Development of duct A
Plan
Development of duct B
Front Elevation
Development of duct A
Plan
Development of duct B
The elevation of an elbow joint for a circular duct is shown. Find the
development of the part of the duct marked A.
A
Development of duct A
A
Development of duct A
Development of duct A
A pipe P intersects a larger pipe at right angles. Draw the given end view and
complete the front elevation. Develop the surface of the pipe P.
Development of P
End Elevation
Front Elevation
End Elevation
Front Elevation
Development
of the hole
The diagram shows the end view of a T-junction joining a 40mm diameter pipe
and a 50mm diameter pipe. One side of the smaller pipe is tangential to the
larger pipe as shown in the figure.
(i) Draw the given view and find the front elevation showing the line of
intersection.
(ii) Develop the surface of the 40mm diameter pipe.
(iii) Develop enough of the 50mm diameter pipe to show the true shape of the
hole to be cut in it.
End Elevation
Front Elevation
The diagram shows the plan and elevation of two intersecting air
conditioning ducts. The ducts intersect at an oblique angle
(i) Draw the plan and elevation of the ducting. Showing the line of
intersection.
(ii) Project an end elevation.
(iii) Develop the oblique duct and show
the true shape of the hole.
End Elevation
Front Elevation
Partial development
of 250mm duct
showing true shape
of hole
Plan
The plan and incomplete elevation of two ducts are shown. One duct is
circular in cross section, while the other is square in cross section.
i.
Find the line of intersection between the two ducts and project an
end view.
ii. Develop the surface of the square duct
Partial
development
of 250mm
duct showing
true shape of
hole
End Elevation
Front Elevation
Plan
Transition Pieces
Transition Pieces
Triangulation Method
Used to develop transition pieces
Front Elevation
Plan
Rebattment
Development
Front Elevation
Plan
To develop the surface of the transition piece connecting two circular pipes
whose axes are not aligned.
Front Elevation
Plan
Development
The figure shows a transition piece starting as a rectangle and ending as a circle. The
circle is off-centre.
Show the complete surface development of the surface of the transition piece.
Development
Front Elevation
Plan
Front Elevation
Plan
Development
Elevation
Plan
Half Development
7
6
Front Elevation
7
6
End Elevation
5
4
4
3
Plan
Half-development of oblique
cylindrical duct
Development of
rectangular duct
``
Front Elevation
End Elevation
Half-development of oblique
cylindrical duct
Plan
Development of
rectangular duct
Cylindrical duct intersecting an oblique cylindrical duct the cylinder duct is off
centre
i. Draw the given views and project a plan
ii. Find the joint line in all views
iii. Develop section A of the cylindrical duct
iv. Develop the oblique cylindrical duct
Front Elevation
End Elevation
Half-development of oblique
cylindrical duct
Front Elevation
End Elevation
Plan
Half-development of oblique
cone duct
Half-development of oblique
cylindrical duct