RAM_16GB_CFG

RAM_8GB_Part
HD_500GB_Part
HD_1TB_CFG
Go to Bill of Materials Responsibility .
2. Navigate to: Routings-> Routing
3. Create a Routing for an item.
4. Assign operations and resources, make sure Schedule_flag for the resources is
set to 'Yes'.
5. Go to: Tools >Compute Lead Times, or Rollup Leadtimes.
6. Run report and monitor for completion.
7. See report output.
Oracle Manufacturing Leadtime Guide - How to Setup Leadtimes (Doc ID 140151.1)
Oracle Manufacturing Lead Time Guide (Doc ID 100127.1)
How Does ASCP Calculate Organization Item Attribute Setup MRP Planned Safety Sto
ck? (Doc ID 376451.1)
ASCP Plan Ignores Current Supply and Creates New Planned Orders for Safety Stock
(Doc ID 290335.1)