AL-Haydaria Project

Defects of GT's Therm

A-

Description for Defected Parts of Thermal


(3 mm) for GT's 21/22

Defects Description :

After finishing the Inspection for Thermal Shield ( for all GT'

we ended with a conclusion as following :


1- Flat Bars edge preparation showed scratches and Grooves prod
2- Thermal Shield Plates adjoining welds showed indications visu
3- some Holes of Thermal Shield Plates edges not collinear ( not i
Samples of Photos attached below shows different types of

B-

Description for Defected Parts of Thermal Shield


(with 3 mm of thickness) for GT's
Defect Description :

Because of irregularity of the cutting processes for the a

which sometimes these angles reach up to 100 with the presenc


which sometimes reach up to 5 mm. So we will re-welding in the
with Grinding for the purpose of obtaining a regular angles( 60
The above Photos explain the status of the Stiffeners:

s of GT's Thermal Shields

Parts of Thermal Shield ST. Plates


m) for GT's 21/22/23/24

rmal Shield ( for all GT's) by AL-ROOKAL Co. for Engineering Inspection Ltd.

tches and Grooves produce welding Defects.


howed indications visual of unacceptable Defects.
ges not collinear ( not in the same center line ).
hows different types of defects for all GT's.

of Thermal Shield (Stiffeners )CST

ickness) for GT's 21/22/23/24

ing processes for the angles of the thermal shields carbon steel(Stiffeners) (with a thicknes

100 with the presence of distortions due to cutting and also presence of gaps
e will re-welding in the areas mentioned above ( we add metal) and then we process
g a regular angles( 60 -70) and so we organized to get a regular Cap, angles & shapes.
he Stiffeners:

(with a thickness of 12 mm)

e process
gles & shapes.

AL-Haydaria Project

Costs for repairing Damaged Parts for Thermal Shield


ST. Plates( 3 mm)
No.

No.

Repair for Therm. Shield for GT's 21/22/23/24


Draw. No. 223D5969

Process Description.
1234-

Manpower

Process Description.

special Tools

Equipment

$/ Hour

Man . Hour

$ . man

123
34
12
16

1
3
3
3

123
102
36
48

$/ Hour

Tool . Hour

$ . Tool

16
3
1.1
5
2
4
37

3
3
10
3
3
2
2

48
9
11
15
6
8
74

Foreman
Welder
Welder Assistant
Fabricator
Repair for Therm. Shield for GT's 21/22/23/24
Draw. No. 223D5969

1-Welding machine
2- grinding machine
3- scaffolds ( 10 boxes per day )
4- Heating furnace welding rods
6- Hole cutter
7- heating torch
RT Crane - 18 ton

Total Cost per hour


No.

Process Description.

Repair of Therm. Shield for GT's


21/22/23/24 Draw. No. 223D5969

Price ($/EA)

100 gr.

3- NDT Paint

100 gr.

10

4-Argon Gas

0.1 bott.

25

2- Grinding Disk

Consumables

Total Costs per hour


Total Costs for all repair process
Process Description.
Pre repairing inspection (3 mm)
After repairing inspection (3 mm)

TOTAL

Inspector

Al Rookhal Company
Al Rookhal Company

90 hr.

480 $
Q'ty / hr.

1- welding Rods (SMAW)

Total working
hours

Total working
hours

90 hr.

* 1 kg. per day


* 20 grinding disk per day
* 1 kg. per day
* 1 bott. Per day

44
(480 + 44 ) $x90hour = 47160

Worker
2
2

Cost per
Hour($)
35
35

Daily working
Hours
8
3

Daily Costs($)
560
210

No.
1
2
3
4

Process Type
Repairing length / hour (Productivity)

Total working Hours


Total Length after Grinding
Total Working Days

Process Description.
0.5 m

90 hour
45 m
9 days

FINAL COSTS( 3mm) = 47160+ 9240 = 56400 $

ding disk per day


Per day

7160

$
Working Days
12
12

Total Costs per


Working Days
6720 $
2520 $

9240 $

AL-Haydaria Project
Costs for repairing Damaged Parts for Thermal Shield
( Stiffeners Thick. 12 mm CST )
No.

No.

Repair of Therm. Shield for GT's 21/22/23/24 Draw. No.


223D5969

Process Description.

Manpower

Process Description.

special Tools

Equipment

1234-

Foreman
Welder
Welder Assistant
Fabricator
Repair for Therm. Shield for GT's 21/22/23/24 Draw. No.
223D5969

1-Welding machine
2- grinding machine
3- scaffolds
4- Heating furnace welding rods
5- NDT Set
6- heating torch
RT Crane -(18 T.)We using two cranes for lifting &
purpose for Adjusting the thermal shield because it
be made from .four quarters

$/hour

Man . Hour

$ . man

123
34
12
16

1
2
3
2

123
68
36
32

$/ Hour

Tool . Hour

$ . Tool

16
3
1.1
5
5
2

2
2
10
2
1
2

32
6
11
10
5
4

37

74

Total Cost per hour


No.

Repair of Therm. Shield for GT's 21/22/23/24 Draw. No.


223D5969

Process Description.

1- welding Rods (SMAW)


4

Consumables

2- Grinding Disk
3- NDT Paint
4- Cooking Gas

401$
Q'ty / hr.

Price ($/EA)

1 kg.

100 gr.

10

0.1 bott.

20

Total Costs per hour

pre repairing inspection (12 mm)


after repairing inspection (12 mm)

Inspector

Al Rookhal Company
Al Rookhal Company

TOTAL

77 hr.

39
(401 + 39 ) $x77 hour = 33880 $

Total Costs for all repair process


Process Description.

Total Working
hours

Worker

Cost per Hour($)

daily working
Hours

2
2

35
35

4
3

No.

Process Type

Repairing length / hour (productivity)

Total working Hours

Total Length after Grinding

Total working Days

Process Description.

0.5 m
77 hr.
(38.5m)*-Welding for defect area after cleaning and then
grind the bevel by grinding until the angle become (30 -35)

8 days

FINAL COSTS( 12mm) =33880 $ + 4900 $ = 38780 $

Total Working
Hours

77 hr.

* 10 kg. per day


* 20 grinding disk per day
* 1 kg. per day
* 1 bott. Per day

Total cost per Day


($)

working Days

Total Costs

280 $
210 $

10
10

2800 $
2100 $

4900$

AL-Haydaria Project

FINAL COSTS( 12mm) =33880$ + 4900 $ = 38780 $


FINAL COSTS( 3mm) = 47160+ 9240 = 56400 $
38780$ + 56400

Final Costs

95180

= 95180 $
$

4900 $ = 38780 $

+ 9240 = 56400 $

= 95180 $