PIQUES
PIQUES yy CHIMENEAS:
CHIMENEAS:
Diseo,
Diseo, Construccin
Construccin yy Operacin
Operacin
Ph. D., P. Eng. TADEUSZ S. GOLOSINSKI
tgolosinski@expo.intercade.org

Consultor INTERCADE
Junio 2008

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

7.PIQUES DE TRASPASO
(Orepasses)

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Chimeneas
(Piques de Traspaso)
Orepasses

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

CONSIDERATIONS

Orepass size and shape.


Wall condition: smooth or rough?
Orientation: vertical or inclined.
Material size, shape and particle distribution.
Operational mode.
Dump when full / empty.
Moisture condition.

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

HOW BIG OREPASS?


Depends on various considerations.
See the slide above.
Usually defined by D/d ratio.
D is pass dia, d is diameter of the largest particles.
For ratios up to D/d < 3, problems are likely.
For ratios of D/d > 5 , problems are unlikely.
Example: EL Teniente.
Largest rocks 1,5m; pass dia 3,5m, 1m x 1m grizzly.

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

LESSARD & HADJIGEORGIU SURVEY


2007

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Scalper (31)

Cone dump (18)

No control structure: 72
Grizzly (32)

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

10

DUMPS: BLOCK SCREENING

Scalper.
High maintenance costs (operator pushing through, broken
bars plugging the orepass).
Large slabs can get through.
Grizzlies.
Better retain big blocks.
Grid dimensions critical (bucket & muck size<<9.
Cone plugs.
Low maintenance costs.
Easy to plug up.
No structure (71/153).
Screens spread out material thus minimize impact forces .

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

11

DRAW CONTROLS

Chutes using control chains (61).


Control chains (35).
Chutes using control chains and an arc gate (21).
No control over flow (33).
Chutes using solid doors (2).
Ross feeder (1).

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

12

DRAWS

Control chains
without chute

Control chains
in a chute

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Control chains and


an arc gate

13

Length
Length of
of excavated
excavated sections
sections

Inclination
Inclination of
of excavated
excavated sections
sections

Minimum
Minimum diameter
diameter

Number
Number of
of finger
finger raises
raises per
per section
section

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

14

LENGTHS & EXCAVATION METHODS

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

15

MATERIAL HANG-UPS

Interlocking arches

Cohesive arches

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

16

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

17

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

18

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

19

OREPASS SUPPORT

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

Ground conditions.
In-situ stress regime.
Mining induced
stresses.
Method of excavation.
Excavation dimensions.
Victinity of other
infrastructure.
Required transfer
capacity.
Access to install
support.
Design life.
Consequences of
failure.

20

TYPES OF GROUND SUPORT

Resin grouted rebar (116).


Resin grouted rebar and cemented grouted cables (9).
Resin-grouted cables (7).
Fibreglass rebar (8).
Resinn grouted rebar and split set (1).
No support (12).

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade

21

Note
Caving
front
determines
stress
conditions
El Teniente
Sec. 4 Sur.

Ph. D. Eng. TADEUSZ S. GOLOSINSKI - tgolosinski@expo.intercade.org - Consultor Intercade