COMPARATIVO DE COSTOS ADQUISICION ARENA FINA

MATERIAL
EXPEDIENTE TECNICO
MATERIALES
Arena Fina

UND

METRADO

P.U. (S/.) INC


IGV

PARCIAL

M3

150.00

59.00

8,850.00

SUBTOTAL
8,850.00

TOTAL
MATERIAL
COTIZACIN DISTRIBUIDOR "EL CHORRILLANO"
MATERIALES
Arena Fina (Inc. Transporte y Puesta en Obra)

UND

METRADO

P.U. (S/.) INC


IGV

PARCIAL

M3

150.00

50.00

7,500.00

CON MAQUINARIA DE OBRA


MANO DE OBRA
Operador
Peon
Administrativos
MATERIALES
Arena Fina
Combustible Cargador Frontal
Combustible Volquete Placa F4K-774
Combustible Volquete Placa V74-846
EQUIPO
Cargador Frontal
Volquete Placa F4K-774
Volquete Placa V74-846

SUBTOTAL
7,500.00

TOTAL
DESCRIPCION

8,850.00

UND

METRADO

P.U. (S/.) INC


IGV

PARCIAL

HH
HH
GLB

15.00
15.00
1.00

20.00
18.00
400.00

300.00
270.00
400.00

M3
GAL
GAL
GAL

150.00
20.25
8.10
8.10

0.00
10.50
10.50
10.50

0.00
212.63
85.05
85.05

HM
HM
HM

4.50
4.50
4.50

7,500.00
SUBTOTAL
970.00

382.73

1,665.00
130.00
585.00
120.00
540.00
120.00
540.00
TOTAL S/.
Costo Unitario S/. / M3

3,017.73
20.12

Nota: Los Volquetes realizaron el trabajo en 5 viajes c/u


RESUMEN COMPARATIVO DE COSTOS (Inc. IGV):
EXPEDIENTE TECNICO
COTIZACIN DISTRIBUIDOR "EL CHORRILLANO"
CON MAQUINARIA DE OBRA

CANTIDIDAD
150.00
150.00
150.00

CU
(INC IGV)
59.00
50.00
20.12

TOTAL S/.

AHORRO S/.

8,850.00
7,500.00
3,017.73

1,350.00
5,832.27