -
0.020 m3 Kayu Begisting @ Rp. 0.000 = Rp. -
0.200 Kg Paku @ Rp. 0.000 = Rp. -
0.175 Lbr Multiplek tebal 9 Mm @ Rp. 0.000 = Rp. -
1.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M @ Rp. = Rp. -
0.100 Ltr Minyak Begisting @ Rp. 0.000 = Rp. -
Upah :
0.660 Oh Pekerja @ Rp. 0.000 = Rp. -
0.330 Oh Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Kepala Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
8 1,00 m2 Pekerjaan Begisting Balok
Bahan :
0.009 m3 Kayu Balok @ Rp. 0.000 = Rp. -
0.020 m3 Kayu Begisting @ Rp. 0.000 = Rp. -
0.200 Kg Paku @ Rp. 0.000 = Rp. -
0.175 Lbr Multiplek tebal 9 Mm @ Rp. 0.000 = Rp. -
1.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M @ Rp. 0.000 = Rp. -
0.100 Ltr Minyak Begisting @ Rp. 0.000 = Rp. -
Upah :
0.660 Oh Pekerja @ Rp. 0.000 = Rp. -
0.330 Oh Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Kepala Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
RENCANA ANALISA PEKERJAAN
9 1,00 m2 Pekerjaan Begisting Plat
Bahan :
0.015 m3 Kayu Balok @ Rp. 0.000 = Rp. -
0.040 m3 Kayu Begisting @ Rp. 0.000 = Rp. -
0.400 Kg Paku @ Rp. 0.000 = Rp. -
0.350 Lbr Multiplek tebal 9 Mm @ Rp. 0.000 = Rp. -
6.000 Btg Dolken ( Dia 8-10 Cm ) x 4 M @ Rp. 0.000 = Rp. -
0.200 Ltr Minyak Begisting @ Rp. 0.000 = Rp. -
Upah :
0.660 Oh Pekerja @ Rp. 0.000 = Rp. -
0.330 Oh Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Kepala Tukang Kayu @ Rp. 0.000 = Rp. -
0.033 Oh Mandor @ Rp. 0.000 = Rp. -
J umlah = Rp. -
- Pek. Beton Balok 25/50 Plat Atap
1.000 m3 Pekerjaan Beton ( K 250 ) @ Rp. 0.00 = Rp. -
222.090 kg Pekerjaan Pembesian @ Rp. - = Rp. -
6.490 m2 Pekerjaan Bekisting Balok @ Rp. - = Rp. -
J umlah = Rp. -
- Pek. Beton Balok 20/35 Plat Atap
1.000 m3 Pekerjaan Beton ( K 250 ) @ Rp. 0.00 = Rp. -
200.800 kg Pekerjaan Pembesian @ Rp. - = Rp. -
6.490 m2 Pekerjaan Bekisting Balok @ Rp. - = Rp. -
J umlah = Rp. -
- Pek. Beton Plat Atap
1.000 m3 Pekerjaan Beton ( K 250 ) @ Rp. 0.00 = Rp. -
115.000 kg Pekerjaan Pembesian @ Rp. - = Rp. -
10.000 m2 Pekerjaan Bekisting Plat @ Rp. - = Rp. -
J umlah = Rp. -
No NAMA BAHAN SAT. HARGA ( Rp. )
I BAHAN PASIR
1 Pasir urug ( lokal ) m
2 Pasir pasang ( lokal ) m
3 Pasir pasang ( jawa ) m
4 Sirtu ( jawa ) m
5 Pasir cor ( jawa ) m
6 Tanah urug ( lokal ) m
7 Pudel putih ( lokal ) m
8 Pudel kuning ( lokal ) m
9 Abu batu m
II BAHAN BATU
1 Batu gunung belah 15/20 ( lokal ) m
2 Batu gunung belah 10/15 ( lokal ) m
3 Batu gunung pecah 5/7 ( lokal ) m
4 Batu gunung pecah 4/6 ( lokal ) m
5 Batu gunung pecah 3/5 ( lokal ) m
6 Batu gunung pecah 2/3 ( lokal ) m
7 Batu kali pecah 5/7 ( jawa ) m
8 Batu kali pecah 3/5 ( jawa ) m
9 Batu pecah tempel/hiasan ( jawa ) m
III BAHAN KORAL/KERIKIL
1 Batu koral bulat 2/3 ( jawa ) m
2 Batu pecah mesin 1/2 ( jawa ) m
3 Batu pecah mesin 2/3 ( jawa ) m
IV BAHAN BATU BATA
1 Batu bata merah ( jawa ) bh
2 Batu putih ( lokal ) bh
3 Batu merah ( lokal ) bh
4 Bataco bh
5 Koral sikat m
V. PORTLAND CEMENT ( PC )
1 Semen Gresik 40 Kg Kg
2 Semen Warna Kg
3 Semen Putih ( Azona / Tiga Roda ) 50 Kg Zak
4 Semen Putih ( Gresik ) 40 Kg Zak
5 Semen AM/Epoxy Kg
VI. BAHAN BESI/LOGAM & KACA
1 Besi Beton Polos Kg
2 Besi Beton Ulir Kg
3 Besi Siku 5.50.50 x 6.00 m Kg
4 Pipa air Galvanis Medium 1/2" x 6,00 m' Ljr
5 Pipa air Galvanis Medium 3/4" x 6,00 m' Ljr
6 Pipa Air Galvanis Medium 1" Ljr
7 Kawat Beton / Kawat Bendrat Kg
8 Kawat BWG ( Penggantung Rangka Plafond ) Kg
9 Kawat Suspention Root ( Rangka Plafond ) M'
16 Alluminium 4" anodized M'
16 Sunscreen Aluminium M2
17 Sealent Karet tube
18 Skrup Fixer Bh
19 U Climb Bh
20 Wall Angle Bh
VII. BAHAN KAYU
1 Kayu Kamper Balok 8/12, 6/12, 8/15 Klas I M
2 Kayu Kamper Papan 3/20, 3/30 x 4,00 m' M
3 Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas I M
4 Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas II M
5 Kayu Bangkirai Papan 2/20, 3/20 x 4,00 m' M
6 Kayu Meranti Balok 3/15, 8/12, 6/12 Klas I M
7 Kayu Meranti Balok 5/7, 4/6, 6/12 Klas II M
8 Kayu Meranti Papan 2/20, 3/20 x 4,00 m' M
9 Kayu Papan Begesting 2/20 x 4,00 m' M
10 Kayu Kelapa Btg
BANGKALAN - MADURA
DAFTAR HARGA BAHAN & UPAH
PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA
No NAMA BAHAN SAT. HARGA ( Rp. )
BANGKALAN - MADURA
DAFTAR HARGA BAHAN & UPAH
PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA
11 Kayu Untuk Perancah M
VIII. BAHAN TRIPLEK/KAYU LAPIS
1 Triplek 1,22 x 2,44 x 4 mm Lbr
2 Triplek 1,10 x 2,10 x 4 mm Lbr
3 Multiplek 1,22 x 2,44 x 6 mm Lbr
4 Multiplek 1,22 x 2,44 x 9 mm Lbr
5 Teakwood 1,22 x 2,44 x 4 mm Lbr
6 Teakwood 1,10 x 2,10 x 4 mm Lbr
IX. BAHAN PAKU
1 Paku Reng Kg
2 Paku Usuk Kg
3 Paku Triplek Kg
4 Paku 12 cm Bh
X. BAHAN PENGECATAN
1 Cat kayu /besi mowilex Kg
2 Cat meni Kg
3 Cat tembok interior mowilex ( setara ) Kg
4 Cat tembok exterior Dulux Weathersheild Kg
5 Minyak Cat/afduner Lt
6 Plamur tembok Kg
7 Lem kayu Kg
8 Water proofing Coating (Ex. Fosroc/Sika/setara) m2
9 Ampelas Lbr
No NAMA BAHAN SAT. HARGA ( Rp. )
BANGKALAN - MADURA
DAFTAR HARGA BAHAN & UPAH
PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA
XI. BAHAN UNTUK LANTAI
1 keramik lantai 20 x 20 M2
2 keramik dinding 20 x 25 M2
3 keramik 30 x 30 M2
4 keramik 40 x 40 ( Motif / warna terang ) Roman kw 1 M2
5 keramik 40 x 40 ( Motif / warna gelap ) Roman kw 1 M2
6 Roster Kramik 20 x 20 bh
7 Parquet M2
8 Batu Ampiang kecil-kecil ( 30/30 cm ) bh
9 Batu alam tempel ( batu piring ) M3
XII. UPAH KERJA
1 Mandor Hari
2 Kepala Tukang Gali Tanah Hari
3 Kepala Tukang Batu Hari
4 Kepala Tukang Kayu Hari
5 Kepala Tukang Besi Hari
6 Kepala Tukang Cat Hari
7 Kepala Tukang Listrik Hari
8 Tukang Gali Tanah Hari
9 Tukang Batu Hari
10 Tukang Kayu Hari
11 Tukang Besi Hari
12 Tukang Cat Hari
13 Tukang Listrik Hari
14 Tukang Pipa Hari
15 Pekerja Hari
16 Sewa Welding set Jam