OBJETO: CONSTRUCCIN DE LAS OBRAS DE MITIGACIN EN EL VIRREY DE LA LOCALIDAD QUINTA DE USME BOGOT D.C.

Contrato de Obra pblica N 14-FDLU-2012 FECHA 15 DE MAYO DE 2014


ENTIDAD CONTRATANTE: ALCALDIA LOCAL DE USME.
CONTRATISTA: EMGESPUBLICA EICE
INTERVENTORIA: SANDRA MONICA CARDOZO ROJAS.
VALOR CONTRATO 651,814,358.00 $
VALOR ANTICIPO 260,725,743.00 $
AMORTIZACION ACTA N 2 231,127,185.00 $
AVANCE % FALTA POR AMORTIZAR 29,598,558.00 $
ITEM UND CANT VR UNITARIO VR TOTAL CANT VR TOTAL CANT VR TOTAL CANT VR TOTAL CANT VR TOTAL
1
1.1 m2 680 2,535.00 1,723,800.00 - 1,242.00 3,148,470.00 1,507.31 3,821,030.85 1,507.31 3,821,030.85
1.2 ml 323 12,316.00 3,978,068.00 - 198.20 2,441,031.20 396.40 4,882,062.40 396.40 4,882,062.40
2 - - - - - - -
2.1 m2 120 921.00 110,520.00 - 1,247.10 1,148,579.10 1,512.41 1,392,929.61 1,512.41 1,392,929.61
2.2 m3 3800 8,878.00 33,736,400.00 436.92 3,878,975.76 - 2,298.00 20,401,644.00 2,734.92 24,280,619.76
2.4 m3 440 23,078.00 10,154,320.00 17.12 395,095.36 227.03 5,239,398.34 370.90 8,559,630.20 388.02 8,954,725.56
2.6 m3 390 8,381.00 3,268,590.00 - - - - - -
2.9 m3 6032 21,667.00 130,695,344.00 65.00 1,408,355.00 732.00 15,860,244.00 3,460.00 74,967,820.00 3,525.00 76,376,175.00
3 - - - - -
3.1 m3 360 158,435.00 57,036,600.00 - 79.75 12,635,191.25 234.75 37,192,616.25 234.75 37,192,616.25
3.2 m2 4300 12,556.00 53,990,800.00 558.00 7,006,248.00 - - - 558.00 7,006,248.00
3.5 m2 205 7,413.00 1,519,665.00 37.80 280,211.40 21.60 160,120.80 457.38 3,390,557.94 495.18 3,670,769.34
3.8 m3 32 546,282.00 17,481,024.00 - 58.28 31,835,949.26 58.28 31,835,949.26 58.28 31,835,949.26
3.9 kg 3496 3,001.00 10,491,496.00 72.77 218,382.77 3,898.06 11,698,078.06 3,898.06 11,698,078.06 3,970.83 11,916,460.83
3.27 ml 10 13,348.00 133,480.00 - 3.90 52,057.20 3.90 52,057.20 3.90 52,057.20
4 - - - -
4.1 m2 240 29,974.00 7,193,760.00 - 328.63 9,850,355.62 398.63 11,948,535.62 398.63 11,948,535.62
4.2 ml 120 33,984.00 4,078,080.00 20.30 689,875.20 232.90 7,914,873.60 423.50 14,392,224.00 443.80 15,082,099.20
4.4 ml 33 94,181.00 3,107,973.00 - 8.00 753,448.00 19.00 1,789,439.00 19.00 1,789,439.00
4.8
CONSTRUCCION CAJAS DE INSPECCION EN
MAMPOSTERIA Y PAETE IMPERMEABILIZADO TIPO 1
(1.0*1.0*1.5) und 8 448,309.00 3,586,472.00 - - - - - -
4.10
CONSTRUCCION CAJAS DE INSPECCION EN
MAMPOSTERIA Y PAETE IMPERMEABILIZADO TIPO 2
(0.8*0.8*1.5) und 13 377,744.00 4,910,672.00 - (7.00) (2,644,208.00) - - - -
4.12 ml 280 186,622.00 52,254,160.00 - 260.00 48,521,720.00 420.00 78,381,240.00 420.00 78,381,240.00
4.13 kg 550 5,558.00 3,056,900.00 535.50 2,976,309.00 290.76 1,616,044.08 373.86 2,077,913.88 909.36 5,054,222.88
4.14 m3 28 612,654.00 17,154,312.00 13.49 8,264,702.46 11.70 7,168,051.80 18.63 11,413,744.02 32.12 19,678,446.48
4.15 ml 372 126,608.00 47,098,176.00 131.50 16,648,952.00 121.10 15,332,228.80 262.90 33,285,243.20 394.40 49,934,195.20
5 - -
5.4 m3 250 66,093.00 16,523,250.00 75.74 5,005,883.82 252.51 16,689,143.43 365.49 24,156,330.57 441.23 29,162,214.39
5.2
m2 80 6,872.00 549,760.00 - - - - - -
6 OBRAS COMPLEMENTARIAS - - - - - - -
6.4 m2 133 55,822.00 7,424,326.00 - - - - - -
6.8 und 3 114,602.00 343,806.00 - - - - - -
6.11 m3 35 280,116.00 9,804,060.00 - 9.93 2,781,551.88 19.23 5,386,630.68 19.23 5,386,630.68
- -
NP-01 und 0 780,545.93 15.60 12,176,516.51 15.60 12,176,516.51 15.60 12,176,516.51
NP-02 M3 0 112,195.72 40.11 4,500,170.33 40.11 4,500,170.33 40.11 4,500,170.33
NP-03 m2 0 110,500.00 - - - - -
NP-04 ML 0 240,500.00 - - - - -
NP-05 GL 0 2,200,000.00 - - - - -
NP-06 MES 0 4,830,000.00 - - - - -
NP-07 M2 0 97,614.00
- - - - -
NP-08 ML 0 64,614.00 - - - - -
NP-09 GL 0 8,500,000.00 - - - - -
VALOR COSTOS DIRECTOS 501,405,814.00 $ 46,772,990.77 $ 208,879,015.25 $ 397,702,363.57 $ 444,475,354.34 $
ADMNISTRACION 22% 110,309,280.00 $ 10,290,058.00 $ 45,953,384.00 $ 87,494,520.00 $ 97,784,578.00 $
IMPREVISTOS 2% 10,028,116.00 $ 935,459.00 $ 4,177,580.00 $ 7,954,047.00 $ 8,889,507.00 $
UTILIDAD 6% 30,084,348.00 $ 2,806,379.00 $ 12,532,740.00 $ 23,862,141.00 $ 26,668,521.00 $
SUB TOTAL 651,814,358.00 $ 60,804,887.00 $ 271,542,720.00 $ 517,013,072.00 $ 577,817,961.00 $
AMORTIZACION DE ANTICIPO 40% 260,725,743.00 $ 24,321,955.00 $ 108,617,088.00 $ 206,805,229.00 $ 231,127,185.00 $
VALOR TOTAL A PAGAR PRESENTE ACTA (REDONDEADO AL PESO) 651,814,358.00 $ 36,482,932.00 $ 162,925,632.00 $ 310,207,843.00 $ 346,690,776.00 $
JAIME ARTURO RODRIGUEZ
REPRESENTANTE LEGAL
CONTRATISTA
RUBEN DARIO MUOZ QUINTERO
INTERVENTORIA Vbo SUPERVISOR FDLU
PMT Y PERMISOS
TOPOGRAFIA
Adoqun arcilla h=.06m Tipo Tolete para pendientes menores al 5% con
estructuravSub-base B=400 e=.20+Base B=600 e=.15+Adoqun sobre arena con
dilatacin de Confinamiento cada 20m2 (Tabla 5-1 Tipo 1 Suelos Blandos)Incluye
excavacin,Compactacin fondo de la excavacin,rellenos en recebo segun tabla
de diseo,Geotextil ST 300 y/o T-2100 Pavco y retiro de material producto de la
Bordillo Prefabricado A-80 en Concreto h=.35b=.19 Incluye excavacin
SISTEMA DE ILUMINACION PARA SENDERO PEATONAL
SANDRA MONICA CARDOZO
PERNOS DE 5/8"
TRINCHERA DRENANTE CON DREN PLANAR Y TUBERIA PVC DE 4"RANURADA INCLUYE EXCAVACION RELLENO
RELLENOS
RELLENO CON MATERIAL SELECCIONADO B-200
SUMINISTRO EXTENDIDA Y COMPACTACION DE MEZCLA PARA TRATAMIENTO
SUPERFICIAL SEGN ARTICULO 400-07-INVIAS
SUMINISTRO E INSTALACION DE ADOQUIN EN ARCILLA
TALA Y DESENRAICE DE ARBOLES
SOLADO EN CONCRETO DE RESISTENCIA 1500 PSI
ACTIVIDADES NO PREVISTAS
CAJAS DE INSPECCION 80 X 80 X 1,5 - MURO DOBLE
EXCAVACION MECANICA EN ROCA +COMPRESOR+CARGUE Y RETIRO ZONA PLANA
MALLA TIPO DELTAX CON GREN
CONCRETO DE 4000 PSI PARA OBRAS DE DRENAJE SUPERFICIAL
EMPRADIZACION EN CESPEDON (INCLUYE SUMINISTRO E INSTALACION DEL
MATERIAL +TIERRA NEGRA+CESPEDON)
SUMINISTRO E INSTALACION DE GEOTEXTIL
CONCRETO DE 3000 PSI PARA ESTRUCTURAS CONTENCION DE
SUMINISTRO E INSTALACION DE ACERO REFUERZO DE 60000 PSI
LLORADEROS TUBERIA EN PVC f=1,5"
OBRAS DE DRENAJE
GEODREN PLANAR
TUBERIA PERFORADA DE 4"
TUBERIA 12" NOVAFORT PARA CONDUCCION A POZO PRINCIPAL INCLUYE MATERIAL
DRENES DE PENETRACION
MALLA ELECTROSOLDADA Q5 ,PARA CONSTRUCCION DE CUNETAS
CONSTRUCCION DE MURO EN GAVION ( INCLUYE SUMINISTRO DE MALLA,
FORMALETA Y PIEDRA EN RAJON SEGN ESPECIFICACION)
DESCRIPCION
GENERALIDADES
LOCALIZACION Y REPLANTEO CON TOPOGRAFIA
AISLAMIENTO Y PROTECCION DE LA ZONA A INTERVENIR
EXCAVACIONES
DESCAPOTE
EXCAVACION MECANICA EN MATERIAL COMUN
EXCAVACION MANUAL EN SUELO
LIMPIEZA DE MATERIAL RODADO
RETIRO DE ESCOMBROS PRODUCTO DE LAS EXCAVACIONES
ESTRUCTURAS DE CONTENCION
OBRAS PARA EL VIRREY
ACTA N 3 ACTA ANTERIOR ACUMULADO ANTERIOR ACUMULADO ACTUAL
CONDICIONES CONTRACTUALES AVANCE DE OBRA
89%
ACTA PARCIAL N 3
DETALLES DE PAGOS
VALOR CONTRATO 651,814,358.00 $ DETALLES DE AMORTIZACION ANTICIPO
ACTA PARCIAL N 2 60,804,887.00 $
VALOR EJECUTADO 577,817,961.00 $
OBJETO: CONSTRUCCIN DE LAS OBRAS DE MITIGACIN EN EL VIRREY DE LA LOCALIDAD QUINTA DE USME BOGOT D.C.
Contrato de Obra pblica N 14-FDLU-2012 FECHA 15 DE MAYO DE 2014
ENTIDAD CONTRATANTE: ALCALDIA LOCAL DE USME.
CONTRATISTA: EMGESPUBLICA EICE
INTERVENTORIA: SANDRA MONICA CARDOZO ROJAS.
VALOR CONTRATO 651,814,358.00 $
VALOR ANTICIPO 260,725,743.00 $
AMORTIZACION ACTA N 4 260,725,743.00 $
AVANCE % FALTA POR AMORTIZAR - $
ITEM UND CANT VR UNITARIO VR TOTAL CANT VR TOTAL CANT VR TOTAL CANT VR TOTAL CANT VR TOTAL
1
1.1 m2 680 2,535.00 1,723,800.00 (1,507.31) (3,821,030.85) - 1,507.31 3,821,030.85 - -
1.2 ml 323 12,316.00 3,978,068.00 - - 396.40 4,882,062.40 396.40 4,882,062.40
2 - - - - - - -
2.1 m2 120 921.00 110,520.00 - - 1,512.41 1,392,929.61 1,512.41 1,392,929.61
2.2 m3 3800 8,878.00 33,736,400.00 245.08 2,175,820.24 436.92 3,878,975.76 2,734.92 24,280,619.76 2,980.00 26,456,440.00
2.4 m3 440 23,078.00 10,154,320.00 - 17.12 395,095.36 388.02 8,954,725.56 388.02 8,954,725.56
2.6 m3 390 8,381.00 3,268,590.00 - - - - - -
2.9 m3 6032 21,667.00 130,695,344.00 349.00 7,561,783.00 65.00 1,408,355.00 3,525.00 76,376,175.00 3,874.00 83,937,958.00
3 - - - -
3.1 m3 360 158,435.00 57,036,600.00 - - 234.75 37,192,616.25 234.75 37,192,616.25
3.2 m2 4300 12,556.00 53,990,800.00 1,462.19 18,359,245.08 558.00 7,006,248.00 558.00 7,006,248.00 2,020.19 25,365,493.08
3.5 m2 205 7,413.00 1,519,665.00 98.55 730,551.15 37.80 280,211.40 495.18 3,670,769.34 593.73 4,401,320.49
3.8 m3 32 546,282.00 17,481,024.00 - - 58.28 31,835,949.26 58.28 31,835,949.26
3.9 kg 3496 3,001.00 10,491,496.00 - 72.77 218,382.77 3,970.83 11,916,460.83 3,970.83 11,916,460.83
3.27 ml 10 13,348.00 133,480.00 - - 3.90 52,057.20 3.90 52,057.20
4 - - -
4.1 m2 240 29,974.00 7,193,760.00 - - 398.63 11,948,535.62 398.63 11,948,535.62
4.2 ml 120 33,984.00 4,078,080.00 - 20.30 689,875.20 443.80 15,082,099.20 443.80 15,082,099.20
4.4 ml 33 94,181.00 3,107,973.00 - - 19.00 1,789,439.00 19.00 1,789,439.00
4.8
CONSTRUCCION CAJAS DE INSPECCION EN
MAMPOSTERIA Y PAETE IMPERMEABILIZADO TIPO 1
(1.0*1.0*1.5) und 8 448,309.00 3,586,472.00 - - - - - -
4.10
CONSTRUCCION CAJAS DE INSPECCION EN
MAMPOSTERIA Y PAETE IMPERMEABILIZADO TIPO 2
(0.8*0.8*1.5) und 13 377,744.00 4,910,672.00 - - - - - -
4.12 ml 280 186,622.00 52,254,160.00 - - 420.00 78,381,240.00 420.00 78,381,240.00
4.13 kg 550 5,558.00 3,056,900.00 - 535.50 2,976,309.00 909.36 5,054,222.88 909.36 5,054,222.88
4.14 m3 28 612,654.00 17,154,312.00 - 13.49 8,264,702.46 32.12 19,678,446.48 32.12 19,678,446.48
4.15 ml 372 126,608.00 47,098,176.00 - 131.50 16,648,952.00 394.40 49,934,195.20 394.40 49,934,195.20
5 - -
5.4 m3 250 66,093.00 16,523,250.00 120.00 7,931,160.00 75.74 5,005,883.82 441.23 29,162,214.39 561.23 37,093,374.39
5.2
m2 80 6,872.00 549,760.00 - - - - - -
6 OBRAS COMPLEMENTARIAS - - - - - - -
6.4 m2 133 55,822.00 7,424,326.00 136.50 7,619,703.00 - - - 136.50 7,619,703.00
6.8 und 3 114,602.00 343,806.00 5.00 573,010.00 - - - 5.00 573,010.00
6.11 m3 35 280,116.00 9,804,060.00 - - 19.23 5,386,630.68 19.23 5,386,630.68
112%
ACTA FINAL DE OBRA
DETALLES DE PAGOS
VALOR CONTRATO 651,814,358.00 $ DETALLES DE AMORTIZACION ANTICIPO
ACTA PARCIAL N 4 153,408,423.00 $
VALOR EJECUTADO 731,226,385.00 $
ACUMULADO ACTUAL
CONDICIONES CONTRACTUALES AVANCE DE OBRA
DESCAPOTE
OBRAS PARA EL VIRREY
ACTA N 4 ACTA ANTERIOR ACUMULADO ANTERIOR
DESCRIPCION
GENERALIDADES
LOCALIZACION Y REPLANTEO CON TOPOGRAFIA
AISLAMIENTO Y PROTECCION DE LA ZONA A INTERVENIR
EXCAVACIONES
OBRAS DE DRENAJE
EXCAVACION MECANICA EN MATERIAL COMUN
EXCAVACION MANUAL EN SUELO
LIMPIEZA DE MATERIAL RODADO
RETIRO DE ESCOMBROS PRODUCTO DE LAS EXCAVACIONES
ESTRUCTURAS DE CONTENCION
CONSTRUCCION DE MURO EN GAVION ( INCLUYE SUMINISTRO DE MALLA,
FORMALETA Y PIEDRA EN RAJON SEGN ESPECIFICACION)
EMPRADIZACION EN CESPEDON (INCLUYE SUMINISTRO E INSTALACION DEL
MATERIAL +TIERRA NEGRA+CESPEDON)
SUMINISTRO E INSTALACION DE GEOTEXTIL
CONCRETO DE 3000 PSI PARA ESTRUCTURAS CONTENCION DE
SUMINISTRO E INSTALACION DE ACERO REFUERZO DE 60000 PSI
LLORADEROS TUBERIA EN PVC f=1,5"
TALA Y DESENRAICE DE ARBOLES
GEODREN PLANAR
TUBERIA PERFORADA DE 4"
TUBERIA 12" NOVAFORT PARA CONDUCCION A POZO PRINCIPAL INCLUYE MATERIAL
DRENES DE PENETRACION
MALLA ELECTROSOLDADA Q5 ,PARA CONSTRUCCION DE CUNETAS
CONCRETO DE 4000 PSI PARA OBRAS DE DRENAJE SUPERFICIAL
TRINCHERA DRENANTE CON DREN PLANAR Y TUBERIA PVC DE 4"RANURADA INCLUYE EXCAVACION RELLENO
RELLENOS
RELLENO CON MATERIAL SELECCIONADO B-200
SUMINISTRO EXTENDIDA Y COMPACTACION DE MEZCLA PARA TRATAMIENTO
SUPERFICIAL SEGN ARTICULO 400-07-INVIAS
SUMINISTRO E INSTALACION DE ADOQUIN EN ARCILLA
SOLADO EN CONCRETO DE RESISTENCIA 1500 PSI
- -
NP-01 und 0 780,545.93 - 15.60 12,176,516.51 15.60 12,176,516.51 15.60 12,176,516.51
NP-02
m3
0 112,195.72 -
40.11
4,500,170.33
40.11
4,500,170.33 40.11 4,500,170.33
NP-03 gl 0 2,214,996.00 1.00 2,214,996.00 - 0.00 - 1.00 2,214,996.00
NP-04 mes 0 4,830,000.00 3.50 16,905,000.00 - 0.00 - 3.50 16,905,000.00
- - - - -
NP-05 ml 78,856.52 - - 0.00 - - -
6.4 m2 55,822.00 - - 0.00 - - -
NP-07 m3 68,381.32 7.2 492,345.50 - 0.00 - 7.20 492,345.50
2.4 m3 23,078.00 62.4 1,440,067.20 - 0.00 - 62.40 1,440,067.20
- - 0.00 - - -
NP-06 ml 53,797.96 - - 0.00 - - -
6.4 m2 55,822.00 64 3,572,608.00 - 0.00 - 64.00 3,572,608.00
NP-07 m3 68,381.32 22.4 1,531,741.57 - 0.00 - 22.40 1,531,741.57
2.4 m3 23,078.00 28.4 655,415.20 - 0.00 - 28.40 655,415.20
NP-08 und 25,982.88 100 2,598,287.50 - 0.00 - 100.00 2,598,287.50
NP-09 ml 194,766.00 48 9,348,768.00 - 0.00 - 48.00 9,348,768.00
- - - -
m3 546,282.00 14.4 7,866,460.80 - 0.00 - 14.40 7,866,460.80
kg 3,001.00 1089.50 3,269,601.50 - 0.00 - 1,089.50 3,269,601.50
2.4 m3 23,078.00 245.7 5,670,264.60 - 0.00 - 245.70 5,670,264.60
6.4 m2 55,822.00 17.2 960,138.40 - 0.00 - 17.20 960,138.40
NP-07 m3 71,200.00 6.03 429,336.00 - 0.00 - 6.03 429,336.00
6.11 m3 280,116.00 0.86 240,899.76 - 0.00 - 0.86 240,899.76
4.1 m2 29,974.00 24 719,376.00 - 0.00 - 24.00 719,376.00
4.2 ml 33,984.00 10 339,840.00 - 0.00 - 10.00 339,840.00
4.12 ml 186,622.00 40 7,464,880.00 - 0.00 - 40.00 7,464,880.00
4.14 m3 612,654.00 - - 0.00 - - -
5.4 m3 66,093.00 106.84 7,061,149.32 - 0.00 - 106.84 7,061,149.32
2.9 m3 21,667.00 189.00 4,095,063.00 - 0.00 - 189.00 4,095,063.00
VALOR COSTOS DIRECTOS 501,405,814.00 $ 118,006,479.98 $ 63,449,677.61 $ 444,475,354.34 $ 562,481,834.32 $
ADMNISTRACION 22% 110,309,280.00 $ 25,961,426.00 $ 13,958,930.00 $ 97,784,578.00 $ 123,746,004.00 $
IMPREVISTOS 2% 10,028,116.00 $ 2,360,129.00 $ 1,268,993.00 $ 8,889,507.00 $ 11,249,636.00 $
UTILIDAD 6% 30,084,348.00 $ 7,080,388.00 $ 3,806,980.00 $ 26,668,521.00 $ 33,748,910.00 $
SUB TOTAL 651,814,358.00 $ 153,408,423.00 $ 82,484,581.00 $ 577,817,961.00 $ 731,226,385.00 $
AMORTIZACION DE ANTICIPO 40% 260,725,743.00 $ 29,598,558.00 $ 32,993,833.00 $ 231,127,185.00 $ 260,725,743.00 $
VALOR TOTAL A PAGAR PRESENTE ACTA (REDONDEADO AL PESO) 391,088,615.00 $ 123,809,865.00 $ 49,490,748.00 $ 346,690,776.00 $ 470,500,642.00 $
JAIME ARTURO RODRIGUEZ
REPRESENTANTE LEGAL
CONTRATISTA
ACTIVIDADES NO PREVISTAS
EXCAVACION MANUAL EN SUELO
Bordillo prefabricadoA-80(0.35x0.2x0.80m) (Incluye suministro e instalacion)
SUMINISTRO E INSTALACION DE ADOQUIN EN ARCILLA
CAJAS DE INSPECCION 80 X 80 X 1,5 - MURO DOBLE
EXCAVACION MECANICA EN ROCA+COMPRESOR+CARGUE Y RETIRO ZONA
PLANA
PMT Y PERMISOS
TOPOGRAFIA
Peldaos escalera contrahuella bordillo A-80 ( Incluye suministro e instalacin)
ESCALERA ACCESO PREDIO
SENDERO PEATONAL
SUMINISTRO E INSTALACION DE ADOQUIN EN ARCILLA
RECEBO B600 ( INLCUYE SUMINISTRO E INSTALACION)
RUBEN DARIO MUOZ QUINTERO
INTERVENTORIA Vbo SUPERVISOR FDLU
CONCRETO DE 4000 PSI PARA OBRAS DE DRENAJE SUPERFICIAL
RELLENO CON MATERIAL SELECCIONADO B-200
RETIRO DE ESCOMBROS PRODUCTO DE LAS EXCAVACIONES
SANDRA MONICA CARDOZO
RECEBO B600 ( INLCUYE SUMINISTRO E INSTALACION)
Suministro y colocacion de acero de refuerzo de 60000 PSI
EXCAVACION MANUAL EN SUELO
SOLADO EN CONCRETO DE RESISTENCIA 1500 PSI
Geodren Planar
TUBERIA PERFORADA DE 4"
DRENES DE PENETRACION
EXCAVACION MANUAL EN SUELO
ANCLAJES 1/4 " a 3/8" (Incluye suministro e instalacion)
BARANDA M80 (Incluye suministro e instalacion)
Concreto de 3000 PSI para estructuras de contencin (suministro e instalacin)
MURO ADICIONAL
SUMINISTRO E INSTALACION DE ADOQUIN EN ARCILLA
RECEBO B600 ( INLCUYE SUMINISTRO E INSTALACION)