Symbiosis Institute of Technology

SIT

Branch: Civil Engineering

Batch: 2012 - 2016

Semester-VII

Course Code - 070121704CE


Course Name Internship
Credit Points
4

Teaching Hrs/Week
-

Practical Hrs/Week
8

Objective

The objective of the Industrial Visit is to help students gain


first hand information regarding functioning of the civil
engineering Industry.

Prerequisites

Practical / Term work


The students should visit at least six project sites in all during Semester VII. The sites
should be selected in such a way that during various visits, they should be able to
observe/study. Most of the activities related to building construction like, concreting of
footings and columns, bar bending, concreting of slab, flooring, plastering, plumbing,
painting, cladding, False ceiling air conditioning. And at least four of the following :
i.
structural steel fabrication and erection
ii.
Ground improvement methods (Grouting / geosynthetics/reinforcement)
iii.
Tunneling by conventional method or by TBM
iv.
Cassion foundations and piling.
v.
Asphalt laying and concreting of roads.
vi.
Ready mix concrete plant and ready mix asphalt plant.
vii.
Earth work for dam or transport project.
viii. Fabrication and accretion of pre-cast concrete elements.
ix.
Mass concreting (roller compacted concrete, hot weather concrete cold
weather concrete / under water concrete)
x.
Mechanized canal construction (excavation, leveling and lining)
xi.
Repairs, rehabilitation works
xii.
Pre-stressing
The students are expected to observe method of work, operation involved, tools used
quality checks, site layouts, productivity of workmen, gang size, equipment used etc.
The student shall prepare and submit detail report for every site visited during
semester VII at the time of Oral examination to be conducted at the end of semester
VII the report should clearly indicate observations made during such visits
supplemented with ample sketches / drawings.

070121704CE, Internship

Page 1 of 2

Symbiosis Institute of Technology

Examination Scheme

070121704CE, Internship

Internal Assessment 150 marks

SIT

Visit Report (100Marks) +


Viva (50marks)

Page 2 of 2