CONTOH PERHITUNGAN PENULANGAN TANGGA


02.29

Teknik Sipil

1 comment

Contoh hasil analisa dari ETABS didapat :


Pada pelat tangga :
M11 = -311,6979 Kgm = -3116979 Nmm
M22 = -1582,6438 Kgm = -15826438 Nmm
Pada bordes :
M11 = -879,6493 Kgm = -8796493 Nmm
M22 = 1863,7989 Kgm = 18637989 Nmm
Tebal pelat t = 15 cm = 150 mm

PADA PELAT TANGGA


ARAH 1-1
d = 150 -25 = 125 mm
As = 86,58 mm2
As min = 0,0020 x b x d = 0,0020 x 1000 x 125 = 250 mm2
250 mm2 > 86,58 mm2
Maka As perlu = 250 mm2
Pakai tulangan diameter 8 mm
A = x x d2 = x x 82 = 50,265 mm2
A = 50,265 x 5 = 253,125 mm2
Jarak tulangan 1000/5 = 200 mm maka 8-200 mm
a = 4,765
Mn = x As x fy x (d-a/2) = 0,8 x 253,125 x 400 x (125-(4,765/2))
= 9932017,5 Nmm
Mn > Mu
9932017,5 Nmm > 3116979 Nmm ..(OK)
Maka dipakai tulangan pembagi 8-200 (arah pendek)
ARAH 2-2
d = 150 -25 = 125 mm
As = 439,62 mm2
As min = 0,0020 x b x d = 0,0020 x 2500 x 125 =
625 mm2 625 mm2 > 439,62 mm2
Maka As perlu = 625 mm2
Pakai tulangan diameter 8 mm
A = x x d2 = x x 82 = 50,265 mm2
A = 50,265 x 13 = 653,445 mm2
Jarak tulangan 2500/13 = 192 mm maka 8-192 mm

BERITA TERPOPULER
Cara menghitung RAB Volume pekerjaan

CONTOH PERHITUNGAN
PERENCANAAN PERKERASAN JALAN

ANALISIS DAN DESAIN KOLOM

CARA MENGHITUNG RAB PEKERJAAN


AWAL, PEKERJAAN GALIAN DAN
URUGAN, PEKERJAAN PASANGAN
FONDASI

CONTOH PERHITUNGAN RAB PLAT


BETON

a = 4,920
Mn = x As x fy x (d-a/2) = 0,8 x 653,445x 400 x (125-(4,920/2))
= 25623408,1 Nmm
Mn > Mu
25623408,1 Nmm > 15826438 Nmm ..(OK)
Maka dipakai tulangan pembagi 8-192 (arah panjang)

PADA PELAT BORDES


ARAH 1-1
d = 150 -25 = 125 mm
As = 244,347 mm2
As min = 0,0020 x b x d = 0,0020 x 1000 x 125 = 250 mm2 250 mm2 > 244,347 mm2
Maka As perlu = 250 mm2
Pakai tulangan diameter 8 mm
A = x x d2 = x x 82 = 50,265 mm2
A = 50,265 x 5 = 253,125 mm2
Jarak tulangan 1000/5 = 200 mm maka 8-200 mm
a = 4,765

ARTIKEL TERBARU
Tata cara perhitungan harga satuan
pekerjaan beton untuk konstruksi
bangunan gedung dan perumahan

Cara Mendapatkan Uang Dollar (USD $)


dengan Smartphone Android "Gratis"

Evaluasi Kinerja Seismik Struktur


Gedung Asimetris dengan Dinding
Geser Nonparalel Sebagai Sistem
Pengekangan Torsi

Mn = x As x fy x (d-a/2) = 0,8 x 253,125x 400 x (125-(4,765/2))


= 9932017,5 Nmm
Mn > Mu
9932017,5 1 Nmm > 8796493 Nmm ..(OK)
Maka dipakai tulangan pembagi 8-200 (arah pendek)
ARAH 2-2
d = 150 -25 = 125 mm
As = 517,722 mm2
As min = 0,0020 x b x d = 0,0020 x 1000 x 125 = 250 mm2
517,722 mm2 > 250 mm2
Maka As perlu = 517,722 mm2
Pakai tulangan diameter 8 mm
A = x x d2 = x x 82 = 50,265 mm2
A = 50,265 x 11 = 552,915 mm2
Jarak tulangan 1000/11 = 90,909 mm 90 mm maka 8-90 mm

Perencanaan Ulang Struktur Gedung


Tahan Gempa Menggunakan Metode
Dinding Geser

CONTOH PERHITUNGAN RAB PLAT


BETON

ARSIP BLOG
2016 (1)

a = 10,408
Mn = x As x fy x (d-a/2) = 0,8 x 552,915x 400 x (125-(10,408/2))
= 21195841,71 Nmm
Mn > Mu 21195841,71 Nmm > 18637989 Nmm
Maka dipakai tulangan pembagi 8-90 (arah panjang)

2015 (3)
2013 (105)
April (48)
Maret (36)
Mar 31 (10)

Posted in: STRUKTUR BETON

Mar 28 (5)
Mar 27 (9)
Mar 25 (3)
Mar 08 (3)
Mar 07 (1)
Mar 03 (1)
Mar 02 (1)
Mar 01 (3)
CONTOH PERHITUNGAN PENULANGAN ATAP
PELAT
CONTOH PERHITUNGAN PENULANGAN
PONDASI TELAPAK
CONTOH PERHITUNGAN PENULANGAN
TANGGA

Artikel Terkait :STRUKTUR BETON


Evaluasi Kinerja Seismik Struktur Gedung Asimetris dengan Dinding Geser
Nonparalel Sebagai Sistem Pengekangan Torsi

Februari (21)

Perencanaan Ulang Struktur Gedung Tahan Gempa Menggunakan Metode


Dinding Geser
CONTOH PERHITUNGAN PERENCANAAN PEMBEBANAN PADA ATAP
Tata cara perhitungan harga satuan pekerjaan beton untuk konstruksi
bangunan gedung dan perumahan

9 0 1 5 1 7

Cara Mendapatkan Uang Dollar (USD $) dengan Smartphone Android "Gratis"


Related Posts Widget[?]

GABUNG YUK!

1 KOMENTAR:
Rifqi Fauzan mengatakan...
mau bertanya untuk a itu apa ya ? terima kasih :)
13 November 2015 08.38

POSKAN KOMENTAR

Masukkan komentar Anda...

Beri komentar sebagai:

Publikasikan

Google Account

Pratinjau

LINK KE POSTING INI


Buat sebuah Link

Copyright 2015 TEKNIK SIPIL | Powered by Blogger

Design by Free Wordpress Themes | Bloggerized by Lasantha - Premium Blogger Templates

You might also like