DAILY OPERATION REPORT SWRO MAJIS 1

1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/1/2016

3/31/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

7438
383

11268
470

18706

11520
480

11000
458

4082

-268

85

766

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

5074

6437

11511

2,700

0.8

1710

3022

RO4

RO5

N Racks running?

9.00

133

136

MF inlet pressure (bar)

3.3

3.32

2.53

Oservations:

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

RO2

Flow (m3/h)

97

76

DPT (bar)
Cond (s)

3.41

3.5

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RO3

CIP

Microfiltration

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.04

55500

34.6

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

38000

29000

12000

1000

54000.000

Temperature

Turbidity

FRC

mg/l

NTU

ppm

29.7

35750

TDS

2.35

0.3

33.54

SDI

ENERGY METER READING

3. Remarks
Operation Comments:
1)SWRO#3 STOPPED AT 14:40HRS,CIP CLEANING.

Specific power consumption (kwh/m3)

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/2/2016

4/1/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

6678
320

6573
360

13251

11520
480

11000
458

4842

4427

90

730

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

6733

6465

13198

2,973

3.7

1710

3014

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE

Microfiltration

RO1

RO2

RO3

RO4

Flow (m3/h)

93

60

134

131

134

MF inlet pressure (bar)

DPT (bar)
Cond (s)

3.11

Oservations:

7.8

3.2
507

2.48

132

3.25
150

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

679
RUNINIG WITH
3ERIs

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.3

55480

35.8

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

36000

36000

12000

600

59400.000

4.5006819215

Temperature

Turbidity

FRC

mg/l

NTU

ppm

26.2

35750

TDS

2.01

0.3

35.26

SDI

ENERGY METER READING

3. Remarks
Operation Comments:
1.SWRO#3 started after CIP at 9:05.
2.SWRO VFD trip (alaram-AFE FC1 trip) at 11:13,later at 11:30 started.
3.BWRO-2 tripped at 11:45,after reset skid started at 11:55.
3.BWRO-3 tripped at 17:45 (alaram-30017) ,after reset skid started at 17:50.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/3/2016

4/2/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

7664
247

8887
104

16551

11520
480

11000
458

3856

2113

114

788

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

6760

5951

12711

3,050

3.3

1461

3019

RO3

RO4

RO5

N Racks running?

9.00

90

132

MF inlet pressure (bar)

3.3

3.1
809

2.66

Oservations:

ERI NO3 IS NOT


WORKING

RUNINIG WITH
3ERIs

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

RO2

Flow (m3/h)

87

54

130

DPT (bar)
Cond (s)

3.34
147

3.34
448

2.61

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

8.32

Microfiltration

657

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.21

55300

35.9

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

37000

36000

13000

800

59200.000

4.6573833687

Temperature

TDS

Turbidity

FRC

mg/l

NTU

ppm

26

37051

1.8

0.1

33.84

SDI

ENERGY METER READING

3. Remarks
Operation Comments:
1.At 22:05 RO-4 ERI-3 stopped workin while skid was running,tried hammering also not working.
2.At 5:08 Intake BP 5101 tripped,meanwhile 5102 came to service.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/4/2016

4/3/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

6911
266

7834
482

14745

11520
480

11000
458

4609

3166

95

709

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

5296

5642

10938

2,887

2910

1074

3025

RO3

RO4

RO5

N Racks running?

9.00

130

130

131

MF inlet pressure (bar)

3.3

2.82
8.06

3.03
517

2.67

Oservations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

RO2

Flow (m3/h)

81

DPT (bar)
Cond (s)

3.38

Obsevations:

RUNINIG WITH 3ERIs

STOPPED FOR
MEMBRANE LOADING

164

Microfiltration

657
RUNINIG WITH
3ERIs

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.33

55000

35.6

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

28000

35000

13000

800

49200.000

4.4980800878

Temperature

Turbidity

FRC

mg/l

NTU

ppm

26

38885

TDS

1.02

0.2

SDI

26

ENERGY METER READING

3. Remarks
Operation Comments:
1)SWRO # 4 stopped at 8:30 a.m for ERI-3 cleaning , Later started at 10:00 a.m , But still the same ERI not working, so again stopped at 10:23 a.m , ERI cleaned one more time and started at 12:08 p.m
2)SWRO#4 stopped at 17:05 and service water circulation given for 30 mins , Later Rack started at 18:35
3) SWRO#2 stopped at 9:05 a.m, and membrane replacement work is going on.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/5/2016

4/4/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

7884
373

11496
300

19380

11520
480

11000
458

3636

-496

78

640

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

6864

6037

12901

2,546

1.6

950

Production

Volum (m3)

2. Plant Status

SPC

Desalia
3019

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Microfiltration

RO2

RO3

RO4

RO5

N Racks running?

9.00
3.3

Flow (m3/h)

67

105

122

114

131

MF inlet pressure (bar)

DPT (bar)
Cond (s)

3.29

0.68
35

3.14
5

2.93
560

2.8
570

Oservations:

220

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.31

55200

35.9

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

35000

35000

12000

1000

57000.000

4.4182621502

Temperature

TDS

Turbidity

FRC

mg/l

NTU

ppm

25.9

39026

1.2

0.2

SDI

34

ENERGY METER READING

3. Remarks
Operation Comments:
1)SWRO#2 membrane replacement work completed and Rack started at 13:15, Inlet pressure - 61 bar, Dp- 0.60 bar, SWRO permeate flow - 122 m3/hr and BWRO permeate flow -104 m3/hr
2)SWRO#3 permeate water converted to potable at 17:35, During that time Blending line FCV valve (FCV-1296) not working, so valve opened manually.
3)At 4:00 a.m again SWRO-3 converted to process and blending line FCV closed.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/6/2016

4/5/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

8398
375

4498
425

12896

11520
480

11000
458

3122

6502

90

590

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

7278

3491

10769

2,442

3.6

1004

Production

Volum (m3)

2. Plant Status

SPC

Desalia
3027

(Hour time: 9:00)

RO's PERFORMANCE

Microfiltration

RO1

RO2

RO3

RO4

RO5

N Racks running?

9.00

Flow (m3/h)

70

106

124

CIP

131

MF inlet pressure (bar)

3.3

DPT (bar)
Cond (s)

3.18

0.8
31

3
7

2.72
614

Oservations:

254

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.28

54900

35.9

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

38000

29000

12000

600

0.000

Temperature

Turbidity

FRC

mg/l

NTU

ppm

25.6

38814

TDS

3.33

0.2

SDI

30.4

ENERGY METER READING

3. Remarks
Operation Comments:
1)RO-4 stopped at 10:37am due to CIP cleaning.
2) MF-8 stopped at 11:30 due to maintenance.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

REPORTING DATE:

4/7/2016

4/6/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

8180
410

7511
485

15691

11520
480

11000
458

3340

3489

79

745

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

7562

5739

13301

2,406

3.8

1025

3016

RO4

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Microfiltration

RO2

RO3
123

141

132

MF inlet pressure (bar)

2.68

Oservations:

Flow (m3/h)

76

114

DPT (bar)
Cond (s)

3.14

0.92

223

33.52

3.31
7.67

1.86
495

657

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS


TOC

pH

Conductivity

Salinity

mg/l

S/cm

PPT

8.2

54099

34.7

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

35000

39000

13000

600

Temperature

TDS

Turbidity

FRC

mg/l

NTU

ppm

26.4

38247.993

1.4

0.2

SDI

30

ENERGY METER READING

3. Remarks
Operation Comments:
1) RO-4 started at 13:35.
2) BWRO-1 tripped at 20:54, alarm is 30017. later started at 21:01.

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)


0

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/8/2016

4/7/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

7097
330

11406
476

18503

11520
480

11000
458

4423

-406

73.4

670

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

6281

6332

12613

2,400

0.8

984

3004

RO4

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Microfiltration

RO2

RO3
127

137

131

MF inlet pressure (bar)

2.37

Oservations:

Flow (m3/h)

83

107

DPT (bar)
Cond (s)

3.08

0.97

162

43.6

2.81
8.18

2.09
523

690

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS

Salinity

TOC

pH

Conductivity

Turbidity

FRC

mg/l

S/cm

PPT

mg/l

NTU

ppm

8.18

54900

35.2

Temperature

26.5

38814.3

TDS

1.82

0.2

33.33

SDI

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

37000

33000

12000

1000

57000.000

ENERGY METER READING

3. Remarks
Operation Comments:
1)All swro racks tripped at 11:49hrs,due to majan substation power failure.
2)Bwro#1 tripped at 15:17hrs,(alarm-30017)
3)SWRO-3 hot water circulation given.

Specific power consumption (kwh/m3)

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/9/2016

4/8/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

8980
417

6357
380

15337

11520
480

11000
458

2540

4643

69

675

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

7176

6958

14134

2,161

3.7

1138

3024

RO4

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Microfiltration

RO2

RO3
128

136

131

MF inlet pressure (bar)

2.47

Oservations:

Flow (m3/h)

84

105

DPT (bar)
Cond (s)

3.21

0.99

152

33

2.75
7.32

2.37
445

596

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS

Salinity

TOC

pH

Conductivity

TDS

Turbidity

FRC

mg/l

S/cm

PPT

mg/l

NTU

ppm

8.27

54800

35.1

Temperature

26.5

35620

2.1

0.2

SDI

33.3

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

37000

34000

13000

600

57400.000

4.061129192

ENERGY METER READING

3. Remarks
Operation Comments:
1)intake booster pump-5104 tripped at 07:18hrs,(alarm-30017),later 5101 came to service.
2)Bwro#3 tripped at 09:04hrs,(alarm-A1920),later started at09:09hrs.
3)SWRO-3 hot water circulation carried out as per recommended temperature .

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/10/2016

4/9/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

7023
390

11464
250

18487

11520
480

11000
458

4497

-464

75

645

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

7350

6291

13641

2,328

977

RO4

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

SPC

Desalia
3031

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Microfiltration

RO2

RO3
127

132

127

MF inlet pressure (bar)

2.52

Oservations:

Flow (m3/h)

81

106

DPT (bar)
Cond (s)

3.26

1.07

168

38

2.77
9

2.59
566

707

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

SEA WATER PARAMETERS

Salinity

TOC

pH

Conductivity

Turbidity

FRC

mg/l

S/cm

PPT

mg/l

NTU

ppm

8.07

55100

35.7

Temperature

26

38955

TDS

1.04

0.2

SDI

31

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

38000

36000

12000

1000

61000.000

4.4718129169

ENERGY METER READING

3. Remarks
Operation Comments:
1.SWRO-3 hot water circulation 1hr given.
2.Bwro#3 tripped at 20:40hrs,(alarm-30017),for that SWRO HP also tripped,later started at 20:58hrs.
3.MF B/W pump(1302) airvent PVC line joint fixed.

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

REPORTING DATE:

4/11/2016

4/10/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

8135
280

6651
450

14786

11520
480

11000
458

3385

4349

78

748

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

7223

6184

13407

2,315

3.5

1038

RO4

RO5

N Racks running?

9.00
3.3

Production

Volum (m3)

2. Plant Status

SPC

3020

(Hour time: 9:00)

RO's PERFORMANCE
RO1

Flow (m3/h)

Desalia

STOPPED

DPT (bar)
Cond (s)

Microfiltration

RO2

RO3

105

128

126

124

MF inlet pressure (bar)

2.57

Oservations:

36

2.82
9

2.68
581

711

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

1.26

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

SEA WATER PARAMETERS

Salinity

TOC

pH

Conductivity

Turbidity

FRC

mg/l

S/cm

PPT

mg/l

NTU

ppm

8.23

55000

36.3

Temperature

25.2

38885

TDS

0.54

0.4

SDI

32

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

38000

36000

13000

700

ENERGY METER READING

3. Remarks
Operation Comments:
1.SWRO-3 hot water circulation 1hr given.

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)


0

DAILY OPERATION REPORT SWRO MAJIS 1


1. Previous day Production and Delivery:

REPORTING DATE:

Delivery
Volume (m3)
Flow (m3/h)
Cond (s)

4/12/2016

4/11/2016

Majis requiremts

Balance

Process

Potable

TOTAL

Process

Potable

Process

Potable

6957
327

11323
153

18280

11520
480

11000
458

4563

-323

63

621

50

1090

Process

Potable

TOTAL

Process tank level (mm)

Potable tank level


(m)

SAPP

SPC

Desalia

2537

8916

11453

1,950

1020

3009

Production

Volum (m3)

2. Plant Status

(Hour time: 9:00)

RO's PERFORMANCE

Microfiltration

RO1

RO2

RO3

RO4

RO5

N Racks running?

9.00

104

123

120

120

MF inlet pressure (bar)

3.3

DPT (bar)
Cond (s)

membrane replacement

1.56

2.99
10

2.87
640

2.71
750

Oservations:

39

Obsevations:

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH 3ERIs

RUNINIG WITH
3ERIs

Flow (m3/h)

SEA WATER PARAMETERS

Salinity

TOC

pH

Conductivity

Turbidity

FRC

mg/l

S/cm

PPT

mg/l

NTU

ppm

8.34

54700

35.4

Temperature

26.1

38672

TDS

0.75

0.4

SDI

30.4

M1 (Kw)

M2 (Kw)

DESALIA (Kw)

POTABLE P/P STATION(kw)

NET POWER CONSUMPTION (Kw)

Specific power consumption (kwh/m3)

28000

36000

12000

1000

51000.000

4.45

ENERGY METER READING

3. Remarks
Operation Comments:
1)SWRO #1 stopped at 8:40 a.m and Membrane replacement work is going on.
2)BWRO#2 tripped at 5:35 a.m(Alarm - A1920), Later started.