Guideline
QHSE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
2 / 145
1
4
3A
CONTENTS
PART 1 HSE PLAN - DESIGN ACTIVITIES
1.
INTRODUCTION..................................................................................................................
2. REFERENCE DOCUMENTS...............................................................................................
3. ORGANISATION AND RESPONSIBILITIES....................................................................
4. HSE ACTIVITIES...............................................................................................................11
5. PROGRAMME.....................................................................................................................28
6. HSE DOCUMENTATION...................................................................................................30
PART 2 HSE PLAN - CONSTRUCTION ACTIVITIES
1.
INTRODUCTION................................................................................................................32
HSE MEETINGS................................................................................................................43
7.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
3 / 145
1
4
3A
10.
11.
12.
13.
14.
SECURITY.......................................................................................................................68
15.
HSE SCHEDULE.............................................................................................................68
16.
17.
18.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
4 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
5 / 145
1.
00
1
4
3A
INTRODUCTION
1.1
General
This document presents the Health, Safety and Environmental Plan for the
design phase of the Bhit Gas Field Development Project for LASMO Oil
Pakistan Limited (LOPL). The Plan is intended to provide direction and
guidance to the Project Team on HSE issues during the detailed design
phase and provide an interface to construction HSE activities.
1.2
The Project
1.2.1
LASMO Oil Pakistan Ltd is developing the field within the Kirthar
region of the Sindh Province of Pakistan. The development of the
site includes the erection of gas gathering and process plant
facilities on and adjacent to the Bhit Mountain.
1.2.2
1.2.3
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
6 / 145
1.2.4
1.3
00
1
4
Wellsites;
Interconnecting infield flowlines and pipelines;
Gas processing plant at the foot of the Bhit Mountain;
safety;
personnel health;
the environment;
the responsibilities of personnel within the project organisation;
and
the approximate timing of the studies.
1.3.2
1.3.3
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
7 / 145
1
4
accommodation facilities.
Identify and inform the design team and other interested parties
of all known safety activities, findings and milestones and the
implications of process design changes for process emissions and
environmental impact.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
8 / 145
1
4
1.3.4
1.4
Definitions
CIV
CSOB
DCN
ELE
HAZAN
HAZOP
HSE
LOPL
MECH
NRU
PEM
PFD
PHA
P&ID
PM
PRC
Civil Discipline
Construction Management Discipline
Design Change Notice
Electrical Discipline
Hazard Analysis
Hazard and Operability Study
Health, Safety and the Environment
LASMO Oil Pakistan Ltd
Mechanical Discipline
Nitrogen Rejection Unit
Project Engineering Manager
Process Flow Diagram
Preliminary Hazard Assessment
Piping and Instrumentation Diagram
Project Manager
Process Discipline
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
9 / 145
PSL
QRA
SHE
SERD
SIL
SPBV
2.
00
1
4
REFERENCE DOCUMENTS
2.1
2.2
2.3
2.4
Project Procedure
Design HSE Philosophy
Local Regulations
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
10 / 145
1
4
3A
Organisation
3.1.1
3.1.2
[4]
Responsibilities
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
11 / 145
1
4
3A
Project Manager
The Project Manager has overall responsibility for HSE issues on the
Project and will act as the overall manager (the HSE Plan
[4]
HSE Supervisor
[4]
Engineering Manager
The Project Engineering Manager (PEM) is responsible for ensuring
that the requirements of the HSE Design Philosophy are
incorporated into the design. Queries regarding the design
philosophy and derived documentation will be referred to the PEM
for resolution.
3.2.4
3.3
HSE activities are not discrete events but have feedback into the
developing design, particularly in the early (conceptual and basic
engineering) stages. It is therefore important to ensure that the
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
12 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
13 / 145
4.
00
1
4
HSE ACTIVITIES
4.1
Project Goals
The purpose of the HSE activities undertaken during the detailed design
phase of the Project is to provide a sound and cost-effective basis for the
process, infrastructure and other facilities in the development, whilst
ensuring compliance with local safety and environmental standards and
regulations. The combination of hazard assessments, risk assessments,
design reviews and safety/environmental design philosophies is intended to
fulfil the goals of:
The principal activities constituting the Design HSE process are described
in Sections 4.2 and 4.3 below.
4.2
4.2.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
14 / 145
1
4
3A
End of Detailed
Engineering/Precommissioning/Construction Planning
(HSE-3)
Activities scheduled for the end of the design phase will be
reviewed for completion and implementation and compliance of
the design with established risk criteria and other identified
safety goals. Precommissioning and commissioning
requirements and preparations for the transfer to site of other
relevant HSE-related information will also be reviewed.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
15 / 145
00
1
4
3A
4.2.3
4.3
The purpose of the reviews and their timing is to ensure that HSErelated activities are identified and executed at the appropriate
point during the Project and the findings implemented as
appropriate in order to achieve an inherently safer design and
ensure that both SPBV and LOPL HSE requirements are met. Level
of LOPL involvement in Project HSE reviews is to be established.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
16 / 145
1
4
4.3.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
17 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
18 / 145
4.3.5
00
1
4
3A
4.3.6
4.3.7
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
19 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
20 / 145
1
4
sewage treatment;
nitrogen generation.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
21 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
22 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
23 / 145
1
4
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
24 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
25 / 145
1
4
3A
4.4.3
4.4.4
4.4.5
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
26 / 145
1
4
3A
(Figure 4.1b). The person preparing shall sign and where actions
involve SPBV, the response shall be approved by the SPBV
Engineering Manager. Completed action response sheets will be
returned to the HSE Supervisor who will own the register and
maintain related records. Prior to the action being closed out on the
register, it shall be confirmed that the action has been performed as
indicated in the response by the person implementing it.
4.5
4.4.6
The Action Tracking Register is intended not only to manage longterm HAZOP actions but any safety-related issues which might arise
during the project for which positive confirmation of close-out is
required. The register will be available to assist in the management
of these issues but some discretion will be required to ensure that a
large number of minor issues are not accumulated.
4.4.7
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
27 / 145
00
1
4
3A
4.5.2
4.5.3
operating manuals;
precommissioning instructions;
commissioning instructions; and
startup instructions
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
28 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
29 / 145
Philosophy/Basis
Owner
of Design
Output
00
1
4
Comments
(Document)
SERD
00-ZA-E-09529
General document
covering wellheads and
main plant. Requirements
for layout, fire protection
etc
Equipment Noise
Levels
MECH
00-MA-E-30009
Emergency
Shutdown
PRC
00-ZA-E-04009
Definition of shutdown
levels, systems and
interactions
Relief and
Blowdown
PRC
00-ZA-E-04005
PRC
00-ZA-E-04002
PRC
00-ZA-E-04007
Explosion
Protection
SERD
N/A
Requirements for
protection by layout
detailed in HSE Design
Philosophy. Blast loads
defined by Hazard
Assessment studies
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
30 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
31 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
32 / 145
1
4
Action/Recommendation:
Sheet 1 of ___________
Action
Agreed as above/Rejected/Other*
(* delete as applicable)
Action Agreed
Date: _______
LOPL : _________________________________
Date: ________
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
33 / 145
Action Implemented:
Signature __________________________
00
1
4
Date: ________
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
34 / 145
1
4
New Actions
Action Register
Existing or
Outstanding
Items
Follow-Up
ALARP Demonstration
(if required)
Signatories
Action Close-Out
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
35 / 145
5.
00
1
4
PROGRAMME
5.1
5.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
36 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
37 / 145
6.
00
1
4
3A
HSE DOCUMENTATION
6.1
6.2
The many HSE activities performed during detailed engineering and during
construction will be drawn together in an overall Project HSE Dossier. The
Project HSE Supervisor will be responsible for the assembly of the HSE
Dossier.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
38 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
39 / 145
1.
00
1
4
INTRODUCTION
This Health, Safety and Environmental (HSE) Plan is designed to give direction
and guidance to the Managing Contractor Project Management Team of Aquater
during Construction and Commissioning phases of the Lasmo (referred to as the
Company), Bhit Gas Field Development project.
In addition to this HSE Plan, each contractor shall prepare and submit his own
project specific HSE Plan for approval by the Managing Contractor/Company.
LASMO Oil Pakistan Ltd is developing the field within the Kirthar region of the
Sindh Province of Pakistan. The development of the site includes the erection of
gas gathering and process plant facilities on and adjacent to the Bhit Mountain.
The object of the plan is to provide an overview of the methods adopted by the
company to ensure that the project complies with statutory, contractual and
company requirements with respect to safety, personnel health and the
environment. It also demonstrates how HSE activities are integrated with the
development and verification of the design.
The Bhit field was discovered in early 1997 and is located approximately 180
kilometres north east of Karachi, within the Kirthar Concession Block. The field
is estimated to contain 1.4tcf of hydrocarbon gas with the potential of producing at
rates of up to 400mmscf/d. The gas is to be gathered from the various well
locations and routed to the Bhit Process Plant. At the Bhit Process Plant
produced water will be removed from the gas stream and treated. The gas will
require CO2 removal and dehydration prior to passing to the Nitrogen Rejection
Unit (NRU). Also significant gas compression will be required due to the low
pressure of operation for the NRU. The complete scope of work will include
flowlines, gathering lines, process plant, export pipelines and metering facilities.
The gas will be exported to tie in with the existing SSGC (Sui Southern Gas
Company) Indus Right Bank Line (IRBL) approximately 30 Km from the plant
(the existing pipeline supplies gas to Karachi).
The field development facilities covered include:
Wellsites;
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
40 / 145
2.
00
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
41 / 145
1
4
Land Use
The Easement Act (No. V) 1882, Law Easements and Licences
Transfer of Property Act 1882
The Land Acquisition Act 1894
Government Grants Act 1895
West Pakistan Land Reform Rules 1959
West Pakistan Land Reform Regulations 1959, MLR No. 64
Consolidations of Holdings Ordnance (No. VI) 1960
West Pakistan Land Reforms (Ejectment of Tenants to provide for Buildings)
Rules 1969
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
42 / 145
1
4
API RP 1102
ASME B31.8
IP Part 6
BS 1722
Part 12
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
43 / 145
BS 5228
00
1
4
BS 4515
ASME B31.3
Process Piping
ASME IX
API 6FA
API RP 520
API RP 521
API 1104
MSS SP 44
MSS SP 75
NACE MR 0175
Packaging code
Protection of metal surfaces against corrosion during
transport and storage
BS 1710
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
44 / 145
1
4
3A
BS 3900
BS 4652
BS 4800
BS 5345
BS 5378
BS 5493
BS 5501
BS 5750
Quality systems
BS 6651
BS 7079
BS 7361
Cathodic protection
BS 7430
BS 7671
BS EN 60529
IP Part 1
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
45 / 145
1
4
IP Part 15
IEC 60331
IEC 60332-3
ASTM B418
ASTM G42
DIN 30670
ISO 8501
ISO 8502
US MIL-A-18001K
BS 5228
BS 5306
BS 5378
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
46 / 145
1
4
BS 5499
BS 5607
BS 5930
BS 6164
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
47 / 145
1
4
Trenching Practice
3.
HSE GOALS
The Managing Contractor (Aquater) and subcontractors employed on this project
shall adhere to all the applicable rules, regulations and guidelines issued by the
Pakistan Government (Workers Safety, Health and Welfare laws contained in
Mines Act 1923) and UK Government (Referenced in Snamprogetti Safety, Health
and Environment procedure POL/QUAL/102).
The objective is to complete the Gas Field Development project fully embracing its
zero accident tolerance philosophy and achieving its target of zero injury or illness
cases, lost time or not, zero fatalities and zero incidents of a nature that damage
the environment, property or equipment. The target will be to strive to achieve
100% of the project job hours being accident or incident free.
The performance toward the achievement of the target of zero will be tracked
using the following indicators:
Cumulative safe hours (safe hours are hours worked without an accident or
incident)
Number of lost time injury-free workhours
Number of lost time injuries
Lost time injury frequency
Number of incidents (non-injury, no-material damage)
Basic and immediate cause
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
48 / 145
4.
00
1
4
3A
HSE PROCEDURES
Relevant Snamprogetti procedures are:POL/QUAL/102
OPR/SRD/351
OPR/CSOB/373
OPR/HRF/466
Safety Audit
Construction SHE
Office Safety, Health and Environment
COP/CSOB/2713
Site Safety
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
49 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
50 / 145
00
1
4
3A
provides for the initial HSE induction. He promotes the co-operation of all
staff, supervision and labour personnel involved in construction for
incidents prevention.
He manages and supervises the HSE training programmes of Managing
Contractor and Contractors. He advises the Managing Contractor Site
Representative of required actions to upgrade any substantial working and
living conditions. He maintains contacts with local authorities in charge of
health and environmental matters.
Through the Managing Contractor Doctor he organises and manages the
medical and first aid service and maintains contacts with local hospitals
and the relevant medical and local authorities
Prioritises and produces a plan of work for implementing the HSE
elements of the HSE Plan
Reports progress monthly, against the implementation schedule, to the
HSE Manager (Head Office)
Reports to the Managing Contractor Site Representative on actual
implementation progress compared with the schedule on a monthly basis
Establishes and maintains a professional relationship with the Company's
HSE personnel and promotes the 'Zero Accident Tolerance' philosophy
Establishes and maintains a professional relationship with Managing
Contractor's HSE personnel. Directs, manages and trains the safety staff
as necessary to attain HSE management standards demanded by the
Managing Contractors HSE programme
Trains local hire HSE personnel and Company's HSE personnel as directed
Receives professional guidance from the HSE Manager (Head Office)
Carries out professional safety and occupational health duties as required
by the Site HSE Supervisor
Provide the professional oversight, guidance and resources to line
management and supervision to ensure Managing Contractor achieves
safety objectives and target of Zero Accidents/Incidents
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
51 / 145
1
4
5.2.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
52 / 145
1
4
3A
5.3.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
53 / 145
6.
00
1
4
HSE MEETINGS
6.1
Responsibilities
6.1.1
6.1.2
6.1.3
Shall, in concert with the Site HSE Supervisor, ensure the line
management and supervisors commit schedule, personnel and
resources for safety meetings as required in this plan or
otherwise deemed necessary by the HSE Manager (Head Office)
Shall participate and contribute actively in site as well as project
management safety meetings
Shall ensure that line management and supervisors participate,
contribute actively and exercise leadership in their respective
individual and collective project safety meetings
Shall ensure that HSE elements be a regular agenda item at site
management meetings
Shall ensure that the scheduled safety meeting occur
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
54 / 145
6.1.4
1
4
3A
6.2
00
Frequency*
Attendance
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
55 / 145
Frequency*
Quarterly
00
1
4
Attendance
Company, HSE Manager (Head
Office), Contractor Site Rep,
Construction Manager, Site HSE
Supervisor.
Monthly
Monthly
Weekly
Weekly
Task/Craft-Specific Talks
6.3
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
56 / 145
00
1
4
6.4
Environmental considerations
Climotological and seasonal considerations
Local health hazards
Technical and safety training program
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
57 / 145
6.5
00
1
4
3A
6.6
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
58 / 145
00
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
59 / 145
6.7
00
1
4
6.8
The Site HSE Supervisor shall ensure that supervisors and their
foremen are:
Conducting Tool Box Talks with their crew each week using their own
and/or material furnished by the Site HSE Supervisor.
Providing employees with the opportunity to ask questions regarding
HSE issues and providing responses to these in a timely fashion
Having all attendees sign the HSE meeting report form during the
meeting
Submitting a completed Tool Box report form to the general foreman or
lead supervisor/manager for review and action, then to the
superintendent for review and action if required, and finally to the Site
HSE Supervisor.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
60 / 145
6.9
00
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
61 / 145
1
4
General
A complete set of HSE procedures has been prepared for site-based
activities to complement the Company safety procedures and in particular
have been developed to include the following requirements:
Adherence to local safety and environmental protection legislation and
company policies.
Adherence to the safety rules and procedures included within Company
Safety Manual, Operators Safety manuals and other Company
procedures and regulations.
Provision of a safe working environment for all personnel engaged on the
project construction sites.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
62 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
63 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
64 / 145
7.2
00
1
4
3A
[4]
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
65 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
66 / 145
8.
00
1
4
3A
9.
Monitor project activities, inspect facilities to ensure that the HSE rules
established within the HSE programme are being complied with
Identify hazards inadequately addressed by established procedures and ensure
that safe work procedures are developed to deal with them
Report both positive and negative aspects of items revealed by inspection,
promptly, in writing and ensure follow-up action
Devise and implement project management 'HSE walks', jointly with
purchasers' representatives and Managing Contractors as necessary
Accompany Company HSE inspectors and promptly respond to their
reasonable requests
The Contract Site Representative shall promptly action matters arising from the
inspections
Contractors shall promptly action matters arising from the inspections and
institute their own programme of inspection and monitoring.
9.1
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
67 / 145
9.2
00
1
4
3A
9.3
9.4
9.5
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
68 / 145
1
4
3A
current work activities. The Site HSE Supervisor and staff shall assist in the
planning of these inspections on a weekly basis.
Inspection logs shall be maintained and submitted to the Site HSE
Supervisor on a weekly basis. Distribution of the inspection log shall include
the Managing Contractor Site Representative and appropriate Contractors,
supervisors and foremen.
Follow-up inspections shall be conducted on the appropriate time basis
whenever the inspection results in required action items.
[4]
9.6
[4]
[4]
[4]
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
1
4
69 / 145
10.
00
NO. OF VEHICLES
KM DRIVEN
(DATE)
WAS CERTIFIED UNFIT ON
WAS CERTIFIED UNFIT ON
WAS CERTIFIED UNFIT ON
NAMES OF EMPLOYEES CERTIFIED FIT FOR DUTY DURING MONTH FOLLOWING LWC OR
RESTRICTED WORK CASE ABSENCE
(NAME)
(DATE)
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
70 / 145
1
4
RETURNED TO WORK ON
RETURNED TO WORK ON
RETURNED TO WORK ON
SIGNED
POSITION
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
71 / 145
10.1
1
4
3A
10.2
00
Category 1
Category 2
Permanent Partial Disabilities, Lost Workday Cases, damage more than US$ 15,000
(inclusive) or major environmental impact.
Fatality (FTL)
A fatality is a death resulting from a Work Injury, regardless of the time intervening
between injury and death.
Any one-time treatment and subsequent observation of minor scratches, cuts, burns,
splinters, and so forth, which does not ordinarily require medical care. Such
treatment and observation are considered first aid even though provided by a
physician or other medical staff.
Lost Time Injuries are the sum of Facilities, Permanent Total Disabilities,
Permanent Partial Disabilities, and Lost Workday Cases. N.B. If, in a single
Incident 20 people receive lost time injuries, then it is accounted for corporate
reporting purposes as 20 LTIs (not 1 LTI).
A Lost Work day Case is any Work Injury/Illness other than a Permanent Partial
Disability which renders the injured person temporarily unable to perform any
Regular Job or Restricted Work on any day after the day on which the injury / illness
was incurred.
A Medical Treatment Case is any Work Injury that involves neither Lost Workdays
nor Restricted Workdays but which requires treatment by, or under the specific
orders of, a physician or could be considered as being in the province of a physician.
Near Miss
Occupational Illness
Occupational Illness is any work related abnormal condition or disorder other than
one resulting from a Work Injury, caused by or mainly caused by exposure at work
Permanent Partial
Disability (PPD)
Permanent Partial Disability is any Work Injury which results in the complete loss,
or permanent impairment, of functions of parts of the body, regardless of any preexisting disability of the injured member or impaired body function. It is a Lost
Time Injury.
Permanent Total
Disability (PTD)
A Restricted Work Case is any Work Injury which results in a work assignment,
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
72 / 145
11.
00
1
4
3A
(RWC)
after the day the Incident occurred, that does not include all the normal duties of
the persons Regular Job. The restricted work assignment must be meaningful and
pre-established or a substantial part of a Regular Job.
A Road Traffic Incident (Accident) is any Incident involving one or more moving
vehicles which results in injuries, and/or damage to property, vehicle(s), or loads
being moved or carried by vehicles. For the purpose of Companys Incident Reporting
procedures, windscreen damage caused by thrown up road debris e.g. stone chips
shall not be statistically reportable unless more serious damage or personal injuries
occur as a result.
Refined Hydrocarbons
Other flammable materials in general
Explosives
Pressure Hazards
Differences in elevation
Objects under induced stress
Dynamic situations
Nature
Ergonomic conditions
Hot surfaces
Hot fluids
Electricity
Electromagnetic radiation
Radioactive sources in general
Non-breathable conditions
Toxic liquid
Biological hazards
Job/incumbent matching
Starting from this basis a hazard analysis has been performed and relevant control
measures identified to reduce the risk as low as reasonably practicable.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
73 / 145
1
4
3A
Hazard Analysis and Control Programme sheets are provided in Appendix A of this
Plan for the following hazard categories in order to :
determine what measures are needed to eliminate, reduce or minimise the
likelihood of the release of the hazard identified
identify technical, operational or organisational measures that will limit the
consequences of the hazard if released
Prior to use on site, the specific supervisors and foremen to perform the work
encompassing the given hazard shall verify that the control measures specified are
in place and confirm that there are no specific additional hazards that apply to the
particular activity.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
74 / 145
1
4
3A
The Hazard Analysis and Control Programme sheets are listed below.
A-1
A-2
A-3
A-4
A-5
A-6
A-7
A-8
A-9
A-10
A-11
A-12
A-13
A-14
A-15
A-16
A-17
A-18
A-19
Civil Works
Civil Works
General
General
General
General
General
Mechanical Installation
Mechanical/Commissioning
Electrical Installation
Electrical Installation
Electrical Installation
General
General
General
Civils
Civils
Civils
Mechanical Installation
A-20
A-21
Temporary Works
Temporary Works
A-22
A-23
A-24
A-25
A-26
A-27
A-28
A-29
Temporary Works
General
Civil Works
Civil Works
Civil Works
General
Mechanical
Mechanical
A-30
Electrical
Excavation
Concreting and Shuttering
Transportation of Gas Cylinders
Gas Cutting
Grinding
Welding
Diesel Engines
Radiography
Pressure Testing
Cable Drum Handling
Cable Pulling
Cable Laying/Cable Termination
Material Handling
Handling of Steel
Handling of Timber
Concrete Pours
Steel Fixing
Backfilling of Excavations
Transportation/Lifting of Heavy
Equipment
Erection of Scaffolding
Provision & Maintenance of Safe
Scaffolding
Dismantling of Scaffolding
Use of Hazardous Substances
Erection of Fencing
Fabrication of Gates
Erection of Gates
Removal of Waste Material
Erection of Steel Work
Installation of Pipeline and
Valve Fittings
Electrical Work
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
75 / 145
A-31
A-32
A-33
A-34
Civil Works
Civil Works
Site Preparation
General
00
1
4
Rock Drilling
Rock Blasting
Earthworks
Site Transport
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
76 / 145
12.
00
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
77 / 145
1
4
12.2
Environmental Auditing
12.2.1 Scope and Objectives
Environmental audits during plant construction are aimed at
verifying the compliance of project activities with the environmental
policy and the environmental requirements stated for the Contract.
12.2.2 Activity
The environmental auditing will be developed by means of the
following activities:
environmental review: aimed at verifying that the significant
design modifications which could arise during plant construction
do not impair the environmental performance requested;
environmental inspections: aimed at ensuring the effective
implementation of the environmental protection/conservation
measures identified.
The main steps of the environmental audit procedure are described
in Appendix B.
In Appendix C are listed the environmental measures to be
complied with by the project construction and commissioning.
During the development of the project phases subject to audit, the
evidence of any non-conformance of the audited activities, if any,
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
78 / 145
1
4
Waste Management
12.3.1 Scope and Objectives
The objectives of Waste Management of the Project activities, as
stated in Companys Waste Management Manual, are:
to ensure the responsible and safe disposal of wastes;
to treat hazardous waste and render it non-hazardous before
disposal or, if it is not possible,
to ensure safe, ultimate disposal of hazardous waste or to ensure
safe disposal while retaining control for future treatment;
to reduce the volumes of (hazardous and non-hazardous) waste
generated.
12.3.2 Activity
To meet the above stated objectives, all waste management will be
carried out as per Company Waste Management Manual.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
79 / 145
1
4
[4]
12.3.3 Responsibility
The Site HSE Supervisor shall appoint a Waste Custodian as the
person responsible for the management of the waste streams. The
main duties of the Waste Custodian are to ensure that:
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
80 / 145
00
1
4
12.3.4 Schedule
Waste management activities will be carried out continuously
during construction and commissioning operations.
12.4
Environmental Awareness
12.4.1 Scope and Objectives
Environmental awareness training will be developed on-site to
ensure that supervisory personnel, employees and Contractors at all
levels are aware of:
the Projects Environmental Policy and Objectives;
the real and potential impact of construction, commissioning and
initial operation on the environment;
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
81 / 145
00
1
4
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
82 / 145
1
4
3A
Responsibilities
The ultimate responsibility for the CEMP will be the Managing Contractor
Site Representative. He will ensure that the Environmental management
system procedures work efficiently, that sufficient resources are devoted to it,
and most importantly that construction and commissioning activities are in
compliance with the CEMP.
The Site HSE Supervisor will be responsible for development and
implementation of the environmental activities described in this CEMP. He
will report to the Managing Contractor Site Representative.
In functional interface with Home Office HSE Manager, the Site HSE
Supervisor environmental responsibilities include the following:
To ensure that all Construction personnel involved with construction
related activities are aware of the objectives and appropriate
environmental requirements;
To acknowledge the Project organization with environmental policy of the
project;
To execute environmental auditing;
To carry out site inspections;
To manage the waste streams
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
83 / 145
00
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
84 / 145
1
4
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
85 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
86 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
87 / 145
1
4
13.3.2 Frequency
13.4
Basic drills for fire evacuation from site support facilities and
offices shall be conducted at a minimum on a monthly basis
Construction area fire drills shall be conducted on a monthly
basis
Other emergency drills (confined space rescue, weather, etc.)
shall be conducted according to the schedule prepared by the Site
HSE Supervisor.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
88 / 145
1
4
The Site HSE Supervisor shall initiate any required procedural changes,
and initiate the dissemination of any lessons learned through the HSE
Programme communications system. The Site HSE Supervisor shall
provide a full report and accounting of the drill, response and follow-up to
the Contract Manager, HSE Manager (Head Office), Managing Contractor
Site Representative and the Company.
14.
SECURITY
See specification 00-ZA-E-09221.
15.
HSE SCHEDULE
[4]
Refer to the HSE Schedule and the site prepared 90 Day Look Ahead.
16.
Poster Programme
The Site HSE Supervisor shall ensure :
Dedicated HSE notice boards are erected as required around the work
site, administration and management offices, residential camps, dining
areas, leisure areas as necessary
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
89 / 145
00
1
4
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
90 / 145
1
4
3A
Cost analysis and financing methods shall be reviewed with the Company,
Managing Contractor Site Representative and Contractors.
The Site HSE Supervisor shall recommend a programme based in accordance
with the following guidelines.
Awards Criteria
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
91 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
92 / 145
17.1
00
1
4
3A
Training Requirements
The matrix provided below outlines the basic training requirements for site
personnel.
17.2
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
1
4
SDriveHEInduct upervisngklo
SafetyF irstad
Firextng uisher
CoMangFireWd ntracsemof
AcHSEW cidentorkshp
HcheLigtvInsao eavyhikscln cle
AcheksEnvi warensomtl
Permit-Sgna ermit-holds rs
93 / 145
Insulation Supervisor
Whd. Weld. Supervisor
Asst Doc. Coordinator
Material Coordinator
Buildings Supervisor
Piping Engineer
Electrical Super.
Welding Inspector
Electrical Supervisor
Instrument Super.
HSE Manager (H.O.)
Machinery Engineer
Electrical Engineer
Instrument Engineer
D.C.S. Specialist
Permit Signatories
Environmental
Aw areness
Heavy vehicle
checks
Management of
Contracts
Fire Warden
Fire
extinguisher
Light vehicle
checks
Accident
Investigation
[4]
HSE Workshop
First aid
Supervising
Safety
Driver skills
Designation
HSE Induction
Permit -holders
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
94 / 145
1
4
3A
The Site HSE Supervisor shall ensure that personnel receive the following
information:
Description of the project
Introduction to the Managing Contractor and Company principal
personnel
Photographs of senior project personnel
Employer and employee HSE responsibilities under Pakistani law and
Company rules
Project HSE objectives
Zero Accident Tolerance philosophy
Education and training programme
HSE safety and health practices booklet, other personal issue booklets
Foreman's tool box talks
Behaviour modification programmes
HSE information communication programme
HSE incentive programme
HSE discipline programme
Reporting hazardous conditions to your foreman
Other matters as necessary, e.g. housekeeping and sanitation procedures
HSE issues and requirements in labour camps
Risk assessments
17.3
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
95 / 145
00
1
4
3A
The Site HSE Supervisor shall monitor Contractors' education and training
activities to ensure that satisfactory standards are maintained.
17.4
17.5
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
96 / 145
1
4
3A
Training curriculum attendance and completion for all site personnel will be
tracked by the Site HSE Supervisor. Each individual shall receive a HSE
Passport which reflects the current status of his training qualifications.
18.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
97 / 145
1
4
Hot work
Isolation/lock-out/tag-out
Lifts
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00-ZA-E-09502
Rev
/ of
98 / 145
00
1
4
3A
18.3 Contractors
A large portion of the Managing Contractors work will involve Contractors.
Contractors will be expected, and bound by contract, to:
Embrace the Managing Contractor HSE Policies
Commit to the Zero Accident Tolerance philosophy
Provide a Contractors HSE programme which equals or exceeds that of
the Managing Contractor
18.3.1 Policy for Evaluation of Potential Contractors
The procurement bid and evaluation cycle shall incorporate strong
participation by the Managing Contractor HSE function both at the
project and site level.
HSE requirements shall be explicitly defined in the Subcontract
language.
Prospective Contractors shall demonstrate a superior HSE
performance via statistics and documentation.
Prospective Contractors shall provide evidence of strong HSE
management commitment with a defined HSE management
program and qualified HSE personnel.
18.3.2 Contractor Involvement in HSE Management
The Managing Contractor mandates active Contractor involvement in
the management of HSE issues, primarily from the line management
and supervision level, at all times. Contractor non-manual and
manual workforce shall participate fully in the day-to-day HSE
Programme execution as well as the longer term planning.
A special emphasis on Contractor performance will be placed on the
following:
Hazard identification and analyses
Effective safety meetings
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
99 / 145
18.4
00
1
4
18.5
Presssurised Systems
Pressurised systems including pressure vessels and air receivers will
be properly maintained, regularly inspected and where necessary
examined by a competent person.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
100 / 145
1
4
001
Civil Works
Excavation
002
Civil Works
003
General
004
General
Gas Cutting
005
General
Grinding
006
General
Welding
007
General
Diesel Engines
008
Mechanical Installation
Radiography
009
010
Electrical Installation
011
Electrical Installation
Cable Pulling
012
Electrical Installation
013
General
Material Handling
014
General
Handling of Steel
015
General
Handling of Timber
016
Civils
Concrete Pours
017
Civils
Steel Fixing
018
Civils
Backfilling of Excavations
019
Mechanical Installation
020
Temporary Works
Erection of Scaffolding
021
Temporary Works
022
Temporary Works
Dismantling of Scaffolding
023
General
024
Civil Works
Erection of Fencing
025
Civil Works
Fabrication of Gates
026
Civil Works
Erection of Gates
027
General
028
Mechanical
029
Mechanical
030
Electrical
Electrical Work
031
Civil Works
Rock Drilling
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
101 / 145
032
Civil Works
Rock Blasting
033
Site Preparation
Earthworks
034
General
Site Transport
00
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
102 / 145
1
4
3A
...A - 001.......................................
ACTIVITY
EXCAVATION
______________________________________________________________________________________________
HAZARDS
A) Cables/pipelines buried underground.
B) Existing Structures/Buildings.
C) Existing pipes being struck or cracking at joints.
D) Vehicles/Plant driving into excavation.
E) Personnel falling into excavation.
F) Collapse of excavation.
G) Accumulation of Gas/Water.
CONTROL MEASURES
1) Cable avoidance tool to be used prior to excavating in order to determine cable routes
.
2) Services drawings to be used to determine cable/pipeline route.
3) Trial hand digging to be undertaken in order to verify cable/pipeline route.
4) Detailed study to be undertaken if excavation work is to be carried out adjacent to existing and/or temporary
foundations/buildings. Temporary shoring or supporting of structures in order to prevent collapse to be approved and
actioned prior to commencement of excavation.
5) Pipework/Cables exposed by excavation to be supported.
6) Stops/Barriers to be provided , where necessary, at excavation edges in order to prevent vehicles driving into them.
7) Banksmen to be provided whenever vehicles are working adjacent to excavations.
8) Guard-rails to be erected around excavations where risk of falling 2 metres or more.
9) Excavations deeper than 1.1 metres to be adequately battered, benched or supported.
10) Adequate means of access/egress into excavations to be provided.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
103 / 145
1
4
CIVIL WORKS
REF No:-
...A - 002.......................................
ACTIVITY
CONCRETING AND SHUTTERING
______________________________________________________________________________________________
HAZARDS
A) Unsafe means of access onto shuttering.
B) Manual and mechanical handling.
C) Handling and use of cement/concrete.
D) Use of hand tools/power tools.
CONTROL MEASURES
1) Access for personnel to carry out work on shuttering to be planned. Safe means of access to be provided at all
times in order to prevent risk of falls from height.
2) Suitable and sufficient craneage to be provided in order to alleviate manual handling of shuttering and associated
components. Manual handling procedure to be developed and implemented.
3) Handling and slinging of shuttering material by crane is to be controlled by experienced slingers and, where
necessary, banksmen. Consideration of high wind conditions and associated risks are to be recognised.
3) Personnel to be provided with appropriate P.P.E during work with cement/concrete - gloves, rubber safety
footwear, R.P.E, hearing protection etc. Training to be given on hazards associated with work with cement/concrete.
4) Hand and power tools to be properly maintained. Defective tools will not be used.
5) Dangerous moving parts of machinery will be guarded.
NOTE: Wash out area for concrete trucks to be identified to prevent build up of waste concrete.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
104 / 145
1
4
GENERAL
REF No:-
...A - 003.......................................
ACTIVITY
TRANSPORTATION OF GAS CYLINDERS
______________________________________________________________________________________________
HAZARDS
A) Fire/Explosion during transportation.
B) Manual handling and health risk.
CONTROL MEASURES
1) Cylinders to be supported during transportation in order to prevent them falling over.
2) Cylinders to be segregated by type in order to prevent fire/explosion risk.
3) Valve caps to be fitted to all gas cylinders during transportation.
4) Loading/Off-Loading of cylinders to be carried out by competent person utilising correct slinging techniques.
5) Cylinders being off-loaded from a vehicle will not be dropped to the ground and shall not be rolled.
6) Only cylinders with in date test certificates shall be transported pressurised
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
105 / 145
1
4
GENERAL
REF No:-
ACTIVITY
GAS CUTTING
______________________________________________________________________________________________
HAZARDS
A) Cylinder explosion.
B) Damage to eyes.
C) Fire.
D) Explosion risk Live plant.
CONTROL MEASURES
1) Oxygen cylinders valves/fittings to be kept free from grease/oil.
2) Flash-back arrestors to be fitted to gas cylinders.
3) Gas hoses and gauges to be maintained in a safe condition and inspected daily. Defective hoses and gauges are to
be replaced immediately.
4) Cylinders to be used in the vertical position and secured against falling.
5) Personnel carrying out gas cutting operations will wear suitable eye protection.
6) Suitable measures e.g. Provision of fire blankets/fire watchers, will be taken to prevent the risk of fire during
cutting operations.
7) Prior to gas cutting operations in Live plant areas, gas checking shall be carried out and work will proceed in
accordance with permit to work requirements.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
106 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
107 / 145
1
4
...A - 005.......................................
ACTIVITY
GRINDING
______________________________________________________________________________________________
HAZARDS
A) Damage to eyes/hearing/other body parts.
B) Fire/Explosion.
C) Wheel burst.
CONTROL MEASURES
1) Grinders to be maintained in good condition and inspected prior to use.
2) Guards to be fitted to grinders.
3) Changing of abrasive wheels to be carried out by trained and authorised personnel using proper disc spanners.
4) Personnel carrying out grinding work will wear suitable eye protection and hearing protection.
5) Grinding operations in Live plant areas, will be carried out in accordance with the permit to work requirements.
6) Grinding operations will be controlled in order to prevent the risk of injury to other personnel from sparks/metal
splinters.
7) Housekeeping in the areas at grinding operations to be maintained to a high level.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
108 / 145
1
4
GENERAL
REF No:-
...A - 006......................................
ACTIVITY
WELDING
______________________________________________________________________________________________
HAZARDS
A) Damage to body parts.
B) Fire/Explosion.
C) Electrocution.
D) Health impairment.
CONTROL MEASURES
1) Welders will be provided with and wear the following personal protective equipment: Welding gloves
Overalls
Welding goggles with correct filter
R.P.E (where identified)
2) Flammable materials will be removed from areas where welding is to be undertaken.
3) If (2) is not practicable, other suitable precautions will be taken to alleviate fire and explosion risk e.g. Provision
of fire blankets/fire watcher.
4) Fire extinguisher to be immediately available in the area of any welding operation.
5) Before welding operations are carried out, the materials involved and their by-products will be identified, the risks
assessed and necessary control measures identified in order to prevent possible respiratory disease/systemic
poisoning (e.g. cadmium, stainless, galvanised, lead coated materials).
6) Welding cables and cable joints will be maintained in a good condition.
7) Welding returns will be firmly connected to the metal on which welding is taking place. This will be carried out
by means of well constructed earthing clamps only.
8) In order to prevent risk of Arc Eye injury to other personnel, suitable screens will be placed around the welders
working area.
9) Damp, humid and wet conditions will be a consideration for the voltage and type of transformer used.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
109 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
110 / 145
1
4
GENERAL
REF No:-
...A - 007.......................................
ACTIVITY
DIESEL ENGINES
______________________________________________________________________________________________
HAZARDS
A) Engine exhaust fires.
B) Overspeeding of the engine in live plant areas.
CONTROL MEASURES
1) Spark arrestors to be fitted to diesel engine exhausts.
2) Chelwyn valves will also be fitted where needed.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
111 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
112 / 145
1
4
MECHANICAL INSTALLATION
REF No:-
...A - 008.......................................
ACTIVITY
RADIOGRAPHY
______________________________________________________________________________________________
HAZARDS
A) Exposure to radiation.
CONTROL MEASURES
1) Site radiography will only be carried out only by competent and experienced radiographers.
2) Site radiography will be carried out in accordance with the procedure for site radiography set out in Company
HSE Manual.
3) Local working rules will be submitted by the N.D.T. Managing Contractor prior to work.
4) Emergency equipment e.g. local shielding, sand bags, tongs to be provided on site.
5) Warning signs/barriers/flashing lights/alarms to be provided.
6) Radiation meters to be calibrated and certification
7) Managing Contractors, adjacent working and security to be notified in advance.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
113 / 145
1
4
MECHANICAL / COMMISSIONING
REF No:-
...A - 009.......................................
ACTIVITY
PRESSURE TESTING
______________________________________________________________________________________________
HAZARDS
A) Bursting of blinds/pipes/fittings under pressure testing.
CONTROL MEASURES
1) Pressure testing of piping will only be carried out by competent and experienced personnel.
2) The pipework under test and the surrounding area will be barriered/cordoned off and suitable warning signs will
be displayed.
3) Personnel will be instructed not to enter areas where pressure testing is being undertaken.
4) A written procedure for gradual pressurisation to be developed.
5) All fittings e.g. sight glasses, gauges, bursting discs, likely to fail under test pressure to be removed.
6) the Company.. will be consulted for any pneumatic testing require.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
114 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
115 / 145
1
4
ELECTRICAL INSTALLATION
REF No:-
...A - 010.......................................
ACTIVITY
CABLE DRUM HANDLING
______________________________________________________________________________________________
HAZARDS
A) Cable drum falling.
B) Trapping injuries.
CONTROL MEASURES
1) Damaged cable drums not to be used.
2) Vehicles to be sited with regard to site traffic and area for off loading to be barriered off.
3) Cable drums to be loaded/off-loaded using slings of an adequate safe working load. This operation is to be carried
out by experienced and competent personnel.
4) Cable jacks will be placed on even surfaces.
5) Cable drums will be located on cable jacks designed for purpose and of a suitable capacity and base.
6) Protruding nails on cable drums to be removed/bent over.
7) Cable drums to be checked when stored.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
116 / 145
1
4
ELECTRICAL INSTALLATION
REF No:-
...A - 011......................................
ACTIVITY
CABLE PULLING
______________________________________________________________________________________________
HAZARDS
A) Cable drum falling.
B) Trapping injuries.
C) Manual handling - back injuries.
CONTROL MEASURES
1) Personnel to wear suitable gloves/footwear when cable pulling.
2) Cable jacks to be of a sufficient capacity and placed on an even surface.
3) Personnel to be instructed in cable pulling techniques, including the requirement for ensuring good manual
handling techniques are adopted.
4) Assessment of the weight of cable to be pulled and numbers of persons required to be defined.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
117 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
118 / 145
1
4
ELECTRICAL INSTALLATION
REF No:-
...A - 012.......................................
ACTIVITY
CABLE LAYING / CABLE TERMINATION
______________________________________________________________________________________________
HAZARDS
A) Cable drum falling.
B) Trapping injuries.
C) Manual handling - back injuries.
CONTROL MEASURES
1) Personnel to war suitable gloves/footwear when cable laying/terminating cables.
2) Cable jacks to be of a sufficient capacity and placed on an even surface.
3) Warning signs to be positioned adjacent to cable laying/cable termination areas.
4) Personnel will be trained in cable laying/cable termination techniques, including the requirements for ensuring
good manual handling techniques are adopted.
5) Cable terminations will be carried out by trained and competent personnel using suitable tools.
6) Permit to work system to be followed to ensure that glanding and termination of cables are on electrically isolated
panels.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
119 / 145
1
4
GENERAL
REF No:-
...A - 013.......................................
ACTIVITY
MATERIAL HANDLING
______________________________________________________________________________________________
HAZARDS
A) Manual handling - back injuries
CONTROL MEASURES
1) Whenever practicable, mechanical lifting aids e.g. cranes, fork lift trucks etc., will be used to alleviate the
requirement for manual handling.
2) Supervision will assess weight, centre of gravity etc. and determine the number of persons required to carry out
the work safely.
3) Personnel will be trained in manual handling techniques.
4) Gloves/Safety footwear will be worn by personnel engaged in material handling.
5) Good housekeeping measures will be enforced in order to prevent slips, trips and falls during material handling.
6) Material will be stored in designated areas.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
120 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
121 / 145
1
4
GENERAL
REF No:-
...A - 014.......................................
ACTIVITY
HANDLING OF STEEL
______________________________________________________________________________________________
HAZARDS
A) Trapping injuries.
B) Falling material.
C) Manual handling.
D) Slips, Trips and Falls.
CONTROL MEASURES
1) Personnel to wear suitable gloves/footwear when handling steel.
2) Personnel to be trained in slinging/banksman techniques in order to ensure the material is lifted in a safe manner.
3) Suitable equipment is to be used to lift the steelwork.
4) Steel will be stored in a designated area on wooden skids/sleepers.
5) Good housekeeping standards will be maintained in steel laydown areas in order to prevent slips, trips and falls.
6) Tag lines will be used when lifting/travelling steelwork by cranes.
7) Personnel not involved in any steel handling, operation will be kept clean of the area of work.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
122 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
123 / 145
1
4
GENERAL
REF No:-
...A - 015.......................................
ACTIVITY
HANDLING OF TIMBER
______________________________________________________________________________________________
HAZARDS
A) Trapping injuries.
B) Slips, Trips and Falls.
C) Hand injuries.
CONTROL MEASURES
1) Personnel to wear suitable gloves/footwear when handling timber products.
2) Timber will be de-nailed in order to prevent puncture wounds.
3) Timber will be stored in designated areas away from offices and other buildings.
4) Good standards of housekeeping will be maintained in order to prevent slips, trips and falls.
5) Swarf, wood chips and sawdust will be removed in a timely manner to prevent accumulation of a fire hazard.
6) Circular saws will be fitted with riving knifes and guards.
7) Push sticks will be used for the cutting of timber by circular saws.
8) Personnel will be instructed on the safe operation of mechanical equipment.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
124 / 145
1
4
CIVILS
REF No:-
...A - 016......................................
ACTIVITY
CONCRETE POURS
______________________________________________________________________________________________
HAZARDS
A) Manual handling.
B) Defective plant/equipment.
C) Falling materials.
CONTROL MEASURES
1) Personnel placing concrete will wear suitable gloves/footwear and eye protection.
2) Plant and equipment used during concrete placing will be operated by trained and authorised personnel under
close supervision.
3) All plant and equipment will carry current certification and be maintained in a safe condition. Defective
plant/equipment will be removed from service and effective remedial actions taken. Only Company approved
plant/equipment will be used.
4) Slinging and lifting operations will be carried out by trained personnel.
5) Unauthorised personnel will be prohibited from entering areas where concrete placing activities are being
undertaken.
6) Access across re-bar fixing will be maintained with timber boardings to provide a sale access and place of work.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
125 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
126 / 145
1
4
CIVILS
REF No:-
...A - 017.......................................
ACTIVITY
STEEL FIXING
______________________________________________________________________________________________
HAZARDS
A) Falling material
B) Slips, Trips and Falls.
C) Manual Handling.
D) Cut injuries.
CONTROL MEASURES
1) Experienced and trained steel fixers will be used with adequate supervision provided.
2) Steel fixers will wear suitable gloves/footwear and eye protection.
3) Re-Bar will be lifted into the work area using certificated lifting equipment and tackle.
4) Re-Bar offcuts/wire will be removed in order to alleviate slips, trips and falls.
5) Steel fixers will use proper tools in order to assist in bar bending (type activities).
6) Tool box talks will be conducted emphasising the hazards of bar bending (pinch points) and handling steel re-bar
(sharp edges)
7) Exposed vertical bars e.g. pile CAPs that are sited in a manner that expose personnel to risk from implement will
be bent, covered or protected by some other means.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
127 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
128 / 145
1
4
CIVILS
REF No:-
...A - 018......................................
ACTIVITY
BACKFILLING OF EXCAVATIONS
______________________________________________________________________________________________
HAZARDS
A) Collapse of excavation.
B) Physical injury due to proximity of plant.
CONTROL MEASURES
1) Only Company approved mechanical shovels/JCB are to be used to carry out this work.
2) Plant used to backfill excavations will carry current certification and will be maintained in a safe condition.
3) The plant will be operated by trained and authorised personnel.
4) Banksmen will be used to control the backfilling operation in order to prevent plant working too close to the
excavation edge.
5) Unauthorised personnel will be excluded from areas where the backfilling of excavations is taking place.
6) A survey of the area will be carried out to asses risks to any adjacent structures and/or utilities that may exist.
Operators will be briefed on any identified potential hazards.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
129 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
130 / 145
1
4
MECHANICAL INSTALLATION
REF No:-
...A - 019.......................................
ACTIVITY
TRANSPORTATION / LIFTING OF HEAVY EQUIPMENT
______________________________________________________________________________________________
HAZARDS
A) Defective equipment.
B) Overloading of vehicles.
CONTROL MEASURES
1) Only Company approved plant will be used to transport heavy loads.
2) Plant/Equipment used will be maintained in a good condition.
3) Licensed and experienced operators will be used to carry out this activity.
4) The loading of equipment will be carried out in accordance with Company approval.
5) Loading will be closely supervised with trained banksmen in attendance.
6) Rigging/Crane studies will be undertaken (if required) to ensure the lifting operation is carried out in a controlled
and effective manner utilising any existing lifting points provided.
7) The weight of any such load will be determined to ensure that overloading is prevented.
8) Banksmen shall wear conspicuous jackets or other means of personal identification.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
131 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
132 / 145
1
4
TEMPORARY WORKS
REF No:-
...A - 020.......................................
ACTIVITY
ERECTION OF SCAFFOLDING
______________________________________________________________________________________________
HAZARDS
A) Scaffolds falling from height.
B) Scaffolders/Other personnel injured by falling materials.
CONTROL MEASURES
1) Scaffold erection to be undertaken by trained scaffolders working under competent supervision.
2) Safe means of access/egress to be provided and maintained for the scaffolders carrying out the erection work.
3) Suitable and sufficient material will be available in order for the scaffold to be erected properly.
4) Scaffolders will wear gloves, safety footwear, safety helmets and safety harnesses during scaffold erection
activities.
5) Scaffold components will be lifted using safe techniques. (Components will not be thrown up to the scaffolder nor
to the ground).
6) Unauthorised personnel will be excluded from the area where scaffold erection is being carried out.
7) Scaffolds will be tagged as Safe to use by a competent person on completion.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
133 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
134 / 145
1
4
TEMPORARY WORKS
REF No:-
...A - 021.......................................
ACTIVITY
PROVISION AND MAINTENANCE OF SAFE SCAFFOLDING.
______________________________________________________________________________________________
HAZARDS
A) Collapse of scaffolding.
B) Personnel falling from scaffolding.
CONTROL MEASURES
1) Detailed consideration will be given to all scaffolding to ensure that it is properly planned and erected to meet the
working requirements, designed to carry the necessary loading and maintained in a sound condition (B.S. 5973 will
be followed as guidance).
2) Scaffolding will be provided with adequate ties/supports in order to prevent collapse.
3) Regular inspections of scaffolding will be undertaken and recorded in order to ensure that the structure is
maintained in a safe condition.
4) Personnel working from scaffolds will be instructed not to interfere or alter an existing scaffold.
5) Effective actions will be taken by supervision in order to ensure that scaffolding defects are rectified immediately
e.g. guard-rails replaced, toe-boards replaced etc.
6) Only authorised scaffolders will be allowed to alter the scaffolding in any way. Supervision will liaise with
scaffolders in order to ensure that the co-ordination of scaffolding maintenance.
7) Incomplete scaffolding will be clearly identified and personnel will be prohibited from using this structure.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
135 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
136 / 145
1
4
TEMPORARY WORKS
REF No:-
...A - 022.......................................
ACTIVITY
DISMANTLING OF SCAFFOLDING
______________________________________________________________________________________________
HAZARDS
A) Fall off scaffold material, during dismantling.
B) Fall off scaffolders/other personnel during dismantling.
CONTROL MEASURES
1) Dismantling of scaffolding to be carried out by trained and competent scaffolders under supervision.
2) An assessment (by the supervisor in charge) of the best method of dismantling the scaffold will take place that
reduces overall risks, risk at falling material and maintenance of the stability of the structure.
3) No ties or bracing will be removed in advance of general dismantling.
4) Working platforms will be dusted and cleared of all materials and debris before dismantling commences.
5) All possible access to the dismantled sections of scaffolding should be barred and a warning sign displayed.
6) Scaffold materials will be lowered carefully. The bombing of scaffold materials will be strictly prohibited.
7) Surplus boards and fittings will be removed from the platforms as the work progresses and at the end of each day.
8) Tubes and fittings will be stacked at ground level unless the first lift has been designed to support the extra
loading.
9) Unauthorised personnel will be excluded from areas where the dismantling of scaffolding is taking place.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
137 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
138 / 145
1
4
GENERAL
REF No:-
...A - 023.......................................
ACTIVITY
USE OF HAZARDOUS SUBSTANCES
______________________________________________________________________________________________
HAZARDS
A) Health impairment.
B) Fire/explosion.
C) Environmental impact.
CONTROL MEASURES
1) Assessments on the hazards and risks to health by potentially harmful substances will be carried out. These
assessments will detail the control measures that will be taken to reduce risks to health.
2) Material safety data sheets and assessments of the risk and necessary control measures will be in place prior to
the work being carried out.
3) Personnel will be instructed to take appropriate precautions to protect their health from the hazards. Training will
be given in the correct use and maintenance of personal protective equipment.
4) Hazardous substances will be stored in a safe manner. Materials will be segregated in accordance with good
practice e.g. keeping oxidising and reducing agents apart.
5) Contingency arrangements will be in place to initiate the spillage of any hazardous substance.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
139 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
140 / 145
1
4
CIVIL WORKS
REF No:-
....A - 024.....................................
ACTIVITY
ERECTION OF FENCING
______________________________________________________________________________________________
HAZARDS
A) Fall of material.
B) Manual handling.
C) Slips, trips and falls.
CONTROL MEASURES
1) The erection of fencing will be carried out by personnel who have been briefed in the correct method of work..
2) Good housekeeping standards will be maintained during the work.
3) The correct tools will be used during the stretching of mesh.
4) Posts will be lifted with mechanical assistance in order to alleviate manual handling.
5) Personnel will wear gloves, safety footwear and safety helmets during the work.
6) Training will be given on the hazards associated with work with cement/concrete.
7) Permit(s) to work will be required when working adjacent to overhead lines, underground utilities etc.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
141 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
142 / 145
1
4
CIVIL WORKS
REF No:-
......A - 025.......
ACTIVITY
FABRICATION OF GATES
______________________________________________________________________________________________
HAZARDS
A) Falling materials.
B) Fire and explosion.
C) Damage to body parts.
D) Electric shock.
CONTROL MEASURES
1) Gate fabrication will be carried out by personnel who have been familiarised with the requirement for safe
working practices.
2) Personnel will wear gloves, safety footwear and welding goggles with the correct filter during this work.
3) Welding will be carried out in dry conditions and in accordance with the requirements of the Hazard Analysis and
Control Procedure 006.
4) Gas cutting will be carried out in accordance with the requirements of the Hazard Analysis and Control Procedure
004.
5) Good standards of housekeeping will be maintained in the fabrication area.
6) Fire extinguishers will be provided.
7) Oxy/Acetylene sets will be sited in an adjacent location with valve keys fitted and secured upright.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
143 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
144 / 145
1
4
CIVIL WORKS
REF No:-
.........A - 026................................
ACTIVITY
ERECTION OF GATES
______________________________________________________________________________________________
HAZARDS
A) Fall of gate.
B) Damage to body parts.
C) Manual handling.
CONTROL MEASURES
1) Gate erection will be carried out by trained personnel under supervision.
2) Personnel will wear gloves, safety footwear and safety helmets.
3) Sharp edges on the gates will be removed by grinding prior to erection.
4) The lifting of gates into position will be undertaken using suitable lifting tackle and equipment.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
145 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
146 / 145
1
4
GENERAL
REF No:-
.........A - 027.......
ACTIVITY
REMOVAL OF WASTE MATERIAL
______________________________________________________________________________________________
HAZARDS
A) Manual handling
B) Damage to body parts
C) Occupational health problems
CONTROL MEASURES
1) Personnel engaged in the removal of waste material will wear gloves, safety footwear and safety helmets.
2) Light waste will be swept up and removed in a wheel barrow.
3) Heavier waste e.g. steel off-cuts, drums etc. will be removed using mechanical plant e.g. fork lift truck, excavator
etc.
4) Waste material will be stored in designated areas in skips.
5) Waste material classified as hazardous will be removed by a Managing Contractor classed as competent for the
task.
6) Hazard sheet no 23 will be followed for the handling of any hazardous waste.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
147 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
148 / 145
1
4
MECHANICAL
REF No:-
......A - 028..................................
ACTIVITY
ERECTION OF STEELWORK
______________________________________________________________________________________________
HAZARDS
A) Falls from height.
B) Structural stability.
C) Manual handling.
D) Falling materials.
E) Trapping injuries.
F) Slips, trips and falls.
CONTROL MEASURES
1) Steel erection will be carried out by trained and competent personnel working under supervision.
2) Method statements detailing the proposed erection schemes will be produced. These method statements will
identify hazardous site features and other aspects likely to impair safe erection. The proposed methods for ensuring
the stability of the framework and its components during erection and until completion will also be addressed.
3) Steelwork will be lifted into position using suitable certificated lifting tackle/equipment.
4) Trained banksmen/slingers will be used to control the lifting operations.
5) Personnel will wear gloves, safety footwear and safety helmets. Safety harnesses will be worn and attached to a
secure anchor point when erection work is being undertaken..
6) Safe means of access onto steelwork will be provided and maintained.
7) Good housekeeping standards will be maintained in areas where equipment erection is being undertaken.
8) The area of the site affected by erection operations will be designated as a restricted area:- barriers and notices
will be erected to prohibit entry to non-erection personnel.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
149 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
150 / 145
1
4
MECHANICAL
REF No:-
.....A - 029..........
ACTIVITY
INSTALLATION OF PIPELINE AND VALVE FITTINGS
______________________________________________________________________________________________
HAZARDS
A) Manual handling.
B) Trapping.
C) Slips, trips and falls.
CONTROL MEASURES
1) Installation will be carried out by trained and competent personnel working under supervision.
2) Heavy fittings will be lifted using suitable certificated lifting tackle/equipment and tag lines.
3) Personnel will wear gloves, safety footwear and safety helmets.
4) Suitable tools will be used to assist in the installation of fittings.
5) Good housekeeping standards will be maintained in areas where installation work is being undertaken.
6) Pipelines will only be installed on structures which have been vetted as mechanically complete or are safe to work
from.
7) Rigging studies will be prepared for spoil pieces/valves etc. Being placed inside structures of limited access.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
151 / 145
1
4
................A - 030..........................
ACTIVITY
ELECTRICAL WORK
______________________________________________________________________________________________
HAZARDS
A) Falls from height.
B) Electric shock.
C) Fire and explosion.
CONTROL MEASURES
1) Electrical work will be carried out by trained and competent electricians. These persons will have the technical
knowledge and experience to understand the hazards which may arise during the work and the precautions which
need to be taken.
2) Work on live conductors, or on electrical equipment which has been made dead will be carried out only under an
appropriate permit to work procedure.
3) Safe means of access will be provided for electricians required to work at height e.g. ladders, scaffold towers etc.
4) Insulated tools will be used in order to carry out electrical work.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
152 / 145
1
4
CIVIL WORKS
REF No:-
.............A - 031.............................
ACTIVITY
ROCK DRILLING
______________________________________________________________________________________________
HAZARDS
A) Cables/pipelines buried underground.
B) Existing structures/buildings.
C) Noise.
CONTROL MEASURES
1) Cable avoidance tools to be used prior to rock drilling in order to determine presence of live cables.
.
2) Services drawings to be used to determine cable/pipeline routes.
.
3) Trial hand digging to be undertaken in order to verify cable/pipeline routes.
4) Temporary sharing or supporting of existing foundations/buildings will be carried out prior to commencement of
rock drilling.
5) Personnel carrying out drilling work will wear safety helmets, gloves, safety footwear and hearing protection.
6) Unauthorised personnel will not be allowed in areas where rock drilling is being undertaken.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
153 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
154 / 145
1
4
3A
CIVIL WORKS
REF No:- ........A - 032......
ACTIVITY
ROCK BLASTING
______________________________________________________________________________________________
HAZARDS
A) Use of explosives.
B) Noise.
CONTROL MEASURES
1) Only trained and experienced shotfirers will be permitted to use explosives.
2) Before explosives are used a written system of work will be prepared. Personnel involved in the blasting operation
will be made aware of the safe systems of work prior to be followed. Consideration will include: blast mats, audible
alarms, site inspection and communications.
3) Sentries and visual warning signs will be posted around the area likely to be affected by the blast.
4) Effective actions will be taken to ensure that the danger area is clear of all personnel/animals immediately before
firing occurs.
5) An audible means of giving warning that a shot is about to be fired and to sound the all clear, will be provided.
6) The police site personnel and other relevant parties will be notified of shot firing times.
7) Existing foundations/pipes in the vicinities of the rock blasting will be protected by shoring.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
155 / 145
1
4
SITE PREPARATION
REF No:-
................A - 033.....................
ACTIVITY
EARTHWORKS
______________________________________________________________________________________________
HAZARDS
A) Movement of heavy mobile plant
B) Dust
C) Noise
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
156 / 145
1
4
CONTROL MEASURES
1) Drivers, operators and banksmen of mechanical plant and equipment will be trained, competent and at least 18
years of age. Only authorised drivers and operators will be allowed to use plant and equipment.
2) Drivers and operators will have been trained not only in the correct operation of the plant and equipment but also
in the limitations of its use and the hazards which exist if it is not used properly.
3) Preventative maintenance programmes will be established to ensure that all plant and equipment is systematically
inspected, serviced, repaired and maintained as necessary.
4) Prior to earthworks commencing overhead and buried electrical cables and other pipelines will be identified and
precautions taken to prevent damage to these services.
5) Non-essential personnel will be kept well away from the area of operation and trained banksmen will be provided
where necessary.
6) Measures will be taken to prevent dust from impairing visibility by use of water spray on roads and if practicable a
one-way system for traffic.
7) Site speed limits will be set and strictly enforced.
8) Plant items will not be parked so as to cause an obstruction to other plant or site activities, or so close together as
to cause danger to personnel in the vicinity. A stacking system will be operated away from the area of activity if
required.
9) Plant will be fitted with reversing alarms where appropriate.
10) Employees working in the vicinity of earth moving operations will wear safety helmets, safety footwear and
high-visibility vests.
11) Drivers will not remain on a vehicle being loaded unless a suitable overhead protective canopy is provided.
Personnel should stand well clear of loading operations.
12) Personnel will be instructed to establish contact with the driver prior to walking in path of a vehicle.
13) Sleeping under or against vehicles is strictly prohibited.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
157 / 145
1
4
3A
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
158 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
159 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
160 / 145
ENVIRONMENTAL
1
4
No.
REVIEW LOG
DEPARTMENT
JOB No.
DATE
TYPE OF DOCUMENT
REV.
TITLE
Sh.
of
DOCUMENT No.
DOCUMENT MODIFICATION FORM
No.
ENVIRONMENTAL TOPIC
ENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL
ENGINEER
SITE HSE SUPERVISOR
SIGNATURE
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
161 / 145
1
4
3A
All the proposed modifications classified as Group B and Group C shall be checked
by the HSE Department. The environmental assessment can lead to different
evaluation on the proposed modification, as following summarised:
N.A.
=
Not Applicable. The modification reviewed doesnt relate to any
environmental issue and does not contain elements against any environmental
requirements;
R.N.C. =
Review with No Comments. The modification reviewed contains
relations with one or more environmental topics and shows compliance with related
environmental requirements;
R.C.
=
Review with Comments. The modification contains relations with one
or more environmental topics but does not fully comply (non-compliance or, simply,
no evidence of environmental restrictions or standards) with related environmental
restrictions.
B2 Environmental inspections
For the purpose of the environmental inspections, the project activities in the scope of
this document are classified in specific stages, as follows:
Construction and
Commissioning
Camps operation
Civil works
Mechanical works
Painting
Electrical
Instrumentation
Insulation
Pre-commissioning
Commissioning
During each stage, the following environmental site supervision protocol will be
adopted during the project:
the Site HSE Supervisor will undertake monthly site inspections of work to identify
potential environmental problems and investigate possible solutions. The Site HSE
Supervisor will liase with the Managing Contractor Site Representative and
eventually with the HSE Manager (Home Office);
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
162 / 145
1
4
3A
the Site HSE Supervisor or an Environmental Specialist from Head Office will
undertake two-weekly inspections and audits to verify the compliance with the
environmental requirements. The on site verification will be carried out using the
control tables in Appendix C.
In the event of non-compliance, the causes will be established as quickly as possible and
reported to the Managing Contractor Site Representative.
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
163 / 145
1
4
3A
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
164 / 145
1
4
TOPIC
SEWAGE TREATMENT
POTENTIAL IMPACT
soil contamination
groundwater pollution
surface water pollution
CONTROL MEASURES
1. Adequate sewage treatment facilities will be provided for the construction
workforce, both at the temporary camps and on the construction sites themselves.
Self contained treatment systems will be provided
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
165 / 145
1
4
TOPIC
SPILLAGES
POTENTIAL IMPACT
soil contamination
groundwater pollution
surface water pollution
CONTROL MEASURES
1. Avoid storage/handling/discharge of fuels, chemicals and waste in or near wadis
2. Immediately clean-up spillages
3. In case of environmental accidents follow the prescription of Guidelines for Site
Protection, Clean-up and Waste Disposal following and Environmental Incident
4. All spills of oil and chemicals, shall be reported as environmental incidents in
accordance with the Companys incident Investigation, Reporting and Follow-up
Procedures and Guidelines.
5. Design tanks to ensure that they are properly bunded and built on an impervious
base.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
166 / 145
1
4
TOPIC
POLLUTANTS DISPOSAL
POTENTIAL IMPACT
soil contamination
groundwater pollution
surface water pollution
CONTROL MEASURES
1. It forbidden to undertake, order or permit the disposal of any environmental
pollutants other than within the limits given in the specifications, regulations and
Laws for disposal, or by the limitations of the licences obtained for executing this
work.
2. Specifications must be given as to the causes and nature of the incident or
contravening disposal and of the arrangements made to rectify the situation in
accordance with this Law, including the period determined for the termination of
such arrangements.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
167 / 145
1
4
TOPIC
LIQUIDS/SLUDGE DISCHARGE
POTENTIAL IMPACT
soil contamination
groundwater pollution
surface water pollution
CONTROL MEASURES
1. The discharge to the environment of any waste water or sludge in whatever form or
condition is prohibited. Tables 1, 2 and 3 shall be adhered to.
2. Wastewater or sludge shall not be discharged sacrificially (i.e. in such a way that no
direct benefit results) except in an exceptional circumstance where no form of
wastewater re-use is possible*
3. Sewage treatment plants should be designed to produce an effluent suitable for
reuse in a drip-feed system for irrigation of ornamental trees and shrubs. As such,
effluent should meet the minimum standards in Table 4
4. Where effluent treated to above standards is in excess of requirements or where
irrigation is not practicable, the effluent may be discharged to wadi, or
underground aquifer to soil, by trench drain or similar, with integral syphon
discharge mechanism.
5. A 20/30 Standard with residual chlorination of 5 mg/l after 30 minutes contact time
is accepted when treated effluent is disposed of by discharge to underground saline
aquifer after field investigations of the suitability of strata, permeability, etc.
6. Solutions of hypochlorites such as chloride of lime and calcium hypochlorite are
highly recommended for chlorination of final effluent. The use of chlorine gas
should be avoided as it is highly toxic and must be handled with due care and
adequate safety measures
7. Storage of treated effluent in a disused septic tank is not acceptable. Such tank
should first be properly cleaned and then filled up. Preferably, a purpose built
storage tank should be constructed.
8. The plant must be provided with adequate laboratory facilities and maintain
complete records of both influent and effluent flow as well as effluent quality.
Records must be routinely sent to the Council in addition to allowing the Council
Officers free access for inspections and spot sampling.
9. The plant should not be closer than 100 m to the nearest residential
accommodation
10 Sewage sludge drying facilities must be provided on site. The dried material
preferably be used on site as a compost for shrub development
11 No wastewater or sludge shall be transported from the site of its origin without
prior approval. Approval shall be subject to conditions that will include the
obligation for all transport movements to be recorded in a manner defined in the
approval
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
168 / 145
1
4
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
169 / 145
1
4
TOPIC
SLUDGE REUSE
POTENTIAL IMPACT
soil contamination
CONTROL MEASURES
1. The soil on which sludge may be applied shall be tested by the owner for the metals
listed in Table 2, and for pH value, prior to any initial application; and the sludge
quality and application constraints shall at all times be within the limits that are set
out in Table 2.
2. Any sludge having concentrations of metals greater than the limits prescribed in
Table 2 shall be disposed of in sanitary landfills or to other facilities but only with
prior approval.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
170 / 145
1
4
TOPIC
MONITORING
POTENTIAL IMPACT
CONTROL MEASURES
1. Facilities and equipment shall be provided and maintained by the owner to the
requirements and satisfaction of the Ministry for sampling, measuring and recording
the quantity and rate of discharge of the wastewater and for determining its
characteristics
2. Samples and readings shall be taken by the owner at intervals. All data shall be
recorded.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
171 / 145
1
4
TOPIC
NOISE LIMITS
POTENTIAL IMPACT
disturbance of shy, sensitive and endangered species
CONTROL MEASURES
1. Select plant and plan construction to minimise/limit sudden and/or loud noise, e.g.
rock hammers or blasting.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
172 / 145
1
4
TOPIC
ECOLOGY
POTENTIAL IMPACT
disturbance of shy, sensitive and endangered species
loss of flora and fauna
CONTROL MEASURES
1. Restrict traffic to designated access routes and site areas and limit traffic to essential
movements and approved daylight hours of working
2. Impose lower speed limit below 80 kph in settlement/sensitive environmental areas
3. Prohibit off-road driving and walking and misdirected recreation including following
and/or hunting animals; select plant and plan construction to minimise/limit sudden
and/or loud noise, e.g. rock hammers or blasting
4. Educate workforce to protect/safeguard wildlife.
5. Every effort will be made to return the disturbed, vegetated areas outside of the
completed facilities sites to their former state at the end of construction. For areas of
special sensitivity remedial techniques including planting native species with locally
obtained seeds will be carried out where practicable.
6. For (authorised) night-time activity limit/control use of lights to minimise
disturbance of nocturnal wildlife
7. Avoid wadis/vegetated/other ecologically sensitive areas for sand borrow pits/access
roads
8. Where operations necessitate off road driving, this shall be done with due care to
avoid damage to vegetation and to the desert surface
9. Company approval for cutting or pruning of trees.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
173 / 145
1
4
TOPIC
EMISSIONS CONTROL
POTENTIAL IMPACT
CONTROL MEASURES
1. Dark smoke (smoke which if compared in the appropriate manner with a chart of the
type known as the Ringelmann Chart, would appear to be as dark as or darker than
shade (one) on the chart, or which has an opacity greater than or equal to 20%) shall
not be emitted from a chimney of any building, or from any industrial or trade
premises, or from any other site
2. The general standard of emission of grit (solid matters with a diameter of 76 m. or
more) and dust (solid matters with an equivalent diameter less than 76 m) is
shown in Table 5
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
174 / 145
1
4
TOPIC
WASTE DISPOSAL
POTENTIAL IMPACT
contaminating land
scavenging wildlife harmed by ingestion/entrapment
CONTROL MEASURES
1. Procedures for waste disposal must be followed as described in Annex C - Waste
Management Plan
2. Any hazardous waste generated during construction will be transported to the
Companys chemical waste facilities
3. Avoid storage/handling/discharge of fuels, chemicals and waste in or near wadis
4. No solid non-hazardous waste should be mixed with any category of hazardous waste
at any time
5. No hazardous waste shall be mixed with any other category of waste nor shall it be
discharged to a common or other internal or external sewerage or other drainage
system without a licence from the Ministry
6. All hazardous waste shall be labelled and packed according to the Ministerial
Decision issued in this respect
7. At camp sites within the Concession Area where waste is not collected by the waste
collection service provided by the Regional Superintendents organisations, there
must be a waste pit. The waste pit must be sectioned with one section being used at
the time and backfilled upon vacation of the camp site. Sewage pits must also be
backfilled at those sites, where no septic tanks are used. The waste pit (if required)
shall be at least 100 m removed from the camp downwind in the predominant wind
direction. The sewage pit shall be at least 25 m removed from the camp.
8. All materials arising from demolition and site clearance work except materials
specified for re-use or as otherwise specified by the Company shall be removed from
site as the work progresses, and shall be disposed of. Such materials should not be
permitted to accumulate and the site shall be maintained in a safe and workmanlike
condition at all times.
9. Unsuitable materials and suitable material not intended for re-use shall be removed
from the work site and disposed of at a location approved by the Company
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
175 / 145
1
4
TOPIC
CHEMICALS MANAGEMENT
POTENTIAL IMPACT
chemical spills
contaminating land
scavenging wildlife harmed by ingestion/entrapment
CONTROL MEASURES
1. All requirements of the Company Chemicals Management Manual shall be complied
with
2. All chemicals used shall have a SHOC card, which must be displayed at site of
storage and use
3. All those chemicals specified in section 5 of the Chemical Management Manual shall
be stored on hardstanding, which is bunded and fitted with a sump to collect any
spillages. In addition, the areas shall be protected from solar radiation when
indicated on the SHOC card
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
176 / 145
1
4
TOPIC
HALONS AND CFCs
POTENTIAL IMPACT
contribution to global warming
1.
2.
3.
4.
CONTROL MEASURES
No Halon releases shall be made to the atmosphere except for emergency situations
i.e. Halons systems shall not be triggered for testing purposes
No Halon based fire fighting extinguishers and fire fighting systems shall be
installed
Recover and recycle all refrigerants removed from equipment under repair or for
any other reason and prevent their discharge to the atmosphere
All releases of Halons and CFCs shall be reported to Company under the
environmental incident reporting procedures
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
177 / 145
1
4
TOPIC
SOILS
POTENTIAL IMPACT
damage to topsoil
groundwater pollution
CONTROL MEASURES
1. Stripped top soil intended for re-use as agreed with the Company shall be stock-piled
and/or spread at approved locations. The remaining top soil shall be disposed of at
locations agreed by the principal. Disposal shall be carried out in accordance with
national and local laws and regulations
2. Suitable materials intended for re-use should be used as soon after excavation as
possible otherwise they shall be stock-piled at a location approved by the principal.
Temporary stockpiling shall be such that the properties and composition of materials
intended for use as construction materials at a later stage will not change. The
influence of stockpiling on ground water, drainage and adjacent structures and
services shall be investigated and where necessary suitable measures should be
taken. Areas used for temporary stockpiling shall be kept clean and orderly and shall
be restored to their original condition before completion of works
3. Minimise landtake including restricting operations which can take place outside site
areas, e.g. turning vehicles
4. Remove assets that reach the end of their useful life and, using the best available
industry practices, to restore the environment as close as is reasonably practicable to
its original condition. This policy statement is included in the Abandonment and
Restoration Manual.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
178 / 145
1
4
TOPIC
SURFACE WATER
POTENTIAL IMPACT
changes to the hydrological and geohydrological regimes
CONTROL MEASURES
1. Existing drainage ditches and water courses shall be temporarily or permanently rerouted upon site preparation, where necessary
2. Roads often interfere with the natural drainage of areas or existing drainage
systems. If so, the (natural) drainage shall be restored, e.g. by means of culverts,
ditches, rerouting of water courses, etc
3. Rainwater from outside the fence shall be diverted in consultation with the principal
to prevent its uncontrolled passing through the site
The subsoil under the road paving system shall be well drained. The distance between
underside paving and (normal) high ground water level shall be not less than:
main roads 0.75 m/1 m
plant roads 0.50 m/0.75 m
off-plot heavy-duty roads 0.50 m/0.75 m
off-plot light-duty roads 0.50 m/0.75 m
patrol roads 0.30 m/0.50 m
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
179 / 145
1
4
TOPIC
SOCIO-ECONOMIC & PLANNING
POTENTIAL IMPACT
Disturbance of population by construction activity
CONTROL MEASURES
1. Advance consultation and liaison, e.g. with local leaders.
2. Restrict workforce to site areas and limit casual and social contact
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
180 / 145
1
4
TOPIC
BORROW PITS DESIGN
POTENTIAL IMPACT
degradation of landscape
CONTROL MEASURES
1. Borrow pits shall not be excavated deeper than 3 metres. After use, the slopes
shall be contoured to a minimum of 30 from the horizontal and all surface
irregularities returned to the borrow pit and smoothed off. The intent is that an
abandoned borrow pit should appear no more than a naturally occurring depression
in the desert, safe for vehicles and animals
2. Borrow pits should not be made closer than 100 m to a road or facility
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
181 / 145
1
4
TOPIC
AREAS RESTORATION
POTENTIAL IMPACT
damage to topsoil
CONTROL MEASURES
1. Temporary camps are restored after use
2. Waste and sewage pits must be filled in, and the entire camp site smoothed
3. Compacted areas, such as the access road and the camp pad do not need to be
broken up or harrowed
4. Temporary earthworks structures (e.g. sound barriers) shall be levelled. In
remote locations, where waste and sewage is disposed of locally, waste pits shall be
backfilled.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
182 / 145
1
4
TOPIC
EROSION PROTECTION AND PAVING
POTENTIAL IMPACT
hydrocarbons/chemicals spillages
CONTROL MEASURES
1. Slopes, for example bund walls, cuts, embankments, open drains and ditches
shall be protected against erosion and subsequent damage and failure on a micro
scale as a consequence of wind, water, and spillages.
2. In areas where hydrocarbon/chemical spill is remote i.e. those areas where an
accidentally oil-contaminated drainage system is installed, all erosion protection
systems, except grass are acceptable.
3. In areas where the occurrence of a hydrocarbon/chemical spill is not remote,
and for drain channels of the accidentally contaminated drainage system, either
concrete slabs or (for major drains) an impermeable sealing membrane shall be used
to at east 0.5 m above design water level
4. Paving consists of a reinforced concrete layer i.e. the pavement slab which rests
on the sub-grade prepared during the site preparation. The paved areas are divided
into slabs separated by expansion joints. Prevention of chemical spillage or
hydrocarbons into the subsoil through the joints may be necessary. In areas where
light-duty paving is sufficient without the probability of a spillage, tiles or bricks
may be acceptable.
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
183 / 145
1
4
TOPIC
ROADS: SURFACE DRAINAGE AND PAVING
POTENTIAL IMPACT
hydrocarbons/chemicals spillages
CONTROL MEASURES
1. Roads on which a hydrocarbon (or chemical) spillage is expected during the lifetime
of the road, shall be surfaced with chemical-resistant (concrete)-type paving
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
184 / 145
1
4
TOPIC
ON PLOT & OFF-PLOT AREAS: PAVING
POTENTIAL IMPACT
hydrocarbons/chemicals spillages
CONTROL MEASURES
1. For on-plot areas to be occupied by utility and processing units, including associated
control rooms, electrical sub-stations, analyser houses, stacks, interconnecting pipe
tracks, flares and plant roads, concrete is generally used
2. For off-plot areas where administration buildings, workshops, laundries, warehouses,
materials yards, storage tank compounds, pump stations, fire-fighting station,
training grounds, cooling water intake station, cooling water settling ponds, cooling
water discharge channels, pipe tracks and main roads are located, bituminous-type
flexible paving
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00
00-ZA-E-09502
Rev
/ of
185 / 145
1
4
TOPIC
GROUNDWATER
POTENTIAL IMPACT
Depletion of local/regional potable water resources
CONTROL MEASURES
1. Limit water use to essential need. Monitor, assess and record abstractions including
local Fars aquifer
COMPLIANCE
RESPONSIBLE OFFICER
DATE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
186 / 145
1.1
Table 1
00
1
4
6-9
5
0.100
2
0.300
1
0.010
650
0.050
0.050
1
0.100
2
5
0.200
0.070
150
0.500
0.001
0.050
0.100
10
50
10
0.500
0.002
30
0.020
0.010
300
400
0.100
0.100
5
1000
<1
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
187 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
188 / 145
1.2
Table 2
00
1
4
Cadmium
Chromium
Copper
Lead
Mercury
Molybdenum
Nickel
Selenium
Zinc
Maximum
Concentration
(mg/kg of dry
Solids)
Maximum
Application
Rate
*
(kg/ha/yr)
20
1000
1000
1000
10
20
300
50
3000
0.150
10
10
15
0.100
0.100
3
0.150
15
Maximum
Permitted
Concentration
in Soil (mg/kg of
dry solids)
3
400
150
30
1
3
75
5
300
After the spreading of sludge there must be a minimum period of three weeks before grazing or
harvesting of forage crops.
Sludge is prohibited:
on soils whilst fruit or vegetable crops, other than fruit trees, are growing or being harvested.
for six months preceding the harvesting of fruit or vegetables which grow in contact with the
soil and which are normally eaten raw
on soils with a pH<7.0.
*Based on a 10-year average and a soil pH>7.0.
1.3
Table 3
CROPS
GRASS
&
ORNAMENTAL AREAS
AQUIFER RECHARGE
METHOD OF
IRRIGATION
B
(See Table 1)
Vegetables likely to be eaten
Vegetables to be cooked or
raw.
processed.
Fruit likely to be eaten raw
Fruit if no irrigation within 2
and within 2 weeks of any
weeks of cropping.
irrigation
Fodder, cereal & seed crops
Public parks, Hotel Lawns
Pastures.
Recreational areas.
Areas with public access.
Areas with no public access.
Lakes with public contact.
(except places which may be
used for praying and hand
washing)
All controlled aquifer recharge
Spray or any other method of aerial irrigation not permitted in
areas with public access unless with timing control
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
189 / 145
1.4
Table 4
00
1
4
3A
The standards shown here are numerical standards for emissions to air which can be
measured with instruments. There are many sources of fugitive emissions which cannot be
measured and for which visible judgements have to be made by authorised
representatives.
In the case of fugitive dust emissions, the requirement is that there shall be no significant
visible emission of dust to the satisfaction of the authorised representative.
Standards of Emission
3
The abbreviation g/m has the meaning grams per cubic metre.
1. General
2. Aggregates Works
Particulates
0.050 g/m
3. Asphalt Works
Bitumen fume
0.030 g/m
Total particulates
0.050 g/m
4. Cement Works
Particulates
H2S
0.100 g/m
nil
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
1
4
190 / 145
5. Incineration Works
3
Hydrogen chloride
0.200 g/m
Hydrogen fluoride
0.100 g/m
0.050 g/m
0.050 g/m
5 p.p.m. v/v
Total particulate
0.100 g/m
3
3
3
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
191 / 145
1.5
Table 5
00
1
4
1. CHEMICAL
SUBSTANCE
Calcium
Magnesium
Sodium
200
Iron
0.3
Manganese
0.1
Zinc
Copper
Lead
0.05
Selenium
0.01
Cadmium
0.005
Arsenic
0.05
Sulphate
400
Chloride
250
Total hardness
500
Nitrate
10
Fluoride
1.5
pH
6.5 - 8.5
1000
2. BACTERIOLOGICAL
TREATED WATER
PAKISTANI
WHO STD.
STD
UNTREATED WATER
PAKISTANI
WHO STD.
STD
E. coli
0/100 ml
Coliform Org.
0/100 ml
3/100 ml *
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
1
4
192 / 145
2.0
00
Area ....................
Waste Custodian.........................
Frequency
of analysis
Environ
(H =Hourly
mental
D = Daily
Concentrations
Impact
W = Weekly
M=
major components of
Ranking
Waste
Management
Chart No.
(see Pt D) (2)
Location
Waste Stream
Index
Environmental
Hazard
(Refer
Performance
Normalised
Rating
Part C
Annual
Indicator (Refer
quantity
(H or
(C3))
Quantity
Part C (C2))
(NQ/a)
NH)s
Analysis
Monthly,
the waste
required
Q=
(Add as an appendix
Target
Refer to
Quarterly
(NQ/a)
A. 4.3.
A=
Annually)
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
193 / 145
3.0
00
1
4
DATE
DISPATCHED
TIME
DISPATCHED
QUANTITY
OF WASTE
PIECES OR
TONNES
DESTINATION OF
WASTE
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
194 / 145
4.0
00
1
4
DISPATCHED
STREAM
DATE
TIME
CONSIGNMT
NOTE
QUANTITY
OF WASTE
PIECES OR
VEHICLE
DESTINATN
DATE WASTE
No.
TONNES
No.
OF WASTE
RECEIVED
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Unit
J33010
Specification No.
Snamprogetti
Engineering BV
Sheet
00-ZA-E-09502
Rev
/ of
195 / 145
5.0
00
1
4
Waste Details
Location ......................
Quantity of waste
Waste Originator
Name: ......................
Date
dispatched: ......................................
Location: ................................................
Signature: ..........................
Waste Transporter
Name: ......................
Company: ...........................
Date: ..............................
Signature: ..........................
Location: ...........................
Signature: ................................................
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A
Project
Snamprogetti
Engineering BV
Unit
J33010
Specification No.
Sheet
00
00-ZA-E-09502
Rev
/ of
196 / 145
1
4
This document is the property of Snamprogetti Engineering BV who will safeguard its rights according to the civil and penal provisions of the law.
SFE/ENPD/4190 Rev 0
3A