ACTION PLAN FOR STATIC EQUIPMENT

RELIABILITY
ON-STREAM INSPECTION PROGRAM
Sr
Inspection Program Description
No.
1)
Review of Critical Loops
a) Identification of critical loops - Class 1 piping as
per OISD-STD-130 (Inspection of Piping Systems)
b) Review of project stage loop files with as -built
for identified critical loops & check for deviations,
if any.
c) Visual inspection of small bore piping (<2inches)
for identified critical loops.
Implementation of Risk Based Inspection
2)
Program
a) CDU/VDU, DCU, FCCU, VGO (Corrosion study
completed). Risk ranking generation to start from
25th March 2015
b) DHDT, MSB, HGU
c) SRU, Treaters, PPU, CPP, Tankfarm

3)

Find Construction Stage QA/QC Pending Punch


Point List

Target
Date
10.04.20
15

Status

Loops Identified. Total


Loops : 82

25.09.20
15
25.09.20
15

10.05.20
15
20.08.20
15
15.11.20
15
13.03.20
15

Corrosion Circuitisation &


Corrosion Study
Completed, Data Collection
Completed.

QA/QC Pending Points list


available
Under Progress

Follow up on the list

TURNAROUND INSPECTION PROGRAM


Sr
Inspection Program Description
No.

20.05.20
15

Target
Date

1)

2)
3)

Boroscopic aided visual internal inspection of


weldolets installed in high pressure loops to
check for weld integrity. Inspection
completed for 185 nos. weldolets in VGO,
DHDT, NHT, CCR & HGU.
Pending inspection of 11 nos. weldolets in
HGU
Internal inspection of static equipments
Inspection of Mixing Points in High
Temperature Service Lines

Dec-16
Dec-16
Dec-16