Terbilang : Empat Ratus Enam Puluh Empat Juta Tujuh Ratus Dua Puluh Enam Ribu Rupiah
Total
PPN 10 %
Jumlah
Dibulatkan
AYA
KS DAN PELABUHAN
JUMLAH HARGA
15,303,586.00
123,101,783.78
153,264,305.71
130,808,894.84
422,478,570.33
42,247,857.03
464,726,427.36
464,726,000.00
Muzakir
Wakil Direktur
Item Pekerjaan
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Direksi Keed / Gudang Material ( sewa )
3 Pemasangan Bauplank Seluruh Bangunan
4 Pembersihan Akhir
5 Administrasi
Item Pekerjaan
II
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
III
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
IV
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
VI
PEKERJAAN BETON
1 Sloop 20/20
2 Kolom 20/20
3 Balok 20/25
4 Plat Daag T = 10 cm
VII
PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VIII
PEKERJAAN PENGECATAN
1 Pengcatan dinding bata
2 Pengecatan Plafond Plat Daag
Item Pekerjaan
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
II
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
III
IV
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
PEKERJAAN BETON
1 Sloop 20/20
2 Kolom 20/20
3 Balok 15/30
4 Plat Daag T = 10 cm
VI
PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VII
PEKERJAAN PENGECATAN
1 Pengcatan Kolom dan Balok
Item Pekerjaan
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
II
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
III
IV
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
PEKERJAAN BETON
1 Sloop 20/25
2 Kolom 25/25
3 Balok 20/25
4 Plat Daag T = 10 cm
VI
PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VII
PEKERJAAN PENGECATAN
1 Pengcatan kolom dan Balok
2 Pengecatan Plafond Plat Daag
3 Pengecatan Listplank
VIII
1.00
1.00
1.00
1.00
1.00
Satuan
Analisa
Unit
Unit
Ls
Ls
Unit
A4
taksir
taksir
taksir
taksir
Harga ( Rp. )
803,586.00
5,000,000.00
5,000,000.00
2,000,000.00
2,500,000.00
Total
JUMLAH TOTAL
Satuan
Analisa
22.96
1.64
7.65
m
m
m
SNI 6.2
A18
16.25
11.07
3.28
m
m
m
117,358.00
660,832.00
299,727.00
Total
28.40
79.30
12.00
m
m
bh
106,492.00
40,315.00
1,820,000.00
Total
7.35
5.88
m
m
A18
MOD A18
SNI 6.9
Harga ( Rp. )
40,186.00
151,100.00
14,653.00
Total
151,100.00
101,180.00
7.35
SNI DT-91-0008-2007-6.8
978,073.00
Total
1.64
1.68
2.58
7.35
m
m
m
m
Supl. Vc1
Supl. Vc3
Supl. Vc2
SNI 6.8 2007
5,242,031.00
5,689,047.00
4,986,839.00
3,897,616.00
Total
3.00
1.00
bh
bh
taksir
taksir
2,000,000.00
163,300.00
Total
192.20
73.50
m
m
SNI 6.14
SNI 6.9
30,586.00
40,108.00
Total
JUMLAH TOTAL
Satuan
Analisa
Harga ( Rp. )
32.48
2.32
10.83
m
m
m
SNI 6.2
A18
SNI 6.9
40,186.00
151,100.00
14,653.00
Total
41.60
15.66
4.64
m
m
m
117,358.00
660,832.00
299,727.00
Total
10.20
31.90
18.00
m
m
bh
117,358.00
40,315.00
1,820,000.00
Total
9.60
7.68
9.60
m
m
m
A18
MOD A18
SNI DT-91-0008-2007-6.8
151,100.00
101,180.00
978,073.00
Total
2.32
2.81
2.61
8.32
m
m
m
m
Supl. Vc1
Supl. Vc3
Supl. Vc2
SNI 6.8 2007
5,242,031.00
5,689,047.00
4,986,839.00
3,897,616.00
Total
4.00
1.00
bh
bh
taksir
taksir
2,000,000.00
163,300.00
Total
94.04
SNI 6.14
30,586.00
83.20
SNI 6.9
40,108.00
Total
JUMLAH TOTAL
Satuan
Analisa
Harga ( Rp. )
17.60
1.76
5.87
m
m
m
SNI 6.2
A18
SNI 6.9
40,186.00
151,100.00
14,653.00
Total
68.21
20.54
3.52
m
m
m
117,358.00
660,832.00
299,727.00
Total
43.25
40,315.00
Total
8.05
39.45
8.05
m
m
m
A18
MOD A18
SNI DT-91-0008-2007-6.8
151,100.00
101,180.00
978,073.00
Total
2.38
1.50
2.38
8.05
m
m
m
m
Supl. Vc1
Supl. Vc3
Supl. Vc2
SNI 6.8 2007
5,242,031.00
5,689,047.00
4,986,839.00
3,897,616.00
Total
3.00
1.00
bh
bh
taksir
taksir
2,000,000.00
163,300.00
Total
43.25
80.50
16.88
m
m
m
SNI 6.14
SNI 6.9
SNI 6.9
30,586.00
40,108.00
40,108.00
Total
4.62
4.62
92.48
13.87
7.91
m
m
m
m
m
SNI DT-91-0008-2007-6.1
A18
Anl. Supl G.2
MOD A18
Anl. Supl G.1
95,005.00
151,100.00
146,791.00
101,180.00
66,951.00
Total
JUMLAH TOTAL
Jumlah ( Rp. )
803,586.00
5,000,000.00
5,000,000.00
2,000,000.00
2,500,000.00
15,303,586.00
15,303,586.00
Jumlah ( Rp. )
922,670.56
247,804.00
112,095.45
1,282,570.01
1,907,067.50
7,315,410.24
983,104.56
10,205,582.30
3,024,372.80
3,196,979.50
21,840,000.00
28,061,352.30
1,110,585.00
594,938.40
7,188,836.55
8,894,359.95
8,596,930.84
9,557,598.96
12,866,044.62
28,647,477.60
59,668,052.02
6,000,000.00
163,300.00
6,163,300.00
5,878,629.20
2,947,938.00
8,826,567.20
123,101,783.78
Jumlah ( Rp. )
1,305,241.28
350,552.00
158,691.99
1,814,485.27
4,882,092.80
10,348,629.12
1,390,733.28
16,621,455.20
1,197,051.60
1,286,048.50
32,760,000.00
35,243,100.10
1,450,560.00
777,062.40
9,389,500.80
11,617,123.20
12,161,511.92
15,986,222.07
13,015,649.79
32,428,165.12
73,591,548.90
8,000,000.00
163,300.00
8,163,300.00
2,876,307.44
3,336,985.60
6,213,293.04
153,264,305.71
Jumlah ( Rp. )
707,273.60
265,936.00
86,013.11
1,059,222.71
8,004,989.18
13,573,489.28
1,055,039.04
22,633,517.50
1,743,623.75
1,743,623.75
1,216,355.00
3,991,551.00
7,873,487.65
13,081,393.65
12,476,033.78
8,533,570.50
11,868,676.82
31,375,808.80
64,254,089.90
6,000,000.00
163,300.00
6,163,300.00
1,322,844.50
3,228,694.00
677,023.04
5,228,561.54
438,923.10
698,082.00
13,575,231.68
1,403,366.60
529,582.41
16,645,185.79
130,808,894.84
JADUAL PELAKSANAAN
NAMA KEGIATAN
LOKASI
TAHUN ANGGARAN
No.
422,478,570.33
Item Pekerjaan
Bobot (%)
BULAN I
1
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Direksi Keed / Gudang Material ( sewa )
3 Pemasangan Bauplank Seluruh Bangunan
4 Pembersihan Akhir
5 Administrasi
PEMBANGUNAN TEMPAT PARKIR RODA 4 KANTOR BPKS
II
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
III
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
IV
PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Bata Atas Balok 1PC : 4 Ps
2 Plasteran Dinding dan Balok
3 Relief Tiang Kolom
V
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
VI
PEKERJAAN BETON
1 Sloop 20/20
2 Kolom 20/20
3 Balok 20/25
4 Plat Daag T = 10 cm
VII PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VIII PEKERJAAN PENGECATAN
1 Pengecatan dinding bata
2 Pengecatan Plafond Plat Daag
PEMBANGUNAN TEMPAT PARKIR RODA 2 KANTOR BPKS
I
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
10
11
12
13
14
15
16
17
18
19
0.19
1.18
1.18
0.47
0.59
0.22
0.06
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.08
0.08
0.08
0.08
0.08
0.08
0.01
0.01
0.01
0.01
0.01
0.01
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.05
0.05
0.05
0.05
0.03
0.03
0.45
1.73
0.23
0.01
0.01
0.01
0.01
0.01
0.11
0.25
0.12
0.25
0.25
0.25
0.12
0.72
0.76
5.17
0.26
0.14
1.70
2.03
2.26
3.05
6.78
0.41
1.42
0.04
1.39
0.70
0.31
0.08
0.04
0.05
0.05
0.05
0.05
0.05
0.05
0.04
0.04
II
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
III
PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Bata 1PC : 2 Ps
2 Plasteran Balok
3 Relief Tiang Kolom
IV
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
V
PEKERJAAN BETON
1 Sloop 20/20
2 Kolom 20/20
3 Balok 15/30
4 Plat Daag T = 10 cm
VI
PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VII PEKERJAAN PENGECATAN
1 Pengcatan Kolom dan Balok
2 Pengecatan Plafond Plat Daag
PEMBANGUNAN TEMPAT PARKIR RODA 4 RUMAH PIMPINAN
I
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
II
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
III
PEKERJAAN PASANGAN DAN PLASTERAN
1 Plasteran Kolom dan Balok
IV
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
V
PEKERJAAN BETON
1 Sloop 20/25
2 Kolom 25/25
3 Balok 20/25
4 Plat Daag T = 10 cm
VI
PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VII PEKERJAAN PENGECATAN
1 Pengcatan kolom dan Balok
2 Pengecatan Plafond Plat Daag
3 Pengecatan Listplank
VIII PEKERJAAN PAVING BLOCK
1 Cor beton bawah pas. Paving block
1.16
2.45
0.33
0.27
0.16
0.16
0.04
0.04
0.27
0.27
0.27
0.32
0.32
0.32
0.28
0.30
7.75
0.34
0.18
2.22
2.88
3.78
3.08
7.68
1.89
0.04
0.68
0.79
0.17
0.06
0.02
1.89
3.21
0.25
0.41
0.29
0.94
1.86
2.95
2.02
2.81
7.43
1.42
0.04
0.31
0.76
0.16
0.10
0.04
0.04
0.06
0.25
0.17
3.21
0.33
0.13
0.17
0.17
0.17
100.00
Rencana
Komulatif Rencana
Realisasi
Komulatif Realisasi
Deviasi
0.12
0.12
0.12
0.12
0.12
0.12
0.24
0.24
0.24
0.24
0.35
0.35
0.42
0.42
0.42
1.26
1.01
1.01
1.53
0.12
0.25
0.37
0.50
0.62
0.74
0.99
1.23
1.47
1.71
2.05
2.40
2.82
3.23
3.66
4.91
5.93
6.94
8.48
BULAN II
20
0.01
21
0.01
22
0.01
23
0.01
24
0.01
25
0.01
26
0.01
27
0.01
28
0.01
29
0.01
30
0.01
31
0.01
32
0.01
33
0.01
34
0.01
35
0.01
36
0.01
37
0.01
38
0.01
39
0.01
40
0.01
41
0.01
42
0.01
43
0.01
44
0.01
45
0.01
46
0.01
47
0.01
48
0.01
49
0.01
50
51
52
53
54
0.01
0.01
0.01
0.01
0.01
0.14
0.14
0.14
0.14
0.14
0.15
0.15
0.14
0.14
0.03
0.11
0.11
0.11
0.25
0.25
0.25
0.13
0.07
0.41
0.13
0.07
0.41
0.41
0.41
0.32
0.32
0.85
0.85
0.32
0.32
0.32
0.32
0.32
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.14
0.04
0.04
0.14
0.23
0.23
0.23
0.23
0.23
0.27
0.27
0.27
0.27
0.27
0.09
0.09
0.09
0.10
0.10
0.39
0.17
0.09
0.72
0.72
0.17
0.09
0.72
0.74
0.74
0.74
0.54
0.54
0.54
0.72
0.54
0.54
0.54
0.54
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.55
0.24
0.24
0.24
0.41
0.41
0.41
0.18
0.18
0.04
0.02
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.14
0.14
0.62
0.62
0.62
0.29
0.29
0.29
0.47
0.74
0.74
0.47
0.74
0.74
0.29
0.29
0.29
0.29
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.04
0.03
0.03
0.03
0.36
0.36
0.36
0.36
0.36
0.36
0.36
0.36
0.36
0.03
0.03
0.03
0.03
0.03
2.42
3.57
4.60
5.18
4.84
4.40
3.52
2.16
1.52
1.65
1.55
1.55
1.31
1.31
1.28
1.28
1.33
1.44
1.44
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.45
1.15
0.84
1.08
1.47
1.76
10.90
14.47
19.07
24.25
29.09
33.50
37.01
39.17
40.69
42.34
43.90
45.45
46.76
48.07
49.36
50.64
51.97
53.42
54.86
56.31
57.76
59.22
60.67
62.12
63.58
65.03
66.48
67.93
69.39
70.84
71.99
72.83
73.91
75.37
77.13
BULAN III
55
56
57
0.01
0.01
0.01
0.15
0.15
0.15
0.32
0.32
0.14
0.14
0.14
58
59
60
61
62
63
64
65
66
67
68
69
70
75
0.07
0.07
0.07
0.07
0.01
0.01
0.01
0.01
0.01
0.09
0.09
0.09
0.09
0.09
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.14
0.14
0.14
0.14
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.14
74
0.07
0.01
0.14
73
0.07
0.01
0.14
72
0.07
0.01
0.14
71
0.10
0.39
0.39
0.39
0.39
0.39
0.24
0.24
0.24
0.24
0.24
0.16
0.41
0.41
0.18
0.18
0.18
0.16
0.18
0.16
0.18
0.39
0.16
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.16
0.18
0.04
0.15
0.15
0.15
0.15
0.04
0.15
1.94
1.98
1.72
1.73
1.73
1.49
1.17
1.05
0.90
0.93
0.93
0.93
0.93
0.93
1.00
0.96
0.64
0.68
0.68
0.29
0.29
79.07
81.05
82.78
84.50
86.23
87.72
88.88
89.93
90.83
91.76
92.69
93.62
94.55
95.48
96.48
97.44
98.07
98.75
99.42
99.71
100
Muzakir
Wakil Direktur
NAMA PEKERJAAN
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek
2 Direksi Keed / Gudang Material ( sewa )
3 Pemasangan Bauplank Seluruh Bangunan
4 Pembersihan Akhir
5 Administrasi
PEMBANGUNAN TEMPAT PARKIR RODA 4 KANTOR BPKS
II
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
III
PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Bata 1Pc : 2Ps
2 Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3 Aanstamping (Batu Kosong)
IV
PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Bata Atas Balok 1PC : 4 Ps
2 Plasteran Dinding dan Balok
3 Relief Tiang Kolom
V
PEKERJAAN LANTAI
1 Pasir Urug Bawah Lantai
2 Tanah Urug
3 Beton Cor Lantai 1Pc : 3Ps : 5Kr T = 10 cm Finishing Plasteran
VI
PEKERJAAN BETON
1 Sloop 20/20
2 Kolom 20/20
3 Balok 20/25
4 Plat Daag T = 10 cm
VII PEKERJAAN ELEKTRIKAL
1 Lampu Hemat Energi 25 Watt + Saklar + Rangkaian
2 Box Zakering
VIII PEKERJAAN PENGECATAN
1 Pengecatan dinding bata
2 Pengecatan Plafond Plat Daag
PEMBANGUNAN TEMPAT PARKIR RODA 2 KANTOR BPKS
I
PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Urugan Pasir Bawah Pondasi
3 Urugan Tanah Kembali
II
PEKERJAAN PONDASI
WAKTU PELAKSANAAN
422,478,570.33
PELABUHAN
BULAN I
803,586.00
5,000,000.00
5,000,000.00
2,000,000.00
2,500,000.00
BULAN II
803,586.00
5,000,000.00
5,000,000.00
- ###
1,000,000.00
922,670.56
247,804.00
112,095.45
922,670.56
247,804.00
112,095.45
1,907,067.50
7,315,410.24
983,104.56
1,907,067.50
7,315,410.24
983,104.56
3,024,372.80
3,196,979.50
21,840,000.00
1,110,585.00
594,938.40
7,188,836.55
1,110,585.00
594,938.40
7,188,836.55
8,596,930.84
9,557,598.96
12,866,044.62
28,647,477.60
8,596,930.84
9,557,598.96
3,676,012.75
6,000,000.00
163,300.00
BULAN III
- ###
- ###
- ###
1,000,000.00
2,000,000.00
500,000.00
3,024,372.80
3,196,979.50
8,190,000.00
13,650,000.00
9,190,031.87
28,647,477.60
6,000,000.00
163,300.00
5,878,629.20
2,947,938.00
1,305,241.28
350,552.00
158,691.99
75 HARI
5,878,629.20
2,947,938.00
1,305,241.28
350,552.00
158,691.99
4,882,092.80
10,348,629.12
1,390,733.28
4,882,092.80
10,348,629.12
1,390,733.28
1,197,051.60
1,286,048.50
32,760,000.00
1,197,051.60
1,286,048.50
11,466,000.00
1,450,560.00
777,062.40
9,389,500.80
1,450,560.00
777,062.40
9,389,500.80
12,161,511.92
15,986,222.07
13,015,649.79
32,428,165.12
12,161,511.92
15,986,222.07
1,859,378.54
32,108,771.32
8,000,000.00
163,300.00
8,000,000.00
163,300.00
2,876,307.44
3,336,985.60
2,669,588.48
707,273.60
265,936.00
86,013.11
707,273.60
265,936.00
86,013.11
8,004,989.18
13,573,489.28
1,055,039.04
8,004,989.18
13,573,489.28
1,055,039.04
1,743,623.75
2,876,307.44
667,397.12
1,743,623.75
1,216,355.00
3,991,551.00
7,873,487.65
1,216,355.00
3,991,551.00
7,873,487.65
12,476,033.78
8,533,570.50
11,868,676.82
31,375,808.80
12,476,033.78
7,314,489.00
6,000,000.00
163,300.00
1,219,081.50
11,868,676.82
31,375,808.80
6,000,000.00
163,300.00
1,322,844.50
3,228,694.00
677,023.04
438,923.10
698,082.00
21,294,000.00
1,322,844.50
3,228,694.00
677,023.04
438,923.10
698,082.00
13,575,231.68
1,403,366.60
529,582.41
12,066,872.60
1,403,366.60
211,832.96
1,508,359.08
185,460,550.92
174,932,529.32
317,749.45
50,609,825.05
Banda
STATUS
NAMA
PERUSAHAAN
UTAMA
JUMLAH
KETERANGAN
803,586.00
5,000,000.00
5,000,000.00
2,000,000.00
2,500,000.00
922,670.56
247,804.00
112,095.45
1,907,067.50
7,315,410.24
983,104.56
3,024,372.80
3,196,979.50
21,840,000.00
1,110,585.00
594,938.40
7,188,836.55
8,596,930.84
9,557,598.96
12,866,044.62
28,647,477.60
6,000,000.00
163,300.00
5,878,629.20
2,947,938.00
1,305,241.28
350,552.00
158,691.99
-
###
###
###
###
###
#
#
###
###
###
#
###
###
###
#
###
###
###
#
###
###
###
#
###
###
###
###
#
###
###
#
###
###
#
#
###
###
###
#
4,882,092.80
10,348,629.12
1,390,733.28
1,197,051.60
1,286,048.50
32,760,000.00
1,450,560.00
777,062.40
9,389,500.80
12,161,511.92
15,986,222.07
1,859,378.54
32,108,771.32
8,000,000.00
163,300.00
2,876,307.44
3,336,985.60
707,273.60
265,936.00
86,013.11
8,004,989.18
13,573,489.28
1,055,039.04
1,743,623.75
1,216,355.00
3,991,551.00
7,873,487.65
12,476,033.78
8,533,570.50
11,868,676.82
31,375,808.80
6,000,000.00
163,300.00
1,322,844.50
3,228,694.00
677,023.04
438,923.10
698,082.00
###
###
###
#
###
###
###
#
###
###
###
#
###
###
###
###
#
###
###
#
###
###
#
#
###
###
###
#
###
###
###
#
###
#
###
###
###
#
###
###
###
###
#
###
###
#
###
###
###
#
###
###
13,575,231.68
1,403,366.60
529,582.41
422,478,570.33
Muzakir
Wakil Direktur
###
###
###
#
ANALIS
No.
Macam Pekerjaan
(1)
(2)
PEKERJAAN PERSIAPAN
SNI
1.0000
m1
6.4
03-2835-2002
0.0120
0.0200
m3
kg
0.0070
0.1000
0.0100
0.1000
m3
oh
oh
oh
0.0050
oh
SNI
6.8
03-2835-2002
1.0000
0.1000
0.0500
m2
oh
oh
A4
1.0000
bh
0.0350
m3
1.4000
0.6000
1.5000
16.8000
m1
kg
kg
kg
0.0270
m3
0.0405
0.0175
1.0000
1.0000
2.1000
1.0050
m3
oh
oh
oh
oh
oh
1.0000
m2
SNI
6.16
0.2750
m3
0.0300
m3
0.0500
1.0000
0.1000
m3
oh
oh
SNI
6.5
1.0000
1.2500
m2
btg
03-2835-2002
0.1800
0.8500
1.1000
35.0000
m3
kg
kg
kg
0.1500
m3
0.1000
m3
0.1500
30.0000
1.2000
m3
bh
lbr
1.1000
m2
0.0800
0.1500
0.3750
0.0300
2.0000
1.0000
0.3000
2.0000
0.0500
m2
bh
lbr
kg
oh
oh
oh
oh
oh
SNI
6.2
03-2835-2002
1.0000
1.2500
2.5000
1.2000
m1
btg
kg
lbr
0.0050
m3
0.0090
m3
0.0250
0.0600
0.4000
0.2000
0.0200
0.4000
0.0200
m3
kg
kg
oh
oh
oh
oh
PEKERJAAN TANAH
SNI
6.1
1.0000
0.4000
0.0400
m3
oh
oh
SNI
6.2
1.0000
0.5260
0.0526
m3
oh
oh
SNI
6.3
1.0000
0.7350
0.0735
m3
oh
oh
SNI
6.4
1.0000
0.6250
0.0620
m3
oh
oh
SNI
1.0000
m3
6.5
1.2500
0.1250
oh
oh
SNI
6.6
1.0000
0.8230
0.0830
m3
oh
oh
A6
1.0000
0.3300
0.0100
m3
oh
oh
SNI
6.8
1.0000
0.5160
0.0500
m3
oh
oh
A14
1.0000
0.2500
0.0100
m3
oh
oh
SNI
6.9
1.0000
0.1920
0.0190
m3
oh
oh
1.0000
0.2500
0.0100
m2
oh
oh
1.0000
m3
1.2000
0.3000
0.0100
m3
oh
oh
MOD
1.0000
m3
A18
1.2000
0.3000
0.0100
m3
oh
oh
SNI
1.0000
m3
6.15
1.2000
0.2500
0.0250
m3
oh
oh
A18
PEKERJAAN PASANGAN
SNI
1.0000
m3
6.14
1.2000
m3
03-2836-2002
0.3000
0.3900
0.0390
0.7800
0.0390
m3
oh
oh
oh
oh
1.0000
m3
1.2000
95.4200
m3
kg
0.2290
m3
0.3820
0.6000
0.0600
1.5000
0.0750
m3
oh
oh
oh
oh
SNI
1.0000
m3
6.12
03-2835-2002
1.1000
61.0000
m3
kg
0.1470
m3
0.4920
0.6000
0.0600
1.5000
0.0750
m3
oh
oh
oh
oh
1.0000
m3
1.1000
163.0000
m3
kg
0.5200
0.6000
0.0600
1.5000
0.0750
m3
oh
oh
oh
oh
SNI
6.5
03-2836-2002
SNI
6.15
03-2837-2002
SNI
6.9
03-2837-2002
SNI
6.11
03-2837-2002
SNI
6.7
03-2837-2002
1.0000
70.0000
4.5000
m2
bh
kg
0.0150
m3
0.0500
0.1000
0.0100
0.3200
0.0150
m3
oh
oh
oh
oh
1.0000
70.0000
18.9500
m2
bh
kg
0.0380
0.1000
0.0100
0.3200
0.0150
m3
oh
oh
oh
oh
1.0000
70.0000
11.5000
m2
bh
kg
0.0430
0.1000
0.0100
0.3200
0.0150
m3
oh
oh
oh
oh
1.0000
140.0000
10.0800
m2
bh
kg
0.0275
m3
0.0925
0.2000
0.0200
0.6500
m3
oh
oh
oh
SNI
6.4
03-2837-2002
0.0300
oh
1.0000
140.0000
26.4500
m2
bh
kg
0.0980
0.2000
0.0200
0.6500
0.0300
m3
oh
oh
oh
oh
PEKERJAAN BETON
SNI DT-91-0008-2007-6.1
SNI DT-91-0008-2007-6.8
1.0000
0.0440
0.4550
0.0700
0.0135
0.1350
0.7200
0.0360
1.0000
0.4510
9.6000
0.8400
0.0280
0.2750
1.6500
0.0830
m2
M3
Zak
M3
Org
Org
Org
Org
m3
M3
Zak
M3
Org
Org
Org
Org
SNI DT-91-0008-2007-6.21
SNI DT-91-0008-2007-6.22
SNI DT-91-0008-2007-6.23
F.8
1.0000
0.0450
0.3000
0.1000
0.0260
0.2600
0.5200
0.0260
1.0000
0.0550
0.4000
0.2000
0.3500
2.0000
0.0260
0.2600
0.5200
0.0260
1.0000
0.0550
0.4000
0.2000
0.3500
0.0330
0.3300
0.6600
0.0330
m2
M3
Kg
liter
Org
Org
Org
Org
m2
M3
Kg
liter
Lbr
Btg
Org
Org
Org
Org
m2
M3
Kg
liter
Lbr
Org
Org
Org
Org
1.0000
m2
0.0170
m3
0.0240
0.4000
0.5000
0.0500
m3
kg
oh
oh
F.8
Supl. Vc1
Supl. Vc3
Supl. Vc2
0.2000
0.0100
oh
oh
1.0000
m2
0.0170
0.3470
0.4000
0.5000
0.0500
0.2000
0.0100
m3
lbr
kg
oh
oh
oh
oh
1.0000
1.0000
170.0000
4.0000
1.0000
m3
1.0000
1.0000
155.0000
4.0000
1.0000
1.0000
1.0000
175.0000
2.0000
1.0000
M3
Kg
M2
M2
m3
M3
Kg
M2
Ls
m3
M3
Kg
M2
Ls
SNI
6.8
1.0000
384.0000
m3
kg
2007
0.6920
m3
SNI
6.36
1.0390
m3
0.2150
0.2750
0.0280
1.6500
0.0830
m3
oh
oh
oh
oh
1.0000
406.0000
m3
kg
0.6840
m3
1.0260
m3
0.2150
0.2750
0.0280
1.6500
0.0830
m3
oh
oh
oh
oh
SNI DT-91-0008-2007-6.17
1.0000
430.0000
m3
kg
0.5160
m3
0.6900
1.0000
0.1000
6.0000
0.3000
m3
oh
oh
oh
oh
1.0000
1.0500
0.0500
0.0007
0.0070
0.0070
0.0040
kg
Kg
Kg
Org
Org
Org
Org
SNI
6.25
1.0000
1.0500
0.0150
0.0070
0.0007
0.0070
0.0003
kg
kg
kg
oh
oh
oh
oh
F.V
1.0000
4.0000
m3
oh
PEKERJAAN PELESTERAN
G.50.q
1.0000
6.5110
m2
kg
0.0209
0.2000
0.0200
m3
oh
oh
0.4000
0.0200
oh
oh
SNI
6.9
1.0000
1.8400
m2
kg
03-2837-2002
0.0060
m3
0.0140
0.1500
0.0150
0.2000
0.0100
m3
oh
oh
oh
oh
SNI
6.4
1.0000
8.5200
m2
kg
03-2837-2002
0.0170
0.1500
0.0150
0.2000
0.0100
m3
oh
oh
oh
oh
SNI
6.4
1.0000
5.2000
m2
kg
03-2837-2002
0.0200
0.1500
0.0150
0.2000
0.0100
m3
oh
oh
oh
oh
SNI
6.30
1.0000
7.0700
m2
kg
03-2837-2002
0.0210
0.2000
0.0200
0.2600
0.0130
m3
oh
oh
oh
org
SNI
6.31
1.0000
0.5000
m1
kg
03-2837-2002
0.0020
0.0380
0.0380
0.0570
0.0020
m3
oh
oh
oh
oh
SNI
6.35
1.0000
4.3200
m2
kg
03-2837-2002
0.0160
0.0700
0.0070
0.1500
0.0080
m3
oh
oh
oh
oh
SNI
6.34
1.0000
4.3200
m2
kg
0.0160
0.1000
0.0100
0.2500
0.0150
m3
oh
oh
oh
oh
1.0000
3.5000
0.0330
0.0033
0.0700
0.0035
m2
kg
oh
oh
oh
oh
Analisa ZAZ
PEKERJAAN CAT-CATAN
SNI
1.0000
m2
6.9
0.2000
0.1500
0.1700
0.3500
0.1050
0.0040
0.0700
0.0025
kg
kg
kg
kg
oh
oh
oh
oh
SNI
6.14
1.0000
0.1000
0.1000
0.2600
0.0630
0.0063
0.0200
0.0025
m2
kg
kg
kg
oh
oh
oh
oh
1.0000
2.500
0.720
0.0216
m2
m'
Zak
M3
0.150
0.070
0.012
0.007
oh
oh
oh
oh
1.0000
1.100
0.048
0.200
0.120
0.012
0.001
m2
M2
M3
M3
oh
oh
oh
Upah
Bahan
(2)
(3)
(4)
6,115,400.00
13,500.00
6,115,400.00
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Membersihkan lapangan
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
85,000.00
102,000.00
68,700.00
77,000.00
68,700.00
77,000.00
6,115,400.00
53,800.00
20,000.00
37,200.00
1,562.50
Pasir beton
400,000.00
Kerikil beton
Tukang batu
Tukang kayu
Tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
400,000.00
87,000.00
85,000.00
85,000.00
68,700.00
77,000.00
Batu belah
144,000.00
Kerikil
400,000.00
Pasir Pasang
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
155,000.00
68,700.00
77,000.00
44,100.00
Kayu meranti
Paku biasa
Baja strip
PC
6,115,400.00
19,700.00
6,600.00
1,562.50
Pasir Urug
108,100.00
Pasir beton
400,000.00
Kerikil beton
Bata merah
Seng gelombang 3" x 6 "
400,000.00
700.00
60,500.00
860,600.00
Kaca polos 3 mm
Kunci tanam
Plywood 4 mm
Paku Plywood
Tukang kayu
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
139,300.00
15,000.00
94,700.00
18,700.00
85,000.00
87,000.00
102,000.00
68,700.00
77,000.00
44,100.00
1,562.50
60,500.00
Pasir Pasang
155,000.00
Kerikil beton
400,000.00
6,115,400.00
19,700.00
25,800.00
85,000.00
102,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Galian tanah lumpur sedalam 1 meter
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Mengangkut tanah sejauh 30 meter
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Pembuangan tanah sejauh 150 meter
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Membuang tanah dengan menghampar
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Urug kembali bekas galian
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
68,700.00
77,000.00
Urug pasir
Pasir urug
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
108,100.00
68,700.00
77,000.00
66,500.00
68,700.00
77,000.00
Urugan sirtu
Sirtu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
350,000.00
68,700.00
77,000.00
144,000.00
Pasir urug
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
108,100.00
87,000.00
102,000.00
68,700.00
77,000.00
Pasangan pondasi 1 Pc : 3 Kp : 5 Ps
Batu belah (hitam) 15/20 cm
PC
144,000.00
1,562.50
Kapur pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
7,100.00
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
Pasangan pondasi 1 Pc : 3 Kp : 10 Ps
Batu belah (hitam) 15/20 cm
PC
144,000.00
1,562.50
Kapur pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
7,100.00
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
Pasangan pondasi 1 Pc : 4 Ps
Batu belah 15/20 cm
PC
144,000.00
1,562.50
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
700.00
1,562.50
Kapur pasang
7,100.00
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
700.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
700.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
700.00
1,562.50
Kapur pasang
7,100.00
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
155,000.00
87,000.00
102,000.00
68,700.00
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
77,000.00
700.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
19,700.00
62,500.00
4,900.00
102,000.00
87,000.00
68,700.00
77,000.00
19,700.00
62,500.00
4,900.00
102,000.00
87,000.00
68,700.00
77,000.00
4,736,400.00
19,700.00
4,900.00
102,000.00
87,000.00
68,700.00
77,000.00
4,736,400.00
19,700.00
4,900.00
121,100.00
44,100.00
102,000.00
87,000.00
68,700.00
77,000.00
4,736,400.00
19,700.00
4,900.00
121,100.00
102,000.00
87,000.00
68,700.00
77,000.00
4,736,400.00
Papan cetakan
Paku
Tukang kayu
Kep. Tk. Kayu
4,294,800.00
19,700.00
87,000.00
102,000.00
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
68,700.00
77,000.00
4,736,400.00
94,700.00
19,700.00
87,000.00
102,000.00
68,700.00
77,000.00
759,527.00
18,308.00
282,536.00
240,000.00
759,527.00
18,308.00
462,945.00
240,000.00
759,527.00
18,308.00
391,706.00
240,000.00
1,562.50
400,000.00
Kerikil beton
400,000.00
Air
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
100,000.00
87,000.00
102,000.00
60,000.00
77,000.00
1,562.50
Pasir beton
400,000.00
Kerikil beton
400,000.00
Air
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
100,000.00
87,000.00
102,000.00
60,000.00
77,000.00
1,562.50
Pasir beton
400,000.00
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
400,000.00
87,000.00
102,000.00
60,000.00
77,000.00
15,000.00
23,000.00
102,000.00
87,000.00
60,000.00
77,000.00
17,500.00
23,000.00
87,000.00
102,000.00
60,000.00
77,000.00
60,000.00
1,562.50
155,000.00
87,000.00
102,000.00
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
68,700.00
77,000.00
1,562.50
Kapur pasang
7,100.00
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
Plesteran Ciprat, 1 Pc : 2 Ps
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Acian dinding bata
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
1,562.50
155,000.00
87,000.00
102,000.00
68,700.00
77,000.00
1,562.50
87,000.00
102,000.00
68,700.00
77,000.00
Cat meni
Plamir
Cat dasar
Cat penutup
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Pasang Kansteen Bata
bata
Semen
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
Pasang Kansteen Paving Block
paving beton
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
JUMLAH ( BELUM PPN )
DIBULATKAN
25,800.00
15,700.00
37,200.00
34,100.00
85,000.00
102,000.00
68,700.00
77,000.00
15,700.00
37,200.00
68,200.00
85,000.00
102,000.00
68,700.00
77,000.00
700.00
62,500.00
155,000.00
60,000.00
87,000.00
102,000.00
77,000.00
105,100.00
155,000.00
60,000.00
87,000.00
102,000.00
77,000.00
Jumlah
(5)
73,384.80
270.00
42,807.80
8,500.00
1,020.00
6,870.00
385.00
133,237.60
133,237.00
6,870.00
3,850.00
10,720.00
10,720.00
214,039.00
75,320.00
12,000.00
55,800.00
26,250.00
10,800.00
16,200.00
1,522.50
85,000.00
85,000.00
144,270.00
77,385.00
803,586.50
803,586.00
39,600.00
12,000.00
7,750.00
68,700.00
7,700.00
135,750.00
135,750.00
55,125.00
1,100,772.00
16,745.00
7,260.00
54,687.50
16,215.00
40,000.00
60,000.00
21,000.00
72,600.00
946,660.00
11,144.00
2,250.00
35,512.50
561.00
170,000.00
87,000.00
30,600.00
137,400.00
3,850.00
2,869,382.00
2,869,382.00
55,125.00
3,906.25
72,600.00
775.00
3,600.00
152,885.00
1,182.00
10,320.00
17,000.00
2,040.00
27,480.00
1,540.00
348,453.25
348,453.00
27,480.00
3,080.00
30,560.00
30,560.00
36,136.20
4,050.20
40,186.40
40,186.00
50,494.50
5,659.50
56,154.00
56,154.00
42,937.50
4,774.00
47,711.50
47,711.00
85,875.00
9,625.00
95,500.00
95,500.00
56,540.10
6,391.00
62,931.10
62,931.00
22,671.00
770.00
23,441.00
23,441.00
35,449.20
3,850.00
39,299.20
39,299.00
17,175.00
770.00
17,945.00
17,945.00
13,190.40
1,463.00
14,653.40
14,653.00
17,175.00
770.00
17,945.00
17,945.00
129,720.00
20,610.00
770.00
151,100.00
151,100.00
79,800.00
20,610.00
770.00
101,180.00
101,180.00
420,000.00
17,175.00
1,925.00
439,100.00
439,100.00
172,800.00
32,430.00
33,930.00
3,978.00
53,586.00
3,003.00
299,727.00
299,727.00
172,800.00
149,093.75
1,625.90
59,210.00
52,200.00
6,120.00
103,050.00
5,775.00
549,874.65
549,874.00
158,400.00
95,312.50
1,043.70
76,260.00
52,200.00
6,120.00
103,050.00
5,775.00
498,161.20
498,161.00
158,400.00
254,687.50
80,600.00
52,200.00
6,120.00
103,050.00
5,775.00
660,832.50
660,832.00
49,000.00
7,031.25
106.50
7,750.00
8,700.00
1,020.00
21,984.00
1,155.00
96,746.75
96,746.00
49,000.00
29,609.38
5,890.00
8,700.00
1,020.00
21,984.00
1,155.00
117,358.38
117,358.00
49,000.00
17,968.75
6,665.00
8,700.00
1,020.00
21,984.00
1,155.00
106,492.75
106,492.00
98,000.00
15,750.00
195.25
14,337.50
17,400.00
2,040.00
44,655.00
2,310.00
194,687.75
194,687.00
98,000.00
41,328.13
15,190.00
17,400.00
2,040.00
44,655.00
2,310.00
220,923.13
220,923.00
866.80
28,437.50
343.00
1,377.00
11,745.00
49,464.00
2,772.00
95,005.30
95,005.00
8,884.70
600,000.00
4,116.00
2,856.00
23,925.00
113,355.00
6,391.00
759,527.70
759,527.00
213,138.00
5,910.00
490.00
2,652.00
22,620.00
35,724.00
2,002.00
282,536.00
282,536.00
260,502.00
7,880.00
980.00
42,385.00
88,200.00
2,652.00
22,620.00
35,724.00
2,002.00
462,945.00
462,945.00
260,502.00
7,880.00
980.00
42,385.00
3,366.00
28,710.00
45,342.00
2,541.00
391,706.00
391,706.00
80,518.80
103,075.20
7,880.00
43,500.00
5,100.00
13,740.00
770.00
254,584.00
254,584.00
80,518.80
32,860.90
7,880.00
43,500.00
5,100.00
13,740.00
770.00
184,369.70
184,369.00
759,527.00
3,112,360.00
1,130,144.00
240,000.00
5,242,031.00
5,242,031.00
759,527.00
2,837,740.00
1,851,780.00
240,000.00
5,689,047.00
5,689,047.00
759,527.00
3,203,900.00
783,412.00
240,000.00
4,986,839.00
4,986,839.00
600,000.00
276,800.00
415,600.00
21,500.00
23,925.00
2,856.00
99,000.00
6,391.00
1,446,072.00
1,446,072.00
634,375.00
273,600.00
410,400.00
21,500.00
23,925.00
2,856.00
99,000.00
6,391.00
1,472,047.00
1,472,047.00
671,875.00
206,400.00
276,000.00
87,000.00
10,200.00
360,000.00
23,100.00
1,634,575.00
1,634,575.00
15,750.00
1,150.00
71.40
609.00
420.00
308.00
18,308.40
18,308.00
18,375.00
345.00
609.00
71.40
420.00
23.10
19,843.50
19,843.00
240,000.00
240,000.00
240,000.00
10,173.44
3,239.50
17,400.00
2,040.00
27,480.00
1,540.00
61,872.94
61,872.00
2,875.00
42.60
2,170.00
13,050.00
1,530.00
13,740.00
770.00
34,177.60
34,177.00
13,312.50
2,635.00
13,050.00
1,530.00
13,740.00
770.00
45,037.50
45,037.00
8,125.00
3,100.00
13,050.00
1,530.00
13,740.00
770.00
40,315.00
40,315.00
11,046.88
3,255.00
17,400.00
2,040.00
17,862.00
1,001.00
52,604.88
52,604.00
781.25
310.00
3,306.00
3,876.00
3,915.90
154.00
12,343.15
12,343.00
6,750.00
2,480.00
6,090.00
714.00
10,305.00
616.00
26,955.00
26,955.00
6,750.00
2,480.00
8,700.00
1,020.00
17,175.00
1,155.00
37,280.00
37,280.00
5,468.75
2,871.00
336.60
4,809.00
269.50
13,754.85
13,754.00
5,160.00
2,355.00
6,324.00
11,935.00
8,925.00
408.00
4,809.00
192.50
40,108.50
40,108.00
1,570.00
3,720.00
17,732.00
5,355.00
642.60
1,374.00
192.50
30,586.10
30,586.00
1,750.00
45,000.00
3,348.00
9,000.00
6,090.00
1,224.00
539.00
66,951.00
66,951.00
115,610.00
7,440.00
12,000.00
10,440.00
1,224.00
77.00
146,791.00
146,791.00
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
Buis Beton 30 cm
Buis Tanah 10 cm
Buis Tanah 20 cm
Cat Kayu Dasar
Cat Kayu Mengkilat
Cat Marka Jalan (Non Thremoplas)
Cat Menie Besi
Cat Tembok
Dempul Kayu
Elbow
Engsel Jendela
Engsel Pintu
Espagnolet
Filler
Floor Drain
Genteng Beton
Genteng Keramik
Gypsum (120 x 240 cm) Tebal 1,2 cm
Grendel Jendela/ Pintu
Gravel
Hak Angin
Handle jendela
Handle Pintu
Ijuk
Isolasi Listrik
Jendela nako
Kabel NYA 1 x 2.5 mm
Kaca Bening Uk. 2 mm
Kaca Bening Uk. 3 mm
Kaca Bening Uk. 5 mm
Kaca Rayband Uk. 3 mm
Kaca Rayband Uk. 5 mm
Kapur Batu
Kapur Sirih
Karpus Asbes Gelombang Besar
Karpus Asbes Gelombang Kecil
Karpus Genteng Beton
Karpus Genteng Keramik
Kawat Beton
Kawat Bronjong 3 mm
Kawat Bronjong 4 mm
Kawat Bronjong 5 mm
Kawat Bronjong Pabrikan Uk. (2 x 1 x 1)
Kawat Bronjong Pabrikan Uk. (2 x 1 x 0,5)
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
Marmer
Minyak Cat
Multipleks 3 mm
Multipleks 4 mm
Multipleks 6 mm
Multipleks 9 mm
Naco ( Kerangka + Daun )
Nok / Rabung Seng 0.35 Cat Pabrik
Nok / Rabung Seng 0.35 Tidak Dicat
Oksigen
Paku Asbes
Paku Beton 8 inchi
Paku Kait
Paku Kayu
Paku Reng
Paku Seng
Paku Sumbat
Paku Ulir Primadek
Paku skrup
Pasir Batu ( Sirtu ) - Material Jalan
Pasir Beton / Krikil
Pasir Pasang
Pasir Urug
Paving Block
Pelumas / oil
Pintu alumunium
Pipa Leiding 3/4" Galvanis Tebal 3,2 mm
Pipa Leiding 1" Galvanis Tebal 3,2 mm
Pipa Leiding 1/2" Galvanis Tebal 3,2 mm
Pipa Leiding 1 1/2" Galvanis Tebal 3,2 mm
Pipa Leiding 2" Galvanis Tebal 3,2 mm
Pipa Leiding 3" Galvanis Tebal 3,2 mm
Pipa Leiding 4" Galvanis Tebal 3,2 mm
Pipa Leiding 6" Galvanis Tebal 3,2 mm
Pipa PVC 1"
Pipa PVC 1/2" Kualitas AWE (United)
Pipa PVC 1 1/2"
Pipa PVC 2"
Pipa PVC 3"
Pipa PVC 3/4"
Pipa PVC 4"
Pipa Instalasi Listrik
Pitting Lampu
Plamir Tembok
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
203
204
205
206
207
208
209
210
211
212
213
Plint Keramik 15 x 30
Plint Keramik abu-abu ukuran 15 x 20
Plint Keramik warna ukuran 15 x 20
Plint Keramik ukuran 10 x 30
Plint Ubin Abu-abu 15 x 20
Plint Ubin Berwarna 15 x 20
Plint Ubin Teraso 10 x 30
Porselin 10 x 15
Porselin 11 x 11
Porselin 15 x 15
Porselin 20 x 20
Rangka Furing / Baja ringan
Residu
Reservoir Air 0,5 m3 Fiber
Reservoir Air 1 m3 Fiber
Reservoir Air 0,5 m3 Stainless Steel
Reservoir Air 1 m3 Stainless Steel
Saklar
Saklar Tunggal
Saklar Seri 2 Tuas
Saklar Seri 3 Tuas
Skrup fixer
Semen @ 40 Kg
Semen @ 50 Kg
Semen Putih @ 50 Kg
Seng BJLS 0,20
Seng BJLS 0,20 Cat Pabrik
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30 Cat Pabrik
Seng Plat BJLS 20
Seng Plat BJLS 30
Solar ( Industri )
Seal tape
Stop Kontak + Instalasi
Stut Werk ( Ska Folding )
Sumur + Pompa Tangan Terpasang
Tanah Timbun
Tanah Timbun Pilihan - Material Jalan
Tedos
Teralis Besi
Titik Lampu + Instalasi
Ubin Abu-Abu 20 x 20
Ubin Berwarna 20 x 20
Ubin Teraso 20 x 20
214
215
216
217
218
219
Ubin Wafel 20 x 20
Urinoir Keramik
Vinyl
Zekering ( Kast Lokal 1 Zekering )
Zekering ( Kast Lokal 2 Zekering )
Zekering ( Kast Lokal 3 Zekering )
220
URAIAN TENAGA
1
2
Mandor
Kepala Tukang Kayu
3
4
5
6
7
8
9
10
11
12
13
14
Tukang Kayu
Kepala Tukang Cat
Tukang Cat
Kepala Tukang Batu
Tukang Batu
Kepala Tukang Besi
Tukang Besi
Tukang Listrik
Pekerja Kayu
Pekerja Besi
Pekerja Cat
Pekerja Batu
& UPAH
SATUAN
HARGA
( Rp. )
Lembar
Kg
Lembar
Lembar
Lembar
Kg
Kg
Lembar
M2
Kg
M2
Buah
Buah
Buah
Buah
Buah
Batang
Buah
M3
M3
M3
Buah
M3
M3
M3
M3
Buah
Kg
Liter
Kg
Kg
Buah
Kg
Buah
M'
M'
Buah
Buah
194,100.00
4,530.00
77,200.00
84,400.00
24,300.00
17,300.00
13,400.00
92,500.00
96,900.00
34,600.00
511,800.00
782,300.00
658,100.00
2,646,300.00
2,907,600.00
3,147,900.00
34,900.00
6,500.00
240,000.00
218,700.00
210,600.00
700.00
144,000.00
175,400.00
578,700.00
228,400.00
7,500.00
8,700.00
9,300.00
15,000.00
17,500.00
11,000.00
6,600.00
11,800.00
81,400.00
36,400.00
57,100.00
63,900.00
Buah
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Kg
Buah
Pasang
Pasang
Buah
Kg
Buah
Keping
Keping
Lembar
Buah
M3
Buah
Buah
Buah
Kg
Buah
Buah
M'
M2
M2
M2
M2
M2
Kg
Kg
M'
M'
M'
M'
Kg
Kg
Kg
Kg
Lembar
Lembar
84,300.00
31,100.00
68,100.00
37,200.00
49,000.00
73,500.00
25,800.00
34,100.00
24,500.00
18,500.00
28,100.00
40,200.00
171,500.00
1,540.00
23,600.00
9,600.00
18,900.00
79,200.00
15,500.00
180,700.00
18,200.00
42,000.00
13,000.00
16,700.00
35,000.00
5,000.00
57,000.00
92,800.00
139,300.00
123,100.00
113,100.00
148,300.00
7,100.00
4,300.00
101,200.00
85,600.00
59,700.00
96,200.00
23,000.00
19,300.00
21,400.00
27,600.00
536,500.00
482,000.00
Lembar
Kg
M2
M2
M2
M3
Batang
M3
M3
M3
M3
M2
M2
M2
Buah
Liter
Liter
Lembar
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M'
Buah
Buah
Buah
Buah
Buah
Liter
M2
M'
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
500,300.00
11,500.00
22,600.00
19,400.00
9,200.00
902,300.00
44,100.00
6,115,400.00
4,736,400.00
4,294,800.00
4,059,300.00
41,200.00
49,700.00
52,100.00
49,700.00
7,400.00
3,300.00
3,090.00
1,686,600.00
166,900.00
250,000.00
150,000.00
200,000.00
200,000.00
15,000.00
70,000.00
5,900.00
7,500.00
85,600.00
114,200.00
22,600.00
33,300.00
28,300.00
33,700.00
7,700.00
25,000.00
16,000.00
50,000.00
15,000.00
18,000.00
80,000.00
100,000.00
150,000.00
491,200.00
M2
Liter
Lembar
Lembar
Lembar
Lembar
M2
Lembar
Lembar
M3
Kg
Kotak
Buah
Kg
Kg
Kg
Buah
Buah
Buah
M3
M3
M3
M3
M2
Liter
M2
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Kg
619,000.00
23,000.00
72,200.00
94,700.00
121,100.00
180,800.00
361,300.00
67,500.00
62,300.00
391,000.00
18,700.00
15,600.00
1,230.00
19,700.00
13,500.00
20,000.00
1,230.00
3,900.00
251,700.00
350,000.00
400,000.00
155,000.00
108,100.00
105,100.00
48,100.00
61,000.00
128,400.00
181,700.00
96,200.00
226,000.00
367,200.00
653,500.00
971,200.00
1,591,900.00
93,100.00
46,800.00
112,900.00
142,800.00
162,700.00
37,500.00
344,100.00
15,000.00
12,400.00
15,700.00
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M2
M2
M2
M2
M'
Kg
Buah
Buah
Buah
Buah
Tube
Buah
Buah
Buah
Buah
Zak
Zak
Zak
M2
M2
M2
M2
M2
M2
Liter
Buah
Buah
M3
Unit
M3
M3
Buah
M2
Titik
M2
M2
M2
14,000.00
3,900.00
3,900.00
6,200.00
3,600.00
7,200.00
6,200.00
151,900.00
151,900.00
151,900.00
150,100.00
4,000.00
4,900.00
1,766,100.00
2,728,800.00
2,087,100.00
3,370,600.00
33,600.00
35,000.00
40,000.00
15,000.00
49,500.00
62,500.00
75,000.00
137,100.00
42,600.00
43,700.00
60,500.00
74,800.00
53,800.00
68,000.00
8,800.00
35,000.00
180,600.00
3,228,200.00
1,322,900.00
66,500.00
156,600.00
346,100.00
499,300.00
149,000.00
46,200.00
46,200.00
46,200.00
M2
Buah
M2
Buah
Buah
Buah
M2
46,200.00
1,212,500.00
243,100.00
163,300.00
207,000.00
299,700.00
93,400.00
JA
SATUAN
HARGA ( RP )
Orang
Orang
77,000.00
102,000.00
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
85,000.00
102,000.00
85,000.00
102,000.00
87,000.00
102,000.00
87,000.00
87,000.00
68,700.00
60,000.00
68,700.00
60,000.00
Muzakir
Wakil Direktur
Nama
Tanggal Lahir
Alamat
Pendidikan Terakhir
Jabatan yang diusulkan
Email
Jenis Kelamin
Kewarganegaraan
Pengalaman Kerja
Status Kepegawaian
Profesi / Keahlian
:
:
:
:
:
:
:
:
:
:
:
Hasanuddin, ST
Aceh Timur/04-04-1967
(47 tahun)
Dusun Petua Abbas Ulee Tanoh Julok - Aceh Timur
S1 Teknik Sipil
Site Manager
Laki - laki
Indonesia
6 tahun
tidak tetap
Ahli Muda Pelaksana Struktur
Curriculum Vitae
Pengalaman
Tahun
2012
2011
2010
2009
2008
2006
Uraian Tugas
1. Tugas Perencanaan
Merencanakan Time Schedule pelaksanaan proyek sesuai dengan kewajiban dari peru
Merencanakan pemakaian bahan dan alat dan pekerjaan instalasi untuk setiap proyek y
2.
Tugas dan controlling pengarahan dapat diuraikan dalam beberapa hal-hal pokok :
Memberikan instruksi pekerjaan dan pengarahan kepada pelaksana dalam menunjangp
bersifat khusus dibukukan dalam buku instruksi pengawas.
Mengadakan kontrol terhadap pelaksanaan pekerjaan sesuai dengan instruksi-instruksi
3.
4.
5.
Pendidikan
Tahun
Sertifikat
Tahun
Bahasa
Uraian
Bahasa Indonesia
Bahasa Inggris
Baik Sekali
Baik
Nama
Tanggal Lahir
Alamat
Pendidikan Terakhir
Jabatan yang diusulkan
Email
Jenis Kelamin
Kewarganegaraan
Pengalaman Kerja
Status Kepegawaian
Profesi / Keahlian
:
:
:
:
:
:
:
:
:
:
:
Ismail
Rantau, 11 Nopember 1978
Jl. Geureudong No. 20 Dusun Permai - Dewantara Kota Lhokseumawe
D-3 Teknik Listrik
Pelaksana Lapangan
Laki - laki
Indonesia
4 tahun
tidak tetap
Instalator jaringan listrik tingkat 1
Curriculum Vitae
Pengalaman
Tahun
2012
2010
2008
2006
Uraian Tugas
1.
2.
3.
4.
Pendidikan
Tahun
Sertifikat
Tahun
Bahasa
Uraian
Bahasa Indonesia
Bahasa Inggris
Baik Sekali
Baik
Nama
Tanggal Lahir
Alamat
Pendidikan Terakhir
Jabatan yang diusulkan
Email
Jenis Kelamin
Kewarganegaraan
Pengalaman Kerja
Status Kepegawaian
Profesi / Keahlian
:
:
:
:
:
:
:
:
:
:
:
Heri Darmawan
11 Agustus 1976
Gampong Bunot
S-1 Tehnik Sipil
Draftman / Juru Gambar
Laki - laki
Indonesia
3 tahun
tidak tetap
SKT Juru Gambar
Curriculum Vitae
Pengalaman
Tahun
2012
2011
2008
Uraian Tugas
1.
2.
3.
4.
5.
Pendidikan
Tahun
Sertifikat
Tahun
Bahasa
Uraian
Bahasa Indonesia
Bahasa Inggris
Nama
Tanggal Lahir
Alamat
Pendidikan Terakhir
Jabatan yang diusulkan
Email
Jenis Kelamin
Kewarganegaraan
Pengalaman Kerja
Status Kepegawaian
Profesi / Keahlian
Curriculum Vitae
Baik Sekali
Baik
:
:
:
:
:
:
:
:
:
:
:
Hadi Syahrizal
26 Maret 1979
Lambhuk Ulee Kareng
S-1 Tehnik Sipil
Surveyor / Juru Ukur
Laki - laki
Indonesia
3 tahun
tidak tetap
SKT Juru Ukur
Pengalaman
Tahun
2012
2010
2008
Uraian Tugas
1.
2.
3.
Pendidikan
Tahun
Sertifikat
Tahun
Bahasa
Uraian
Bahasa Indonesia
Bahasa Inggris
Baik Sekali
Baik
Nama
Tanggal Lahir
Alamat
Pendidikan Terakhir
Jabatan yang diusulkan
Email
Jenis Kelamin
Kewarganegaraan
Pengalaman Kerja
Status Kepegawaian
Profesi / Keahlian
:
:
:
:
:
:
:
:
:
:
:
Nuraini, SE
2 Oktober 1981
Cot Girek Aceh Utara
S-1 Ekonomi
Administrasi / Keuangan
Perempuan
Indonesia
3 tahun
tidak tetap
-
Curriculum Vitae
Pengalaman
Tahun
2012
2010
2008
Uraian Tugas
1.
2.
3.
Mempersiapkan daftar biaya berkaitan dengan rancangan dalam bentuk batas biaya dan
Menyelenggarakan sistim administrasi umum dan teknis dalam rangka memperlancar pe
Membuat arsip-arsip yang berhubungan dengan pelaksanaan proyek.
4.
Pendidikan
Tahun
Sertifikat
Tahun
Bahasa
Uraian
Bahasa Indonesia
Bahasa Inggris
Baik Sekali
Baik
Uraian
kewajiban dari perusahaan terhadap pemilik proyek atau kepentingan perusahaan sendiri.
ntuk setiap proyek yang ditangani sesuai dengan volume dan waktu penggunaannnya.
hal-hal pokok :
dalam menunjangpelaksanaan proyek. Instruksi-instruksi pekerjaan secara umum dapat diberikan secara lisan dan yang
n instruksi-instruksi yang diberikan baik segi teknis, kualitas pekerjaan, maupun time schedulenya.
mandor maupun tenaga kerja sesuai dengan tugas, kewajiban dan wewenang masing-masing.
m segala hal yang berkaitan dengan pelaksanaan proyek untuk menunjang kewajiban perusahaan dengan pemilik
meliputi
pemilihan
material,
surat-menyurat,
penyelesaian
klaim dan sebagainya.
aan tambah
kurang.
Dan diberikan
ke Budget
Control sepengetahuan
Proyek Manager dan disetujui oleh Direktur Proyek.
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
aan di lapangan
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
Uraian
No.
:
:
:
NAMA
JABATAN
PENDIDIKAN TERAKHIR
S 1 Teknik Sipil
D3 Teknik Listrik
Bireuen, 26-03-1979
S1 Teknik Sipil
Aceh Timur/04-04-1967
(47 tahun)
Hasanuddin, ST
Site Manager
Ismail
Pelaksana
Hadi Syahrizal
Heri Darmawan
S1 Arsitektur
312188/054/TA-033/2004
Nuraini, SE
S1 Ekonomi
1.4.1.00386/001298
0719/4172/TS/2006
Formulir 7
PERSONIL INTI
PENGALAMAN
KERJA (TAHUN)
41475/01/175/ATAKI/SKA/XI/2010
, tanggal 30/11/2010
11140/PATI-SKTK/TE049/2011,
tanggal 10 Mei 2011
044653/SMK-PU/SKTK/I/2013
01341/01/175/ATAKI/DPD/SKT/V/20
11
KET./ALAMA
T
Muzakir
Wakil Direktur
URAIAN ANAL
No.
A.
1.
2.
3.
4.
5.
B.
1.
URAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a.
b.
c.
a.
b.
c.
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
2.
i x (1 + i)^A'
(1 + i)^A' - 1
3.
b. Asuransi, dll =
( B' - C ) x D
W'
0.002 x B'
W'
(E+F)
1.
2.
Pelumas
3.
Perawatan dan
perbaikan
4.
5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
Operator
Pembantu Operator
(H+I+K+L+M)
D.
(G+P)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANAL
No.
A.
1.
2.
3.
4.
5.
B.
1.
2.
URAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a.
b.
c.
a.
b.
c.
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)
i x (1 + i)^A'
(1 + i)^A' - 1
3.
b. Asuransi, dll =
0.002 x B'
W'
( B' - C ) x D
W'
(E+F)
1.
2.
Pelumas
3.
Perawatan dan
perbaikan
4.
5.
= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
(12,5 % - 17,5 %) x B'
W'
Operator
Pembantu Operator
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
(H+I+K+L+M)
D.
(G+P)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
IAN
am 1 Tahun
am 1 Tahun
KODE
KOEF.
SATUAN
3,960,000
(1 + i)^A'
+ i)^A' - 1
0.38629
B' - C ) x D
6,883.67
Rupiah
39.60
Rupiah
6,923.27
Rupiah
16,875.00
Rupiah
2,700.00
Rupiah
2,475.00
Rupiah
L
M
13,000.00
6,000.00
Rupiah
Rupiah
x Pw x Ms
m ) x U1
m ) x U2
Rupiah
+I+K+L+M)
41,050.00
Rupiah
47,973.27
Rupiah
i
U1
U2
Mb
Ms
Mp
20.00
13,000.00
6,000.00
9,000.00
9,000.00
18,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
IAN
am 1 Tahun
am 1 Tahun
(1 + i)^A'
KODE
Pw
Cp
A
W
B
A'
W'
B'
KOEF.
GENERATOR SET
175.0
125.0
5.0
2,000.0
140,800,000
5.0
2,000.0
140,800,000
14,080,000
0.33438
SATUAN
HP
KVA
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah
Rupiah
-
+ i)^A' - 1
B' - C ) x D
21,186.30
Rupiah
140.80
Rupiah
21,327.10
Rupiah
196,875.00
Rupiah
31,500.00
Rupiah
8,800.00
Rupiah
m ) x U1
m ) x U2
L
M
13,000.00
6,000.00
Rupiah
Rupiah
+I+K+L+M)
256,175.00
Rupiah
277,502.10
Rupiah
x Pw x Ms
i
U1
U2
Mb
Ms
Mp
20.00
13,000.00
6,000.00
9,000.00
9,000.00
18,000.00
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
KET.
E06
alat baru
alat baru
alat baru
KET.
E12
alat baru
alat baru
alat baru
ANALISA
NAMA KEGIATAN
LOKASI
TAHUN ANGGARAN
:
:
:
NO
URAIAN PEKERJAAN
VOL
SAT.
ANALISA
DURASI (HARI)
1
I
PEKERJAAN PERSIAPAN
2.00
1.00
1.00
1.00
Unit
Unit
Unit
Unit
MOBILISASI
2.
Pengukuran
1.00
Ls
3.
Penerangan
1.00
Ls
75
4.
As Built Drawing
1.00
Ls
5.
Direksi Keet
1.00
taksir
73.04
SNI 6.2
10
II
1
taksir
PEKERJAAN KONSTRUKSI
Galian tanah pondasi
5.72
A18
24.35
SNI 6.9
126.06
10
47.27
10
11.44
28.40
154.45
10
25.00
A18
10
Tanah Urug
53.01
MOD A18
11
25.00
SNI DT-91-0008-2007-6.8
Plasteran
12
Sloop 20/20
3.96
Supl. Vc1
13
Sloop 20/25
2.38
Supl. Vc1
14
Kolom 20/20
4.49
Supl. Vc3
15
Kolom 25/25
1.50
Supl. Vc3
16
Balok 20/25
4.96
Supl. Vc2
17
Balok 15/30
2.61
Supl. Vc2
18
192.20
SNI 6.14
19
237.20
SNI 6.9
20
43.25
SNI 6.14
21
Pengecatan Listplank
16.88
SNI 6.9
22
92.48
23
7.91
ANALISA TEKNIK
PROD. ALAT YG
DIGUNAKAN
KEBUTUHAN
PERALATAN
SATUAN ALAT
10
11
12
13
Concrete Mixer
Genset
Thedollite
Water Pass
Water Pass
Thedollite
1.00
1.00
###
###
Generator Set
1.00
###
Pekerja
Juru Ukur
Kabel
Lampu
Mekanik
Juru Gambar
Tukang
Mandor
Alat bantu
1.00
Ls
Pekerja
Mandor
Alat bantu
1.00
Ls
Pasir urug
Pekerja
Mandor
Alat bantu
1.00
Ls
Tanah Urug
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Bata merah 5 x 11 x 22 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Bata merah 5 x 11 x 22 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
Concrete Mixer
Alat bantu
Pasir urug
Pekerja
Mandor
Tanah urug
Pekerja
Mandor
2.00
1.00
Unit
Ls
Pasir Beton
Kepala Tukang
Semen PC
Kerikil
Tukang
Pekerja
Mandor
2.00
-
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kerikil
Kayu Bekesting/Balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
Kepala Tukang
Tukang
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kerikil
Kayu Bekesting/Balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
Kepala Tukang
Tukang
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kerikil
Kepala Tukang
Tukang
Pekerja
Kayu Bekesting/Balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
Mandor
plywood tebal 6 mm
Dolken kayu @ 8-10/4 m
Concrete Mixer
Alat bantu
2.00
-
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kerikil
Kayu Bekesting/Balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
plywood tebal 6 mm
Dolken kayu @ 8-10/4 m
Kepala Tukang
Tukang
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kerikil
Kayu perancah / balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
plywood tebal 6 mm
Kepala Tukang
Tukang
Pekerja
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
Pasir Beton
Semen PC
Kepala Tukang
Tukang
Kerikil
Kayu perancah / balok
Paku
Minyak bekisting
Besi Beton
Kawat Beton
plywood tebal 6 mm
Pekerja
Mandor
Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
paving beton
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Concrete Mixer
Alat bantu
2.00
2.00
1.00
Unit
Ls
bata
Semen
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Muzakir
Wakil Direktur
KEBUTUHAN T.
KERJA
14
2.00
2.00
1.00
2.00
1.00
0.53
0.05
0.30
0.01
0.30
0.01
0.10
0.01
0.32
0.02
0.60
0.06
1.50
0.08
0.39
0.04
0.78
0.04
0.10
0.01
0.32
0.02
0.20
0.02
0.26
0.01
0.30
0.01
0.30
0.01
0.01
0.14
0.72
0.04
0.03
0.26
0.52
0.03
0.03
0.26
0.52
0.03
0.03
0.26
0.52
0.03
0.03
0.26
0.52
0.03
0.03
0.33
0.66
0.03
0.03
0.33
0.66
0.03
0.06
0.01
0.02
0.00
0.06
0.01
0.02
0.00
0.06
0.01
0.02
0.00
0.06
0.01
0.02
0.00
0.20
0.12
0.01
0.00
0.15
0.07
0.01
0.01
Muzakir
Wakil Direktur
NO
Nihil
TOTAL ( % )
VOLUME
NILAI PEKERJAAN
(Rp)
KETERANGAN
#
zak
###
###
###
###
0.00
Muzakir
Wakil Direktur
NO.
JENIS PERALATAN
KUANTITAS (Unit)
UKURAN KAPASITAS
ATAU DAYA
TAHUN PEMBUATAN
KONDISI
BUKTI KEPEMILIKAN
0.3 M3
Tiga Ring/Kubota
2013
Sewa
Baik
Banda Aceh
Dukungan
Generator Set
10 Kva
Denyo
2011
Sewa
Baik
Banda Aceh
Dukungan
Survey Equipment
Standar
Top Corn
2012
Sewa
Baik
Banda Aceh
Dukungan
Standar
Krisbow
2014
Sewa
Baik
Banda Aceh
Dukungan
Pompa Air
3 Inc
Honda
2012
Sewa
Baik
Banda Aceh
Dukungan
ABUKARI
Direktur
JADWAL PERALATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
NO.
JENIS PERALATAN
KUANTITAS
(Unit)
Generator Set
Survey Equipment
Pompa Air
BULAN I
1
BULAN II
4
BULAN III
4
BULAN IV
4
BULAN V
4
BULAN VI
4
ABUKARI
Direktur
LOKASI
KOTA SABANG
TAHUN ANGGARAN
2013
JAD
NO
PERSONIL INTI
JMLH
SAT.
Bulan 1
I
Site Manager
1.00
Org
Pelaksana Lapanan
1.00
Org
1.00
Org
1.00
Org
1.00
Org
II
III
L PERSONIL INTI
Bulan 2
IV
II
III
Muzakir
Wakil Direktur
KET.
Bulan 3
IV
II
STRUKTUR ORG
NAMA KEGIATAN
LOKASI
TAHUN ANGGARAN
:
:
:
HASANUDD
Site Mana
HADI SYAHRIZAL
Surveyor / Juru Ukur
HERI DARM
Draftman / Jur
TUR ORGANISASI
U BURO
HASANUDDIN, ST
Site Manager
NURAINI, SE
Administrasi & Keuangan
HERI DARMAWAN
ISMAIL, A.Md
Pelaksanan Lapangan
Muzakir
Wakil Direktur
METODE PELAKSANAAN
NAMA KEGIATAN
LOKASI
TAHUN ANGGARAN
Dalam melaksanakan pekerjaan tersebut diatas diperlukan Metoda Pelaksanaan yaitu cara pelaksanaan suatu pekerjaan agar
Kalender),tepat biaya, waktu dan spesifikasi tenis + rencana kerja (Bestek).
Adapun metode yang digunakan yaitu sebagai berikut :
Pekerjaan yang akan dilaksanakan antara lain:
A. PEKERJAAN PERSIAPAN
1). Pekerjaan Persiapan
Seminggu sebelum dimulainya pekerjaan pelaksana harus mengajukan usulan mengenai urutan rencana pemancangan yang h
mengganggu.
Membuat Time Shcedule/jadwal pelaksanaan lapangan secara rinci. Pekerjaan harus sudah diselesaikan dalam kurun waktu 75
Surat Perintah Mulai Kerja (SPMK) ditandatangani, percepatan penyelesaian setinggi-tingginya 10% (sepuluh persen) dari kuru
Kantor peroyek di bangun sebagai tempat bekerja bagi para staf baik staf dari kontraktor, pengawas, maupun pemilik proyek di
permanen karena hanya bersifat sementara, namun tetap mengutamakan kenyaman yang mengacu pada spesifikasi teknis dok
ketentuan dalam dokumen kontrak.
3). Mobilisasi
Mobilisasi bertujuan untuk mengadakan/mendatangkan peralatan, personil, dan perlengkapan untuk melaksanakan semua item
yang diinginkan sesuai dengan gambar kerja.
Dalam Pelaksanaan Proyek ini Mobilisasi dan Demobilisasi Peralatan yang dilakukan terdiri dari:
1.
Concrete Mixer
2.
Genset
3.
Thedollite
4.
Water Pass
Personil terdiri dari:
1.
Site Manager
2.
Pelaksana Lapangan
3.
4.
5.
Drafmen/Juru gambar
Surveyor/Juru Ukur
Administrasi Proyek
Untuk mendapatkan volume yang akurat dilapangan maka akan dilakukan pengukuran ulang secara horizontal dan vertikal, me
pekerjaan tersebut. Volume yang didapat adalah acuan kerja selanjutnya di lapangan sebagai MC-0.
B. PEKERJAAN KONSTRUKSI
1). Pekerjaan Galian
Pekerjaan galian dilakukan untuk memperoleh kedalaman tertentu dimana pelindung kaki dan lapis batu pelindung
Pelaksanaan pekerjaan galian dilakukan dengan menggunakan peralatan tukang / alat bantu tukang
2). Pekerjaan Pasangan Batu
Pasangan batu belah tersebut harus di kerjakan dengan cara yang terbaik dengan permukaan kasar tanpa cacat atau retak .
Pekerjaan pemasangan batu belah dilaksanakan sesuai dengan ukuran dan bentuk -bentuk yang di tunjukan dalam gambar. Tia
semua hubungan batu melekat satu dengan yang lainnya dengan sempurna, semua batu harus di pasang diatas lapisan aduka
mengisi penuh rongga-rongga antara batu untuk mendapatkan masa yang kuat dan integral.
Pada umumnya tampang lintang dari badan pondasi batu belah berbentuk trapesium dengan lebar sisi bagian atas paling sedik
Sebelum dipasang, batu belah harus disiram air terlebih dahulu. Bila tanah dasar pondasi banyak mengandung air, maka sebel
batu kosong yang diisi pasir pada rongga-rongganya.
Bila kondisi lapisan tanah banyak mengandung air, maka sebelum badan pondasi dipasang terlebih dahulu disusun pasangan b
batu kosong tersebut dinamakan aanstamping, yang berfungsi sebagai drainase untuk mengeringkan air tanah yang terdapat
Sebelum pekerjaan penulangan plat lantai dilaksanakan perlu dibuat bangunan perancah terlebih dahulu. Suatu struktur sangat
karena seluruh beban pada awalnya ditahan oleh bangunan perancah. Bila suatu bangunan perancah tidak kuat dan saat peng
gagal. Setelah pekerjaan perancah selesai dilakukan pekerjaan penulangan.
Bekisting merupakan rangkaian kayu dan papan yang dibuat menjadi satu bentuk tertentu. Bekisting mencetak beton sesuai de
bekisting pada pembuatan plat lantai ini dilaksanakan bersamaan pada waktu pembuatan bekisting pada balok. Hal ini
perencanaan bekisting keseluruhan dan pemasangannya, disamping itu dapat mempercepat pekerjaan dalam pengecoran. Un
yang diperlukan, hal ini untuk memenuhi aspek ekonomi dan teknologi, dengan sasaran kemudahan, aman dan eko
4). Pengecoran
Mutu beton yang dipakai untuk pengecoran balok dan plat lantai ini adalah mutu K250. Pekerjaan ini dilakukan setelah pemasa
Ketepatan ukuran dan elevasi harus diperhatikan dan dicheck. Sebelum dilakukan pengecoran, pengawas hendaknya mengisi
kesalahan fatal terhadap struktur.
Zone pengecoran harus direncanakan dan ukurannya ditentukan, untuk merencanakan etika-etika pengecoran, termasuk diman
memungkinkan.
bekisting kuat dan instalasi Mekanikal dan Elektrikal telah terpasang di dalam pelat atau kolom sebelum dicor. Apabila hal ini ter
memahat struktur akan mengakibatkan keretakan dan bekas pahatan akan menjadi titik lemah struktur.
Pekerjaan bisa terundur / delay diakibatkan oleh cuaca panas, atau angin yang kencang, sehingga beton mengeras lebih cepat
cuaca sebaiknya diperhitungkan berdasakan keadaan lapangan.
Jangan menambahkan air pada beton untuk memudahkan pelaksanaan cor. Jika terpaksa gunakanlah campuran air dan semen
Beton yang akan dicor harus langsung ke tempat yang jadi posisi akhirnya. Mulailah dari pojok bekisting.
Untuk mencegah segregasi, cek beton jangan terlalu basah atau kering, beton diaduk dengan baik, jika menjatuhkan beton sec
melebihi 2 meter, maka harus memakai talang cor.
Pemadatan beton dilakukan dengan cara digetarkan, untuk mengeluarkan udara yang terperangkap dalam beton, sehingga bet
cara-cara yang benar untuk memakai vibrator, supaya tidak terjadi segregasi dan pergeseran tulangan bahkan kesalahan pema
meledak.
5). Pekerjaan Lain-lain
Kontraktor harus membuat laporan harian yang ditanda tangani oleh wakil kontraktor dan konsultan pengawas
8). Demobilisasi
Jika pekerjaan ini selesai dilakukan, kontraktor belum dapat melakukan demobilisasi alat maupun personil, sebelum mendapatk
Tahapan meninggalkan lokasi pekerjaan selesai dilakukan dan telah ada persetujuan dari direksi, kontraktor berkewajiban untuk
peralatan bantu, demobilisasi tenaga kerja juga bertanggung jawab untuk membersihkan lokasi pekerjaan secara keseluruhan,
pelaksanaan pekerjaan sesuai dengan petunjuk direksi
DE PELAKSANAAN
20M DARAT DI PULAU BURO
u cara pelaksanaan suatu pekerjaan agar dapat diselesaikan tepat waktu yaitu selama 2,5 bulan (75 hari
enai urutan rencana pemancangan yang harus diatur sedemikian rupa sehingga tidak akan saling
sudah diselesaikan dalam kurun waktu 75 (tujuh puluh lima)hari kalender (HK), terhitung sejak tanggal
-tingginya 10% (sepuluh persen) dari kurun waktu yang ditetapkan.
ktor, pengawas, maupun pemilik proyek di lapangan. Pembuatan direksi keet tidak di bangun secara
yang mengacu pada spesifikasi teknis dokumen pelelangan yakni Direksi keet dilengkapi dengan
ngkapan untuk melaksanakan semua item pekerjaan di lapangan, dan mengembalikan pada keadaan
n ulang secara horizontal dan vertikal, memasang patok-patok untuk pedoman penentuan letak dari
sebagai MC-0.
bentuk yang di tunjukan dalam gambar. Tiap-tiap batu harus dipasang penuh dengan adukan sehingga
batu harus di pasang diatas lapisan adukan dan di cetak di tempatnya sehingga tegak.adukan harus
ntegral.
dengan lebar sisi bagian atas paling sedikit 25 cm, sehingga didapatkan susunan batu yang kokoh.
dasi banyak mengandung air, maka sebelum pondasi dipasang harus disusun terlebih dahulu pasangan
asang terlebih dahulu disusun pasangan batu kosong yang diisi pasir pada rongga-rongganya. Susunan
uk mengeringkan air tanah yang terdapat di sekitar badan pondasi.
cah terlebih dahulu. Suatu struktur sangat bergantung pada bangunan perancahnya, hal ini disebabkan
ngunan perancah tidak kuat dan saat pengecoran runtuh maka dapat dikatakan itu suatu konstruksi yang
entu. Bekisting mencetak beton sesuai dengan bentuk yang direncanakan. Pekerjaan pemasangan
embuatan bekisting pada balok. Hal ini dilaksanakan dengan tujuan untuk memudahkan dalam
percepat pekerjaan dalam pengecoran. Untuk pembuatan bekisting perlu dipertimbangkan bahan-bahan
gan sasaran kemudahan, aman dan ekonomis.
ngecoran, pengawas hendaknya mengisi dulu checklist inspeksi, sehingga tidak terjadi kesalahan-
an etika-etika pengecoran, termasuk dimana pengecoran bisa berhenti apabila keadaan tidak
au kolom sebelum dicor. Apabila hal ini terlalai, maka akan berakibat fatal terhadap struktur, karena
tik lemah struktur.
ang, sehingga beton mengeras lebih cepat. Untuk mencegah delay maka tenaga kerja, peralatan, dan
g terperangkap dalam beton, sehingga beton memadat memenuhi bekisting, tapi harus diperhatikan juga
geseran tulangan bahkan kesalahan pemakaian vibrator bisa mengakibatkan bekisting/cetakan/mal cor
g data-data proyek, termasuk disini adalah pengajuan izin pekerjaan ( request ), pembuatan laporan
aksanaan dan surat menyurat.
dari direksi, kontraktor berkewajiban untuk disamping membawa kembali semua peralatan kerja dan
kan lokasi pekerjaan secara keseluruhan, juga pembongkaran bangunan-bangunan penunjang untuk
Muzakir
Wakil Direktur
Uraian Pekerjaan
(1)
Barang
I. Material Langsung (Bahan Baku)
II. Peralatan (Barang jadi)
A. Sub Total Barang Jasa
DN
LN
(2)
(3)
Ribu
Rp
(4)
%
KDN
(5)
232,363,000.00
92,945,200.00
325,308,200.00
0.00
0.00
0.00
232,363,000.00
92,945,200.00
325,308,200.00
50.00%
20.00%
70.00%
0.00
0.00
92,945,200.00
46,472,600.00
139,417,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
92,945,200.00
46,472,600.00
139,417,800.00
0.00%
0.00%
20.00%
10.00%
30.00%
C. TOTAL Biaya (A + B)
464,726,000.00
0.00
464,726,000.00
100.00%
464,726,000
- Rp.0,00
464,726,000.00
Formulasi perhitungan :
% TKDN (Gabungan
Barang dan Jasa)
Rp
Rp
=
=
1,00
100.00 %
0,00 - 0,00
Rp
464,726,000.00
0
Gabungan
%
(6)
(7)
232,363,000.00
92,945,200.00
325,308,200.00
0.00
0.00
92,945,200.00
46,472,600.00
139,417,800.00
464,726,000.00
X
100%
0.50
0.20
70.00
###
0.00
0.00
28.57
14.29
30.00
###
100.00
100%
Muzakir
Wakil Direktur
NETWORK PLANNING
NAMA KEGIATAN
LOKASI
TAHUN ANGGARAN
:
:
:
Pekerjaan Pondasi
I
7
14
14
14
21
7
A
0
1. Pek. Persiapan
2. Mobilisasi
1. Pekerjaan Tanah
2. Galian
3. Timbunan
B
7
21
7
C
28
PEKERJAAN PONDASI
1. Pasangan Pondasi Batu Bata 1Pc : 2Ps
2. Pasangan Pondasi Batu Gunung 1Pc : 4 Ps
3. Aanstamping (Batu Kosong)
N
14
10
28
30
38
1. Pek. Listrik
2.Pek. Lantai
J
28
K
35
14
42
1. Pek. Pengecatan
L
49
14
53
68
M
45
10
D
38
68
10
38
E
48
10
48
F
58
10
58
O
44
68
68
1. Pengukuran
2. Penerangan & Keselamatan Kerja
3.Administrasi & Dokumentasi
4. Air Kerja
G
68
68
H
75
1. As Built Drawing
2. Demobilisasi
75
Muzakir
Wakil Direktur