PIONEER GAS POWER LIMITED

380-425 MW COMBINED CYCLE POWER PLANT APSIPL-05EPC-


3-A21
INSPECTION REQUIREMENTS

Mechanical Inspection Requirement

The Contractor is required to prepare a detailed quality assurance plan in the


specific format and submit within 4 weeks on award of the contract, to the Owner
for review and approval. Some of the equipments / systems to which quality
plans are to be prepared and submitted are as referred below. However, the
Contractor to include all equipment / systems which are applicable to this project

1. HP drum, LP drum, suspension rod


2. HRSG modules
3. Headers
4. Steam generator structure (columns, girders, built-up beams)
5. Heat exchangers
6. Boiler feed pump
7. Centrifugal pump
8. Dosing pump
9. Positive displacement pumps
10. Gate, globe, regulating, check valves
11. Ball, diaphragm and plug valves
12. Control valves, pneumatic block valves, pressure reducing valves
13. Butterfly valves
14. Safety and safety relief valves
15. Automatic recirculation valves
16. Silencer
17. Piping (IBR)
18. Piping (Non-IBR)
19. Storage tank
20. IBD and CBD tanks
21. Deaerator
22. Fans
23. Ducts, casing and chimneys
24. Metallic expansion joints
25. Rubber expansion joints
26. Hangers and tie rods
27. Strainers and filters
28. Gas turbine package
29. Steam turbine package
30. Diesel engine
31. EOT cranes, hoists

Page 1 of 2
PIONEER GAS POWER LIMITED
380-425 MW COMBINED CYCLE POWER PLANT APSIPL-05EPC-
3-A21
INSPECTION REQUIREMENTS

32. Air compressor


33. Air drying plant

Page 2 of 2