Equipment

Rating

Qty

HV Switch gear
PMCC
MCC-1
MCC-2
EPDB
PAP Panel GEG 1,2,3,4
MIP Panel GEG 1,2,3,4
NGR Panel GEG 1,2,3,4
MCP Panel GEG 1,2,3,4
Transformer 1
Transformer 2
Bus duct - 1
Bus duct - 2
Motors
Motors
Motors
Motors
Motors
Motors
Motors
Motors
Motors

11 KV
415 V
415 V
415 V
415 V
415 V
11 KV
11 KV
240 V
2 MVA
2 MVA
415 V
415 V
90KW
30KW
18.5 KW
11 KW
7.5 KW
5.5 KW
3.7 KW
2.2 KW
1.1 KW

16 cubicles
19 cubicle
3 cubicle
3 cubicle
2 cubicles
4
4
4
4
1
1
1
1
2
15
2
4
1
26
20
6
15

Test Report status


Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted
Submitted

to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to

L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T
L&T

RIL signature
Under RIL Review
Under RIL Review
Under L&T Review
Under L&T Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under RIL Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review
Under L&T Review

Scope

Fab shop Electrical works


Sl no Area
1 General
2
3
4
5
6
7
8
9
10
11
12
13 Ground floor - Toilet
14
15 Staircase
16 Laboratory
17
18 First floor - Toilet
19 First floor - corridor
20 First floor - Instrument store
21 First floor - Office area
22
23 First floor - Pantry Area
24
25

Description
Fix coupler plates properly and provide missing nut/bolts for all cable trays
Unsused slots in all Sitch boards shall be closed
Double earthing shall be done for all DBs and Panels
Earthing jumper between earthing stud and earthing bar shall be connected in all DBs
Door earth bonding for all DBs shall be connected
Provide missing screws inside the all DBs
Identification stickers shall be provided for all DBs
Unused MCB slots in DBs shall be sealed
FF3-PDB main cable to be properly clamped
Earthing and earth testing work outside the building incomplete
Lightning system works incomplete
Telecom works and tagging incomplete
Exhaust fan connection pending
Wash basin light found broken
Flexible conduit to be provided for light fixture cable
Item no S6 not complete (sockets)
Item no S5 not complete (sockets)
Exhaust fan connection pending
Light fixture on wetern end to be properly fixed
Switch boards incomplete
Switch boards incomplete
Computer power sockets and lan socket not accessible
Switch boards incomplete
Exhaust fans not installed
Wall mounted fans not installed

Action By

Completion