MASTER DELIVERABLE LIST

SUBSTATION (SS)
DRAWING TITLE

PROVISION DRAWING NO

A
1
2
3
4
5
6
7
8
9
10

SUBSTATION SWITCHYARD
Single Line Diagram
Overall General Layout
Sectional View Drawing
Lightning Protection Zone (Lightning Rods Method)
Control Building Layout
Propose Earthing Latout
Typical Earthing Detail
Cabble Ladder Layout (Indoor Arrangement)
Typical Detail of Cable Support System
Multicore Cables Route Plan

HC-GBU/2014/003/SS/A01
HC-GBU/2014/003/SS/A02
HC-GBU/2014/003/SS/A03
HC-GBU/2014/003/SS/A04
HC-GBU/2014/003/SS/A05
HC-GBU/2014/003/SS/A06
HC-GBU/2014/003/SS/A07
HC-GBU/2014/003/SS/A08
HC-GBU/2014/003/SS/A09
HC-GBU/2014/003/SS/A10

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

PRIMARY EQUIPMENT
240MVA 275/132kV Auto Transformer
275kV Current Transformes (CT)
275kV Capacitive Voltage Transformers (CVT)
275kV Inductive Voltage Transformers (IVT)
275kV Current Transformers for Metering
275kV Inductive Voltage Transformer for Metering
275kV Circuit Breakers
275kV Surge Arrestors (SA)
275kV Disconnectors Parallel with Earthswitch
275kV Disconnectors Tandem Arrengement
132kV Current Transformers
132kV Capacitive Voltage Transformers
132kV Inductive Voltage Transformers
132kV Circuit Breakers
132kV Surge Arrestors
132kV Disconnectors Parallel with Earthswitch

HC-GBU/2014/003/SS/B01
HC-GBU/2014/003/SS/B02
HC-GBU/2014/003/SS/B03
HC-GBU/2014/003/SS/B04
HC-GBU/2014/003/SS/B05
HC-GBU/2014/003/SS/B06
HC-GBU/2014/003/SS/B07
HC-GBU/2014/003/SS/B08
HC-GBU/2014/003/SS/B09
HC-GBU/2014/003/SS/B10
HC-GBU/2014/003/SS/B11
HC-GBU/2014/003/SS/B12
HC-GBU/2014/003/SS/B13
HC-GBU/2014/003/SS/B14
HC-GBU/2014/003/SS/B15
HC-GBU/2014/003/SS/B16

17 132kV Disconnector Tandem Arrangement

HC-GBU/2014/003/SS/B17

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

SECONDARY EQUIPMENTS
240MVA 275/132kV Auto Transformer Secondary
275kV Conceptual Drawing
275/132kV Supervisory Interface Panel (SIP)
275/132kV Remote Terminal Unit (RTU)
275kV Remote Tap Change Controllers (RTCC)
275kV Conceptual Remote End
275kV Major Relay List
275kV Disconnector tendem arrangement secondary
275kV Line Disconnectors secondary
275kV Current Transformers secondary
275kV Capacitive Voltage Transformers Secondary
275kV Inductive Voltage Transformers Secondary
275kV Metering Panel Drawings
132kV Conceptual Drawing
132kV Conceptual Remote End
132kV Major Relay List
132kV Disconnectors tandem arrangement secondary
132kV Line Disconnectors secondary
132kV Substation Layout for Secondary
132kV Current Transformers Secondary
132kV Capacitive Voltage Transformers Secondary
132kV Inductive Voltage Transformers Secondary

PROVISION DRAWING NO

HC-GBU/2014/003/SS/C01
HC-GBU/2014/003/SS/C02
HC-GBU/2014/003/SS/C03
HC-GBU/2014/003/SS/C04
HC-GBU/2014/003/SS/C05
HC-GBU/2014/003/SS/C06
HC-GBU/2014/003/SS/C07
HC-GBU/2014/003/SS/C08
HC-GBU/2014/003/SS/C09
HC-GBU/2014/003/SS/C10
HC-GBU/2014/003/SS/C11
HC-GBU/2014/003/SS/C12
HC-GBU/2014/003/SS/C13
HC-GBU/2014/003/SS/C14
HC-GBU/2014/003/SS/C15
HC-GBU/2014/003/SS/C16
HC-GBU/2014/003/SS/C17
HC-GBU/2014/003/SS/C18
HC-GBU/2014/003/SS/C19
HC-GBU/2014/003/SS/C20
HC-GBU/2014/003/SS/C21
HC-GBU/2014/003/SS/C22

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

ANCILLARY EQUIPMENT
415 LVAC System
275kV Marshalling Kiosks
275kV 3-phase Tubular Aluminium Busbars
275kV 3-phase Aluminium Conductors
275kV 3-phase Rigid Aluminium Tubular Conductors
275kV Post Insulators
275kV Fittings
275kV Disc Insulator
275kV Connector and Clamp
132kV Marshalling Kiosks
132kV 3-phase Tubular Aluminium Busbars
132kV 3-phase Aluminium Conductors
132kV 3-phase Rigid Aluminium Tubular Conductors
132kV Post Insulators
132kV Fittings
132kV Disc Insulators
132kV Connector and Clamp
Local Transformer
Neutral Current Transformer
Neutral Earthing Resistor
Lightning Rods
Multicore Cables
1Cx630mmsq Power Cable + Aux. Power Cable

PROVISION DRAWING NO

HC-GBU/2014/003/SS/D01
HC-GBU/2014/003/SS/D02
HC-GBU/2014/003/SS/D03
HC-GBU/2014/003/SS/D04
HC-GBU/2014/003/SS/D05
HC-GBU/2014/003/SS/D06
HC-GBU/2014/003/SS/D07
HC-GBU/2014/003/SS/D08
HC-GBU/2014/003/SS/D09
HC-GBU/2014/003/SS/D10
HC-GBU/2014/003/SS/D11
HC-GBU/2014/003/SS/D12
HC-GBU/2014/003/SS/D13
HC-GBU/2014/003/SS/D14
HC-GBU/2014/003/SS/D15
HC-GBU/2014/003/SS/D16
HC-GBU/2014/003/SS/D17
HC-GBU/2014/003/SS/D18
HC-GBU/2014/003/SS/D19
HC-GBU/2014/003/SS/D20
HC-GBU/2014/003/SS/D21
HC-GBU/2014/003/SS/D22
HC-GBU/2014/003/SS/D23

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
F
1
2
3
4

PROVISION DRAWING NO

STEEL STRUCTURES
275kV Steel Support Structure for CVT
275kV Steel Support Structure for CT
275kV Steel Support Structure for IVT
275kV Steel Support Structure for CB
275kV Steel Support Structure for Isulator (Parallel)
275kV Steel Support Structure for Isulator (Tandem)
275kV Steel Support Structure for SA
275kV Steel Support Structure for Gantry
275kV Steel Support Structure for Busbar
275kV Steel Support Structure for CVT
132kV Steel Support Structure for CT
132kV Steel Support Structure for IVT
132kV Steel Support Structure for CB
132kV Steel Support Structure for Isolator (Parallel)
132kV Steel Support Structure for Isolator (Tandem)
132kV Steel Support Structure for SA
132kV Steel Support Structure for Gantry
132kV Steel Support Structure for Busbar
ANCHOR BOLT M32x1000 C/W 3 MUTS & 2 WASHERS
ANCHOR BOLT M24x750 C/W 3 MUTS & 2 WASHERS

HC-GBU/2014/003/SS/E01
HC-GBU/2014/003/SS/E02
HC-GBU/2014/003/SS/E03
HC-GBU/2014/003/SS/E04
HC-GBU/2014/003/SS/E05
HC-GBU/2014/003/SS/E06
HC-GBU/2014/003/SS/E07
HC-GBU/2014/003/SS/E08
HC-GBU/2014/003/SS/E09
HC-GBU/2014/003/SS/E10
HC-GBU/2014/003/SS/E11
HC-GBU/2014/003/SS/E12
HC-GBU/2014/003/SS/E13
HC-GBU/2014/003/SS/E14
HC-GBU/2014/003/SS/E15
HC-GBU/2014/003/SS/E16
HC-GBU/2014/003/SS/E17
HC-GBU/2014/003/SS/E18
HC-GBU/2014/003/SS/E19
HC-GBU/2014/003/SS/E20

DESIGN CALCULATION
275kV CT & VT Calculation
132kV CT & VT Calculation
Earthing System Calculation
Steel Structure

HC-GBU/2014/003/SS/D01
HC-GBU/2014/003/SS/D02
HC-GBU/2014/003/SS/D03
HC-GBU/2014/003/SS/D04

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE
G
1
2
3

CIVIL
Pre Comp Survey
General Layout
Propose Soil Investigation Location

PROVISION DRAWING NO

HC-GBU/2014/003/SS/G/01
HC-GBU/2014/003/SS/G/02
HC-GBU/2014/003/SS/G/03

G1
1
2
3
4
5
6
7
8
9
10
11

ARCHITECTURE
Site Plan
HC-GBU/2014/003/SS/G1/01
Ground Floor Plan
HC-GBU/2014/003/SS/G1/02
First Floor Plan
HC-GBU/2014/003/SS/G1/03
Roof Plan
HC-GBU/2014/003/SS/G1/04
Front and Rear Plan
HC-GBU/2014/003/SS/G1/05
Left and Right Plan
HC-GBU/2014/003/SS/G1/06
Section A-A and B-B
HC-GBU/2014/003/SS/G1/07
Window Detail
HC-GBU/2014/003/SS/G1/08
Door Detail
HC-GBU/2014/003/SS/G1/09
Staircase 1&2 Details, Detachable & Fixed Steel Pipe Raili HC-GBU/2014/003/SS/G1/10
Staircase Details
HC-GBU/2014/003/SS/G1/11

G2
1
2
3
4

EARTHWORKS
Earthwork Layout
Crossection AA & B-B
Key Plan, Site Plan Location Plan
Wash Through

G3 ROAD AND DRAINAGE


1 Key Plan, Site Plan Location Plan
2 Detail for premix work & Detail for drainage

HC-GBU/2014/003/SS/G2/01
HC-GBU/2014/003/SS/G2/02
HC-GBU/2014/003/SS/G2/03
HC-GBU/2014/003/SS/G2/04

HC-GBU/2014/003/SS/G3/01
HC-GBU/2014/003/SS/G3/02

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE

PROVISION DRAWING NO

G4
1
2
3

GUARD HOUSE
Guard house Layout
Architecture - Guard House
Guard House Details

G5
1
2
3
4
5
6

SANITARY
Toilet & Battery Room Layout
HC-GBU/2014/003/SS/G5/01
Manhole, Bedding & Floor Trap Detail
HC-GBU/2014/003/SS/G5/02
Toilet & Battery Room Diagramatic
HC-GBU/2014/003/SS/G5/03
Details Of Anchor Blocks Pillar Hydrant & Precast ConcreteHC-GBU/2014/003/SS/G5/04
Details Of Fire Hydrant
HC-GBU/2014/003/SS/G5/05
Water Rectuculation
HC-GBU/2014/003/SS/G5/06

G6
1
2
3
4
5
6
7
8
9

STRUCTURE
Pile Cap & Column Layout Plan
Column Schedule
Ground Slab Detail
Ground Beam Layout
Ground Beam Detail
1st Floor Slab Detail
1st Floor Beam Layout
1st Floor Beam Detail
Roof Beam

HC-GBU/2014/003/SS/G6/01
HC-GBU/2014/003/SS/G6/02
HC-GBU/2014/003/SS/G6/03
HC-GBU/2014/003/SS/G6/04
HC-GBU/2014/003/SS/G6/05
HC-GBU/2014/003/SS/G6/06
HC-GBU/2014/003/SS/G6/07
HC-GBU/2014/003/SS/G6/08
HC-GBU/2014/003/SS/G6/09

G7
1
2
3

SWITCHYARD
Switchyard Piling Layout Plan
Pile Cap Detail 1
Pile Cap Detail 2

HC-GBU/2014/003/SS/G7/01
HC-GBU/2014/003/SS/G7/02
HC-GBU/2014/003/SS/G7/03

HC-GBU/2014/003/SS/G4/01
HC-GBU/2014/003/SS/G4/02
HC-GBU/2014/003/SS/G4/03

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE

PROVISION DRAWING NO

G8
1
2
3
4

MECHANICAL & ELECTRICAL SERVICES


External Compound Lighting Layout
Lighting And Power Layout Cable Celler
Lighting And Power Layout First Floor
Main Schematic Diagram

HC-GBU/2014/003/SS/G8/01
HC-GBU/2014/003/SS/G8/02
HC-GBU/2014/003/SS/G8/03
HC-GBU/2014/003/SS/G8/04

G9
1
2
3
4

FIRE FIGHTING SERVICES


Key Plan
Fire Protection System Cable Cellar
Fire Protection System First Floor
Fire Protection Schematic Dragramme

HC-GBU/2014/003/SS/G9/01
HC-GBU/2014/003/SS/G9/02
HC-GBU/2014/003/SS/G9/03
HC-GBU/2014/003/SS/G9/04

G10
1
2
3
4

AIR COND AND VENTILATION SYSTEM


Air-Condition Layout And Schematic Single Line Diagram HC-GBU/2014/003/SS/G10/01
Air-Cond Layout Cable Cellar
HC-GBU/2014/003/SS/G10/02
Air-Cond Layout First Floor
HC-GBU/2014/003/SS/G10/03
Air-Cond Schematic Diagram
HC-GBU/2014/003/SS/G10/04

G11 LIGHTNING PROTECTION SERVICES


1 Lightning Protection System And Detail

HC-GBU/2014/003/SS/G11/01

G12
1
2
3

HC-GBU/2014/003/SS/G12/01
HC-GBU/2014/003/SS/G12/02
HC-GBU/2014/003/SS/G12/03

TELEPHONE SERVICES
Showing External Tel. Manhole And Schematic Diagram
Telephone Installation
Intercom

G13 FENCING
Detail Fencing
G14 TRUSSES

HC-GBU/2014/003/SS/G13/01

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

MASTER DELIVERABLE LIST


SUBSTATION (SS)
DRAWING TITLE
1

TRUSSES

PROVISION DRAWING NO
HC-GBU/2014/003/SS/G14/01

1 ST
PLANNED
SUBMISSION SUBMISSION RETURNED

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

2 ND
SUBMISSION

RETURNED

STATUS

You might also like