ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Electrical Transient Analyzer Program


ETAP PowerStation

Load Flow Analysis


Loading Category:

Design

Load Diversity Factor:

None

Swing

Generator

Load

Total

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

Number of Buses:

Number of Branches:

Method of Solution:

Gauss-Seidel Method

Maximum No. of Iteration:

2000

Precision of Solution:

0.000001

Load Flow Acceleration Factor:

1.45

System Frequency:

60.00

Unit System:

English

Project Filename:

low

Output Filename:

C:\ETAP 400\PowerStation\low\Untitled.lf1

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS Input Data

Bus
ID

Initial Voltage
Type

kV

% Mag.

Ang.

Generator
MW

Motor Load

Mvar

MW

Mvar

Static Load
MW

Mvar

Bus1

Swing

1.000

100.0

0.0

Bus 2

Gen.

0.980

102.0

0.0

15.001

9.999

Bus 3

Load

0.880

100.0

0.0

44.999

20.001

Bus 4

Load

0.869

100.0

0.0

44.999

20.001

Bus 5

Load

0.875

100.0

0.0

49.999

25.003

154.998

75.004

Total Nunmber of Buses: 5

0.000

0.000

0.000

0.000

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LINE / CABLE Input Data


Line/Cable
ID

Ohms or Mohs / 1000 ft per Conductor (Cable) or per Phase (Line)


Library

Size

Length(ft)

#/Phase

T (C)

Line1

100.0

75

20.000000

40.000000

20.0000000

Line2

100.0

75

40.000000

200.000000

20.0000000

Line3

100.0

75

20.000000

60.000000

10.0000000

Line4

100.0

75

150.000000

400.000000

25.0000000

Line5

100.0

75

20.000000

40.000000

10.0000000

Line6

100.0

75

80.000000

200.000000

20.0000000

Line / Cable resistances are listed at the specified temperatures.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH CONNECTIONS
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

Line1

Line

Bus1

Bus 2

20000.00

40000.00

44721.36

2.0000000

Line2

Line

Bus 2

Bus 3

40000.00

200000.00

203960.78

2.0000000

Line3

Line

Bus 3

Bus 4

20000.00

60000.00

63245.55

1.0000000

Line4

Line

Bus 5

Bus 3

150000.00

400000.00

427200.19

2.5000000

Line5

Line

Bus 5

Bus 4

20000.00

40000.00

44721.36

1.0000000

Line6

Line

Bus1

Bus 5

80000.00

200000.00

215406.59

2.0000000

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE Input Data


O/L
Equipment Cable
ID

Equipment
ID

ohms / 1000 ft per Conductor


Type

Library

Size

L(ft)

#/ph

T (C)

Heater
R

R (ohm)

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT

Bus
ID
* Bus1

Voltage
kV

%Mag.

1.000

100.000

Generation

Ang.
0.0

MW

Mvar

0.12

Motor Load

Static Load

MW

MW

-1.76

Mvar
0

Load Flow

Mvar
0

ID
0

Bus 2

0.980

1.271

-34.6

0.00

0.00

Bus 3

0.880

0.001

-91.5

Bus 4

0.869

0.000

-84.0

Bus 5

0.875

0.074

-43.4

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

MW

XFMR
Mvar

Amp

%PF

Bus 2

0.10

-0.80

467

Bus 5

0.02

-0.96

553

-1.8

Bus1

0.00

0.00

131

85.6

Bus 3

0.00

0.00

0.0

Bus 2

0.00

0.00

0.0

Bus 4

0.00

0.00

0.0

Bus 5

0.00

0.00

0.0

Bus 3

0.00

0.00

0.0

Bus 5

0.00

0.00

0.0

Bus 3

0.00

0.00

0.0

Bus 4

0.00

0.00

0.0

Bus1

0.00

0.00

27

0.0

-12.4

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS LOADING Summary Report

Bus
ID

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

Bus1

1.000

0.118

-1.760

1.764

-6.7

1018.22

Bus 2

0.980

0.002

0.002

0.003

83.2

135.02

Bus 3

0.880

0.000

0.000

0.000

91.4

0.37

Bus 4

0.869

0.000

0.000

0.000

91.4

0.08

Bus 5

0.875

0.000

0.000

0.000

89.5

27.20

% Loading

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOADING Summary Report

Transformer
Cable & Reactor

CKT / Branch
ID

Type

Ampacity
(Amp)

* Indicates a branch with operating load exceeding the branch capability

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)
MVA

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOSSES Summary Report

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
To

Vd
% Drop
in Vmag

Kvar

From

Line1

0.100

-0.803

-0.002

-0.001

98.0

-804.2

100.0

1.3

98.75

Line6

0.017

-0.957

0.000

0.000

17.2

-956.9

100.0

0.1

99.94

Line2

0.000

0.000

0.000

0.000

0.0

-0.1

1.3

0.0

1.27

Line3

0.000

0.000

0.000

0.000

0.0

0.0

0.0

0.0

0.00

Line4

0.000

0.000

0.000

0.000

0.0

0.0

0.0

0.1

0.07

Line5

0.000

0.000

0.000

0.000

0.0

0.0

0.0

0.1

0.07

115.2

-1761.3

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

10

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE LOSSES Summary Report

Equipment Cable

Connected

ID

Load Type

Losses
kW

% Voltage
kvar

Bus

Load

Vd
% Drop
in Vmag

Vst
% for
Motor

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

Page:

11

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device

Bus Voltage
OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)

Critical Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

Bus 2

Bus

0.980

kV

0.012

1.3

UnderVoltage

Bus 5

Bus

0.875

kV

0.001

0.1

UnderVoltage

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
low

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Swing Bus(es):

0.118

-1.760

1.764

6.67 Leading

Generators:

0.000

0.000

0.000

100.00 Lagging

Total Demand:

0.118

-1.760

1.764

6.67 Leading

Total Motor Load:

0.000

0.000

0.000

100.00 Lagging

Total Static Load:

0.002

0.002

Apparent Losses:

0.115

-1.761

System Mismatch:

0.000

0.000

Number of Iterations: 38

Page:

12

Date:

04-02-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal