Professional Documents
Culture Documents
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Design
None
Swing
Generator
Load
Total
42
43
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
28
28
56
Number of Buses:
Number of Branches:
Method of Solution:
Newton-Raphson Method
99
Precision of Solution:
0.000100
System Frequency:
60.00
Unit System:
Metric
Project Filename:
bebanminimum1
Output Filename:
C:\ETAP 400\PowerStation\bebanminimum1\Untitled.lf1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Initial Voltage
Type
kV
% Mag.
Ang.
Generator
MW
Mvar
Motor Load
MW
Mvar
Static Load
MW
Mvar
Bus2
Load
20.000
100.0
0.0
44.700
21.726
Bus3
Load
20.000
100.0
0.0
16.900
8.236
Bus4
Load
20.000
100.0
0.0
14.600
7.248
Bus5
Load
20.000
100.0
0.0
34.300
16.587
Bus6
Load
20.000
100.0
0.0
22.400
10.875
Bus7
Load
20.000
100.0
0.0
12.700
6.126
Bus8
Load
20.000
100.0
0.0
43.500
21.221
Bus11
Load
20.000
100.0
0.0
40.100
19.294
Bus12
Load
20.000
100.0
0.0
44.800
21.749
Bus13
Load
20.000
100.0
0.0
34.400
16.839
Bus16
Load
20.000
100.0
0.0
20.500
9.980
Bus17
Load
20.000
100.0
0.0
19.000
9.177
Bus18
Load
20.000
100.0
0.0
24.600
0.000
Bus21
Load
20.000
100.0
0.0
34.900
16.954
Bus22
Load
20.000
100.0
0.0
35.400
17.298
Bus26
Load
20.000
100.0
0.0
17.800
8.672
Bus27
Load
20.000
100.0
0.0
33.800
16.472
Bus31
Load
20.000
100.0
0.0
20.799
10.050
Bus32
Load
20.000
100.0
0.0
19.100
9.201
Bus37
Load
20.000
100.0
0.0
16.400
7.892
Bus38
Load
20.000
100.0
0.0
11.500
5.389
Bus40
Load
20.000
100.0
0.0
39.400
18.904
Bus42
Load
20.000
100.0
0.0
11.700
5.668
Bus43
Load
20.000
100.0
0.0
5.700
2.911
Bus44
Load
20.000
100.0
0.0
16.900
8.236
Bus45
Load
20.000
100.0
0.0
16.500
7.915
Bus46
Load
20.000
100.0
0.0
16.900
8.236
Bus47
Load
20.000
100.0
0.0
18.100
8.741
GI_BANTUL
Load
150.000
100.0
0.0
GI_BAWEN
Load
150.000
100.0
0.0
GI_GEJAYAN
Load
150.000
100.0
0.0
GI_GODEAN
Load
150.000
100.0
0.0
GI_KALASAN
Load
150.000
100.0
0.0
GI_KENTUNGAN
Load
150.000
100.0
0.0
GI_KLATEN
Load
150.000
100.0
0.0
Mvar Limits
Max.
Min.
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Bus
ID
Initial Voltage
Type
kV
% Mag.
Ang.
GI_MEDARI
Load
150.000
100.0
0.0
GI_PEDAN
Swing
150.000
100.0
0.0
GI_PURWOREJO
Load
150.000
100.0
0.0
GI_SANGGRAHAN
Load
150.000
100.0
0.0
GI_SEMANU
Load
150.000
100.0
0.0
GI_WATES
Load
150.000
100.0
0.0
GI_WIROBRAJAN
Load
150.000
100.0
0.0
GI_WONOSARI
Load
150.000
100.0
0.0
Generator
MW
0.000
Motor Load
Mvar
0.000
MW
0.000
Mvar
0.000
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Static Load
MW
Mvar
687.396
321.595
Mvar Limits
Max.
Min.
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Size
Length(m)
#/Phase
T (C)
Line5
25470.0
75
0.118300
Line6
25470.0
75
0.118300
Line7
64760.0
75
0.118300
Line8
64760.0
75
0.118300
Line9
27270.0
75
0.118300
Line10
10640.0
75
0.118300
Line11
37910.0
75
0.118300
Line12
7710.0
75
0.118300
Line13
12250.0
75
0.118300
Line14
19960.0
75
0.118300
Line17
76390.0
75
0.118300
Line18
34770.0
75
0.118300
Line19
34770.0
75
0.118300
Line20
22110.0
75
0.118300
Line21
22110.0
75
0.118300
Line24
5950.0
75
0.075400
Line25
5950.0
75
0.075400
Line26
6400.0
75
0.075400
Line27
6400.0
75
0.075400
Line28
25250.0
75
0.118300
Line29
25250.0
75
0.118300
Line30
23260.0
75
0.118300
Line31
18300.0
75
0.118300
Line33
18300.0
75
0.118300
Line34
20000.0
75
0.118300
Line35
20000.0
75
0.118300
Line36
39040.0
75
0.118300
Line37
39040.0
75
0.118300
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Transformer
ID
Rating
Z Variation
%Z
X/R
+ 5%
- 5%
% Tap Setting
% Tol.
Prim.
Adjusted
Sec.
%Z
Phase Shift
MVA
Prim. kV
Sec. kV
Type
Angle
T1
30.000
150.000
20.000
7.750
23.7
7.7500
0.0
T2
30.000
150.000
20.000
7.750
23.7
7.7500
0.0
T3
60.000
150.000
20.000
9.500
34.1
9.5000
0.0
T4
30.000
150.000
20.000
7.750
23.7
7.7500
0.0
T5
30.000
150.000
20.000
7.750
23.7
7.7500
0.0
T8
60.000
150.000
20.000
7.750
34.1
7.7500
0.0
T9
60.000
150.000
20.000
7.750
34.1
7.7500
0.0
0.0
T12
30.000
150.000
20.000
7.750
23.7
7.7500
T13
30.000
150.000
20.000
7.750
23.7
7.7500
0.0
T16
60.000
150.000
20.000
7.750
34.1
7.7500
0.0
T17
60.000
150.000
20.000
7.750
34.1
7.7500
0.0
T20
60.000
150.000
20.000
7.750
34.1
7.7500
0.0
0.0
T21
60.000
150.000
20.000
7.750
34.1
7.7500
T24
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
T25
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
T29
60.000
150.000
20.000
9.500
34.1
9.5000
0.0
T30
20.000
150.000
20.000
9.500
18.6
9.5000
0.0
T31
60.000
150.000
20.000
9.500
34.1
9.5000
0.0
T35
60.000
150.000
20.000
9.500
29.5
9.5000
0.0
T36
60.000
150.000
20.000
9.500
29.5
9.5000
0.0
T38
60.000
150.000
20.000
9.500
34.1
9.5000
0.0
T39
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
T40
16.000
150.000
20.000
9.500
18.6
9.5000
0.0
T41
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
0.0
T42
60.000
150.000
20.000
9.500
34.1
9.5000
T43
60.000
150.000
20.000
9.500
34.1
9.5000
0.0
T44
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
T45
30.000
150.000
20.000
9.500
23.7
9.5000
0.0
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
BRANCH CONNECTIONS
CKT/Branch
Connected Bus ID
ID
Type
From Bus
T1
2W XFMR
GI_SANGGRAHAN
Bus3
1.09
25.81
25.83
T2
2W XFMR
GI_SANGGRAHAN
Bus4
1.09
25.81
25.83
T3
2W XFMR
GI_SANGGRAHAN
Bus5
0.46
15.83
15.83
T4
2W XFMR
GI_MEDARI
Bus7
1.09
25.81
25.83
T5
2W XFMR
GI_MEDARI
Bus6
1.09
25.81
25.83
T8
2W XFMR
GI_KENTUNGAN
Bus11
0.38
12.91
12.92
T9
2W XFMR
GI_KENTUNGAN
Bus12
0.38
12.91
12.92
T12
2W XFMR
GI_GODEAN
Bus16
1.09
25.81
25.83
T13
2W XFMR
GI_GODEAN
Bus17
1.09
25.81
25.83
T16
2W XFMR
GI_BANTUL
Bus21
0.38
12.91
12.92
T17
2W XFMR
GI_BANTUL
Bus22
0.38
12.91
12.92
T20
2W XFMR
GI_BAWEN
Bus26
0.38
12.91
12.92
T21
2W XFMR
GI_BAWEN
Bus27
0.38
12.91
12.92
T24
2W XFMR
GI_KLATEN
Bus31
1.33
31.64
31.67
T25
2W XFMR
GI_KLATEN
Bus32
1.33
31.64
31.67
T29
2W XFMR
GI_WONOSARI
Bus37
0.46
15.83
15.83
T30
2W XFMR
GI_WONOSARI
Bus38
2.55
47.43
47.50
T31
2W XFMR
GI_WONOSARI
Bus40
0.46
15.83
15.83
T35
2W XFMR
GI_GEJAYAN
Bus2
0.54
15.82
15.83
T36
2W XFMR
GI_GEJAYAN
Bus8
0.54
15.82
15.83
T38
2W XFMR
GI_WIROBRAJAN
Bus13
0.46
15.83
15.83
T39
2W XFMR
GI_WATES
Bus42
1.33
31.64
31.67
T40
2W XFMR
GI_WATES
Bus43
3.19
59.29
59.38
T41
2W XFMR
GI_PURWOREJO
Bus45
1.33
31.64
31.67
T42
2W XFMR
GI_PURWOREJO
Bus46
0.46
15.83
15.83
T43
2W XFMR
GI_KALASAN
Bus18
0.46
15.83
15.83
T44
2W XFMR
GI_SEMANU
Bus44
1.33
31.64
31.67
T45
2W XFMR
GI_SEMANU
Bus47
1.33
31.64
31.67
Line5
Line
GI_PEDAN
GI_KLATEN
1.34
1.34
Line6
Line
GI_PEDAN
GI_KLATEN
1.34
1.34
Line7
Line
GI_BAWEN
GI_KLATEN
3.40
3.40
Line8
Line
GI_BAWEN
GI_KLATEN
3.40
3.40
Line9
Line
GI_SANGGRAHAN
GI_MEDARI
1.43
1.43
Line10
Line
GI_MEDARI
GI_KENTUNGAN
0.56
0.56
Line11
Line
GI_SANGGRAHAN
GI_KENTUNGAN
1.99
1.99
Line12
Line
GI_KENTUNGAN
GI_GODEAN
0.41
0.41
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
CKT/Branch
Connected Bus ID
ID
Type
From Bus
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Line13
Line
GI_GODEAN
GI_BANTUL
0.64
0.64
Line14
Line
GI_KENTUNGAN
GI_BANTUL
1.05
1.05
Line17
Line
GI_BAWEN
GI_SANGGRAHAN
4.02
4.02
Line18
Line
GI_KLATEN
GI_BANTUL
1.83
1.83
Line19
Line
GI_KLATEN
GI_BANTUL
1.83
1.83
Line20
Line
GI_PEDAN
GI_WONOSARI
1.16
1.16
Line21
Line
GI_PEDAN
GI_WONOSARI
1.16
1.16
Line24
Line
GI_GEJAYAN
GI_KENTUNGAN
0.20
0.20
Line25
Line
GI_GEJAYAN
GI_KENTUNGAN
0.20
0.20
Line26
Line
GI_WIROBRAJAN
GI_BANTUL
0.21
0.21
Line27
Line
GI_WIROBRAJAN
GI_BANTUL
0.21
0.21
Line28
Line
GI_WATES
GI_BANTUL
1.33
1.33
Line29
Line
GI_PURWOREJO
GI_BANTUL
1.33
1.33
Line30
Line
GI_PURWOREJO
GI_WATES
1.22
1.22
Line31
Line
GI_PEDAN
GI_KALASAN
0.96
0.96
Line33
Line
GI_PEDAN
GI_KALASAN
0.96
0.96
Line34
Line
GI_KENTUNGAN
GI_KALASAN
1.05
1.05
Line35
Line
GI_KENTUNGAN
GI_KALASAN
1.05
1.05
Line36
Line
GI_BANTUL
GI_SEMANU
2.05
2.05
Line37
Line
GI_BANTUL
GI_SEMANU
2.05
2.05
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment
ID
Library
Size
L(m)
#/ph
T (C)
Heater
R
R (ohm)
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
bebanminimum1
Page:
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
Voltage
Generation
Motor Load
Static Load
MW
MW
Load Flow
kV
%Mag.
Bus2
20.000
93.251
-2.9
38.87
18.89
Bus3
20.000
94.194
-1.3
14.99
Bus4
20.000
94.474
-1.0
Bus5
20.000
93.714
-1.9
Bus6
20.000
93.696
-2.1
Bus7
20.000
95.019
-0.8
Bus8
20.000
93.340
-2.8
Bus11
20.000
94.364
-1.9
Bus12
20.000
94.029
-2.2
Bus13
20.000
93.989
Bus16
20.000
94.066
Bus17
20.000
Bus18
20.000
Bus21
ID
Ang.
MW
Mvar
Mvar
Mvar
ID
XFMR
MW
Mvar
Amp
%PF
GI_GEJAYAN
-38.87
-18.89
1337
89.9
7.31
GI_SANGGRAHAN
-14.99
-7.31
511
89.9
13.03
6.47
GI_SANGGRAHAN
-13.03
-6.47
444
89.6
30.12
14.57
GI_SANGGRAHAN
-30.12
-14.57
1030
90.0
19.66
9.55
GI_MEDARI
-19.66
-9.55
673
90.0
11.47
5.53
GI_MEDARI
-11.47
-5.53
386
90.1
37.90
18.49
GI_GEJAYAN
-37.90
-18.49
1304
89.9
35.71
17.18
GI_KENTUNGAN
-35.71
-17.18
1212
90.1
39.61
19.23
GI_KENTUNGAN
-39.61
-19.23
1351
90.0
-2.0
30.39
14.88
GI_WIROBRAJAN
-30.39
-14.88
1039
89.8
-1.9
18.14
8.83
GI_GODEAN
-18.14
-8.83
619
89.9
94.288
-1.7
16.89
8.16
GI_GODEAN
-16.89
-8.16
574
90.0
98.305
-1.8
23.77
0.00
GI_KALASAN
-23.77
0.00
698
100.0
20.000
94.524
-1.5
31.18
15.15
GI_BANTUL
-31.18
-15.15
1058
89.9
Bus22
20.000
94.479
-1.5
31.60
15.44
GI_BANTUL
-31.60
-15.44
1074
89.8
Bus26
20.000
95.974
-0.4
16.40
7.99
GI_BAWEN
-16.40
-7.99
548
89.9
Bus27
20.000
94.912
-1.5
30.45
14.84
GI_BAWEN
-30.45
-14.84
1030
89.9
Bus31
20.000
94.785
-3.0
18.69
9.03
GI_KLATEN
-18.69
-9.03
632
90.0
Bus32
20.000
95.080
-2.8
17.27
8.32
GI_KLATEN
-17.27
-8.32
581
90.1
Bus37
20.000
98.296
-1.3
15.85
7.63
GI_WONOSARI
-15.85
-7.63
516
90.1
Bus38
20.000
96.741
-2.8
10.76
5.04
GI_WONOSARI
-10.76
-5.04
354
90.6
Bus40
20.000
96.394
-3.3
36.61
17.56
GI_WONOSARI
-36.61
-17.56
1216
90.2
Bus42
20.000
94.621
-1.0
10.48
5.07
GI_WATES
-10.48
-5.07
355
90.0
Bus43
20.000
94.671
-0.8
5.11
2.61
GI_WATES
-5.11
-2.61
174
89.1
Bus44
20.000
93.704
-1.8
14.84
7.23
GI_SEMANU
-14.84
-7.23
508
89.9
Bus45
20.000
93.791
-1.8
14.51
6.96
GI_PURWOREJO
-14.51
-6.96
495
90.2
Bus46
20.000
95.118
-0.4
15.29
7.45
GI_PURWOREJO
-15.29
-7.45
516
89.9
Bus47
20.000
93.527
-2.0
15.83
7.65
GI_SEMANU
-15.83
-7.65
542
90.1
150.000
96.809
1.0
GI_GODEAN
GI_BANTUL
-1.93
-1.46
79.9
GI_KENTUNGAN
-15.50
-8.87
71
86.8
GI_KLATEN
-76.24
-40.96
344
88.1
GI_KLATEN
-76.24
-40.96
344
88.1
GI_WIROBRAJAN
15.23
8.46
69
87.4
GI_WIROBRAJAN
15.23
8.46
69
87.4
GI_WATES
20.58
10.94
92
88.3
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
bebanminimum1
Bus
ID
GI_BAWEN
GI_GEJAYAN
GI_GODEAN
Voltage
kV
150.000
150.000
150.000
%Mag.
97.138
96.898
96.822
Generation
Ang.
0.9
1.0
1.0
MW
Mvar
Motor Load
Static Load
MW
MW
Mvar
ID
GI_KENTUNGAN
GI_KLATEN
150.000
150.000
150.000
98.492
96.977
98.252
0.4
0.9
0.5
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
MW
XFMR
Mvar
Amp
%PF
GI_PURWOREJO
25.09
13.29
112
88.4
GI_SEMANU
15.45
8.49
70
87.6
GI_SEMANU
15.45
8.49
70
87.6
Bus21
31.23
16.88
141
88.0
Bus22
31.65
17.23
143
87.8
GI_KLATEN
-31.73
-16.90
142
88.3
GI_KLATEN
-31.73
-16.90
142
88.3
GI_SANGGRAHAN
16.56
8.86
74
88.2
Bus26
16.41
8.45
73
88.9
Bus27
30.50
16.48
137
88.0
GI_KENTUNGAN
-38.50
-22.00
176
86.8
GI_KENTUNGAN
-38.50
-22.00
176
86.8
Bus2
38.99
22.29
178
86.8
Bus8
38.01
21.72
173
86.8
-37.06
-20.65
168
87.3
GI_KENTUNGAN
GI_BANTUL
GI_KALASAN
10
Load Flow
Mvar
Page:
1.93
1.46
79.9
Bus16
18.19
10.02
82
87.6
Bus17
16.93
9.18
76
87.9
GI_PEDAN
-154.09
-77.92
674
89.2
GI_PEDAN
-154.09
-77.92
674
89.2
GI_KENTUNGAN
142.19
77.46
632
87.8
GI_KENTUNGAN
142.19
77.46
632
87.8
Bus18
23.80
0.93
93
99.9
GI_MEDARI
48.01
26.03
216
87.9
GI_SANGGRAHAN
25.47
13.84
115
87.9
GI_GODEAN
37.13
20.65
168
87.4
GI_BANTUL
15.53
8.87
71
86.8
GI_GEJAYAN
38.54
22.00
176
86.8
GI_GEJAYAN
38.54
22.00
176
86.8
GI_KALASAN
-139.35
-77.46
632
87.4
GI_KALASAN
-139.35
-77.46
632
87.4
Bus11
35.77
19.46
161
87.8
Bus12
39.69
22.06
180
87.4
GI_PEDAN
-127.94
-67.94
567
88.3
GI_PEDAN
-127.94
-67.94
567
88.3
GI_BAWEN
32.20
16.90
142
88.5
GI_BAWEN
32.20
16.90
142
88.5
GI_BANTUL
77.70
40.96
344
88.5
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
bebanminimum1
Bus
ID
GI_MEDARI
Voltage
kV
150.000
%Mag.
96.700
Generation
Ang.
1.0
MW
Mvar
Motor Load
Static Load
MW
MW
Mvar
ID
150.000
100.000
0.0
639.44
325.98
GI_SANGGRAHAN
150.000
96.465
96.454
1.1
1.1
150.000
96.482
1.1
96.527
1.1
150.000
96.775
1.0
150.000
99.630
0.1
XFMR
Mvar
Amp
%PF
88.5
84
87.2
Bus32
17.32
9.60
77
87.5
GI_SANGGRAHAN
16.62
9.08
75
87.8
-47.83
-26.03
216
87.8
Bus7
11.49
5.99
51
88.7
Bus6
19.72
10.95
89
87.4
GI_KLATEN
130.85
67.94
567
88.8
GI_KLATEN
130.85
67.94
567
88.8
31.83
17.13
139
88.1
31.83
17.13
139
88.1
GI_KALASAN
157.05
77.92
674
89.6
GI_KALASAN
157.05
77.92
674
89.6
GI_BANTUL
-24.98
-13.29
112
88.3
GI_WATES
-4.88
-2.56
21
88.6
Bus45
14.55
7.89
66
87.9
Bus46
15.31
7.96
68
88.7
GI_MEDARI
-16.57
-9.08
75
87.7
GI_KENTUNGAN
-25.30
-13.84
115
87.7
GI_BAWEN
-16.41
-8.86
74
88.0
Bus3
15.03
8.12
68
88.0
Bus4
13.06
7.08
59
87.9
30.18
16.58
137
87.6
GI_BANTUL
-15.38
-8.49
70
87.6
GI_BANTUL
-15.38
-8.49
70
87.6
14.88
8.21
67
87.5
15.88
8.76
72
87.6
-20.50
-10.94
92
88.2
4.88
2.56
21
88.6
Bus42
10.50
5.55
47
88.4
Bus43
5.12
2.83
23
87.5
GI_BANTUL
-15.22
-8.46
69
87.4
GI_BANTUL
-15.22
-8.46
69
87.4
GI_BANTUL
Bus13
GI_WONOSARI
MW
344
GI_PURWOREJO
GI_WIROBRAJAN
Normal
10.55
Bus47
150.000
Base
Config.:
40.96
Bus44
GI_WATES
Revision:
18.75
Bus5
GI_SEMANU
KLGCONSULT
77.70
GI_WONOSARI
150.000
05-24-2015
SN:
Bus31
GI_WONOSARI
GI_PURWOREJO
Date:
GI_BANTUL
GI_KENTUNGAN
* GI_PEDAN
11
Load Flow
Mvar
Page:
30.45
16.93
138
87.4
GI_PEDAN
-31.68
-17.13
139
88.0
GI_PEDAN
-31.68
-17.13
139
88.0
Bus37
15.86
8.13
68
89.0
Bus38
10.80
5.76
47
88.2
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
bebanminimum1
Bus
ID
Voltage
kV
%Mag.
Ang.
Generation
MW
Mvar
Motor Load
Static Load
MW
MW
Mvar
12
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Load Flow
Mvar
ID
Bus40
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
Page:
MW
36.69
XFMR
Mvar
20.37
Amp
162
%PF
87.4
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
13
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Rated Amp
MW
Mvar
MVA
% PF
Amp
Bus2
20.000
38.870
18.892
43.218
89.9
1337.89
Bus3
20.000
14.995
7.307
16.680
89.9
511.20
Bus4
20.000
13.031
6.469
14.548
89.6
444.54
Bus5
20.000
30.123
14.567
33.461
90.0
1030.72
Bus6
20.000
19.665
9.547
21.860
90.0
673.49
Bus7
20.000
11.466
5.531
12.730
90.1
386.76
Bus8
20.000
37.898
18.488
42.167
89.9
1304.13
Bus11
20.000
35.707
17.180
39.625
90.1
1212.20
Bus12
20.000
39.610
19.229
44.031
90.0
1351.76
Bus13
20.000
30.389
14.875
33.834
89.8
1039.17
Bus16
20.000
18.139
8.831
20.174
89.9
619.12
Bus17
20.000
16.891
8.158
18.758
90.0
574.31
Bus18
20.000
23.773
0.000
23.773
100.0
698.11
Bus21
20.000
31.182
15.148
34.667
89.9
1058.73
Bus22
20.000
31.599
15.441
35.169
89.8
1074.58
Bus26
20.000
16.396
7.988
18.238
89.9
548.57
Bus27
20.000
30.448
14.838
33.871
89.9
1030.19
Bus31
20.000
18.686
9.029
20.753
90.0
632.06
Bus32
20.000
17.267
8.318
19.166
90.1
581.91
Bus37
20.000
15.846
7.625
17.585
90.1
516.44
Bus38
20.000
10.763
5.043
11.886
90.6
354.67
Bus40
20.000
36.609
17.565
40.605
90.2
1216.02
Bus42
20.000
10.476
5.075
11.640
90.0
355.12
Bus43
20.000
5.108
2.609
5.736
89.1
174.91
Bus44
20.000
14.839
7.232
16.507
89.9
508.54
Bus45
20.000
14.514
6.963
16.098
90.2
495.47
Bus46
20.000
15.290
7.451
17.009
89.9
516.22
Bus47
20.000
15.833
7.646
17.582
90.0
542.68
GI_BANTUL
150.000
169.913
92.250
193.340
87.9
768.70
GI_BAWEN
150.000
63.462
33.801
71.902
88.3
284.90
GI_GEJAYAN
150.000
76.993
44.009
88.683
86.8
352.27
GI_GODEAN
150.000
37.057
20.655
42.424
87.3
168.65
GI_KALASAN
150.000
308.177
155.844
345.341
89.2
1349.57
GI_KENTUNGAN
150.000
278.692
154.919
318.856
87.4
1265.53
% Loading
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Bus
ID
Page:
14
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Rated Amp
MW
Mvar
MVA
% PF
Amp
GI_KLATEN
150.000
255.871
135.870
289.708
88.3
GI_MEDARI
150.000
47.830
26.027
54.453
87.8
216.74
GI_PEDAN
150.000
639.441
325.979
717.738
89.1
2762.57
GI_PURWOREJO
150.000
29.859
15.852
33.806
88.3
134.89
GI_SANGGRAHAN
150.000
58.268
31.783
66.372
87.8
264.86
GI_SEMANU
150.000
30.760
16.977
35.134
87.6
140.16
GI_WATES
150.000
20.500
10.938
23.236
88.2
92.65
GI_WIROBRAJAN
150.000
30.449
16.926
34.837
87.4
138.56
GI_WONOSARI
150.000
63.353
34.264
72.025
88.0
278.26
1134.93
% Loading
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
15
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Transformer
Cable & Reactor
CKT / Branch
ID
Type
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
T1
Transformer
30.000
17.081
56.9
16.680
55.6
T2
Transformer
30.000
14.853
49.5
14.548
48.5
T3
Transformer
60.000
34.439
57.4
33.461
55.8
T4
Transformer
30.000
12.956
43.2
12.730
42.4
T5
Transformer
30.000
22.561
75.2
21.860
72.9
T8
Transformer
60.000
40.723
67.9
39.625
66.0
T9
Transformer
60.000
45.411
75.7
44.031
73.4
T12
Transformer
30.000
20.766
69.2
20.174
67.2
T13
Transformer
30.000
19.262
64.2
18.758
62.5
T16
Transformer
60.000
35.505
59.2
34.667
57.8
T17
Transformer
60.000
36.037
60.1
35.169
58.6
T20
Transformer
60.000
18.459
30.8
18.238
30.4
T21
Transformer
60.000
34.666
57.8
33.871
56.5
T24
Transformer
30.000
21.513
71.7
20.753
69.2
T25
Transformer
30.000
19.806
66.0
19.166
63.9
T29
Transformer
60.000
17.824
29.7
17.585
29.3
T30
Transformer
20.000
12.241
61.2
11.886
59.4
T31
Transformer
60.000
41.968
69.9
40.605
67.7
T35
Transformer
60.000
44.908
74.8
43.218
72.0
T36
Transformer
60.000
43.775
73.0
42.167
70.3
T38
Transformer
60.000
34.837
58.1
33.834
56.4
T39
Transformer
30.000
11.875
39.6
11.640
38.8
T40
Transformer
16.000
5.849
36.6
5.736
35.9
T41
Transformer
30.000
16.557
55.2
16.098
53.7
T42
Transformer
60.000
17.250
28.8
17.009
28.3
T43
Transformer
60.000
23.818
39.7
23.773
39.6
T44
Transformer
30.000
16.997
56.7
16.507
55.0
T45
Transformer
30.000
18.137
60.5
17.582
58.6
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
16
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
CKT / Branch
ID
Losses
% Bus Voltage
From
To
Vd
% Drop
in Vmag
MW
Mvar
MW
Mvar
kW
Kvar
T35
-38.870
-18.892
38.985
22.291
115.2
3398.9
93.3
96.9
3.65
T1
-14.995
-7.307
15.029
8.117
34.2
809.4
94.2
96.5
2.26
T2
-13.031
-6.469
13.057
7.081
25.8
612.1
94.5
96.5
1.98
T3
-30.123
-14.567
30.183
16.585
59.2
2017.7
93.7
96.5
2.74
T5
-19.665
-9.547
19.724
10.952
59.3
1404.9
93.7
96.7
3.00
T4
-11.466
-5.531
11.486
5.994
19.5
463.3
95.0
96.7
1.68
T36
-37.898
-18.488
38.008
21.718
109.5
3229.6
93.3
96.9
3.56
T8
-35.707
-17.180
35.774
19.457
66.8
2276.6
94.4
97.0
2.61
T9
-39.610
-19.229
39.693
22.060
83.0
2831.0
94.0
97.0
2.95
T38
-30.389
-14.875
30.449
16.926
60.1
2050.9
94.0
96.8
2.79
T12
-18.139
-8.831
18.189
10.018
50.1
1187.2
94.1
96.8
2.76
T13
-16.891
-8.158
16.934
9.180
43.1
1021.6
94.3
96.8
2.53
T43
-23.773
0.000
23.800
0.926
27.1
925.6
98.3
98.5
0.19
T16
-31.182
-15.148
31.233
16.885
50.9
1736.7
94.5
96.8
2.29
T17
-31.599
-15.441
31.651
17.230
52.5
1789.1
94.5
96.8
2.33
T20
-16.396
-7.988
16.409
8.454
13.7
466.2
96.0
97.1
1.16
T21
-30.448
-14.838
30.496
16.483
48.2
1644.3
94.9
97.1
2.23
T24
-18.686
-9.029
18.750
10.546
64.0
1516.8
94.8
98.3
3.47
T25
-17.267
-8.318
17.321
9.604
54.2
1285.6
95.1
98.3
3.17
T29
-15.846
-7.625
15.861
8.132
14.9
506.5
98.3
99.6
1.33
T30
-10.763
-5.043
10.801
5.759
38.5
716.0
96.7
99.6
2.89
T31
-36.609
-17.565
36.691
20.373
82.4
2808.3
96.4
99.6
3.24
T39
-10.476
-5.075
10.496
5.554
20.2
478.8
94.6
96.5
1.91
T40
-5.108
-2.609
5.120
2.827
11.7
217.7
94.7
96.5
1.86
T44
-14.839
-7.232
14.880
8.213
41.4
981.9
93.7
96.5
2.78
T41
-14.514
-6.963
14.554
7.895
39.3
932.0
93.8
96.5
2.67
T42
-15.290
-7.451
15.305
7.958
14.8
506.1
95.1
96.5
1.35
T45
-15.833
-7.646
15.880
8.764
47.2
1118.1
93.5
96.5
2.96
Line13
-1.933
-1.457
1.933
1.457
0.4
96.8
96.8
0.01
Line14
-15.497
-8.873
15.533
8.873
35.7
96.8
97.0
0.17
Line18
-76.241
-40.960
77.703
40.960
1461.1
96.8
98.3
1.44
Line19
-76.241
-40.960
77.703
40.960
1461.1
96.8
98.3
1.44
Line26
15.231
8.463
-15.224
-8.463
6.9
0.0
96.8
96.8
0.03
Line27
15.231
8.463
-15.224
-8.463
6.9
0.0
96.8
96.8
0.03
Line28
20.577
10.938
-20.500
-10.938
76.9
96.8
96.5
0.28
Line29
25.093
13.294
-24.979
-13.294
114.2
96.8
96.5
0.34
Line36
15.448
8.489
-15.380
-8.489
68.0
96.8
96.5
0.33
Line37
15.448
8.489
-15.380
-8.489
68.0
96.8
96.5
0.33
Line7
-31.731
-16.900
32.197
16.900
466.4
97.1
98.3
1.11
Line8
-31.731
-16.900
32.197
16.900
466.4
97.1
98.3
1.11
Line17
16.556
8.864
-16.406
-8.864
150.1
97.1
96.5
0.68
Line24
-38.496
-22.005
38.538
22.005
41.8
96.9
97.0
0.08
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
CKT / Branch
ID
Losses
kW
Page:
17
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
% Bus Voltage
Kvar
From
To
Vd
% Drop
in Vmag
MW
Mvar
MW
Mvar
Line25
-38.496
-22.005
38.538
22.005
41.8
96.9
97.0
0.08
Line12
-37.057
-20.655
37.135
20.655
77.8
0.0
96.8
97.0
0.16
Line31
-154.088
-77.922
157.046
77.922
2957.3
0.0
98.5
100.0
1.51
Line33
-154.088
-77.922
157.046
77.922
2957.3
0.0
98.5
100.0
1.51
Line34
142.188
77.459
-139.346
-77.459
2842.0
98.5
97.0
1.51
Line35
142.188
77.459
-139.346
-77.459
2842.0
98.5
97.0
1.51
Line10
48.008
26.027
-47.830
-26.027
177.4
0.0
97.0
96.7
0.28
Line11
25.474
13.837
-25.296
-13.837
178.1
0.0
97.0
96.5
0.52
Line5
-127.936
-67.935
130.846
67.935
2910.8
98.3
100.0
1.75
Line6
-127.936
-67.935
130.846
67.935
2910.8
98.3
100.0
1.75
Line9
16.621
9.081
-16.566
-9.081
55.0
96.7
96.5
0.25
Line20
31.828
17.132
-31.677
-17.132
151.9
100.0
99.6
0.37
Line21
31.828
17.132
-31.677
-17.132
151.9
100.0
99.6
0.37
Line30
-4.880
-2.558
4.884
2.558
4.0
0.0
96.5
96.5
0.06
24028.9
38932.7
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
18
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment Cable
Connected
ID
Load Type
Losses
kW
% Voltage
kvar
Bus
Load
Vd
% Drop
in Vmag
Vst
% for
Motor
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
19
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Marginal
Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device
Bus Voltage
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)
Critical Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
Bus11
Bus
20.000
kV
18.873
94.4
UnderVoltage
Bus12
Bus
20.000
kV
18.806
94.0
UnderVoltage
Bus13
Bus
20.000
kV
18.798
94.0
UnderVoltage
Bus16
Bus
20.000
kV
18.813
94.1
UnderVoltage
Bus17
Bus
20.000
kV
18.858
94.3
UnderVoltage
Bus2
Bus
20.000
kV
18.650
93.3
UnderVoltage
Bus21
Bus
20.000
kV
18.905
94.5
UnderVoltage
Bus22
Bus
20.000
kV
18.896
94.5
UnderVoltage
Bus27
Bus
20.000
kV
18.982
94.9
UnderVoltage
Bus3
Bus
20.000
kV
18.839
94.2
UnderVoltage
Bus31
Bus
20.000
kV
18.957
94.8
UnderVoltage
Bus4
Bus
20.000
kV
18.895
94.5
UnderVoltage
Bus42
Bus
20.000
kV
18.924
94.6
UnderVoltage
Bus43
Bus
20.000
kV
18.934
94.7
UnderVoltage
Bus44
Bus
20.000
kV
18.741
93.7
UnderVoltage
Bus45
Bus
20.000
kV
18.758
93.8
UnderVoltage
Bus47
Bus
20.000
kV
18.705
93.5
UnderVoltage
Bus5
Bus
20.000
kV
18.743
93.7
UnderVoltage
Bus6
Bus
20.000
kV
18.739
93.7
UnderVoltage
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
Page:
20
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Critical Report
ID
Bus8
Device Type
Bus
Rating
20.000
Unit
kV
Calculated
18.668
%Mag.
93.3
Condition
UnderVoltage
Marginal Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
Bus26
Bus
20.000
kV
19.195
96.0
UnderVoltage
Bus32
Bus
20.000
kV
19.016
95.1
UnderVoltage
Bus38
Bus
20.000
kV
19.348
96.7
UnderVoltage
Bus40
Bus
20.000
kV
19.279
96.4
UnderVoltage
Bus46
Bus
20.000
kV
19.024
95.1
UnderVoltage
Bus7
Bus
20.000
kV
19.004
95.0
UnderVoltage
GI_BANTUL
Bus
150.000
kV
145.214
96.8
UnderVoltage
GI_BAWEN
Bus
150.000
kV
145.707
97.1
UnderVoltage
GI_GEJAYAN
Bus
150.000
kV
145.347
96.9
UnderVoltage
GI_GODEAN
Bus
150.000
kV
145.233
96.8
UnderVoltage
GI_KENTUNGAN
Bus
150.000
kV
145.466
97.0
UnderVoltage
GI_MEDARI
Bus
150.000
kV
145.051
96.7
UnderVoltage
GI_PURWOREJO
Bus
150.000
kV
144.698
96.5
UnderVoltage
GI_SANGGRAHAN
Bus
150.000
kV
144.681
96.5
UnderVoltage
GI_SEMANU
Bus
150.000
kV
144.723
96.5
UnderVoltage
GI_WATES
Bus
150.000
kV
144.791
96.5
UnderVoltage
GI_WIROBRAJAN
Bus
150.000
kV
145.163
96.8
UnderVoltage
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
bebanminimum1
MW
Mvar
MVA
% PF
639.441
325.979
717.738
89.09 Lagging
0.000
0.000
0.000
100.00 Lagging
639.441
325.979
717.738
89.09 Lagging
0.000
0.000
0.000
100.00 Lagging
615.412
287.047
Apparent Losses:
24.029
38.933
System Mismatch:
0.000
0.000
Swing Bus(es):
Generators:
Total Demand:
Number of Iterations: 3
Page:
21
Date:
05-24-2015
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal