.,.l.:>~ ~"'~I as~1


Saudi Electricity Company

CONTRACT NO. 30621127{00

SCHEDULE "8"
v

Provision of list of capital spares (priced list with options) as


described in Section 4.9.2 of the Scope of Work and Technical
Specifications, PTS No. 07EG908, Volume 1 of 3.

vi

Preparation of Contract
construction procedures.

vii

Quality Control, inspection and testing.

viii

Provision of Operation and Maintenance Manuals.

ix

Training of COMPANY's personnel on the operation and maintenance


of the CCGT Power Plant, including provision of all training manuals
and aids, as described in Section 4.8 of the Scope of Work and
Technical Specifications, PTS No. 07EG908, Volume 1. of 3 and
Pricing Attachment to Schedule "C" on Training. CONTRACTOR shall
complete the Training before Preliminary Acceptance of the first
Power Plant Unit (CCGT Power Block).

Supply of local lifting beams and manual hoists as described in


Section 4.10 of the Scope of Work and Technical Specifications, PTS
No. 07EG908, Volume 1.

xi

Supply of special tools and maintenance equipment for all plant and
equipment supplied by CONTRACTOR under this CONTRACT as
described in Section 4.10 of the Scope of Work and Technical
Specifications, PTS No. 07EG908, Volume 1.

xii

Provision of all flushing facilities and flushing oils.

xiii

Provision of first charge


lubricants

xiv

Preparation of as-built drawings.

xv

Preparation. of erection & commissioning document packages


test
proced ures,
(Turnover
Packages),
with
schedules,
check/inspection sheets and reports.

xvi

Provision of Vendor manuals

xvii

Provision of Operation and Maintenance Manuals

xviii

Supply of test equipment as described in Section 4.10 of the Scope


of Work and Technical Specifications, PTS No. 07EG908, Volume 1.

documents

and

drawings

including

of all chemicals, lubricating oils and

xvi x Provision of Inspection Sheets for all equipment.


xx

Provision of permanent and portable iube oil/control oil purification


equipment.

xxi

Provision of safety gear for fire fighting, chemical spills, portable


combustible and hazardous gas detectors, electrical protection gear,
etc.

B-11
Conversion of Open Cycle Gas Turbines to Combined Cycle at Qurayyah Power Plant
Schedule "8 II