You are on page 1of 21

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Electrical Transient Analyzer Program


ETAP PowerStation

Load Flow Analysis


Loading Category:

Design

Load Diversity Factor:

None

Swing

Generator

Load

Total

42

43

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

28

28

56

Number of Buses:

Number of Branches:

Method of Solution:

Newton-Raphson Method

Maximum No. of Iteration:

99

Precision of Solution:

0.000100

System Frequency:

60.00

Unit System:

Metric

Project Filename:

bebanminimum1

Output Filename:

C:\ETAP 400\PowerStation\bebanminimum1\Untitled.lf1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS Input Data

Bus
ID

Initial Voltage
Type

kV

% Mag.

Ang.

Generator
MW

Mvar

Motor Load
MW

Mvar

Static Load
MW

Mvar

Bus2

Load

20.000

100.0

0.0

44.700

21.726

Bus3

Load

20.000

100.0

0.0

16.900

8.236

Bus4

Load

20.000

100.0

0.0

14.600

7.248

Bus5

Load

20.000

100.0

0.0

34.300

16.587

Bus6

Load

20.000

100.0

0.0

22.400

10.875

Bus7

Load

20.000

100.0

0.0

12.700

6.126

Bus8

Load

20.000

100.0

0.0

43.500

21.221

Bus11

Load

20.000

100.0

0.0

40.100

19.294

Bus12

Load

20.000

100.0

0.0

44.800

21.749

Bus13

Load

20.000

100.0

0.0

34.400

16.839

Bus16

Load

20.000

100.0

0.0

20.500

9.980

Bus17

Load

20.000

100.0

0.0

19.000

9.177

Bus18

Load

20.000

100.0

0.0

24.600

0.000

Bus21

Load

20.000

100.0

0.0

34.900

16.954

Bus22

Load

20.000

100.0

0.0

35.400

17.298

Bus26

Load

20.000

100.0

0.0

17.800

8.672

Bus27

Load

20.000

100.0

0.0

33.800

16.472

Bus31

Load

20.000

100.0

0.0

20.799

10.050

Bus32

Load

20.000

100.0

0.0

19.100

9.201

Bus37

Load

20.000

100.0

0.0

16.400

7.892

Bus38

Load

20.000

100.0

0.0

11.500

5.389

Bus40

Load

20.000

100.0

0.0

39.400

18.904

Bus42

Load

20.000

100.0

0.0

11.700

5.668

Bus43

Load

20.000

100.0

0.0

5.700

2.911

Bus44

Load

20.000

100.0

0.0

16.900

8.236

Bus45

Load

20.000

100.0

0.0

16.500

7.915

Bus46

Load

20.000

100.0

0.0

16.900

8.236

Bus47

Load

20.000

100.0

0.0

18.100

8.741

GI_BANTUL

Load

150.000

100.0

0.0

GI_BAWEN

Load

150.000

100.0

0.0

GI_GEJAYAN

Load

150.000

100.0

0.0

GI_GODEAN

Load

150.000

100.0

0.0

GI_KALASAN

Load

150.000

100.0

0.0

GI_KENTUNGAN

Load

150.000

100.0

0.0

GI_KLATEN

Load

150.000

100.0

0.0

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Bus
ID

Initial Voltage
Type

kV

% Mag.

Ang.

GI_MEDARI

Load

150.000

100.0

0.0

GI_PEDAN

Swing

150.000

100.0

0.0

GI_PURWOREJO

Load

150.000

100.0

0.0

GI_SANGGRAHAN

Load

150.000

100.0

0.0

GI_SEMANU

Load

150.000

100.0

0.0

GI_WATES

Load

150.000

100.0

0.0

GI_WIROBRAJAN

Load

150.000

100.0

0.0

GI_WONOSARI

Load

150.000

100.0

0.0

Total Nunmber of Buses: 43

Generator
MW

0.000

Motor Load

Mvar

0.000

MW

0.000

Mvar

0.000

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Static Load
MW

Mvar

687.396

321.595

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LINE / CABLE Input Data


Line/Cable
ID

Ohms or Mohs / 1000 m per Conductor (Cable) or per Phase (Line)


Library

Size

Length(m)

#/Phase

T (C)

Line5

25470.0

75

0.118300

Line6

25470.0

75

0.118300

Line7

64760.0

75

0.118300

Line8

64760.0

75

0.118300

Line9

27270.0

75

0.118300

Line10

10640.0

75

0.118300

Line11

37910.0

75

0.118300

Line12

7710.0

75

0.118300

Line13

12250.0

75

0.118300

Line14

19960.0

75

0.118300

Line17

76390.0

75

0.118300

Line18

34770.0

75

0.118300

Line19

34770.0

75

0.118300

Line20

22110.0

75

0.118300

Line21

22110.0

75

0.118300

Line24

5950.0

75

0.075400

Line25

5950.0

75

0.075400

Line26

6400.0

75

0.075400

Line27

6400.0

75

0.075400

Line28

25250.0

75

0.118300

Line29

25250.0

75

0.118300

Line30

23260.0

75

0.118300

Line31

18300.0

75

0.118300

Line33

18300.0

75

0.118300

Line34

20000.0

75

0.118300

Line35

20000.0

75

0.118300

Line36

39040.0

75

0.118300

Line37

39040.0

75

0.118300

Line / Cable resistances are listed at the specified temperatures.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

2-WINDING TRANSFORMER Input Data

Transformer
ID

Rating

Z Variation
%Z

X/R

+ 5%

- 5%

% Tap Setting
% Tol.

Prim.

Adjusted

Sec.

%Z

Phase Shift

MVA

Prim. kV

Sec. kV

Type

Angle

T1

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

0.0

T2

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

0.0

T3

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

0.0

T4

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

0.0

T5

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

0.0

T8

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

0.0

T9

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

0.0
0.0

T12

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

T13

30.000

150.000

20.000

7.750

23.7

7.7500

Std Pos. Seq.

0.0

T16

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

0.0

T17

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

0.0

T20

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

0.0
0.0

T21

60.000

150.000

20.000

7.750

34.1

7.7500

Std Pos. Seq.

T24

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0

T25

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0

T29

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

0.0

T30

20.000

150.000

20.000

9.500

18.6

9.5000

Std Pos. Seq.

0.0

T31

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

0.0

T35

60.000

150.000

20.000

9.500

29.5

9.5000

Std Pos. Seq.

0.0

T36

60.000

150.000

20.000

9.500

29.5

9.5000

Std Pos. Seq.

0.0

T38

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

0.0

T39

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0

T40

16.000

150.000

20.000

9.500

18.6

9.5000

Std Pos. Seq.

0.0

T41

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0
0.0

T42

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

T43

60.000

150.000

20.000

9.500

34.1

9.5000

Std Pos. Seq.

0.0

T44

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0

T45

30.000

150.000

20.000

9.500

23.7

9.5000

Std Pos. Seq.

0.0

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH CONNECTIONS
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

T1

2W XFMR

GI_SANGGRAHAN

Bus3

1.09

25.81

25.83

T2

2W XFMR

GI_SANGGRAHAN

Bus4

1.09

25.81

25.83

T3

2W XFMR

GI_SANGGRAHAN

Bus5

0.46

15.83

15.83

T4

2W XFMR

GI_MEDARI

Bus7

1.09

25.81

25.83

T5

2W XFMR

GI_MEDARI

Bus6

1.09

25.81

25.83

T8

2W XFMR

GI_KENTUNGAN

Bus11

0.38

12.91

12.92

T9

2W XFMR

GI_KENTUNGAN

Bus12

0.38

12.91

12.92

T12

2W XFMR

GI_GODEAN

Bus16

1.09

25.81

25.83

T13

2W XFMR

GI_GODEAN

Bus17

1.09

25.81

25.83

T16

2W XFMR

GI_BANTUL

Bus21

0.38

12.91

12.92

T17

2W XFMR

GI_BANTUL

Bus22

0.38

12.91

12.92

T20

2W XFMR

GI_BAWEN

Bus26

0.38

12.91

12.92

T21

2W XFMR

GI_BAWEN

Bus27

0.38

12.91

12.92

T24

2W XFMR

GI_KLATEN

Bus31

1.33

31.64

31.67

T25

2W XFMR

GI_KLATEN

Bus32

1.33

31.64

31.67

T29

2W XFMR

GI_WONOSARI

Bus37

0.46

15.83

15.83

T30

2W XFMR

GI_WONOSARI

Bus38

2.55

47.43

47.50

T31

2W XFMR

GI_WONOSARI

Bus40

0.46

15.83

15.83

T35

2W XFMR

GI_GEJAYAN

Bus2

0.54

15.82

15.83

T36

2W XFMR

GI_GEJAYAN

Bus8

0.54

15.82

15.83

T38

2W XFMR

GI_WIROBRAJAN

Bus13

0.46

15.83

15.83

T39

2W XFMR

GI_WATES

Bus42

1.33

31.64

31.67

T40

2W XFMR

GI_WATES

Bus43

3.19

59.29

59.38

T41

2W XFMR

GI_PURWOREJO

Bus45

1.33

31.64

31.67

T42

2W XFMR

GI_PURWOREJO

Bus46

0.46

15.83

15.83

T43

2W XFMR

GI_KALASAN

Bus18

0.46

15.83

15.83

T44

2W XFMR

GI_SEMANU

Bus44

1.33

31.64

31.67

T45

2W XFMR

GI_SEMANU

Bus47

1.33

31.64

31.67

Line5

Line

GI_PEDAN

GI_KLATEN

1.34

1.34

Line6

Line

GI_PEDAN

GI_KLATEN

1.34

1.34

Line7

Line

GI_BAWEN

GI_KLATEN

3.40

3.40

Line8

Line

GI_BAWEN

GI_KLATEN

3.40

3.40

Line9

Line

GI_SANGGRAHAN

GI_MEDARI

1.43

1.43

Line10

Line

GI_MEDARI

GI_KENTUNGAN

0.56

0.56

Line11

Line

GI_SANGGRAHAN

GI_KENTUNGAN

1.99

1.99

Line12

Line

GI_KENTUNGAN

GI_GODEAN

0.41

0.41

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

CKT/Branch

Connected Bus ID

ID

Type

From Bus

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

% Impedance, Pos. Seq., 100 MVAb


To Bus

Line13

Line

GI_GODEAN

GI_BANTUL

0.64

0.64

Line14

Line

GI_KENTUNGAN

GI_BANTUL

1.05

1.05

Line17

Line

GI_BAWEN

GI_SANGGRAHAN

4.02

4.02

Line18

Line

GI_KLATEN

GI_BANTUL

1.83

1.83

Line19

Line

GI_KLATEN

GI_BANTUL

1.83

1.83

Line20

Line

GI_PEDAN

GI_WONOSARI

1.16

1.16

Line21

Line

GI_PEDAN

GI_WONOSARI

1.16

1.16

Line24

Line

GI_GEJAYAN

GI_KENTUNGAN

0.20

0.20

Line25

Line

GI_GEJAYAN

GI_KENTUNGAN

0.20

0.20

Line26

Line

GI_WIROBRAJAN

GI_BANTUL

0.21

0.21

Line27

Line

GI_WIROBRAJAN

GI_BANTUL

0.21

0.21

Line28

Line

GI_WATES

GI_BANTUL

1.33

1.33

Line29

Line

GI_PURWOREJO

GI_BANTUL

1.33

1.33

Line30

Line

GI_PURWOREJO

GI_WATES

1.22

1.22

Line31

Line

GI_PEDAN

GI_KALASAN

0.96

0.96

Line33

Line

GI_PEDAN

GI_KALASAN

0.96

0.96

Line34

Line

GI_KENTUNGAN

GI_KALASAN

1.05

1.05

Line35

Line

GI_KENTUNGAN

GI_KALASAN

1.05

1.05

Line36

Line

GI_BANTUL

GI_SEMANU

2.05

2.05

Line37

Line

GI_BANTUL

GI_SEMANU

2.05

2.05

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE Input Data


O/L
Equipment Cable
ID

Equipment
ID

ohms / 1000 m per Conductor


Type

Library

Size

L(m)

#/ph

T (C)

Heater
R

R (ohm)

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

bebanminimum1

Page:

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT

Bus

Voltage

Generation

Motor Load

Static Load

MW

MW

Load Flow

kV

%Mag.

Bus2

20.000

93.251

-2.9

38.87

18.89

Bus3

20.000

94.194

-1.3

14.99

Bus4

20.000

94.474

-1.0

Bus5

20.000

93.714

-1.9

Bus6

20.000

93.696

-2.1

Bus7

20.000

95.019

-0.8

Bus8

20.000

93.340

-2.8

Bus11

20.000

94.364

-1.9

Bus12

20.000

94.029

-2.2

Bus13

20.000

93.989

Bus16

20.000

94.066

Bus17

20.000

Bus18

20.000

Bus21

ID

Ang.

MW

Mvar

Mvar

Mvar

ID

XFMR

MW

Mvar

Amp

%PF

GI_GEJAYAN

-38.87

-18.89

1337

89.9

7.31

GI_SANGGRAHAN

-14.99

-7.31

511

89.9

13.03

6.47

GI_SANGGRAHAN

-13.03

-6.47

444

89.6

30.12

14.57

GI_SANGGRAHAN

-30.12

-14.57

1030

90.0

19.66

9.55

GI_MEDARI

-19.66

-9.55

673

90.0

11.47

5.53

GI_MEDARI

-11.47

-5.53

386

90.1

37.90

18.49

GI_GEJAYAN

-37.90

-18.49

1304

89.9

35.71

17.18

GI_KENTUNGAN

-35.71

-17.18

1212

90.1

39.61

19.23

GI_KENTUNGAN

-39.61

-19.23

1351

90.0

-2.0

30.39

14.88

GI_WIROBRAJAN

-30.39

-14.88

1039

89.8

-1.9

18.14

8.83

GI_GODEAN

-18.14

-8.83

619

89.9

94.288

-1.7

16.89

8.16

GI_GODEAN

-16.89

-8.16

574

90.0

98.305

-1.8

23.77

0.00

GI_KALASAN

-23.77

0.00

698

100.0

20.000

94.524

-1.5

31.18

15.15

GI_BANTUL

-31.18

-15.15

1058

89.9

Bus22

20.000

94.479

-1.5

31.60

15.44

GI_BANTUL

-31.60

-15.44

1074

89.8

Bus26

20.000

95.974

-0.4

16.40

7.99

GI_BAWEN

-16.40

-7.99

548

89.9

Bus27

20.000

94.912

-1.5

30.45

14.84

GI_BAWEN

-30.45

-14.84

1030

89.9

Bus31

20.000

94.785

-3.0

18.69

9.03

GI_KLATEN

-18.69

-9.03

632

90.0

Bus32

20.000

95.080

-2.8

17.27

8.32

GI_KLATEN

-17.27

-8.32

581

90.1

Bus37

20.000

98.296

-1.3

15.85

7.63

GI_WONOSARI

-15.85

-7.63

516

90.1

Bus38

20.000

96.741

-2.8

10.76

5.04

GI_WONOSARI

-10.76

-5.04

354

90.6

Bus40

20.000

96.394

-3.3

36.61

17.56

GI_WONOSARI

-36.61

-17.56

1216

90.2

Bus42

20.000

94.621

-1.0

10.48

5.07

GI_WATES

-10.48

-5.07

355

90.0

Bus43

20.000

94.671

-0.8

5.11

2.61

GI_WATES

-5.11

-2.61

174

89.1

Bus44

20.000

93.704

-1.8

14.84

7.23

GI_SEMANU

-14.84

-7.23

508

89.9

Bus45

20.000

93.791

-1.8

14.51

6.96

GI_PURWOREJO

-14.51

-6.96

495

90.2

Bus46

20.000

95.118

-0.4

15.29

7.45

GI_PURWOREJO

-15.29

-7.45

516

89.9

Bus47

20.000

93.527

-2.0

15.83

7.65

GI_SEMANU

-15.83

-7.65

542

90.1

150.000

96.809

1.0

GI_GODEAN

GI_BANTUL

-1.93

-1.46

79.9

GI_KENTUNGAN

-15.50

-8.87

71

86.8

GI_KLATEN

-76.24

-40.96

344

88.1

GI_KLATEN

-76.24

-40.96

344

88.1

GI_WIROBRAJAN

15.23

8.46

69

87.4

GI_WIROBRAJAN

15.23

8.46

69

87.4

GI_WATES

20.58

10.94

92

88.3

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

bebanminimum1

Bus
ID

GI_BAWEN

GI_GEJAYAN

GI_GODEAN

Voltage
kV

150.000

150.000

150.000

%Mag.

97.138

96.898

96.822

Generation

Ang.

0.9

1.0

1.0

MW

Mvar

Motor Load

Static Load

MW

MW

Mvar

ID

GI_KENTUNGAN

GI_KLATEN

150.000

150.000

150.000

98.492

96.977

98.252

0.4

0.9

0.5

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

MW

XFMR
Mvar

Amp

%PF

GI_PURWOREJO

25.09

13.29

112

88.4

GI_SEMANU

15.45

8.49

70

87.6

GI_SEMANU

15.45

8.49

70

87.6

Bus21

31.23

16.88

141

88.0

Bus22

31.65

17.23

143

87.8

GI_KLATEN

-31.73

-16.90

142

88.3

GI_KLATEN

-31.73

-16.90

142

88.3

GI_SANGGRAHAN

16.56

8.86

74

88.2

Bus26

16.41

8.45

73

88.9

Bus27

30.50

16.48

137

88.0

GI_KENTUNGAN

-38.50

-22.00

176

86.8

GI_KENTUNGAN

-38.50

-22.00

176

86.8

Bus2

38.99

22.29

178

86.8

Bus8

38.01

21.72

173

86.8

-37.06

-20.65

168

87.3

GI_KENTUNGAN
GI_BANTUL

GI_KALASAN

10

Load Flow

Mvar

Page:

1.93

1.46

79.9

Bus16

18.19

10.02

82

87.6

Bus17

16.93

9.18

76

87.9

GI_PEDAN

-154.09

-77.92

674

89.2

GI_PEDAN

-154.09

-77.92

674

89.2

GI_KENTUNGAN

142.19

77.46

632

87.8

GI_KENTUNGAN

142.19

77.46

632

87.8

Bus18

23.80

0.93

93

99.9

GI_MEDARI

48.01

26.03

216

87.9

GI_SANGGRAHAN

25.47

13.84

115

87.9

GI_GODEAN

37.13

20.65

168

87.4

GI_BANTUL

15.53

8.87

71

86.8

GI_GEJAYAN

38.54

22.00

176

86.8

GI_GEJAYAN

38.54

22.00

176

86.8

GI_KALASAN

-139.35

-77.46

632

87.4

GI_KALASAN

-139.35

-77.46

632

87.4

Bus11

35.77

19.46

161

87.8

Bus12

39.69

22.06

180

87.4

GI_PEDAN

-127.94

-67.94

567

88.3

GI_PEDAN

-127.94

-67.94

567

88.3

GI_BAWEN

32.20

16.90

142

88.5

GI_BAWEN

32.20

16.90

142

88.5

GI_BANTUL

77.70

40.96

344

88.5

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

bebanminimum1

Bus
ID

GI_MEDARI

Voltage
kV

150.000

%Mag.

96.700

Generation

Ang.

1.0

MW

Mvar

Motor Load

Static Load

MW

MW

Mvar

ID

150.000

100.000

0.0

639.44

325.98

GI_SANGGRAHAN

150.000

96.465

96.454

1.1

1.1

150.000

96.482

1.1

96.527

1.1

150.000

96.775

1.0

150.000

99.630

0.1

XFMR
Mvar

Amp

%PF
88.5

84

87.2

Bus32

17.32

9.60

77

87.5

GI_SANGGRAHAN

16.62

9.08

75

87.8

-47.83

-26.03

216

87.8

Bus7

11.49

5.99

51

88.7

Bus6

19.72

10.95

89

87.4

GI_KLATEN

130.85

67.94

567

88.8

GI_KLATEN

130.85

67.94

567

88.8

31.83

17.13

139

88.1

31.83

17.13

139

88.1

GI_KALASAN

157.05

77.92

674

89.6

GI_KALASAN

157.05

77.92

674

89.6

GI_BANTUL

-24.98

-13.29

112

88.3

GI_WATES

-4.88

-2.56

21

88.6

Bus45

14.55

7.89

66

87.9

Bus46

15.31

7.96

68

88.7

GI_MEDARI

-16.57

-9.08

75

87.7

GI_KENTUNGAN

-25.30

-13.84

115

87.7

GI_BAWEN

-16.41

-8.86

74

88.0

Bus3

15.03

8.12

68

88.0

Bus4

13.06

7.08

59

87.9

30.18

16.58

137

87.6

GI_BANTUL

-15.38

-8.49

70

87.6

GI_BANTUL

-15.38

-8.49

70

87.6

14.88

8.21

67

87.5

15.88

8.76

72

87.6

-20.50

-10.94

92

88.2

4.88

2.56

21

88.6

Bus42

10.50

5.55

47

88.4

Bus43

5.12

2.83

23

87.5

GI_BANTUL

-15.22

-8.46

69

87.4

GI_BANTUL

-15.22

-8.46

69

87.4

GI_BANTUL

Bus13
GI_WONOSARI

MW

344

GI_PURWOREJO

GI_WIROBRAJAN

Normal

10.55

Bus47
150.000

Base

Config.:

40.96

Bus44

GI_WATES

Revision:

18.75

Bus5
GI_SEMANU

KLGCONSULT

77.70

GI_WONOSARI

150.000

05-24-2015

SN:

Bus31

GI_WONOSARI

GI_PURWOREJO

Date:

GI_BANTUL

GI_KENTUNGAN

* GI_PEDAN

11

Load Flow

Mvar

Page:

30.45

16.93

138

87.4

GI_PEDAN

-31.68

-17.13

139

88.0

GI_PEDAN

-31.68

-17.13

139

88.0

Bus37

15.86

8.13

68

89.0

Bus38

10.80

5.76

47

88.2

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

bebanminimum1

Bus
ID

Voltage
kV

%Mag.

Ang.

Generation
MW

Mvar

Motor Load

Static Load

MW

MW

Mvar

# Indicates a bus with a load mismatch of more than 0.1 MVA

12

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Load Flow

Mvar

ID
Bus40

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

Page:

MW
36.69

XFMR
Mvar
20.37

Amp
162

%PF
87.4

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

13

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS LOADING Summary Report

Bus
ID

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

Bus2

20.000

38.870

18.892

43.218

89.9

1337.89

Bus3

20.000

14.995

7.307

16.680

89.9

511.20

Bus4

20.000

13.031

6.469

14.548

89.6

444.54

Bus5

20.000

30.123

14.567

33.461

90.0

1030.72

Bus6

20.000

19.665

9.547

21.860

90.0

673.49

Bus7

20.000

11.466

5.531

12.730

90.1

386.76

Bus8

20.000

37.898

18.488

42.167

89.9

1304.13

Bus11

20.000

35.707

17.180

39.625

90.1

1212.20

Bus12

20.000

39.610

19.229

44.031

90.0

1351.76

Bus13

20.000

30.389

14.875

33.834

89.8

1039.17

Bus16

20.000

18.139

8.831

20.174

89.9

619.12

Bus17

20.000

16.891

8.158

18.758

90.0

574.31

Bus18

20.000

23.773

0.000

23.773

100.0

698.11

Bus21

20.000

31.182

15.148

34.667

89.9

1058.73

Bus22

20.000

31.599

15.441

35.169

89.8

1074.58

Bus26

20.000

16.396

7.988

18.238

89.9

548.57

Bus27

20.000

30.448

14.838

33.871

89.9

1030.19

Bus31

20.000

18.686

9.029

20.753

90.0

632.06

Bus32

20.000

17.267

8.318

19.166

90.1

581.91

Bus37

20.000

15.846

7.625

17.585

90.1

516.44

Bus38

20.000

10.763

5.043

11.886

90.6

354.67

Bus40

20.000

36.609

17.565

40.605

90.2

1216.02

Bus42

20.000

10.476

5.075

11.640

90.0

355.12

Bus43

20.000

5.108

2.609

5.736

89.1

174.91

Bus44

20.000

14.839

7.232

16.507

89.9

508.54

Bus45

20.000

14.514

6.963

16.098

90.2

495.47

Bus46

20.000

15.290

7.451

17.009

89.9

516.22

Bus47

20.000

15.833

7.646

17.582

90.0

542.68

GI_BANTUL

150.000

169.913

92.250

193.340

87.9

768.70

GI_BAWEN

150.000

63.462

33.801

71.902

88.3

284.90

GI_GEJAYAN

150.000

76.993

44.009

88.683

86.8

352.27

GI_GODEAN

150.000

37.057

20.655

42.424

87.3

168.65

GI_KALASAN

150.000

308.177

155.844

345.341

89.2

1349.57

GI_KENTUNGAN

150.000

278.692

154.919

318.856

87.4

1265.53

% Loading

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Bus
ID

Page:

14

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

GI_KLATEN

150.000

255.871

135.870

289.708

88.3

GI_MEDARI

150.000

47.830

26.027

54.453

87.8

216.74

GI_PEDAN

150.000

639.441

325.979

717.738

89.1

2762.57

GI_PURWOREJO

150.000

29.859

15.852

33.806

88.3

134.89

GI_SANGGRAHAN

150.000

58.268

31.783

66.372

87.8

264.86

GI_SEMANU

150.000

30.760

16.977

35.134

87.6

140.16

GI_WATES

150.000

20.500

10.938

23.236

88.2

92.65

GI_WIROBRAJAN

150.000

30.449

16.926

34.837

87.4

138.56

GI_WONOSARI

150.000

63.353

34.264

72.025

88.0

278.26

1134.93

% Loading

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

15

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOADING Summary Report

Transformer
Cable & Reactor

CKT / Branch
ID

Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)
MVA

T1

Transformer

30.000

17.081

56.9

16.680

55.6

T2

Transformer

30.000

14.853

49.5

14.548

48.5

T3

Transformer

60.000

34.439

57.4

33.461

55.8

T4

Transformer

30.000

12.956

43.2

12.730

42.4

T5

Transformer

30.000

22.561

75.2

21.860

72.9

T8

Transformer

60.000

40.723

67.9

39.625

66.0

T9

Transformer

60.000

45.411

75.7

44.031

73.4

T12

Transformer

30.000

20.766

69.2

20.174

67.2

T13

Transformer

30.000

19.262

64.2

18.758

62.5

T16

Transformer

60.000

35.505

59.2

34.667

57.8

T17

Transformer

60.000

36.037

60.1

35.169

58.6

T20

Transformer

60.000

18.459

30.8

18.238

30.4

T21

Transformer

60.000

34.666

57.8

33.871

56.5

T24

Transformer

30.000

21.513

71.7

20.753

69.2

T25

Transformer

30.000

19.806

66.0

19.166

63.9

T29

Transformer

60.000

17.824

29.7

17.585

29.3

T30

Transformer

20.000

12.241

61.2

11.886

59.4

T31

Transformer

60.000

41.968

69.9

40.605

67.7

T35

Transformer

60.000

44.908

74.8

43.218

72.0

T36

Transformer

60.000

43.775

73.0

42.167

70.3

T38

Transformer

60.000

34.837

58.1

33.834

56.4

T39

Transformer

30.000

11.875

39.6

11.640

38.8

T40

Transformer

16.000

5.849

36.6

5.736

35.9

T41

Transformer

30.000

16.557

55.2

16.098

53.7

T42

Transformer

60.000

17.250

28.8

17.009

28.3

T43

Transformer

60.000

23.818

39.7

23.773

39.6

T44

Transformer

30.000

16.997

56.7

16.507

55.0

T45

Transformer

30.000

18.137

60.5

17.582

58.6

* Indicates a branch with operating load exceeding the branch capability

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

16

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOSSES Summary Report

CKT / Branch
ID

From-To Bus Flow

To-From Bus Flow

Losses

% Bus Voltage
From

To

Vd
% Drop
in Vmag

MW

Mvar

MW

Mvar

kW

Kvar

T35

-38.870

-18.892

38.985

22.291

115.2

3398.9

93.3

96.9

3.65

T1

-14.995

-7.307

15.029

8.117

34.2

809.4

94.2

96.5

2.26

T2

-13.031

-6.469

13.057

7.081

25.8

612.1

94.5

96.5

1.98

T3

-30.123

-14.567

30.183

16.585

59.2

2017.7

93.7

96.5

2.74

T5

-19.665

-9.547

19.724

10.952

59.3

1404.9

93.7

96.7

3.00

T4

-11.466

-5.531

11.486

5.994

19.5

463.3

95.0

96.7

1.68

T36

-37.898

-18.488

38.008

21.718

109.5

3229.6

93.3

96.9

3.56

T8

-35.707

-17.180

35.774

19.457

66.8

2276.6

94.4

97.0

2.61

T9

-39.610

-19.229

39.693

22.060

83.0

2831.0

94.0

97.0

2.95

T38

-30.389

-14.875

30.449

16.926

60.1

2050.9

94.0

96.8

2.79

T12

-18.139

-8.831

18.189

10.018

50.1

1187.2

94.1

96.8

2.76

T13

-16.891

-8.158

16.934

9.180

43.1

1021.6

94.3

96.8

2.53

T43

-23.773

0.000

23.800

0.926

27.1

925.6

98.3

98.5

0.19

T16

-31.182

-15.148

31.233

16.885

50.9

1736.7

94.5

96.8

2.29

T17

-31.599

-15.441

31.651

17.230

52.5

1789.1

94.5

96.8

2.33

T20

-16.396

-7.988

16.409

8.454

13.7

466.2

96.0

97.1

1.16

T21

-30.448

-14.838

30.496

16.483

48.2

1644.3

94.9

97.1

2.23

T24

-18.686

-9.029

18.750

10.546

64.0

1516.8

94.8

98.3

3.47

T25

-17.267

-8.318

17.321

9.604

54.2

1285.6

95.1

98.3

3.17

T29

-15.846

-7.625

15.861

8.132

14.9

506.5

98.3

99.6

1.33

T30

-10.763

-5.043

10.801

5.759

38.5

716.0

96.7

99.6

2.89

T31

-36.609

-17.565

36.691

20.373

82.4

2808.3

96.4

99.6

3.24

T39

-10.476

-5.075

10.496

5.554

20.2

478.8

94.6

96.5

1.91

T40

-5.108

-2.609

5.120

2.827

11.7

217.7

94.7

96.5

1.86

T44

-14.839

-7.232

14.880

8.213

41.4

981.9

93.7

96.5

2.78

T41

-14.514

-6.963

14.554

7.895

39.3

932.0

93.8

96.5

2.67

T42

-15.290

-7.451

15.305

7.958

14.8

506.1

95.1

96.5

1.35

T45

-15.833

-7.646

15.880

8.764

47.2

1118.1

93.5

96.5

2.96

Line13

-1.933

-1.457

1.933

1.457

0.4

96.8

96.8

0.01

Line14

-15.497

-8.873

15.533

8.873

35.7

96.8

97.0

0.17

Line18

-76.241

-40.960

77.703

40.960

1461.1

96.8

98.3

1.44

Line19

-76.241

-40.960

77.703

40.960

1461.1

96.8

98.3

1.44

Line26

15.231

8.463

-15.224

-8.463

6.9

0.0

96.8

96.8

0.03

Line27

15.231

8.463

-15.224

-8.463

6.9

0.0

96.8

96.8

0.03

Line28

20.577

10.938

-20.500

-10.938

76.9

96.8

96.5

0.28

Line29

25.093

13.294

-24.979

-13.294

114.2

96.8

96.5

0.34

Line36

15.448

8.489

-15.380

-8.489

68.0

96.8

96.5

0.33

Line37

15.448

8.489

-15.380

-8.489

68.0

96.8

96.5

0.33

Line7

-31.731

-16.900

32.197

16.900

466.4

97.1

98.3

1.11

Line8

-31.731

-16.900

32.197

16.900

466.4

97.1

98.3

1.11

Line17

16.556

8.864

-16.406

-8.864

150.1

97.1

96.5

0.68

Line24

-38.496

-22.005

38.538

22.005

41.8

96.9

97.0

0.08

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

CKT / Branch
ID

From-To Bus Flow

To-From Bus Flow

Losses
kW

Page:

17

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

% Bus Voltage
Kvar

From

To

Vd
% Drop
in Vmag

MW

Mvar

MW

Mvar

Line25

-38.496

-22.005

38.538

22.005

41.8

96.9

97.0

0.08

Line12

-37.057

-20.655

37.135

20.655

77.8

0.0

96.8

97.0

0.16

Line31

-154.088

-77.922

157.046

77.922

2957.3

0.0

98.5

100.0

1.51

Line33

-154.088

-77.922

157.046

77.922

2957.3

0.0

98.5

100.0

1.51

Line34

142.188

77.459

-139.346

-77.459

2842.0

98.5

97.0

1.51

Line35

142.188

77.459

-139.346

-77.459

2842.0

98.5

97.0

1.51

Line10

48.008

26.027

-47.830

-26.027

177.4

0.0

97.0

96.7

0.28

Line11

25.474

13.837

-25.296

-13.837

178.1

0.0

97.0

96.5

0.52

Line5

-127.936

-67.935

130.846

67.935

2910.8

98.3

100.0

1.75

Line6

-127.936

-67.935

130.846

67.935

2910.8

98.3

100.0

1.75

Line9

16.621

9.081

-16.566

-9.081

55.0

96.7

96.5

0.25

Line20

31.828

17.132

-31.677

-17.132

151.9

100.0

99.6

0.37

Line21

31.828

17.132

-31.677

-17.132

151.9

100.0

99.6

0.37

Line30

-4.880

-2.558

4.884

2.558

4.0

0.0

96.5

96.5

0.06

24028.9

38932.7

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

18

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE LOSSES Summary Report

Equipment Cable

Connected

ID

Load Type

Losses
kW

% Voltage
kvar

Bus

Load

Vd
% Drop
in Vmag

Vst
% for
Motor

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

19

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device

Bus Voltage
OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)

Critical Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

Bus11

Bus

20.000

kV

18.873

94.4

UnderVoltage

Bus12

Bus

20.000

kV

18.806

94.0

UnderVoltage

Bus13

Bus

20.000

kV

18.798

94.0

UnderVoltage

Bus16

Bus

20.000

kV

18.813

94.1

UnderVoltage

Bus17

Bus

20.000

kV

18.858

94.3

UnderVoltage

Bus2

Bus

20.000

kV

18.650

93.3

UnderVoltage

Bus21

Bus

20.000

kV

18.905

94.5

UnderVoltage

Bus22

Bus

20.000

kV

18.896

94.5

UnderVoltage

Bus27

Bus

20.000

kV

18.982

94.9

UnderVoltage

Bus3

Bus

20.000

kV

18.839

94.2

UnderVoltage

Bus31

Bus

20.000

kV

18.957

94.8

UnderVoltage

Bus4

Bus

20.000

kV

18.895

94.5

UnderVoltage

Bus42

Bus

20.000

kV

18.924

94.6

UnderVoltage

Bus43

Bus

20.000

kV

18.934

94.7

UnderVoltage

Bus44

Bus

20.000

kV

18.741

93.7

UnderVoltage

Bus45

Bus

20.000

kV

18.758

93.8

UnderVoltage

Bus47

Bus

20.000

kV

18.705

93.5

UnderVoltage

Bus5

Bus

20.000

kV

18.743

93.7

UnderVoltage

Bus6

Bus

20.000

kV

18.739

93.7

UnderVoltage

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

Page:

20

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Critical Report
ID
Bus8

Device Type
Bus

Rating
20.000

Unit
kV

Calculated
18.668

%Mag.
93.3

Condition
UnderVoltage

Marginal Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

Bus26

Bus

20.000

kV

19.195

96.0

UnderVoltage

Bus32

Bus

20.000

kV

19.016

95.1

UnderVoltage

Bus38

Bus

20.000

kV

19.348

96.7

UnderVoltage

Bus40

Bus

20.000

kV

19.279

96.4

UnderVoltage

Bus46

Bus

20.000

kV

19.024

95.1

UnderVoltage

Bus7

Bus

20.000

kV

19.004

95.0

UnderVoltage

GI_BANTUL

Bus

150.000

kV

145.214

96.8

UnderVoltage

GI_BAWEN

Bus

150.000

kV

145.707

97.1

UnderVoltage

GI_GEJAYAN

Bus

150.000

kV

145.347

96.9

UnderVoltage

GI_GODEAN

Bus

150.000

kV

145.233

96.8

UnderVoltage

GI_KENTUNGAN

Bus

150.000

kV

145.466

97.0

UnderVoltage

GI_MEDARI

Bus

150.000

kV

145.051

96.7

UnderVoltage

GI_PURWOREJO

Bus

150.000

kV

144.698

96.5

UnderVoltage

GI_SANGGRAHAN

Bus

150.000

kV

144.681

96.5

UnderVoltage

GI_SEMANU

Bus

150.000

kV

144.723

96.5

UnderVoltage

GI_WATES

Bus

150.000

kV

144.791

96.5

UnderVoltage

GI_WIROBRAJAN

Bus

150.000

kV

145.163

96.8

UnderVoltage

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
bebanminimum1

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

639.441

325.979

717.738

89.09 Lagging

0.000

0.000

0.000

100.00 Lagging

639.441

325.979

717.738

89.09 Lagging

Total Motor Load:

0.000

0.000

0.000

100.00 Lagging

Total Static Load:

615.412

287.047

Apparent Losses:

24.029

38.933

System Mismatch:

0.000

0.000

Swing Bus(es):
Generators:
Total Demand:

Number of Iterations: 3

Page:

21

Date:

05-24-2015

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

You might also like