REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/1/2016
3/31/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
7438
383
11268
470
18706
11520
480
11000
458
4082
-268
85
766
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
5074
6437
11511
2,700
0.8
1710
3022
RO4
RO5
N Racks running?
9.00
133
136
3.3
3.32
2.53
Oservations:
RUNINIG WITH
3ERIs
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
RO2
Flow (m3/h)
97
76
DPT (bar)
Cond (s)
3.41
3.5
Obsevations:
RO3
CIP
Microfiltration
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.04
55500
34.6
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
38000
29000
12000
1000
54000.000
Temperature
Turbidity
FRC
mg/l
NTU
ppm
29.7
35750
TDS
2.35
0.3
33.54
SDI
3. Remarks
Operation Comments:
1)SWRO#3 STOPPED AT 14:40HRS,CIP CLEANING.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/2/2016
4/1/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
6678
320
6573
360
13251
11520
480
11000
458
4842
4427
90
730
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
6733
6465
13198
2,973
3.7
1710
3014
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
Microfiltration
RO1
RO2
RO3
RO4
Flow (m3/h)
93
60
134
131
134
DPT (bar)
Cond (s)
3.11
Oservations:
7.8
3.2
507
2.48
132
3.25
150
Obsevations:
679
RUNINIG WITH
3ERIs
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.3
55480
35.8
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
36000
36000
12000
600
59400.000
4.5006819215
Temperature
Turbidity
FRC
mg/l
NTU
ppm
26.2
35750
TDS
2.01
0.3
35.26
SDI
3. Remarks
Operation Comments:
1.SWRO#3 started after CIP at 9:05.
2.SWRO VFD trip (alaram-AFE FC1 trip) at 11:13,later at 11:30 started.
3.BWRO-2 tripped at 11:45,after reset skid started at 11:55.
3.BWRO-3 tripped at 17:45 (alaram-30017) ,after reset skid started at 17:50.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/3/2016
4/2/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
7664
247
8887
104
16551
11520
480
11000
458
3856
2113
114
788
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
6760
5951
12711
3,050
3.3
1461
3019
RO3
RO4
RO5
N Racks running?
9.00
90
132
3.3
3.1
809
2.66
Oservations:
RUNINIG WITH
3ERIs
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
RO2
Flow (m3/h)
87
54
130
DPT (bar)
Cond (s)
3.34
147
3.34
448
2.61
Obsevations:
8.32
Microfiltration
657
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.21
55300
35.9
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
37000
36000
13000
800
59200.000
4.6573833687
Temperature
TDS
Turbidity
FRC
mg/l
NTU
ppm
26
37051
1.8
0.1
33.84
SDI
3. Remarks
Operation Comments:
1.At 22:05 RO-4 ERI-3 stopped workin while skid was running,tried hammering also not working.
2.At 5:08 Intake BP 5101 tripped,meanwhile 5102 came to service.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/4/2016
4/3/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
6911
266
7834
482
14745
11520
480
11000
458
4609
3166
95
709
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
5296
5642
10938
2,887
2910
1074
3025
RO3
RO4
RO5
N Racks running?
9.00
130
130
131
3.3
2.82
8.06
3.03
517
2.67
Oservations:
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
RO2
Flow (m3/h)
81
DPT (bar)
Cond (s)
3.38
Obsevations:
STOPPED FOR
MEMBRANE LOADING
164
Microfiltration
657
RUNINIG WITH
3ERIs
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.33
55000
35.6
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
28000
35000
13000
800
49200.000
4.4980800878
Temperature
Turbidity
FRC
mg/l
NTU
ppm
26
38885
TDS
1.02
0.2
SDI
26
3. Remarks
Operation Comments:
1)SWRO # 4 stopped at 8:30 a.m for ERI-3 cleaning , Later started at 10:00 a.m , But still the same ERI not working, so again stopped at 10:23 a.m , ERI cleaned one more time and started at 12:08 p.m
2)SWRO#4 stopped at 17:05 and service water circulation given for 30 mins , Later Rack started at 18:35
3) SWRO#2 stopped at 9:05 a.m, and membrane replacement work is going on.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/5/2016
4/4/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
7884
373
11496
300
19380
11520
480
11000
458
3636
-496
78
640
50
1090
Process
Potable
TOTAL
SAPP
6864
6037
12901
2,546
1.6
950
Production
Volum (m3)
2. Plant Status
SPC
Desalia
3019
RO's PERFORMANCE
RO1
Microfiltration
RO2
RO3
RO4
RO5
N Racks running?
9.00
3.3
Flow (m3/h)
67
105
122
114
131
DPT (bar)
Cond (s)
3.29
0.68
35
3.14
5
2.93
560
2.8
570
Oservations:
220
Obsevations:
RUNINIG WITH
3ERIs
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.31
55200
35.9
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
35000
35000
12000
1000
57000.000
4.4182621502
Temperature
TDS
Turbidity
FRC
mg/l
NTU
ppm
25.9
39026
1.2
0.2
SDI
34
3. Remarks
Operation Comments:
1)SWRO#2 membrane replacement work completed and Rack started at 13:15, Inlet pressure - 61 bar, Dp- 0.60 bar, SWRO permeate flow - 122 m3/hr and BWRO permeate flow -104 m3/hr
2)SWRO#3 permeate water converted to potable at 17:35, During that time Blending line FCV valve (FCV-1296) not working, so valve opened manually.
3)At 4:00 a.m again SWRO-3 converted to process and blending line FCV closed.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/6/2016
4/5/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
8398
375
4498
425
12896
11520
480
11000
458
3122
6502
90
590
50
1090
Process
Potable
TOTAL
SAPP
7278
3491
10769
2,442
3.6
1004
Production
Volum (m3)
2. Plant Status
SPC
Desalia
3027
RO's PERFORMANCE
Microfiltration
RO1
RO2
RO3
RO4
RO5
N Racks running?
9.00
Flow (m3/h)
70
106
124
CIP
131
3.3
DPT (bar)
Cond (s)
3.18
0.8
31
3
7
2.72
614
Oservations:
254
Obsevations:
RUNINIG WITH
3ERIs
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.28
54900
35.9
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
38000
29000
12000
600
0.000
Temperature
Turbidity
FRC
mg/l
NTU
ppm
25.6
38814
TDS
3.33
0.2
SDI
30.4
3. Remarks
Operation Comments:
1)RO-4 stopped at 10:37am due to CIP cleaning.
2) MF-8 stopped at 11:30 due to maintenance.
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
REPORTING DATE:
4/7/2016
4/6/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
8180
410
7511
485
15691
11520
480
11000
458
3340
3489
79
745
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
7562
5739
13301
2,406
3.8
1025
3016
RO4
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
Microfiltration
RO2
RO3
123
141
132
2.68
Oservations:
Flow (m3/h)
76
114
DPT (bar)
Cond (s)
3.14
0.92
223
33.52
3.31
7.67
1.86
495
657
Obsevations:
RUNINIG WITH
3ERIs
pH
Conductivity
Salinity
mg/l
S/cm
PPT
8.2
54099
34.7
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
35000
39000
13000
600
Temperature
TDS
Turbidity
FRC
mg/l
NTU
ppm
26.4
38247.993
1.4
0.2
SDI
30
3. Remarks
Operation Comments:
1) RO-4 started at 13:35.
2) BWRO-1 tripped at 20:54, alarm is 30017. later started at 21:01.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/8/2016
4/7/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
7097
330
11406
476
18503
11520
480
11000
458
4423
-406
73.4
670
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
6281
6332
12613
2,400
0.8
984
3004
RO4
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
Microfiltration
RO2
RO3
127
137
131
2.37
Oservations:
Flow (m3/h)
83
107
DPT (bar)
Cond (s)
3.08
0.97
162
43.6
2.81
8.18
2.09
523
690
Obsevations:
RUNINIG WITH
3ERIs
Salinity
TOC
pH
Conductivity
Turbidity
FRC
mg/l
S/cm
PPT
mg/l
NTU
ppm
8.18
54900
35.2
Temperature
26.5
38814.3
TDS
1.82
0.2
33.33
SDI
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
37000
33000
12000
1000
57000.000
3. Remarks
Operation Comments:
1)All swro racks tripped at 11:49hrs,due to majan substation power failure.
2)Bwro#1 tripped at 15:17hrs,(alarm-30017)
3)SWRO-3 hot water circulation given.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/9/2016
4/8/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
8980
417
6357
380
15337
11520
480
11000
458
2540
4643
69
675
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
7176
6958
14134
2,161
3.7
1138
3024
RO4
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
RO1
Microfiltration
RO2
RO3
128
136
131
2.47
Oservations:
Flow (m3/h)
84
105
DPT (bar)
Cond (s)
3.21
0.99
152
33
2.75
7.32
2.37
445
596
Obsevations:
RUNINIG WITH
3ERIs
Salinity
TOC
pH
Conductivity
TDS
Turbidity
FRC
mg/l
S/cm
PPT
mg/l
NTU
ppm
8.27
54800
35.1
Temperature
26.5
35620
2.1
0.2
SDI
33.3
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
37000
34000
13000
600
57400.000
4.061129192
3. Remarks
Operation Comments:
1)intake booster pump-5104 tripped at 07:18hrs,(alarm-30017),later 5101 came to service.
2)Bwro#3 tripped at 09:04hrs,(alarm-A1920),later started at09:09hrs.
3)SWRO-3 hot water circulation carried out as per recommended temperature .
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/10/2016
4/9/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
7023
390
11464
250
18487
11520
480
11000
458
4497
-464
75
645
50
1090
Process
Potable
TOTAL
SAPP
7350
6291
13641
2,328
977
RO4
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
SPC
Desalia
3031
RO's PERFORMANCE
RO1
Microfiltration
RO2
RO3
127
132
127
2.52
Oservations:
Flow (m3/h)
81
106
DPT (bar)
Cond (s)
3.26
1.07
168
38
2.77
9
2.59
566
707
Obsevations:
RUNINIG WITH
3ERIs
Salinity
TOC
pH
Conductivity
Turbidity
FRC
mg/l
S/cm
PPT
mg/l
NTU
ppm
8.07
55100
35.7
Temperature
26
38955
TDS
1.04
0.2
SDI
31
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
38000
36000
12000
1000
61000.000
4.4718129169
3. Remarks
Operation Comments:
1.SWRO-3 hot water circulation 1hr given.
2.Bwro#3 tripped at 20:40hrs,(alarm-30017),for that SWRO HP also tripped,later started at 20:58hrs.
3.MF B/W pump(1302) airvent PVC line joint fixed.
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
REPORTING DATE:
4/11/2016
4/10/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
8135
280
6651
450
14786
11520
480
11000
458
3385
4349
78
748
50
1090
Process
Potable
TOTAL
SAPP
7223
6184
13407
2,315
3.5
1038
RO4
RO5
N Racks running?
9.00
3.3
Production
Volum (m3)
2. Plant Status
SPC
3020
RO's PERFORMANCE
RO1
Flow (m3/h)
Desalia
STOPPED
DPT (bar)
Cond (s)
Microfiltration
RO2
RO3
105
128
126
124
2.57
Oservations:
36
2.82
9
2.68
581
711
RUNINIG WITH
3ERIs
1.26
Obsevations:
Salinity
TOC
pH
Conductivity
Turbidity
FRC
mg/l
S/cm
PPT
mg/l
NTU
ppm
8.23
55000
36.3
Temperature
25.2
38885
TDS
0.54
0.4
SDI
32
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
38000
36000
13000
700
3. Remarks
Operation Comments:
1.SWRO-3 hot water circulation 1hr given.
REPORTING DATE:
Delivery
Volume (m3)
Flow (m3/h)
Cond (s)
4/12/2016
4/11/2016
Majis requiremts
Balance
Process
Potable
TOTAL
Process
Potable
Process
Potable
6957
327
11323
153
18280
11520
480
11000
458
4563
-323
63
621
50
1090
Process
Potable
TOTAL
SAPP
SPC
Desalia
2537
8916
11453
1,950
1020
3009
Production
Volum (m3)
2. Plant Status
RO's PERFORMANCE
Microfiltration
RO1
RO2
RO3
RO4
RO5
N Racks running?
9.00
104
123
120
120
3.3
DPT (bar)
Cond (s)
membrane replacement
1.56
2.99
10
2.87
640
2.71
750
Oservations:
39
Obsevations:
RUNINIG WITH
3ERIs
Flow (m3/h)
Salinity
TOC
pH
Conductivity
Turbidity
FRC
mg/l
S/cm
PPT
mg/l
NTU
ppm
8.34
54700
35.4
Temperature
26.1
38672
TDS
0.75
0.4
SDI
30.4
M1 (Kw)
M2 (Kw)
DESALIA (Kw)
28000
36000
12000
1000
51000.000
4.45
3. Remarks
Operation Comments:
1)SWRO #1 stopped at 8:40 a.m and Membrane replacement work is going on.
2)BWRO#2 tripped at 5:35 a.m(Alarm - A1920), Later started.