Professional Documents
Culture Documents
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Design
None
Swing
Generator
Load
Total
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
Number of Buses:
Number of Branches:
Method of Solution:
Gauss-Seidel Method
2000
Precision of Solution:
0.000001
1.45
System Frequency:
60.00
Unit System:
English
Project Filename:
low
Output Filename:
C:\ETAP 400\PowerStation\low\Untitled.lf1
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Initial Voltage
Type
kV
% Mag.
Ang.
Generator
MW
Motor Load
Mvar
MW
Mvar
Static Load
MW
Mvar
Bus1
Swing
1.000
100.0
0.0
Bus 2
Gen.
0.980
102.0
0.0
15.001
9.999
Bus 3
Load
0.880
100.0
0.0
44.999
20.001
Bus 4
Load
0.869
100.0
0.0
44.999
20.001
Bus 5
Load
0.875
100.0
0.0
49.999
25.003
154.998
75.004
0.000
0.000
0.000
0.000
Mvar Limits
Max.
Min.
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Size
Length(ft)
#/Phase
T (C)
Line1
100.0
75
20.000000
40.000000
20.0000000
Line2
100.0
75
40.000000
200.000000
20.0000000
Line3
100.0
75
20.000000
60.000000
10.0000000
Line4
100.0
75
150.000000
400.000000
25.0000000
Line5
100.0
75
20.000000
40.000000
10.0000000
Line6
100.0
75
80.000000
200.000000
20.0000000
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
BRANCH CONNECTIONS
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Line1
Line
Bus1
Bus 2
20000.00
40000.00
44721.36
2.0000000
Line2
Line
Bus 2
Bus 3
40000.00
200000.00
203960.78
2.0000000
Line3
Line
Bus 3
Bus 4
20000.00
60000.00
63245.55
1.0000000
Line4
Line
Bus 5
Bus 3
150000.00
400000.00
427200.19
2.5000000
Line5
Line
Bus 5
Bus 4
20000.00
40000.00
44721.36
1.0000000
Line6
Line
Bus1
Bus 5
80000.00
200000.00
215406.59
2.0000000
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment
ID
Library
Size
L(ft)
#/ph
T (C)
Heater
R
R (ohm)
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
* Bus1
Voltage
kV
%Mag.
1.000
100.000
Generation
Ang.
0.0
MW
Mvar
0.12
Motor Load
Static Load
MW
MW
-1.76
Mvar
0
Load Flow
Mvar
0
ID
0
Bus 2
0.980
1.271
-34.6
0.00
0.00
Bus 3
0.880
0.001
-91.5
Bus 4
0.869
0.000
-84.0
Bus 5
0.875
0.074
-43.4
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
MW
XFMR
Mvar
Amp
%PF
Bus 2
0.10
-0.80
467
Bus 5
0.02
-0.96
553
-1.8
Bus1
0.00
0.00
131
85.6
Bus 3
0.00
0.00
0.0
Bus 2
0.00
0.00
0.0
Bus 4
0.00
0.00
0.0
Bus 5
0.00
0.00
0.0
Bus 3
0.00
0.00
0.0
Bus 5
0.00
0.00
0.0
Bus 3
0.00
0.00
0.0
Bus 4
0.00
0.00
0.0
Bus1
0.00
0.00
27
0.0
-12.4
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Rated Amp
MW
Mvar
MVA
% PF
Amp
Bus1
1.000
0.118
-1.760
1.764
-6.7
1018.22
Bus 2
0.980
0.002
0.002
0.003
83.2
135.02
Bus 3
0.880
0.000
0.000
0.000
91.4
0.37
Bus 4
0.869
0.000
0.000
0.000
91.4
0.08
Bus 5
0.875
0.000
0.000
0.000
89.5
27.20
% Loading
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Transformer
Cable & Reactor
CKT / Branch
ID
Type
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
CKT / Branch
ID
Mvar
Mvar
Losses
kW
% Bus Voltage
To
Vd
% Drop
in Vmag
Kvar
From
Line1
0.100
-0.803
-0.002
-0.001
98.0
-804.2
100.0
1.3
98.75
Line6
0.017
-0.957
0.000
0.000
17.2
-956.9
100.0
0.1
99.94
Line2
0.000
0.000
0.000
0.000
0.0
-0.1
1.3
0.0
1.27
Line3
0.000
0.000
0.000
0.000
0.0
0.0
0.0
0.0
0.00
Line4
0.000
0.000
0.000
0.000
0.0
0.0
0.0
0.1
0.07
Line5
0.000
0.000
0.000
0.000
0.0
0.0
0.0
0.1
0.07
115.2
-1761.3
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
10
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment Cable
Connected
ID
Load Type
Losses
kW
% Voltage
kvar
Bus
Load
Vd
% Drop
in Vmag
Vst
% for
Motor
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
Page:
11
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Marginal
Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device
Bus Voltage
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)
Critical Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
Bus 2
Bus
0.980
kV
0.012
1.3
UnderVoltage
Bus 5
Bus
0.875
kV
0.001
0.1
UnderVoltage
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
low
MW
Mvar
MVA
% PF
Swing Bus(es):
0.118
-1.760
1.764
6.67 Leading
Generators:
0.000
0.000
0.000
100.00 Lagging
Total Demand:
0.118
-1.760
1.764
6.67 Leading
0.000
0.000
0.000
100.00 Lagging
0.002
0.002
Apparent Losses:
0.115
-1.761
System Mismatch:
0.000
0.000
Number of Iterations: 38
Page:
12
Date:
04-02-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal