You are on page 1of 3

DAFTAR HARGA

UPAH, BAHAN DAN ALAT


NO.

URAIAN

SATUAN

HARGA

1
I
1
2
3
4
5
6

2
UPAH KERJA
Mandor Lapangan
Kepala Tukang Besi, Kayu, Batu
Tukang Besi, Kayu, Batu
Buruh Lapangan/Pekerja
Operator
Mekanik

II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Batu Gunung
Kerikil Sungai
Batu Pecah 1 - 2 cm
Batu Pecah 0.5 - 1 cm
Pasir Pasangan
Pasir Urug/Pasir Timbunan
Tanah Timbunan/Material Dilokasi Pekerjaan (Gedung)
Batu Bata Merah
Semen PC
Semen Putih
Baut 12 mm
Angkur
Minyak Pelumas
Tandon Air 1.100 L

M
M3
M3
M3
3
M
3
M
M3
Bj
Zak
Zak
Bh
Bh
Liter
Bh

300,000.00
300,000.00
500,000.00
500,000.00
275,000.00
130,000.00
30,000.00
1,200.00
90,000.00
300,000.00
13,000.00
15,000.00
42,000.00
1,700,000.00

III.
1
2
3
4
5
6
7
8
9
10
11

BAHAN KAYU
Kayu Ulin
Kayu Bangkirai (Sejenis)
Kayu Kapur
Kayu Meranti
Nok Kayu
Lem Kayu
Kayu Balok Meranti
Daun Pintu
Daun Jendela
Kusen Pintu dan Jendela
Lubang Angin

M3
M3
M3
M3
M'
Kg
M3
Buah
Buah
Buah
Buah

7,200,000.00
4,300,000.00
3,600,000.00
3,200,000.00
25,000.00
15,000.00
3,200,000.00
950,000.00
200,000.00
1,000,000.00
90,000.00

IV.
1
2
3
4
5

BAHAN BESI/LOGAM
Besi Tulangan Beton
Kawat Baja (Bindrat)
Paku Biasa
Paku Ulin
Paku Genteng Metal

V.
1
2
3
4

BAHAN LANTAI
Tegel Kramik Kasar 20 x 20 cm
Tegel Kramik 20 x 20 cm
Tegel Kramik 30 x 30 cm
Tegel Keramik 20 x 25 cm

VI.
1
2
3
4

BAHAN ATAP
Atap Multi Roof
Atap Sakura Roof
Bubungan Multi Roof
Bubungan Sakura Roof

Hari
Hari
Hari
Hari
Hari
Hari

82,500.00
75,000.00
67,500.00
67,500.00
67,500.00
60,000.00

BAHAN BANGUNAN
3

Kg
Kg
Kg
Kg
Kg

17,500.00
19,000.00
18,000.00
45,000.00
91,200.00

Kotak
Kotak
Kotak
Kotak

78,000.00
78,000.00
64,800.00
80,000.00

Lbr
Lbr
Lbr
Lbr

102,000.00
37,200.00
36,000.00
36,000.00

NO.

URAIAN

SATUAN

HARGA

VII.
1
2
3
4
5
6
7

BAHAN INSTALASI
Body + Balon Lampu SL 18 Watt
Stop Kontak Putih
Saklar Tunggal Putih
Saklar Ganda Putih
Instalasi Titik Lampu
Sekring Kas + Arde
Kabel Tunggal 2,5 mm

Bh
Bh
Bh
Bh
Bh
Set
Rol

65,000.00
28,000.00
26,000.00
28,000.00
300,000.00
200,000.00
500,000.00

VIII.
1
2
3
4
5
6

BAHAN LANGIT - LANGIT


Plywood (Multifleks) 3 mm
Plywood (Multifleks) 4 mm
Plywood (Multifleks) 6 mm
Plywood (Multifleks) 9 mm
Plywood Permika 4 mm
List Plafond

Lbr
Lbr
Lbr
Lbr
Lbr
M'

62,400.00
72,000.00
102,000.00
130,000.00
140,000.00
38,000.00

IX.
1
2
3
4
5
6

BAHAN KACA
Kaca Polos T. 3 mm
Kaca Polos T. 5 mm
Kaca Buram T. 3 mm
Kaca Buram T. 5 mm
Kaca Riben T. 3 mm
Kaca Riben T. 5 mm

M
M2
M2
2
M
M2
2
M

132,000.00
150,000.00
156,000.00
168,000.00
144,000.00
156,000.00

X.
1
2
3
4
5
6
7
8
9
10
11

KUNCI & PENGGANTUNG


Kunci Tanam Biasa 1 x Putar
Kunci Tanam Biasa 2 x Putar
Kunci Lips 2 x Putar
Engsel Pintu 4''
Engsel Pintu 3''
Engsel Jendela
Hak Angin
Handle Jendela
Grendel Pintu
Grendel Jendela
Grendel Tanam

Psg
Psg
Psg
Psg
Psg
Psg
Psg
Psg
Psg
Psg
Psg

102,000.00
102,000.00
210,000.00
36,000.00
30,000.00
30,000.00
30,000.00
12,000.00
30,000.00
24,000.00
102,000.00

XI.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

HAK FINISHING
Amplas Kayu/Besi
Meni Kayu
Dempul/Plamir
Plitur/Sirlak
Cat Air
Cat Kilap Glotek
Cat Kilap Altek
Cat Tembok/Altex
Cat Tembok Dulux
Cat Meny
Minyak Cat
Cat Dasar
Tiner A Biasa
Tiner B Special
Seal Tape
Angkur
Kapur

Lbr
Kg
Kg
Ons/Kg
Kg
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Bh
Bh
Kg

3,600.00
54,000.00
12,000.00
66,000.00
24,000.00
60,000.00
60,000.00
24,000.00
90,000.00
30,000.00
30,000.00
24,000.00
30,000.00
28,000.00
7,344.00
66,000.00
3,500.00

NO.

URAIAN

1
XII.
1
2
3
4
5
6
7
8
9
10

2
BAHAN SANITASI
Closet Jongkok
Wastafel
Bak Cuci Alumunium 1 Lubang
Kran Air
Floor Drain
Pipa PVC Dia 3'
Pipa PVC Dia 4'
Pipa PVC Dia 1/2 '
Pipa PVC Dia 3/4'
Talang Air

XIII.
1

ALAT BERAT
Excavator

SATUAN

HARGA

Bh
Bh
Bh
Bh
Bh
m
m
m
m
Bh

360,000.00
420,000.00
240,000.00
30,000.00
30,000.00
58,600.00
88,000.00
10,000.00
15,000.00
60,000.00

Jam

600,000.00

You might also like