Precios y cantidades de recursos requeridos por tipo


Obra

0492017

Subpresupuesto

001
01/01/2013
210101

Fecha
Lugar

Precio S/.

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL EN LOS BARRIOS PROGRESO, TUPAC


AMARU, CESAR VALLEJO Y URBANIZACIONES ROMEP DE LA CIUDAD DE PUNO,
PROVINCIA DE PUNO - PUNO
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL EN LOS BARRIOS PROGRESO, TUPAC
PUNO - PUNO - PUNO

Cdigo

Recurso

Unidad

0147000032
0147010002
0147010003
0147010004

TOPOGRAFO
OPERARIO
OFICIAL
PEON

MANO DE OBRA
hh
144.3227
hh
1,989.2068
hh
1,772.2105
hh
9,114.8449

Cantidad

8.62
7.99
7.61
7.04

Parcial S/.

Presupuestado

1,244.04
15,893.79
13,486.52
64,168.47

1,244.71
15,898.86
13,429.77
64,145.63

94,792.82

94,718.97

MATERIALES
0202000007
0202000008
0202010005
0202020008
0202830002
0202970002
0205000013
0205010035
0205010037
0205010039
0205010040
0205010041
0205530003
0213000006
0221000002
0221000003
0229150099
0229150100
0229150102
0230200005
0230200007
0239050000
0239130020
0239160010
0239300005
0239900081
0243720005
0244010036
0244030022
0244030025
0251080003
0253000001
0253000002
0253030027
0254020081
0254110090
0254450071
0254450072
0256010099
0283010001

0283010002
0283010003
0283010006
0283010007
0283010008
0283010009
0283010019
0283010020
0283010021

ALAMBRE NEGRO RECOCIDO # 16


ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA MADERA C/C 3"
CLAVOS PARA MADERA C/C 2"- 4"
CLAVOS PARA CALAMINA
ACERO DE REFUERZO FY=4200 GRADO 60
ENRROCADO DE PIEDRA-CANTERA DE 50CM
MATERIAL CLASIFICADO PARA BASE
(KUNTUR WASI)
ARENA FINA
AGREGADO GRUESO
AGREGADO FINO
MATERIAL CLASIFICADO PARA BASE
AFIRMADO 10CM
HORMIGON
ASFALTO RC-250
YESO DE 28 KG
CEMENTO TIPO PUZOLANICO IP (42.5KG)
OCRE
CORDEL
OCRE ROJO
LACA DESMOLDEADORA
GIGANTOGRAFIA DE IDENTIFICACION DE OBRA
DE 3.60x2.40 m
AGUA
MALLA TIPO ARPILLERA DE H=2.00M
RODILLO DE PINTURA 4"
TECNOPORT DE 1" 120 X2.40 M
MOV. Y DESMOV. DE EQUIPO
MADERA EUCALIPTO ROLLIZO DE 3" X 3.00M
MADERA TORNILLO
TRIPLAY DE 4'x8'x 6 mm
TRIPLAY DE 4'x8'x 19 mm
ADITIVO SELLADOR DE CONCRETO
GASOLINA DE 84 OCTANOS
PETROLEO DIESSEL # 2
THINER
PINTURA DE TRAFICO
PINTURA ESMALTE
MICROESFERAS DE VIDRIO DROP ON
DISOLVENTE
CALAMINA GALVANIZADA DE ZINC DE
24CANALES 2.40X0.66X0.4MM
SUMINISTRO DE AGUA PARA LA OBRA PAGO
MES
1.0000
200.00
200.00
SUMINISTRO DE AGUA PARA LA OBRA PAGO
MES
SUMINISTRO DE ENERGIA PARA LA OBRA
PAGO MES
SUMINISTRO DE DESAGUE PARA LA OBRA
CAJA DE DESAGUE DE 12"X24"
TAPA C/MARCO FF DE DESAGUE 12"X24"
CAJA DE AGUA 9"X11"
TAPA C/MARCO FF DE AGUA 9"X11"
REPARACION DE CONEXIONES DOMICILIARIAS
DE AGUA 1/2"
REPARACION DE CONEXIONES
DOMICILIARIAS DE DESAGUE 110mm.
BISAGRA ALUMINIZADA 3 1/2"X3 1/2"

kg
kg
kg
kg
kg
kg
m3
m3

76.2500
78.0024
93.8270
7.5500
1.5000
111.4738
1,227.0350
638.0582

5.00
5.00
5.00
5.00
7.50
3.20
40.00
30.00

381.25
390.00
469.15
37.75
11.25
356.70
49,081.60
19,141.80

381.25
390.01
469.14
37.75
11.20
356.72
49,081.40
19,141.75

m3
m3
m3
m3

33.1045
516.0635
344.2280
111.5188

60.00
30.00
40.00
35.00

1,986.00
15,481.80
13,769.20
3,903.20

1,986.45
15,481.91
13,769.34
3,907.62

m3
gln
BOL
BOL
kg
m
kg
gln
m2

442.8326
38.0186
19.4392
5,970.9683
125.5350
1,231.1430
64.7970
3.4823
8.6400

35.00
15.00
15.00
22.00
12.50
1.00
12.00
110.00
32.50

15,499.05
570.30
291.60
131,361.34
1,569.13
1,231.14
777.60
382.80
280.80

15,499.14
561.86
324.00
131,361.07
1,573.37
1,231.14
777.56
384.44
280.80

m3
m2
und
m2
est
m
p2
pln
pln
kg
gln
gln
gln
gln
gln
kg
gln
pln

465.7754
52.5000
80.3209
27.9315
1.0000
150.0000
3,037.1364
28.0000
93.4914
53.1755
608.5239
6,100.9614
17.3131
8.8280
17.1435
52.7048
9.3214
36.0000

4.00
12.00
18.00
25.00
2,335.80
4.50
4.50
45.00
120.00
5.50
13.10
14.20
15.00
62.00
32.00
15.00
40.00
26.00

1,863.12
630.00
1,445.76
698.25
2,335.80
675.00
13,667.13
1,260.00
11,218.80
292.49
7,971.61
86,633.63
259.65
547.46
548.48
790.50
372.80
936.00

1,864.67
630.00
1,443.38
702.27
2,335.80
675.00
13,667.12
1,260.00
11,218.42
297.78
7,966.06
86,619.57
263.05
549.81
533.58
790.57
372.86
936.00

mes

2.0000

120.00

240.00

240.00

mes

2.0000

180.00

360.00

360.00

GLB
und
pza
und
pza
und

2.0000
20.0000
20.0000
20.0000
20.0000
25.0000

320.00
25.00
45.00
35.00
30.00
30.00

640.00
500.00
900.00
700.00
600.00
750.00

640.00
500.00
900.00
700.00
600.00
750.00

und

25.0000

30.00

750.00

750.00

und

6.0000

10.00

60.00

60.00

S10

Pgina :

Precios y cantidades de recursos requeridos por tipo


Obra

0492017

Subpresupuesto

001
01/01/2013
210101

Fecha
Lugar
Cdigo

Precio S/.

MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL EN LOS BARRIOS PROGRESO, TUPAC


AMARU, CESAR VALLEJO Y URBANIZACIONES ROMEP DE LA CIUDAD DE PUNO,
PROVINCIA DE PUNO - PUNO
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL EN LOS BARRIOS PROGRESO, TUPAC
PUNO - PUNO - PUNO

Recurso

Unidad

Cantidad

Parcial S/.

Presupuestado

394,619.94

394,633.86
2,786.27
2,885.71
82.38
37,666.04
3,904.89
35.48
17.74
4,564.57
1,619.69
1,730.77
28,629.47
7,368.55

EQUIPOS
0330550012
0337010001
0348070026
0348110007
0348120002
0349020007
0349020093
0349030007
0349030025
0349030044
0349040011
0349040038
0349070003
0349090003
0349100008

ESTACION TOTAL INCL. PRISMAS


HERRAMIENTAS MANUALES
ZARANDA METALICA
VOLQUETE 6X4 330 HP 15 M3
CAMION CISTERNA 4X2 (AGUA) 2,000 GAL.
COMPRESORA NEUMATICA 76 HP 125-175 PCM
MARTILLO (2) ROMPEPAVIMETO
RODILLO LISO VIBR AUTOP 101-135HP 10-12T
RODILLO NEUMATICO AUTOP 81-100HP 5.5-20T
COMPACTADOR VIBR. TIPO PLANCHA 7HP
CARGADOR S/LLANTAS 160-195 HP 3.5 YD3.
RETROEXCAVADOR SOBRE ORUGAS DE 325HP
, 2-3.5YD3
VIBRADOR DE CONCRETO 4 HP 1.50"
MOTONIVELADORA DE 130-135 HP
MEZCLADORA CONCRETO TAMBOR 9HP 11P3

HE
%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

138.9895

20.00

16.2933
376.6604
32.2952
1.7740
1.7740
32.6391
11.5341
86.6278
238.3149
40.9626

5.00
100.00
120.00
20.00
10.00
140.00
140.00
20.00
120.00
180.00

2,779.80
2,885.71
81.45
37,666.00
3,876.00
35.40
17.70
4,569.60
1,614.20
1,732.60
28,597.20
7,372.80

hm
hm
hm

140.2244
52.5172
384.0913

10.00
180.00
15.00

1,402.20
9,453.60
5,761.35

1,403.72
9,472.70
5,760.43

107,845.61

107,928.41

597,258.37

597,281.24

Total

S/.
S/.

La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

597,281.24