If the CCGT Power Plant or any portion thereof fails under
test to give the required performance, such further tests whlcn are considered necessary by COMPANY shall be carried out :;;y CONTRACTOR, and the whole cost of the repeated tests shall be bor"le by CONTRACTOR, This also applies to tests carried out at SUBCONTRACTOR's works.
vendors and Sub-Vendors
a)
The vendors approved by COMPANY in Project B (Contract No,
30621090/00) and in Project C [Contract No, 30621127/00] will be considered approved in this CONTRACT, without the need for COMPANY review and approval process, except those vendors with unsatisfactory performarlce,
b)
For Steam Turbine Generator (STG), CONTRACTOR reserves
the right in Its discretion to obtain, source, subcontract, manufacturer, fabricate and assemble materials or equipment and any components and systems from non-domestic concern; it being understood that the quality standards and warranties of the CONTRACTOR's proposed manufacturer under the CONTRACT shall be adhered to in all cases irrespective of source and all sourcing shall be consistent with all applicable laws and regulations, subject to the following conditions: b.1
Sub-vendors can be accepted by COMPANY provided
that those suppliers are proven, qualified and used frequently by the STG vendor. The proposed suppliers should have adequate experience in producing the components/parts/equipment in question.
b.2
STG vendor to submit a draft Inspection Test Plan (ITP)
for all major components Including the steam turbine and generator within three (3) months after award of contract.
b.3
STG vendor to confirm that all the material selection
and design is as per the original steam turbine design requirements.
bA
STG vendor to confirm that QA/QC standards & controls
Imposed by sub-vendors are similar/equivalent to STG vendor standards,
b,S
STG Vendor should confirm compliance with the
warranty requirements and latent defect warranty requirements as stipulated in Paragraph 18, Warranties and Remedy of Defec:s, of this Schedule "A".
The provisions of this sub-paragraph 40,2.6.b shall also apply
to the other major equipment,
39,2.3
The "Consortium" as the CONTRACTOR
.In the case of a Consortium as the CONTRACTOR, as mentioned in
Paragraph 1.9 of this Schedule "A":
A-62 QurlllyyahCombined Cycle Power Plant, Extension 1 [Block 6]