You are on page 1of 504

prepared by:

Project: TABUK SEWAGE NETWORK (SIXTH STAGE)


Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

25 0.00 755.420 754.280 1.300 1.300


1.299 0.80

0.80 755.430 754.292 1.298 1.298


1.267 9.20
10.00 755.510 754.433 1.237 1.237
1.268 10.00
20.00 755.724 754.586 1.298 1.298
1.313 10.00
30.00 755.907 754.739 1.328 1.328
1.365 10.00
40.00 756.135 754.892 1.403 1.403
1.461 10.00
50.00 756.404 755.045 1.519 1.519
1.609 10.00
60.00 756.737 755.198 1.699 1.699
1.829 10.00
70.00 757.151 755.351 1.960 1.960
2.184 10.00
80.00 757.753 755.504 2.409 2.409
2.681 10.00
90.00 758.450 755.657 2.953 2.953
3.115 7.00
97.00 758.880 755.764 3.276 3.276
3.285 0.80
26 97.80 758.910 755.776 3.294 3.294

TOTAL 97.80

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

26 0.00 758.910 756.964 2.106 2.106


2.106 0.80

0.80 758.920 756.973 2.107 2.107


2.202 9.20
10.00 759.211 757.074 2.297 2.297
2.327 10.00
20.00 759.380 757.184 2.356 2.356
2.368 3.40
23.40 759.440 757.221 2.379 2.379
2.376 0.80
27 24.20 759.443 757.230 2.373 2.373

TOTAL 24.20

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

27 0.00 759.457 757.230 2.387 2.387


2.380 0.80

0.80 759.457 757.244 2.373 2.373


2.338 9.20
10.00 759.554 757.410 2.304 2.304
2.268 10.00
20.00 759.662 757.590 2.232 2.232
2.177 10.00
30.00 759.732 757.770 2.122 2.122
2.081 10.00
40.00 759.831 757.950 2.041 2.041
1.991 10.00
50.00 759.911 758.130 1.941 1.941
1.886 10.00
60.00 759.980 758.310 1.830 1.830
1.817 2.60
62.60 760.000 758.357 1.803 1.803
1.799 0.80
28 63.40 760.005 758.371 1.794 1.794

TOTAL 63.40

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

28 0.00 760.005 758.371 1.794 1.794


1.807 0.80

0.80 760.040 758.381 1.819 1.819


1.814 9.20
10.00 760.140 758.491 1.809 1.809
1.797 10.00
20.00 760.235 758.611 1.784 1.784
1.751 10.00
30.00 760.289 758.731 1.718 1.718
1.696 10.00
40.00 760.365 758.851 1.674 1.674
1.658 5.60
45.60 760.400 758.918 1.642 1.642
1.639 0.80
29 46.40 760.403 758.928 1.635 1.635

TOTAL 46.40

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 755.273 754.110 1.323 1.323


1.318 0.80

0.80 755.280 754.127 1.313 1.313


1.317 9.20
10.00 755.483 754.322 1.321 1.321
1.285 10.00
20.00 755.623 754.534 1.249 1.249
1.263 10.00
30.00 755.863 754.746 1.277 1.277
1.281 10.00
40.00 756.083 754.958 1.285 1.285
1.269 10.00
50.00 756.263 755.170 1.253 1.253
1.272 10.00
60.00 756.513 755.382 1.291 1.291
1.320 10.00
70.00 756.783 755.594 1.349 1.349
1.380 10.00
80.00 757.058 755.806 1.412 1.412
1.432 4.30
84.30 757.188 755.895 1.453 1.453
1.454 0.80
3 85.10 757.208 755.914 1.454 1.454

TOTAL 85.10

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 757.211 755.914 1.457 1.457


1.448 0.80

0.80 757.213 755.934 1.439 1.439


1.442 9.20
10.00 757.496 756.210 1.446 1.446
1.441 10.00
20.00 757.786 756.510 1.436 1.436
1.414 10.00
30.00 758.041 756.810 1.391 1.391
1.386 10.00
40.00 758.331 757.110 1.381 1.381
1.381 10.00
50.00 758.631 757.410 1.381 1.381
1.379 6.20
56.20 758.813 757.596 1.377 1.377
1.372 0.80
4 57.00 758.826 757.620 1.366 1.366

TOTAL 57.00

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 758.823 757.620 1.363 1.363


1.365 0.80

0.80 758.830 757.624 1.366 1.366


1.484 9.20
10.00 759.113 757.672 1.601 1.601
1.680 10.00
20.00 759.323 757.724 1.759 1.759
1.848 10.00
30.00 759.553 757.776 1.937 1.937
2.011 10.00
40.00 759.753 757.828 2.085 2.085
2.154 10.00
50.00 759.943 757.880 2.223 2.223
2.277 10.00
60.00 760.103 757.932 2.331 2.331
2.338 1.15
61.15 760.123 757.938 2.345 2.345
2.348 0.80
5 61.95 760.133 757.942 2.351 2.351

TOTAL 61.95

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

15 0.00 759.240 756.930 2.470 2.470


2.468 0.80

0.80 759.240 756.934 2.466 2.466


2.442 9.20
10.00 759.240 756.982 2.418 2.418
2.377 10.00
20.00 759.210 757.034 2.336 2.336
2.308 10.00
30.00 759.205 757.086 2.279 2.279
2.228 10.00
40.00 759.155 757.138 2.177 2.177
2.156 10.00
50.00 759.165 757.190 2.135 2.135
2.121 9.20
59.20 759.185 757.238 2.107 2.107
2.108 0.80
16 60.00 759.190 757.242 2.108 2.108

TOTAL 60.00

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

14 0.00 759.214 756.706 2.668 2.668


2.669 0.80

0.80 759.220 756.710 2.670 2.670


2.658 9.20
10.00 759.244 756.758 2.646 2.646
2.625 10.00
20.00 759.254 756.810 2.604 2.604
2.596 10.00
30.00 759.289 756.862 2.587 2.587
2.544 10.00
40.00 759.254 756.914 2.500 2.500
2.490 2.20
42.20 759.244 756.925 2.479 2.479
2.475 0.80
15 43.00 759.240 756.930 2.470 2.470

TOTAL 43.00

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level ( a ) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level ( a ) TOP Bottm Level (c) +0.15+t (m) (m) (m)

13 0.00 759.145 756.289 3.016 3.016


3.016 0.80

0.80 759.150 756.293 3.017 3.017


3.008 9.20
10.00 759.180 756.341 2.999 2.999
2.983 10.00
20.00 759.200 756.393 2.967 2.967
2.933 10.00
30.00 759.185 756.445 2.900 2.900
2.871 10.00
40.00 759.180 756.497 2.843 2.843
2.817 10.00
50.00 759.180 756.549 2.791 2.791
2.765 10.00
60.00 759.180 756.601 2.739 2.739
2.725 10.00
70.00 759.205 756.653 2.712 2.712
2.689 10.00
80.00 759.210 756.705 2.665 2.665
2.663 0.80
80.80 759.210 756.709 2.661 2.661
2.661 0.80
14 81.60 759.214 756.713 2.661 2.661

TOTAL 81.60

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

12 0.00 759.127 756.104 3.183 3.183


3.181 0.80

0.80 759.127 756.108 3.179 3.179


3.147 9.20
10.00 759.110 756.156 3.114 3.114
3.092 10.00
20.00 759.117 756.208 3.069 3.069
3.056 10.00
30.00 759.142 756.260 3.042 3.042
3.032 4.80
34.80 759.147 756.285 3.022 3.022
3.019 0.80
13 35.60 759.145 756.289 3.016 3.016

TOTAL 35.60

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

11A 0.00 758.889 755.956 3.093 3.093


3.091 0.80

0.80 758.890 755.960 3.090 3.090


3.135 9.20
10.00 759.029 756.008 3.181 3.181
3.210 10.00
20.00 759.139 756.060 3.239 3.239
3.203 7.70
27.70 759.107 756.100 3.167 3.167
3.165 0.80
12 28.50 759.107 756.104 3.163 3.163

TOTAL 28.50

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

11 0.00 757.664 755.700 2.124 2.124


2.132 0.80

0.80 757.684 755.704 2.140 2.140


2.304 9.20
10.00 758.059 755.752 2.467 2.467
2.488 1.80
11.80 758.110 756.774 755.601 755.761 2.509 2.509
2.600 3.20
15.00 758.309 757.919 755.618 755.778 2.691 2.691
2.758 5.00
20.00 758.469 758.881 755.644 755.804 2.825 2.825
2.888 2.00
22.00 758.605 758.674 755.654 755.814 2.951 2.951
3.097 8.00
30.00 758.939 755.856 3.243 3.243
3.192 10.00
40.00 758.889 755.908 3.141 3.141
3.120 8.40
48.40 758.890 755.952 3.098 3.098
3.095 0.80
11A 49.20 758.889 755.956 3.093 3.093

TOTAL 49.20

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

10 0.00 757.021 755.530 1.651 1.651


1.648 0.80

0.80 757.020 755.534 1.646 1.646


1.617 9.20
10.00 757.011 755.582 1.589 1.589
1.688 10.00
20.00 757.261 755.634 1.787 1.787
1.946 10.00
30.00 757.631 755.686 2.105 2.105
2.111 1.95
31.95 757.654 755.696 2.118 2.118
2.121 0.80
11 32.75 757.664 755.700 2.124 2.124

TOTAL 32.75

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 757.906 756.040 2.026 2.026


2.023 0.80

0.80 757.904 756.044 2.020 2.020


2.002 9.20
10.00 757.916 756.092 1.984 1.984
1.956 10.00
20.00 757.911 756.144 1.927 1.927
1.898 10.00
30.00 757.906 756.196 1.870 1.870
1.839 10.00
40.00 757.896 756.248 1.808 1.808
1.761 9.20
49.20 757.850 756.296 1.714 1.714
1.715 0.80
6 50.00 757.856 756.300 1.716 1.716

TOTAL 50.00

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 752.879 751.879 749.890 749.730 3.309 3.309


3.314 1.20

1.20 752.889 751.889 749.891 749.731 3.318 3.318


3.303 8.80
10.00 752.869 751.869 749.902 749.742 3.287 3.287
3.301 10.00
20.00 752.909 751.909 749.914 749.754 3.315 3.315
3.344 10.00
30.00 752.979 751.979 749.926 749.766 3.373 3.373
3.352 10.00
40.00 752.949 751.949 749.938 749.778 3.331 3.331
3.329 10.00
50.00 752.956 751.956 749.950 749.790 3.326 3.326
3.340 8.60
58.60 752.994 751.994 749.960 749.800 3.354 3.354
3.353 1.20
2 59.80 752.994 751.994 749.962 749.802 3.352 3.352

TOTAL 59.80

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)
8 0.00 753.630 751.630 750.490 750.650 3.140 3.140
3.133 3.133

1.20 753.622 751.622 750.496 750.656 3.126 3.126


3.101 3.101
10.00 753.618 751.618 750.542 750.702 3.076 3.076
3.066 3.066
20.00 753.650 751.650 750.594 750.754 3.056 3.056
3.042 3.042
30.00 753.675 751.675 750.646 750.806 3.029 3.029
3.011 3.011
40.00 753.690 751.690 750.698 750.858 2.992 2.992
2.976 2.976
50.00 753.710 751.710 750.750 750.910 2.960 2.960
2.961 2.961
51.30 753.717 751.717 750.756 750.916 2.961 2.961
2.961 2.961
1 52.10 753.720 751.720 750.760 750.920 2.960 2.960
1.480

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.720 752.720 750.761 750.921 2.959 2.959


2.953 2.953

0.80 753.711 752.711 750.765 750.925 2.946 2.946


0.80 753.711 752.711 750.765 750.925 2.946 2.946
2.892 2.892
10.00 753.651 752.651 750.813 750.973 2.838 2.838
2.787 2.787
20.00 753.600 752.600 750.865 751.025 2.735 2.735
2.679 2.679
30.00 753.540 752.540 750.917 751.077 2.623 2.623
2.565 2.565
40.00 753.477 752.477 750.969 751.129 2.508 2.508
2.449 2.449
50.00 753.411 752.411 751.021 751.181 2.390 2.390
2.349 2.349
58.60 753.375 752.375 751.066 751.226 2.309 2.309
2.302 2.302
2 59.40 753.366 752.366 751.070 751.230 2.296 2.296
1.148

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.366 752.366 751.070 751.230 2.296 2.296


2.291 2.291

0.80 753.360 752.360 751.074 751.234 2.286 2.286


2.252 2.252
10.00 753.340 752.340 751.122 751.282 2.218 2.218
10.00 753.340 752.340 751.122 751.282 2.218 2.218
2.180 2.180
20.00 753.315 752.315 751.174 751.334 2.141 2.141
2.103 2.103
30.00 753.290 752.290 751.226 751.386 2.064 2.064
2.028 2.028
40.00 753.271 752.271 751.278 751.438 1.993 1.993
1.956 1.956
50.00 753.248 752.248 751.330 751.490 1.918 1.918
1.886 1.886
59.15 753.232 752.232 751.377 751.537 1.855 1.855
1.853 1.853
3 59.90 753.233 752.233 751.381 751.541 1.852 1.852
0.926

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

8 0.00 753.630 752.630 750.740 750.900 2.890 2.890


2.889 2.889

1.20 753.634 752.634 750.746 750.906 2.888 2.888


2.874 2.874
10.00 753.651 752.651 750.792 750.952 2.859 2.859
2.847 2.847
20.00 753.680 752.680 750.844 751.004 2.836 2.836
20.00 753.680 752.680 750.844 751.004 2.836 2.836
2.847 2.847
30.00 753.755 752.755 750.896 751.056 2.859 2.859
2.847 2.847
40.00 753.782 752.782 750.948 751.108 2.834 2.834
2.832 2.832
50.00 753.830 752.830 751.000 751.160 2.830 2.830
2.831 2.831
52.05 753.843 752.843 751.011 751.171 2.832 2.832
2.834 2.834
1 52.85 753.851 752.851 751.015 751.175 2.836 2.836
1.418

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.851 752.851 751.015 751.175 2.836 2.836


2.840 2.840

0.80 753.862 752.862 751.019 751.179 2.843 2.843


2.833 2.833
10.00 753.890 752.890 751.067 751.227 2.823 2.823
2.814 2.814
20.00 753.925 752.925 751.119 751.279 2.806 2.806
2.797 2.797
30.00 753.960 752.960 751.171 751.331 2.789 2.789
30.00 753.960 752.960 751.171 751.331 2.789 2.789
2.778 2.778
40.00 753.991 752.991 751.223 751.383 2.768 2.768
2.758 2.758
50.00 754.022 753.022 751.275 751.435 2.747 2.747
2.747 2.747
51.95 754.032 753.032 751.285 751.445 2.747 2.747
2.749 2.749
2 52.75 754.040 753.040 751.289 751.449 2.751 2.751
1.376

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.040 752.040 751.289 751.449 2.751 2.751


2.745 2.744

0.80 754.031 752.031 751.293 751.453 2.738 2.738


2.699 2.699
10.00 754.002 752.002 751.341 751.501 2.661 2.661
2.619 2.619
20.00 753.970 751.970 751.393 751.553 2.577 2.577
2.537 2.537
30.00 753.942 751.942 751.445 751.605 2.497 2.497
2.452 2.452
40.00 753.905 751.905 751.497 751.657 2.408 2.408
40.00 753.905 751.905 751.497 751.657 2.408 2.408
2.365 2.365
50.00 753.870 751.870 751.549 751.709 2.321 2.321
2.282 2.282
60.00 753.844 751.844 751.601 751.761 2.243 2.243
2.208 2.208
68.25 753.816 751.816 751.644 751.804 2.172 2.172
2.166 2.166
3 69.05 753.807 751.807 751.648 751.808 2.159 2.159

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 753.807 751.807 751.648 751.808 2.159 2.159


2.153 2.153

0.80 753.800 751.800 751.652 751.812 2.148 2.148


2.121 2.121
10.00 753.795 751.795 751.700 751.860 2.095 2.095
2.066 2.066
20.00 753.790 751.790 751.752 751.912 2.038 2.038
2.007 2.007
30.00 753.780 751.780 751.804 751.964 1.976 1.976
1.947 1.947
40.00 753.775 751.775 751.856 752.016 1.919 1.919
1.890 1.890
50.00 753.768 751.768 751.908 752.068 1.860 1.860
50.00 753.768 751.768 751.908 752.068 1.860 1.860
1.836 1.836
57.70 753.760 751.760 751.948 752.108 1.812 1.812
1.808 1.808
4 58.50 753.756 751.756 751.952 752.112 1.804 1.804
0.902

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 753.166 752.166 750.210 750.370 2.956 2.956


2.957 2.957

1.20 753.174 752.174 750.216 750.376 2.958 2.958


2.948 2.948
10.00 753.200 752.200 750.262 750.422 2.938 2.938
2.927 2.927
20.00 753.231 752.231 750.314 750.474 2.917 2.917
2.912 2.912
30.00 753.272 752.272 750.366 750.526 2.906 2.906
2.900 2.900
40.00 753.311 752.311 750.418 750.578 2.893 2.893
2.884 2.884
50.00 753.344 752.344 750.470 750.630 2.874 2.874
2.875 2.875
52.04 753.356 752.356 750.481 750.641 2.875 2.875
52.04 753.356 752.356 750.481 750.641 2.875 2.875
2.876 2.876
1 52.84 753.362 752.362 750.485 750.645 2.877 2.877
1.439

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.362 752.362 750.485 750.645 2.877 2.877


2.876 2.876

0.80 753.364 752.364 750.489 750.649 2.875 2.875


2.859 2.859
10.00 753.380 752.380 750.537 750.697 2.843 2.843
2.825 2.825
20.00 753.396 752.396 750.589 750.749 2.807 2.807
2.788 2.788
30.00 753.411 752.411 750.641 750.801 2.770 2.770
2.749 2.749
40.00 753.422 752.422 750.693 750.853 2.729 2.729
2.709 2.709
50.00 753.434 752.434 750.745 750.905 2.689 2.689
2.692 2.691
50.95 753.444 752.444 750.750 750.910 2.694 2.694
2.693 2.693
2 51.75 753.446 752.446 750.754 750.914 2.692 2.692
2 51.75 753.446 752.446 750.754 750.914 2.692 2.692

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.446 752.266 750.754 750.914 2.692 2.692


2.687 2.687

0.80 753.440 752.260 750.758 750.918 2.682 2.682


2.643 2.643
10.00 753.410 752.230 750.806 750.966 2.604 2.604
2.565 2.565
20.00 753.385 752.205 750.858 751.018 2.527 2.527
2.438 2.438
30.00 753.260 752.080 750.910 751.070 2.350 2.350
2.314 2.314
40.00 753.241 752.061 750.962 751.122 2.279 2.279
2.240 2.240
50.00 753.214 752.034 751.014 751.174 2.200 2.200
2.209 2.209
60.00 753.283 752.103 751.066 751.226 2.217 2.217
2.189 2.189
68.80 753.272 752.092 751.112 751.272 2.160 2.160
2.157 2.157
3 69.60 753.269 752.089 751.116 751.276 2.153 2.153
3 69.60 753.269 752.089 751.116 751.276 2.153 2.153

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 753.269 752.069 751.116 751.276 2.153 2.153


2.150 2.150

0.80 753.267 752.067 751.120 751.280 2.147 2.147


2.118 2.118
10.00 753.257 752.057 751.168 751.328 2.089 2.089
2.057 2.057
20.00 753.245 752.045 751.220 751.380 2.025 2.025
1.992 1.992
30.00 753.232 752.032 751.272 751.432 1.960 1.960
1.930 1.930
40.00 753.224 752.024 751.324 751.484 1.900 1.900
1.868 1.868
50.00 753.211 752.011 751.376 751.536 1.835 1.835
1.807 1.807
59.70 753.205 752.005 751.426 751.586 1.779 1.779
1.776 1.776
4 60.50 753.202 752.002 751.430 751.590 1.772 1.772
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

14 0.00 754.800 752.800 751.320 751.480 3.480 3.480


3.480 3.480

0.80 754.805 752.805 751.324 751.484 3.481 3.481


3.479 3.479
10.00 754.850 752.850 751.372 751.532 3.478 3.478
3.472 3.472
20.00 754.890 752.890 751.424 751.584 3.466 3.466
3.460 3.460
30.00 754.930 752.930 751.476 751.636 3.454 3.454
3.453 3.453
40.00 754.980 752.980 751.528 751.688 3.452 3.452
3.434 3.434
50.00 754.995 752.995 751.580 751.740 3.415 3.415
3.416 3.416
50.75 755.000 753.000 751.583 751.743 3.417 3.417
3.416 3.416
1 51.55 755.004 753.004 751.588 751.748 3.416 3.416
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 755.004 753.004 751.588 751.748 3.416 3.416


3.396 3.396

0.80 754.968 752.968 751.592 751.752 3.376 3.376


3.347 3.347
10.00 754.958 752.958 751.640 751.800 3.318 3.318
3.285 3.285
20.00 754.943 752.943 751.692 751.852 3.251 3.251
3.228 3.228
30.00 754.949 752.949 751.744 751.904 3.205 3.205
3.173 3.173
40.00 754.938 752.938 751.796 751.956 3.142 3.142
3.131 3.131
50.00 754.968 752.968 751.848 752.008 3.120 3.120
3.123 3.123
2 50.80 754.978 752.978 751.852 752.012 3.126 3.126
1.563
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.978 752.978 751.852 752.012 3.126 3.126


3.117 3.117

0.80 754.963 752.963 751.856 752.016 3.107 3.107


3.056 3.056
10.00 754.908 752.908 751.904 752.064 3.004 3.004
2.953 2.953
20.00 754.858 752.858 751.956 752.116 2.902 2.902
2.846 2.846
30.00 754.798 752.798 752.008 752.168 2.790 2.790
2.742 2.742
40.00 754.755 752.755 752.060 752.220 2.695 2.695
2.620 2.620
50.00 754.658 752.658 752.112 752.272 2.546 2.546
2.473 2.473
60.00 754.563 752.563 752.164 752.324 2.399 2.399
2.371 2.371
68.10 754.548 752.548 752.206 752.366 2.342 2.342
2.338 2.338
3 68.90 754.543 752.543 752.210 752.370 2.333 2.333
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 754.543 752.543 752.210 752.370 2.333 2.333


2.333 2.333

0.80 754.548 752.548 752.214 752.374 2.334 2.334


2.275 2.275
10.00 754.478 752.478 752.262 752.422 2.216 2.216
2.180 2.180
20.00 754.458 752.458 752.314 752.474 2.144 2.144
2.078 2.078
30.00 754.378 752.378 752.366 752.526 2.012 2.012
1.951 1.951
40.00 754.308 752.308 752.418 752.578 1.890 1.890
1.864 1.864
50.00 754.308 752.308 752.470 752.630 1.838 1.838
1.833 1.833
55.96 754.328 752.328 752.501 752.661 1.827 1.827
1.823 1.823
4 56.76 754.323 752.323 752.505 752.665 1.818 1.818
0.909
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 753.841 752.130 2.161 2.161


2.014 2.014

0.80 753.840 752.134 1.866 1.866


1.842 1.842
10.00 753.839 752.182 1.817 1.817
1.810 1.810
20.00 753.877 752.234 1.803 1.803
1.783 1.783
30.00 753.889 752.286 1.763 1.763
1.755 1.755
40.00 753.924 752.338 1.746 1.746
1.725 1.725
50.00 753.935 752.390 1.705 1.705
1.706 1.706
52.50 753.950 752.403 1.707 1.707
1.852 1.852
4 53.30 753.954 752.407 1.997 1.997
0.998

0.000

0.000

0.000
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.925 752.370 2.005 2.005


1.849 1.849

0.80 753.920 752.386 1.694 1.694


1.651 1.651
10.00 754.020 752.572 1.608 1.608
1.555 1.554
20.00 754.115 752.774 1.501 1.501
1.526 1.526
29.20 754.350 752.959 1.551 1.551
1.696 1.696
1 30.00 754.367 752.976 1.841 1.841
0.920

0.000

0.000

0.000

0.000

0.000

0.000

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.797 751.930 2.317 2.317


2.172 2.172

0.80 753.800 751.934 2.026 2.026


2.053 2.053
10.00 753.902 751.982 2.080 2.080
2.121 2.121
20.00 754.035 752.034 2.161 2.161
2.142 2.142
30.00 754.050 752.086 2.124 2.124
2.140 2.140
40.00 754.135 752.138 2.157 2.157
2.178 2.178
50.00 754.229 752.190 2.199 2.199
2.205 2.205
60.00 754.292 752.242 2.210 2.210
2.187 2.187
70.00 754.297 752.294 2.163 2.163
2.154 2.154
76.00 754.310 752.325 2.145 2.145
2.294 2.294
1 76.80 754.322 752.329 2.443 2.443
1.222

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.322 752.329 2.443 2.443


2.300 2.300

0.80 754.330 752.333 2.157 2.157


2.172 2.172
10.00 754.407 752.381 2.186 2.186
2.160 2.160
20.00 754.407 752.433 2.134 2.134
2.123 2.123
30.00 754.437 752.485 2.112 2.112
2.111 2.111
40.00 754.487 752.537 2.110 2.110
2.103 2.103
50.00 754.525 752.589 2.096 2.096
2.093 2.093
60.00 754.572 752.641 2.091 2.091
2.073 2.073
70.00 754.587 752.693 2.054 2.054
2.061 2.061
77.50 754.640 752.732 2.068 2.068
2.217 2.217
2 78.30 754.652 752.736 2.366 2.366
1.183

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 753.841 752.130 2.161 2.161


2.009 2.009

0.80 753.830 752.134 1.856 1.856


1.828 1.828
10.00 753.828 752.188 1.800 1.800
1.793 1.793
20.00 753.872 752.246 1.786 1.786
1.796 1.796
30.00 753.950 752.304 1.806 1.806
1.805 1.805
40.00 754.005 752.362 1.803 1.803
1.739 1.739
50.00 753.935 752.420 1.675 1.675
1.626 1.626
60.00 753.895 752.478 1.577 1.577
1.576 1.576
70.00 753.950 752.536 1.574 1.574
1.560 1.560
80.00 753.980 752.594 1.546 1.546
1.692 1.692
1 80.80 753.985 752.598 1.837 1.837

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.985 752.598 1.837 1.837


1.693 1.693

0.80 753.990 752.602 1.548 1.548


1.515 1.515
10.00 753.980 752.659 1.481 1.481
1.468 1.468
20.00 754.015 752.720 1.455 1.455
1.450 1.450
30.00 754.065 752.781 1.444 1.444
1.427 1.427
40.00 754.091 752.842 1.409 1.409
1.418 1.418
50.00 754.170 752.903 1.427 1.427
1.416 1.416
60.00 754.210 752.964 1.406 1.406
1.431 1.431
70.00 754.320 753.025 1.455 1.455
1.470 1.470
78.20 754.400 753.075 1.485 1.485
1.635 1.635
2 79.00 754.415 753.079 1.786 1.786
0.893

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)
20 0.00 753.876 752.070 2.256 2.256
2.032 2.032

0.80 753.724 752.076 1.808 1.808


1.971 1.971
10.00 754.119 752.145 2.134 2.134
2.029 2.029
20.00 753.984 752.220 1.924 1.924
2.132 2.132
30.00 754.474 752.295 2.339 2.339
2.502 2.502
40.00 754.874 752.370 2.664 2.664
2.596 2.596
50.00 754.814 752.445 2.529 2.529
2.507 2.506
60.00 754.844 752.520 2.484 2.484
2.452 2.452
70.00 754.854 752.595 2.419 2.419
2.357 2.357
80.00 754.804 752.670 2.294 2.294
2.291 2.291
87.70 754.854 752.727 2.287 2.287
2.429 2.429
1 88.50 754.854 752.734 2.570 2.570
1.285

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.854 * 752.734 2.570 2.570


2.411 2.411

0.80 754.831 752.738 2.253 2.253


0.80 754.831 752.738 2.253 2.253
2.222 2.222
10.00 754.816 752.786 2.190 2.190
2.154 2.154
20.00 754.796 752.838 2.118 2.118
2.045 2.045
30.00 754.701 752.890 1.971 1.971
1.933 1.933
40.00 754.676 752.942 1.894 1.894
1.868 1.868
50.00 754.676 752.994 1.842 1.842
1.806 1.806
60.00 754.656 753.046 1.770 1.770
1.769 1.769
61.20 754.660 753.052 1.768 1.768
1.913 1.913
2 62.00 754.665 * 753.056 2.059 2.059

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 755.890 * 754.220 2.120 2.120


1.979 1.979

0.80 755.902 754.224 1.838 1.838


1.834 1.834
10.00 755.942 754.272 1.830 1.830
10.00 755.942 754.272 1.830 1.830
1.817 1.816
20.00 755.967 754.324 1.803 1.803
1.770 1.770
30.00 755.952 754.376 1.736 1.736
1.720 1.720
40.00 755.972 754.428 1.704 1.704
1.728 1.728
50.00 756.072 754.480 1.752 1.752
1.776 1.776
60.00 756.172 754.532 1.800 1.800
1.945 1.945
2 60.80 756.175 * 754.536 2.089 2.089

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 755.865 * 754.220 2.095 2.095


1.953 1.953

0.80 755.875 754.224 1.811 1.811


1.886 1.886
10.00 756.074 754.272 1.962 1.962
10.00 756.074 754.272 1.962 1.962
2.033 2.033
20.00 756.268 754.324 2.104 2.104
2.187 2.187
30.00 756.485 754.376 2.269 2.269
2.282 2.282
40.00 756.562 754.428 2.294 2.294
2.271 2.271
50.00 756.569 754.480 2.249 2.249
2.243 2.243
55.00 756.584 754.506 2.238 2.238
2.379 2.379
1 55.80 756.580 * 754.510 2.520 2.520

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 756.580 * 754.510 2.520 2.520


2.378 2.378

0.80 756.589 754.514 2.235 2.235


2.270 2.270
10.00 756.706 754.562 2.304 2.304
2.247 2.247
20.00 756.644 754.614 2.190 2.190
20.00 756.644 754.614 2.190 2.190
2.126 2.126
30.00 756.569 754.666 2.063 2.063
1.972 1.972
40.00 756.439 754.718 1.881 1.881
1.813 1.813
50.00 756.354 754.770 1.744 1.744
1.732 1.732
53.70 756.349 754.789 1.720 1.720
1.863 1.863
2 54.50 756.349 * 754.793 2.006 2.006

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.854 * 752.734 2.570 2.570


2.411 2.411

0.80 754.831 752.738 2.253 2.253


2.222 2.222
10.00 754.816 752.786 2.190 2.190
2.154 2.154
20.00 754.796 752.838 2.118 2.118
2.045 2.045
30.00 754.701 752.890 1.971 1.971
1.933 1.933
1.933 1.933
40.00 754.676 752.942 1.894 1.894
1.868 1.868
50.00 754.676 752.994 1.842 1.842
1.806 1.806
60.00 754.656 753.046 1.770 1.770
1.769 1.769
61.20 754.660 753.052 1.768 1.768
1.913 1.913
2 62.00 754.665 * 753.056 2.059 2.059

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 755.890 * 754.220 2.120 2.120


1.979 1.979

0.80 755.902 754.224 1.838 1.838


1.834 1.834
10.00 755.942 754.272 1.830 1.830
1.817 1.816
20.00 755.967 754.324 1.803 1.803
1.770 1.770
30.00 755.952 754.376 1.736 1.736
1.720 1.720
40.00 755.972 754.428 1.704 1.704
1.728 1.728
1.728 1.728
50.00 756.072 754.480 1.752 1.752
1.776 1.776
60.00 756.172 754.532 1.800 1.800
1.945 1.945
2 60.80 756.175 * 754.536 2.089 2.089

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 755.865 * 754.220 2.095 2.095


1.953 1.953

0.80 755.875 754.224 1.811 1.811


1.886 1.886
10.00 756.074 754.272 1.962 1.962
2.033 2.033
20.00 756.268 754.324 2.104 2.104
2.187 2.187
30.00 756.485 754.376 2.269 2.269
2.282 2.282
40.00 756.562 754.428 2.294 2.294
2.271 2.271
2.271 2.271
50.00 756.569 754.480 2.249 2.249
2.243 2.243
55.00 756.584 754.506 2.238 2.238
2.379 2.379
1 55.80 756.580 * 754.510 2.520 2.520

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 756.580 * 754.510 2.520 2.520


2.378 2.378

0.80 756.589 754.514 2.235 2.235


2.270 2.270
10.00 756.706 754.562 2.304 2.304
2.247 2.247
20.00 756.644 754.614 2.190 2.190
2.126 2.126
30.00 756.569 754.666 2.063 2.063
1.972 1.972
40.00 756.439 754.718 1.881 1.881
1.813 1.813
50.00 756.354 754.770 1.744 1.744
1.732 1.732
1.732 1.732
53.70 756.349 754.789 1.720 1.720
1.863 1.863
2 54.50 756.349 * 754.793 2.006 2.006

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

2 0.00 756.175 * 754.536 2.089 2.089


1.936 1.936

0.80 756.179 754.556 1.783 1.783


1.720 1.720
10.00 756.284 754.786 1.658 1.658
1.636 1.636
20.00 756.489 755.036 1.613 1.613
1.638 1.638
30.00 756.789 755.286 1.663 1.663
1.712 1.712
39.50 757.124 755.523 1.761 1.761
1.899 1.899
3 40.30 757.131 * 755.543 2.038 2.038
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

3 0.00 757.131 * 755.543 2.038 2.038


1.939 1.939

0.80 757.227 755.546 1.841 1.841


1.971 1.971
10.00 757.522 755.581 2.101 2.101
2.141 2.141
15.90 757.624 755.603 2.181 2.181
2.330 2.330
4 16.70 757.634 755.606 2.478 2.478
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

4 0.00 757.634 * 755.606 2.478 2.478


2.351 2.351

0.80 757.672 755.609 2.223 2.223


2.170 2.170
10.00 757.600 755.644 2.116 2.116
2.078 2.078
20.00 757.562 755.682 2.040 2.040
2.045 2.045
30.00 757.609 755.720 2.049 2.049
2.062 2.062
40.00 757.672 755.758 2.074 2.074
2.088 2.088
45.00 757.719 755.777 2.102 2.102
2.248 2.248
4A 45.80 757.723 * 755.780 2.393 2.393
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

4A 0.00 757.723 * 755.780 2.393 2.393


2.248 2.248

0.80 757.727 755.783 2.104 2.104


2.089 2.089
10.00 757.732 755.818 2.074 2.074
2.076 2.076
20.00 757.774 755.856 2.078 2.078
2.098 2.098
30.00 757.852 755.894 2.118 2.118
2.139 2.139
40.00 757.932 755.932 2.160 2.160
2.156 2.155
50.00 757.962 755.971 2.151 2.151
2.127 2.127
60.00 757.952 756.009 2.103 2.103
2.080 2.080
67.40 757.934 756.037 2.057 2.057
2.186 2.186
5 68.20 757.906 * 756.040 2.316 2.316
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.812 * 753.350 1.912 1.912


1.755 1.755

0.80 754.798 753.359 1.599 1.599


1.549 1.549
10.00 754.813 753.474 1.499 1.499
1.473 1.473
20.00 754.883 753.597 1.446 1.446
1.404 1.404
30.00 754.923 753.721 1.362 1.362
1.363 1.363
40.00 755.048 753.844 1.364 1.364
1.355 1.355
50.00 755.153 753.968 1.345 1.345
1.339 1.339
60.00 755.263 754.091 1.332 1.332
1.331 1.331
60.70 755.269 754.100 1.329 1.329
1.471 1.471
2 61.50 755.273 * 754.110 1.613 1.613
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 754.812 * 753.35 1.912 1.912


1.7615 1.762
0.8 754.816 753.365 1.611 1.611
1.531 1.531
10 754.829 753.538 1.451 1.451
1.3835 1.383
20 754.882 753.726 1.316 1.316
1.332 1.332
30 755.102 753.914 1.348 1.348
1.274 1.274
40 755.142 754.102 1.2 1.2
1.322 1.322
50 755.574 754.29 1.444 1.444
1.4165 1.417
60 755.707 754.478 1.389 1.389
1.4225 1.422
70 755.962 754.666 1.456 1.456
1.371 1.371
80 755.98 754.854 1.286 1.286
1.3165 1.316
87.15 756.175 754.988 1.347 1.347
1.5055 1.505
1 87.95 756.217 * 755.003 1.664 1.664
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 756.217 * 755.003 1.664 1.664


1.561 1.561
0.8 756.32 755.022 1.458 1.458
1.5115 1.511
10 756.643 755.238 1.565 1.565
1.5275 1.527
20 756.803 755.473 1.49 1.49
1.4635 1.463
30 756.985 755.708 1.437 1.437
1.4045 1.404
40 757.155 755.943 1.372 1.372
1.4515 1.451
43.1 757.387 756.016 1.531 1.531
1.7505 1.750
2 43.9 757.555 * 756.035 1.97 1.97
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 754.876 * 753.16 2.166 2.166


2.025 2.025
0.8 754.895 753.171 1.884 1.884
1.874 1.874
10 755.008 753.304 1.864 1.864
1.8595 1.860
20 755.143 753.448 1.855 1.855
1.8465 1.847
30 755.27 753.592 1.838 1.838
1.8285 1.828
40 755.395 753.736 1.819 1.819
1.8295 1.829
50 755.56 753.88 1.84 1.84
1.933 1.933
60 755.89 754.024 2.026 2.026
2.07 2.070
70 756.122 754.168 2.114 2.114
2.148 2.148
73.9 756.251 754.229 2.182 2.182
2.342 2.342
4 74.7 756.292 * 754.24 2.502 2.502
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

4 0 756.292 * 754.24 2.502 2.502


2.363 2.363
0.8 756.33 754.266 2.224 2.224
2.1745 2.175
10 756.535 754.57 2.125 2.125
2.105 2.105
20 756.825 754.9 2.085 2.085
2.1025 2.103
30 757.19 755.23 2.12 2.12
2.1175 2.118
40 757.515 755.56 2.115 2.115
2.16 2.160
50 757.935 755.89 2.205 2.205
2.2255 2.225
60 758.306 756.22 2.246 2.246
2.2535 2.254
63 758.42 756.319 2.261 2.261
2.398 2.398
5 63.8 758.43 * 756.345 2.535 2.535

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

9 0 756.987 * 755.35 2.087 2.087


1.9505 1.950
0.8 757.007 755.353 1.814 1.814
1.8165 1.816
10 757.052 755.393 1.819 1.819
1.8275 1.827
20 757.112 755.436 1.836 1.836
1.7485 1.748
30 756.98 755.479 1.661 1.661
1.628 1.628
40 756.957 755.522 1.595 1.595
1.607 1.607
41 756.985 755.526 1.619 1.619
1.78 1.780
10 41.8 757.021 * 755.53 1.941 1.941

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

4 0 755.329 * 753.526 2.253 2.253


2.107 2.107
0.8 755.331 753.53 1.961 1.961
1.938 1.938
10 755.333 753.578 1.915 1.915
0.9115 0.912
20 755.378 755.63 -0.092 -0.092
0.877 0.877
30 755.368 753.682 1.846 1.846
1.82 1.820
40 755.368 753.734 1.794 1.794
1.7695 1.770
50 755.371 753.786 1.745 1.745
1.7305 1.731
57 755.378 753.822 1.716 1.716
1.8605 1.861
5 57.8 755.382 * 753.827 2.005 2.005

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

5 0 755.382 * 753.826 2.006 2.006


1.8685 1.868
0.8 755.401 753.83 1.731 1.731
1.7295 1.729
5 755.42 753.852 1.728 1.728
1.72 1.720
8.6 755.423 753.871 1.712 1.712
1.858 1.858
6 9.4 755.429 753.875 2.004 2.004

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

6 0 755.429 * 753.875 2.004 2.004


1.854 1.854
0.8 755.423 753.879 1.704 1.704
1.6875 1.687
10 755.438 753.927 1.671 1.671
1.6585 1.658
20 755.465 753.979 1.646 1.646
1.6015 1.602
30 755.428 754.031 1.557 1.557
1.5585 1.559
40 755.483 754.083 1.56 1.56
1.5575 1.557
43.3 755.495 754.1 1.555 1.555
1.6995 1.699
7 44.1 755.498 * 754.104 1.844 1.844

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

7 0 755.498 * 754.104 1.844 1.844


1.7035 1.704
0.8 755.511 754.108 1.563 1.563
1.561 1.561
10 755.555 754.156 1.559 1.559
1.5505 1.550
20 755.59 754.208 1.542 1.542
1.531 1.531
30 755.62 754.26 1.52 1.52
1.506 1.506
40 755.644 754.312 1.492 1.492
1.501 1.501
40.8 755.666 754.316 1.51 1.51
1.65 1.650
8 41.6 755.66 754.32 1.79 1.79

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

4 0 755.329 * 753.526 2.253 2.253


2.108 2.108
0.8 755.333 753.53 1.963 1.963
1.9595 1.960
5.6 755.351 753.555 1.956 1.956
2.1035 2.104
1 6.4 755.36 753.559 2.251 2.251
1.1255

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 755.36 * 753.559 2.251 2.251


2.109 2.109
0.8 755.37 753.563 1.967 1.967
1.9575 1.958
10 755.399 753.611 1.948 1.948
1.9275 1.927
20 755.41 753.663 1.907 1.907
1.9075 1.908
22.2 755.422 753.674 1.908 1.908
2.0545 2.055
2 23 755.43 753.679 2.201 2.201

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

2 0 755.43 * 753.679 2.201 2.201


2.055 2.055
0.8 755.432 753.683 1.909 1.909
1.889 1.889
10 755.44 753.731 1.869 1.869
1.847 1.847
20 755.448 753.783 1.825 1.825
1.7935 1.794
30 755.455 753.853 1.762 1.762
1.752 1.752
40 755.469 753.887 1.742 1.742
1.7315 1.732
44.3 755.47 753.909 1.721 1.721
1.8685 1.869
3 45.1 755.48 * 753.914 2.016 2.016

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 755.48 * 753.914 2.016 2.016


1.8795 1.880
0.8 755.501 753.918 1.743 1.743
1.7635 1.764
10 755.59 753.966 1.784 1.784
1.803 1.803
20 755.68 754.018 1.822 1.822
1.828 1.828
29.5 755.741 754.067 1.834 1.834
1.981 1.981
4 30.3 755.75 754.072 2.128 2.128

TOTAL

Project: TABUK SEWAGE NETWORK (SIXTH STAGE)


Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth
1 0 754.87 * 752.99 2.33 2.33
2.198 2.198
0.8 754.9 752.994 2.066 2.066
2.0825 2.082
10 754.981 753.042 2.099 2.099
2.088 2.088
17.8 755 753.083 2.077 2.077
2.225 2.225
2 18.6 755.01 * 753.087 2.373 2.373

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 755.01 * 753.087 2.373 2.373


2.231 2.231
2.231 2.231
0.8 755.02 753.091 2.089 2.089
2.095 2.095
10 755.08 753.139 2.101 2.101
2.105 2.105
20 755.14 753.191 2.109 2.109
2.113 2.113
30 755.2 753.243 2.117 2.117
2.116 2.116
40 755.25 753.295 2.115 2.115
2.1135 2.114
46.7 755.282 753.33 2.112 2.112
2.259 2.259
2 47.5 755.29 * 753.334 2.406 2.406
1.203

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 755.23 * 753.338 2.342 2.342


2.1975 2.198
0.8 755.235 753.342 2.053 2.053
2.0365 2.037
2.0365 2.037
10 755.25 753.39 2.02 2.02
2.021 2.021
11.8 755.261 753.399 2.022 2.022
2.169 2.169
1 12.6 755.27 * 753.404 2.316 2.316

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 755.27 * 753.404 2.316 2.316


2.1725 2.173
0.8 755.277 753.408 2.029 2.029
2.009 2.009
10 755.285 753.456 1.989 1.989
1.9705 1.970
1.9705 1.970
20 755.3 753.508 1.952 1.952
1.931 1.931
30 755.31 753.56 1.91 1.91
1.896 1.896
37.8 755.323 753.601 1.882 1.882
2.0235 2.024
2 38.6 755.32 * 753.605 2.165 2.165

TOTAL

Project: TABUK SEWAGE NETWORK (SIXTH STAGE)


Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 755.55 * 753.474 2.526 2.526


2.377 2.377
0.8 755.546 753.478 2.228 2.228
2.201 2.201
10 755.54 753.526 2.174 2.174
2.144 2.144
20 755.532 753.578 2.114 2.114
2.087 2.087
30 755.53 753.63 2.06 2.06
30 755.53 753.63 2.06 2.06
2.024 2.024
40 755.51 753.682 1.988 1.988
1.9685 1.968
50 755.523 753.734 1.949 1.949
1.9285 1.929
60 755.534 753.786 1.908 1.908
1.891 1.891
69.7 755.55 753.836 1.874 1.874
2.0215 2.021
1 70.5 755.56 * 753.841 2.169 2.169

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 755.56 * 753.841 2.169 2.169


2.0285 2.028
0.8 755.573 753.845 1.888 1.888
1.878 1.878
10 755.601 753.893 1.868 1.868
1.8615 1.861
20 755.64 753.945 1.855 1.855
1.8555 1.855
25.8 755.671 753.975 1.856 1.856
2.0035 2.003
2 26.6 755.68 * 753.979 2.151 2.151
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 755.55 * 753.474 2.526 2.526


2.387 2.387
0.8 755.566 753.478 2.248 2.248
2.296 2.296
10 755.71 753.526 2.344 2.344
2.388 2.388
20 755.85 753.578 2.432 2.432
2.476 2.476
30 755.99 753.63 2.52 2.52
2.5655 2.566
40 756.133 753.682 2.611 2.611
2.6335 2.634
50 756.23 753.734 2.656 2.656
2.6625 2.663
52.3 756.255 753.746 2.669 2.669
2.8195 2.820
4 53.1 756.27 * 753.75 2.97 2.97
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

4 0 756.27 * 753.75 2.97 2.97


2.832 2.832
0.8 756.288 753.754 2.694 2.694
2.7715 2.771
10 756.491 753.802 2.849 2.849
2.9025 2.902
20 756.65 753.854 2.956 2.956
3.0265 3.026
30 756.843 753.906 3.097 3.097
3.1445 3.145
40 756.99 753.958 3.192 3.192
3.203 3.203
43.4 757.03 753.976 3.214 3.214
3.367 3.367
5 44.2 757.05 * 753.98 3.52 3.52

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

5 0 757.05 * 753.98 3.52 3.52


3.383 3.383
0.8 757.07 753.984 3.246 3.246
3.287 3.287
10 757.2 754.032 3.328 3.328
3.377 3.377
20 757.35 754.084 3.426 3.426
3.52 3.520
30 757.59 754.136 3.614 3.614
3.709 3.709
39.7 757.83 754.186 3.804 3.804
3.9665 3.966
6 40.5 757.87 * 754.191 4.129 4.129

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

6 0 759.42 * 756.879 2.991 2.991


2.4635 2.463
0.8 759.43 757.654 1.936 1.936
1.93 1.930
10 759.466 757.702 1.924 1.924
1.911 1.911
20 759.492 757.754 1.898 1.898
1.891 1.891
30 759.53 757.806 1.884 1.884
1.878 1.878
40 759.57 757.858 1.872 1.872
1.8735 1.874
40.45 759.575 757.86 1.875 1.875
2.02 2.020
7 41.25 759.58 * 757.865 2.165 2.165

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

7 0 759.58 * 757.865 2.165 2.165


2.023 2.023
7 0 759.58 * 757.865 2.165 2.165
2.023 2.023
0.8 759.59 757.869 1.881 1.881
1.873 1.873
10 759.622 757.917 1.865 1.865
1.855 1.855
20 759.654 757.969 1.845 1.845
1.837 1.837
30 759.69 758.021 1.829 1.829
1.828 1.828
32.25 759.7 758.033 1.827 1.827
1.975 1.975
8 33.05 759.71 * 758.037 2.123 2.123

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

8 0 759.71 * 758.037 2.123 2.123


1.986 1.986
0.8 759.73 758.041 1.849 1.849
1.8465 1.846
10 759.773 758.089 1.844 1.844
1.8425 1.843
20 759.822 758.141 1.841 1.841
20 759.822 758.141 1.841 1.841
1.836 1.836
27.3 759.85 758.179 1.831 1.831
1.979 1.979
9 28.1 759.86 * 758.183 2.127 2.127

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

9 0 759.86 * 758.183 2.127 2.127


1.99 1.990
0.8 759.88 758.187 1.853 1.853
1.854 1.854
10 759.93 758.235 1.855 1.855
1.8545 1.854
20 759.981 758.287 1.854 1.854
1.8525 1.852
30 760.03 758.339 1.851 1.851
1.839 1.839
40.3 760.06 758.393 1.827 1.827
1.975 1.975
10 41.1 760.07 * 758.397 2.123 2.123
10 41.1 760.07 * 758.397 2.123 2.123

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 759.3 * 757.435 2.315 2.315


2.1735 2.174
0.8 759.311 757.439 2.032 2.032
2.0245 2.025
10 759.344 757.487 2.017 2.017
2.0125 2.013
20 759.387 757.539 2.008 2.008
2.005 2.005
30 759.433 757.591 2.002 2.002
1.9945 1.994
40 759.47 757.643 1.987 1.987
1.9805 1.980
46.45 759.491 757.677 1.974 1.974
2.1215 2.121
2 47.25 759.5 * 757.681 2.269 2.269
1.1345

0
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

24 0 754.798 * 752.692 2.556 2.556


2.36 2.36
0.8 754.8 752.796 2.164 2.164
2.1505 2.15
10 754.821 752.844 2.137 2.137
2.118 2.118
20 754.835 752.896 2.099 2.099
2.0805 2.081
30 754.85 752.948 2.062 2.062
2.046 2.046
40 754.87 753 2.03 2.03
2.016 2.016
50 754.894 753.052 2.002 2.002
1.9835 1.983
58.5 754.901 753.096 1.965 1.965
2.1125 2.112
1 59.3 754.91 * 753.1 2.26 2.26
1.13
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

13 0 759.145 * 756.289 3.306 3.306


3.1585 3.159
0.8 759.148 756.297 3.011 3.011
2.971 2.971
10 759.16 756.389 2.931 2.931
2.894 2.894
20 759.186 756.489 2.857 2.857
2.8 2.800
30 759.172 756.589 2.743 2.743
2.6845 2.684
40 759.155 756.689 2.626 2.626
2.5845 2.585
46.8 759.14 756.757 2.543 2.543
2.6795 2.680
A1 47.6 759.131 * 756.765 2.816 2.816
1.408

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

A1 0 759.131 * 756.765 2.816 2.816


2.6715 2.671
0.8 759.14 756.773 2.527 2.527
2.4945 2.494
10 759.167 756.865 2.462 2.462
2.4195 2.420
20 759.182 756.965 2.377 2.377
2.34 2.340
30 759.208 757.065 2.303 2.303
2.259 2.259
40 759.22 757.165 2.215 2.215
2.1875 2.188
46.8 759.233 757.233 2.16 2.16
2.3045 2.305
A2 47.6 759.24 757.241 2.449 2.449

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep
M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

5 0 759.24 * 756.662 3.028 3.028


2.5995 2.599
0.8 759.236 757.225 2.171 2.171
2.1565 2.156
10 759.262 757.28 2.142 2.142
2.1265 2.127
20 759.291 757.34 2.111 2.111
2.092 2.092
30 759.313 757.4 2.073 2.073
2.0465 2.047
40 759.32 757.46 2.02 2.02
2.005 2.005
50 759.35 757.52 1.99 1.99
1.975 1.975
60 759.38 757.58 1.96 1.96
1.959 1.959
60.5 759.381 757.583 1.958 1.958
2.105 2.105
1 61.3 759.39 * 757.588 2.252 2.252

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1A 0 755.962 * 754.328 2.084 2.084


1.946 1.946
0.8 755.98 754.332 1.808 1.808
0.8 755.98 754.332 1.808 1.808
1.799 1.799
10 756.01 754.38 1.79 1.79
1.7875 1.788
20 756.057 754.432 1.785 1.785
1.776 1.776
30 756.091 754.484 1.767 1.767
1.7615 1.761
40 756.132 754.536 1.756 1.756
1.7515 1.752
50 756.175 754.588 1.747 1.747
1.751 1.751
51 756.188 754.593 1.755 1.755
1.903 1.903
2 51.8 756.198 754.597 2.051 2.051

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

7 0 757.87 * 754.394 3.926 3.926


3.77 3.770
0.8 757.852 754.398 3.614 3.614
3.486 3.486
10 757.644 754.446 3.358 3.358
3.225 3.225
20 757.43 754.498 3.092 3.092
2.9645 2.964
30 757.227 754.55 2.837 2.837
2.7065 2.707
2.7065 2.707
40 757.018 754.602 2.576 2.576
2.4875 2.488
49.4 756.89 754.651 2.399 2.399
2.5195 2.520
8 50.2 756.84 * 754.65 2.64 2.64

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

15 0 759.24 * 756.93 2.76 2.76


2.6195 2.620
0.8 759.255 756.936 2.479 2.479
2.47 2.470
10 759.311 757.01 2.461 2.461
2.4505 2.451
20 759.37 757.09 2.44 2.44
2.4315 2.432
30 759.433 757.17 2.423 2.423
2.4145 2.415
40 759.496 757.25 2.406 2.406
2.393 2.393
50 759.55 757.33 2.38 2.38
2.365 2.365
60 759.6 757.41 2.35 2.35
2.328 2.328
69.4 759.631 757.485 2.306 2.306
69.4 759.631 757.485 2.306 2.306
2.452 2.452
1 70.2 759.64 757.492 2.598 2.598

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.: 300 mm
mi) LINE TRUNK-K MH 25 to MH 26 PIPE THICKNESS 9 mm
LENGTH (C-C): 97.80 m SLOPE 0.0153
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m )
3

EXCAVATION
1.039 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
11.661
6.01 - 8.00

12.675
ROCK EXCAVATION

13.130
BEDDING
PIPE DIA 300 mm
13.655

PIPING
14.610
PIPE DIA 300 mm

16.090
ASPHALT
PIPE DIA 300 mm
18.295

CONC. TILES
20.000 1.845
PIPE DIA.

20.000 6.810
Demolitiion Septic t

14.000 7.801
Const Temp. Sepic Ta

1.600 1.028

156.76 17.48 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE TRUNK-K MH 26 to MH 27 PIPE THICKNESS 9 mm
LENGTH (C-C): 24.20 m SLOPE 0.0110
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.085 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 1.858
6.01 - 8.00

20.000 3.265
ROCK EXCAVATION

6.800 1.250
BEDDING
PIPE DIA 200 mm
1.600 0.301

PIPING
PIPE DIA 200 mm

ASPHALT
PIPE DIA 200 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

48.40 6.76 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE TRUNK-K MH 27 to MH 28 PIPE THICKNESS 9 mm
LENGTH (C-C): 63.40 m SLOPE 0.0180
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.304 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 3.114
6.01 - 8.00

20.000 2.680
ROCK EXCAVATION

20.000 1.770
BEDDING
PIPE DIA 200 mm
20.000 0.815

PIPING
19.910
PIPE DIA 200 mm

18.855
ASPHALT
PIPE DIA 200 mm
4.723

CONC. TILES
1.439
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

124.93 8.68 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE TRUNK-K MH 28 to MH 29 PIPE THICKNESS 9 mm
LENGTH (C-C): 46.40 m SLOPE 0.0120
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.445 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
16.689
6.01 - 8.00

17.965
ROCK EXCAVATION

17.510
BEDDING
PIPE DIA 200 mm
16.960

PIPING
9.285
PIPE DIA 200 mm

1.311
ASPHALT
PIPE DIA 200 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

81.16 0.00 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 29-1 MH 2 to MH 3 PIPE THICKNESS 9 mm
LENGTH (C-C): 85.10 m SLOPE 0.0212
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.054 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
12.116
6.01 - 8.00

12.850
ROCK EXCAVATION

12.630
BEDDING
PIPE DIA 200 mm
12.810

PIPING
12.690
PIPE DIA 200 mm

12.720
ASPHALT
PIPE DIA 200 mm
13.200

CONC. TILES
13.805
PIPE DIA.

6.160
Demolitiion Septic t

1.163
Const Temp. Sepic Ta

111.20 0.00 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 29-1 MH 3 to MH 4 PIPE THICKNESS 9 mm
LENGTH (C-C): 57.00 m SLOPE 0.0300
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.158 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
13.271
6.01 - 8.00

14.410
ROCK EXCAVATION

14.135
BEDDING
PIPE DIA 200 mm
13.860

PIPING
13.810
PIPE DIA 200 mm

8.550
ASPHALT
PIPE DIA 200 mm
1.097

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

80.29 0.00 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 29-1 MH 4 to MH 5 PIPE THICKNESS 9 mm
LENGTH (C-C): 61.95 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.092 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
13.648
6.01 - 8.00

16.800
ROCK EXCAVATION

18.480
BEDDING
PIPE DIA 200 mm
20.000 0.110

PIPING
20.000 1.540
PIPE DIA 200 mm

20.000 2.770
ASPHALT
PIPE DIA 200 mm
2.300 0.389

CONC. TILES
1.600 0.278
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

113.92 5.09 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 15 to MH 16 PIPE THICKNESS 9 mm
LENGTH (C-C): 60.00 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.374 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 4.066
6.01 - 8.00

20.000 3.770
ROCK EXCAVATION

20.000 3.075
BEDDING
PIPE DIA 250 mm
20.000 2.280

PIPING
20.000 1.560
PIPE DIA 250 mm

18.400 1.113
ASPHALT
PIPE DIA 250 mm
1.600 0.086

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

120.00 16.32 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 14 to MH 15 PIPE THICKNESS 9 mm
LENGTH (C-C): 43.00 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.535 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 6.054
6.01 - 8.00

20.000 6.250
ROCK EXCAVATION

20.000 5.955
BEDDING
PIPE DIA 250 mm
20.000 5.435

PIPING
4.400 1.077
PIPE DIA 250 mm

1.600 0.380
ASPHALT
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

86.00 25.69 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 13 to MH 14 PIPE THICKNESS 9 mm
LENGTH (C-C): 81.60 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.813 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 9.274
6.01 - 8.00

20.000 9.830
ROCK EXCAVATION

20.000 9.335
BEDDING
PIPE DIA 250 mm
20.000 8.715

PIPING
20.000 8.170
PIPE DIA 250 mm

20.000 7.650
ASPHALT
PIPE DIA 250 mm
20.000 7.255

CONC. TILES
20.000 6.885
PIPE DIA.

1.600 0.530
Demolitiion Septic t

1.600 0.529
Const Temp. Sepic Ta

163.20 68.99 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 13 to MH 12 PIPE THICKNESS 9 mm
LENGTH (C-C): 35.60 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.945 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 10.548
6.01 - 8.00

20.000 10.915
ROCK EXCAVATION

20.000 10.555
BEDDING
PIPE DIA 250 mm
9.600 4.954

PIPING
1.600 0.815
PIPE DIA 250 mm

ASPHALT
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

71.20 38.73 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 11A to MH 12 PIPE THICKNESS 9 mm
LENGTH (C-C): 28.50 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.873 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 10.447
6.01 - 8.00

20.000 12.100
ROCK EXCAVATION

15.400 9.263
BEDDING
PIPE DIA 200 mm
1.600 0.932

PIPING
PIPE DIA 200 mm

ASPHALT
PIPE DIA 200 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

57.00 33.61 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 11 to MH 11A PIPE THICKNESS 9 mm
LENGTH (C-C): 49.20 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.106 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 2.792
6.01 - 8.00

3.600 0.878
ROCK EXCAVATION
1.173
6.400 1.920 1.737 3.20 0.65 3.613
BEDDING
2.301
PIPE DIA 200 mm
10.000 3.790 2.769 5.00 0.65 8.999
3.237
PIPING
4.000 1.776 3.1285 2.00 0.65 4.067
PIPE DIA 200 mm
3.020
16.000 8.776
ASPHALT
PIPE DIA 200 mm
20.000 11.920

CONC. TILES
16.800 9.404
PIPE DIA.

1.600 0.876
Demolitiion Septic t

Const Temp. Sepic Ta

98.40 42.24 0.00 0.00 16.68

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30 MH 10 to MH 11 PIPE THICKNESS 9 mm
LENGTH (C-C): 32.75 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.319 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
14.881
6.01 - 8.00

16.880
ROCK EXCAVATION

19.460
BEDDING
PIPE DIA 200 mm
3.900 0.217

PIPING
1.600 0.097
PIPE DIA 200 mm

ASPHALT
PIPE DIA 200 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

58.04 0.31 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 200 mm
mi) LINE K 30-1 MH 5 to MH 6 PIPE THICKNESS 9 mm
LENGTH (C-C): 50.00 m SLOPE 0.0052
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.600 0.018 0.00 - 2.00
2.01 - 4.00
4.01 - 6.00
18.400 0.018
6.01 - 8.00

19.555
ROCK EXCAVATION

18.985
BEDDING
PIPE DIA 200 mm
18.390

PIPING
16.201
PIPE DIA 200 mm

1.372
ASPHALT
PIPE DIA 200 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

94.50 0.04 0.00 0.00 0.000

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 1 to MH 2 PIPE THICKNESS 16 mm
LENGTH (C-C): 59.80 m SLOPE 0.0012
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.989
2.400 1.576 1.9935 1.20 1.05 2.512 0.00 - 2.00
2.01 - 4.00
1.998
4.01 - 6.00
17.600 11.462 1.9825 8.80 1.05 18.318
6.01 - 8.00
1.967
20.000 13.010 1.981 10.00 1.05 20.801
ROCK EXCAVATION
1.995
20.000 13.440 2.024 10.00 1.05 21.252
BEDDING
2.053
PIPE DIA 600 mm
20.000 13.520 2.032 10.00 1.05 21.336
2.011
PIPING
20.000 13.285 2.0085 10.00 1.05 21.089
PIPE DIA 600 mm
2.006
17.200 11.524 2.02 8.60 1.05 18.241
ASPHALT
2.034
PIPE DIA 600 mm
2.400 1.624 2.033 1.20 1.05 2.562
2.032
CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

119.60 79.44 0.00 0.00 126.110

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K6 MH 8 to MH 1 PIPE THICKNESS
LENGTH (C-C): 52.10 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
1.140
1.20 2.400 1.360 1.133 1.133 1.20 0.65

1.126
8.80 17.600 9.689 1.101 1.101 8.80 0.65
1.076
10.00 20.000 10.660 1.066 1.066 10.00 0.65
1.056
10.00 20.000 10.420 1.042 1.042 10.00 0.65
1.029
10.00 20.000 10.110 1.010 1.010 10.00 0.65
0.992
10.00 20.000 9.760 0.976 0.976 10.00 0.65
0.960
1.30 2.600 1.249 0.960 0.960 1.30 0.65
0.961
0.80 1.600 0.769 0.960 0.960 0.80 0.65
0.960

52.10 104.200 54.017 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 6 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 59.40 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.959
0.80 1.600 0.762 1.952 1.952 0.80 0.65

1.946
1.946
9.20 18.400 8.206 1.892 1.892 9.20 0.65
1.838
10.00 20.000 7.870 1.786 1.786 10.00 0.65
1.735
10.00 20.000 6.790 1.679 1.679 10.00 0.65
1.623
10.00 20.000 5.650 1.565 1.565 10.00 0.65
1.508
10.00 20.000 4.490 1.449 1.449 10.00 0.65
1.390
8.60 17.200 3.001 1.349 1.349 8.60 0.65
1.309
0.80 1.600 0.242 1.302 1.302 0.80 0.65
1.296

59.40 118.800 37.012 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 6 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 59.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.296
0.80 1.600 0.233 1.291 1.291 0.80 0.65

1.286
9.20 18.400 2.318 1.252 1.252 9.20 0.65
1.218
1.218
10.00 20.000 1.800 1.180 1.180 10.00 0.65
1.141
10.00 20.000 1.030 1.103 1.103 10.00 0.65
1.064
10.00 20.000 0.280 1.028 1.028 10.00 0.65
0.993
10.00 19.560 0.955 0.955 10.00 0.65
0.918
9.15 17.257 0.886 0.886 9.15 0.65
0.855
0.75 1.390 0.853 0.853 0.75 0.65
0.852

59.90 118.207 5.661 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 5 MH 8 to MH 1 PIPE THICKNESS
LENGTH (C-C): 52.85 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.890
1.20 2.400 1.067 1.889 1.889 1.20 0.65

1.888
8.80 17.600 7.691 1.873 1.873 8.80 0.65
1.859
10.00 20.000 8.470 1.847 1.847 10.00 0.65
1.836
1.836
10.00 20.000 8.470 1.847 1.847 10.00 0.65
1.859
10.00 20.000 8.470 1.847 1.846 10.00 0.65
1.834
10.00 20.000 8.320 1.832 1.832 10.00 0.65
1.830
2.05 4.100 1.704 1.831 1.831 2.05 0.65
1.832
0.80 1.600 0.667 1.834 1.834 0.80 0.65
1.836

52.85 105.700 44.859 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 5 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 52.75 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.836
0.80 1.600 0.672 1.839 1.839 0.80 0.65

1.843
9.20 18.400 7.664 1.833 1.833 9.20 0.65
1.823
10.00 20.000 8.140 1.814 1.814 10.00 0.65
1.806
10.00 20.000 7.970 1.797 1.797 10.00 0.65
1.789
1.789
10.00 20.000 7.780 1.778 1.778 10.00 0.65
1.768
10.00 20.000 7.580 1.758 1.757 10.00 0.65
1.747
1.95 3.900 1.457 1.747 1.747 1.95 0.65
1.747
0.80 1.600 0.599 1.749 1.749 0.80 0.65
1.751

52.75 105.500 41.861 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 5 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 69.05 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.751
0.80 1.600 0.595 0.744 0.744 0.80 0.65

0.738
9.20 18.400 6.431 0.699 0.699 9.20 0.65
0.661
10.00 20.000 6.190 0.619 0.619 10.00 0.65
0.577
10.00 20.000 5.370 0.537 0.537 10.00 0.65
0.497
10.00 20.000 4.520 0.452 0.452 10.00 0.65
0.408
0.408
10.00 20.000 3.650 0.364 0.364 10.00 0.65
0.321
10.00 20.000 2.820 0.282 0.282 10.00 0.65
0.243
8.25 16.500 1.716 0.208 0.208 8.25 0.65
0.172
0.80 1.600 0.133 0.166 0.166 0.80 0.65
0.159

69.05 138.100 31.425 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 5 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 58.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.159
0.80 1.600 0.122 0.153 0.153 0.80 0.65

0.148
9.20 18.400 1.113 0.121 0.121 9.20 0.65
0.095
10.00 20.000 0.660 0.066 0.066 10.00 0.65
0.038
10.00 20.000 0.070 0.019

10.00 19.470 0.000

10.00 18.900 0.000


7.70 14.137 0.000

0.80 1.446 0.000

58.50 113.954 1.966 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 3 MH 6 to MH 1 PIPE THICKNESS
LENGTH (C-C): 52.84 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.956
1.20 2.400 1.148 1.957 1.957 1.20 0.65

1.958
8.80 17.600 8.342 1.948 1.948 8.80 0.65
1.938
10.00 20.000 9.270 1.927 1.927 10.00 0.65
1.917
10.00 20.000 9.120 1.911 1.911 10.00 0.65
1.906
10.00 20.000 9.000 1.900 1.900 10.00 0.65
1.893
10.00 20.000 8.840 1.884 1.884 10.00 0.65
1.874
2.04 4.080 1.785 1.875 1.875 2.04 0.65
1.875
1.875
0.80 1.600 0.701 1.876 1.876 0.80 0.65
1.877

52.84 105.680 48.207 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 3 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 51.75 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.877
0.80 1.600 0.701 1.876 1.876 0.80 0.65

1.875
9.20 18.400 7.903 1.859 1.859 9.20 0.65
1.843
10.00 20.000 8.250 1.825 1.825 10.00 0.65
1.807
10.00 20.000 7.880 1.788 1.788 10.00 0.65
1.770
10.00 20.000 7.490 1.749 1.749 10.00 0.65
1.729
10.00 20.000 7.090 1.709 1.709 10.00 0.65
1.689
0.95 1.900 0.656 1.691 1.691 0.95 0.65
1.694
0.80 1.600 0.554 1.693 1.693 0.80 0.65
1.692
1.692

51.75 103.500 40.524 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 3 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 69.60 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.512
0.80 1.600 0.550 1.507 1.507 0.80 0.65

1.502
9.20 18.400 5.916 1.463 1.463 9.20 0.65
1.424
10.00 20.000 5.650 1.385 1.385 10.00 0.65
1.347
10.00 20.000 4.380 1.258 1.258 10.00 0.65
1.170
10.00 20.000 3.140 1.135 1.135 10.00 0.65
1.099
10.00 20.000 2.400 1.060 1.060 10.00 0.65
1.020
10.00 20.000 2.090 1.029 1.029 10.00 0.65
1.037
8.80 17.600 1.663 1.009 1.009 8.80 0.65
0.980
0.80 1.600 0.126 0.977 0.977 0.80 0.65
0.973
0.973

69.60 139.200 25.914 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 3 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 60.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.953
0.80 1.600 0.120 0.950 0.950 0.80 0.65

0.947
9.20 18.400 1.086 0.918 0.918 9.20 0.65
0.889
10.00 20.000 0.570 0.857 0.857 10.00 0.65
0.825
10.00 19.920 0.792 0.792 10.00 0.65
0.760
10.00 19.300 0.730 0.730 10.00 0.65
0.700
10.00 18.680 0.667 0.667 10.00 0.65
0.635
9.70 17.528 0.607 0.607 9.70 0.65
0.579
0.80 1.421 0.575 0.575 0.80 0.65
0.572
60.50 116.849 1.776 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 17 MH 14 to MH 1 PIPE THICKNESS
LENGTH (C-C): 51.55 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.480
0.80 1.600 1.184 1.480 1.480 0.80 0.65

1.481
9.20 18.400 13.607 1.479 1.479 9.20 0.65
1.478
10.00 20.000 14.720 1.472 1.472 10.00 0.65
1.466
10.00 20.000 1.460 1.460 10.00 0.65
1.454
10.00 20.000 1.453 1.453 10.00 0.65
1.452
10.00 20.000 1.433 1.433 10.00 0.65
1.415
0.75 1.500 1.416 1.416 0.75 0.65
1.417
0.80 1.600 1.416 1.416 0.80 0.65
1.416
51.55 103.100 29.511 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 17 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 50.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.416
0.80 1.600 1.117 1.396 1.396 0.80 0.65

1.376
9.20 18.400 12.392 1.347 1.347 9.20 0.65
1.318
10.00 20.000 12.850 1.284 1.284 10.00 0.65
1.251
10.00 20.000 12.280 1.228 1.228 10.00 0.65
1.205
10.00 20.000 11.730 1.173 1.173 10.00 0.65
1.142
10.00 20.000 11.310 1.131 1.131 10.00 0.65
1.120
0.80 1.600 0.898 1.123 1.123 0.80 0.65
1.126
0.563
50.80 101.600 62.578 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 17 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 68.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.126
0.80 1.600 0.894 1.116 1.116 0.80 0.65

1.107
9.20 18.400 9.715 1.056 1.055 9.20 0.65
1.004
10.00 20.000 9.530 0.953 0.953 10.00 0.65
0.902
10.00 20.000 8.460 0.846 0.846 10.00 0.65
0.790
10.00 20.000 7.420 0.742 0.742 10.00 0.65
0.695
10.00 20.000 6.200 0.620 0.620 10.00 0.65
0.546
10.00 20.000 4.730 0.472 0.472 10.00 0.65
0.399
8.10 16.200 3.005 0.370 0.370 8.10 0.65
0.342
0.80 1.600 0.270 0.337 0.337 0.80 0.65
0.333
68.90 137.800 50.224 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 17 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 56.76 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.333
0.80 1.600 0.266 0.333 0.333 0.80 0.65

0.334
9.20 18.400 2.530 0.275 0.275 9.20 0.65
0.216
10.00 20.000 1.800 0.180 0.180 10.00 0.65
0.144
10.00 20.000 0.780 0.078 0.078 10.00 0.65
0.012
10.00 19.510 0.006

10.00 18.640 0.000

5.96 10.925 0.000

0.80 1.458 0.000

0.000
56.76 110.533 5.376 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 53.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.011 0.000

9.20 16.946 0.000

10.00 18.100 0.000

10.00 17.830 0.000

10.00 17.550 0.000

10.00 17.250 0.000

2.50 4.265 0.000

0.80 1.482 0.000


53.30 95.023 0.011 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25-1 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 30.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.479 0.000

9.20 15.189 0.000

10.00 15.540 0.000

9.20 14.039 0.000

0.80 1.357 0.000

0.000

0.000

0.000

30.00 47.604 0.000 0.000 0.000


Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25-2 MH 2 to MH 1 PIPE THICKNESS
LENGTH (C-C): 76.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.138 0.000

9.20 18.400 0.488 0.000

10.00 20.000 1.210 0.000

10.00 20.000 1.420 0.000

10.00 20.000 1.400 0.000

10.00 20.000 1.780 0.000

10.00 20.000 2.050 0.000

10.00 20.000 1.870 0.000

6.00 12.000 0.924

0.80 1.600 0.235

76.80 153.600 11.514 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25-2 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 78.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.240 0.000

9.20 18.400 1.582 0.000

10.00 20.000 1.600 0.000

10.00 20.000 1.230 0.000

10.00 20.000 1.110 0.000

10.00 20.000 1.030 0.000

10.00 20.000 0.930 0.000

10.00 20.000 0.730 0.000

7.50 15.000 0.458

0.80 1.600 0.174

78.30 156.600 9.084 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25-3 MH 3 to MH 1 PIPE THICKNESS
LENGTH (C-C): 80.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.007 0.000

9.20 16.818 0.000

10.00 17.930 0.000

10.00 17.960 0.000

10.00 18.050 0.000

10.00 17.390 0.000

10.00 16.260 0.000

10.00 15.760 0.000

10.00 15.600 0.000

0.80 1.354

80.80 138.721 0.007 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25-3 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 79.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.354 0.000

9.20 13.938 0.000

10.00 14.680 0.000

10.00 14.500 0.000

10.00 14.270 0.000

10.00 14.180 0.000

10.00 14.160 0.000

10.00 14.310 0.000

8.20 12.054

0.80 1.308

79.00 114.754 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 27 MH 20 to MH 1 PIPE THICKNESS
LENGTH (C-C): 88.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
0.80 1.600 0.026

9.20 18.133

10.00 20.000 0.290

10.00 20.000 1.320

10.00 20.000 5.020

10.00 20.000 5.960

10.00 20.000 5.060

10.00 20.000 4.520

10.00 20.000 3.570

7.70 15.400 2.241

0.80 1.600 0.343

88.50 176.733 28.350 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 27 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 62.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.329


9.20 18.400 2.042

10.00 20.000 1.540

10.00 20.000 0.450

10.00 19.330

10.00 18.680

10.00 18.060

1.20 2.123

0.80 1.530

62.000 119.723 4.361 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 60.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.583

9.20 16.873
10.00 18.160

10.00 17.700

10.00 17.200

10.00 17.280

10.00 17.760

0.80 1.556

60.800 108.112 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-2 MH 7 to MH 1 PIPE THICKNESS
LENGTH (C-C): 55.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.562

9.20 17.351
10.00 20.000 0.330

10.00 20.000 1.870

10.00 20.000 2.820

10.00 20.000 2.710

5.00 10.000 1.215

0.80 1.600 0.303

55.800 110.514 9.248 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-2 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 54.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.302

9.20 18.400 2.484

10.00 20.000 2.470


10.00 20.000 1.260

10.00 19.720

10.00 18.130

3.70 6.408

0.80 1.490

54.500 105.748 6.516 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 27 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 62.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.329

9.20 18.400 2.042

10.00 20.000 1.540

10.00 20.000 0.450

10.00 19.330
10.00 19.330

10.00 18.680

10.00 18.060

1.20 2.123

0.80 1.530

62.000 119.723 4.361 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 60.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.583

9.20 16.873

10.00 18.160

10.00 17.700

10.00 17.200

10.00 17.280
10.00 17.280

10.00 17.760

0.80 1.556

60.800 108.112 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-2 MH 7 to MH 1 PIPE THICKNESS
LENGTH (C-C): 55.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.562

9.20 17.351

10.00 20.000 0.330

10.00 20.000 1.870

10.00 20.000 2.820

10.00 20.000 2.710


10.00 20.000 2.710

5.00 10.000 1.215

0.80 1.600 0.303

55.800 110.514 9.248 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-2 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 54.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.302

9.20 18.400 2.484

10.00 20.000 2.470

10.00 20.000 1.260

10.00 19.720

10.00 18.130

3.70 6.408
3.70 6.408

0.80 1.490

54.500 105.748 6.516 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 40.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth (m Depth
(m) - 2.0 ( m2 ) (m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.549

9.20 15.824

10.00 16.360

10.00 16.380

9.50 16.264

0.80 1.519
40.300 67.896 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 16.70 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m )
2
(m) (m) (m)
( m2 ) ( m2 ) ( m2 ) ) (m)

0.80 1.551

9.20 18.133

5.90 11.800 0.832

0.80 1.600 0.264


16.700 33.084 1.096 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 4 to MH 4A PIPE THICKNESS
LENGTH (C-C): 45.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth (m Depth
(m) - 2.0 ( m2 ) (m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.600 0.281

9.20 18.400 1.564

10.00 20.000 0.780

10.00 20.000 0.450

10.00 20.000 0.620

5.00 10.000 0.440

0.80 1.600 0.198


45.800 91.600 4.333 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 4A to MH 5 PIPE THICKNESS
LENGTH (C-C): 68.20 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m )
2
(m) (m) (m)
( m2 ) ( m2 ) ( m2 ) ) (m)

0.80 1.600 0.198

9.20 18.400 0.819

10.00 20.000 0.760

10.00 20.000 0.980

10.00 20.000 1.390

10.00 20.000 1.550

10.00 20.000 1.270

7.40 14.800 0.592

0.80 1.600 0.149


68.200 136.400 7.708 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K29-1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 61.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.404 0.000

9.20 14.251 0.000

10.00 14.730 0.000

10.00 14.040 0.000

10.00 13.630 0.000

10.00 13.550 0.000

10.00 13.390 0.000

0.70 0.932 0.000

0.80 1.177 0.000


61.500 87.104 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K29-1-1 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 87.95 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.4096

9.2 14.0852

10 13.83

10 13.32

10 12.74

10 13.22

10 14.17

10 14.22

10 13.71

7.15 9.4094

0.8 1.204
87.95 121.3182 0 0 0

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K29-1-1 MH 1 to MH2 PIPE THICKNESS
LENGTH (C-C): 43.9 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.2488

9.2 13.9012

10 15.27

10 14.63

10 14.04

3.1 4.4981

0.8 1.4
43.9 64.9881 0 0 0

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 29 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 74.7 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.02

9.2 17.2408

10 18.6

10 18.47

10 18.28

10 18.29

10 19.33

10 20 0.7

3.9 7.8 0.5772

0.8 1.6 0.2736


74.7 141.2108 1.5708 0 0

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 29 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 63.8 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.2904

9.2 18.4 1.61

10 20 1.05

10 20 1.03

10 20 1.18

10 20 1.6

10 20 2.25

3 6 0.762

0.8 1.6 0.3184

63.8 127.6 10.09 0 0


Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 30 MH 9 to MH 10 PIPE THICKNESS
LENGTH (C-C): 41.80 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.56

9.2 16.7072

10 18.27

10 17.48

10 16.28

1 1.607

0.8 1.424

41.8 73.3282
Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 57.80 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.0856

9.2 17.8296 0

10 9.12 0

10 8.77 0

10 18.2 0

10 17.7 0

7 12.117 0

0.8 1.4888 0

57.8 86.826 0.0856

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 9.40 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.4944

4.2 7.2618

3.6 6.192

0.8 1.4864

9.4 16.434

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 6 to MH 7 PIPE THICKNESS
LENGTH (C-C): 44.10 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.4832

9.2 15.5204

10 16.58

10 16.02

10 15.59

3.3 5.1381

0.8 1.3592

44.1 71.69

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 7 to MH 8 PIPE THICKNESS
LENGTH (C-C): 41.60 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.3632

9.2 14.3612

10 15.5

10 15.31

10 15.06

0.8 1.2008

0.8 1.32

41.6 64.1152

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-4 MH 4 to MH 1 PIPE THICKNESS
LENGTH (C-C): 6.40 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.0864

4.8 9.408 0

0.8 1.6 0.0832

6.4 12.608 0.169

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-4 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 23.00 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.0872

9.2 18.0136 0

10 19.27 0

2.2 4.1976 0

0.8 1.6 0.044

23 44.682 0.1312

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-4 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 45.10 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.044

9.2 17.3788 0

10 18.47 0

10 17.94 0

10 17.52 0

4.3 7.4476 0

0.8 1.4952 0

45.1 81.8516 0.044

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-4 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 30.30 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.504

9.2 16.2288

10 18.03

9.5 17.366

0.8 1.5848

30.3 54.7136

AREA ABU SABAA PIPE DIA.:


i) LINE K 31-1 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 18.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m
0.8 1.6 0.1584

9.2 18.4 0.7544

7.8 15.6 0.6864

0.8 1.6 0.18

18.6 37.2 1.778

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 -1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 47.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.1848


0.8 1.6 0.1848

9.2 18.4 0.874

10 20 1.05

10 20 1.13

10 20 1.16

6.7 13.4 0.7638

0.8 1.6 0.2072

47.5 95 5.3698

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-3 MH 3 to MH 1 PIPE THICKNESS
LENGTH (C-C): 12.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.1584

9.2 18.4 0.3404


9.2 18.4 0.3404

1.8 3.6 0.0378

0.8 1.6 0.1352

12.6 25.2 0.671

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-3 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 38.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.1384

9.2 18.4 0.0828

10 19.7 0
10 19.7 0

10 19.31 0

7.8 14.7888 0

0.8 1.6 0.0192

38.6 75.3988 0.2404

AREA ABU SABAA PIPE DIA.:


i) LINE K 31-2.1 MH 3 to MH 1 PIPE THICKNESS
LENGTH (C-C): 70.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.3016

9.2 18.4 1.8492

10 20 1.44

10 20 0.87
10 20 0.24

10 19.68

10 19.29

9.7 18.3427

0.8 1.6 0.0168

70.5 138.9127 4.7176

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-2.1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 26.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.0224

9.2 17.2776

10 18.61

5.8 10.759

0.8 1.6 0.0024


26.6 49.8466 0.024

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31.2 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 53.10 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.3096

9.2 18.4 2.7232

10 20 3.88

10 20 4.76

10 20 5.66

10 20 6.34

2.3 4.6 1.5249

0.8 1.6 0.656


53.1 106.2 25.8537

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-2 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 44.20 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.6656

9.2 18.4 7.0932

10 20 9.02

10 20 10.26

10 20 11.45

3.4 6.8 4.0902

0.8 1.6 1.0936

44.2 88.4 43.6726


Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-2 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 40.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 1.1064

9.2 18.4 11.8404

10 20 13.77

10 20 15.2

9.7 19.4 16.5773

0.8 1.6 1.5728

40.5 81 60.066

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 6 to MH 7 PIPE THICKNESS
LENGTH (C-C): 41.25 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.37

9.2 17.756

10 19.11

10 18.91

10 18.78

0.45 0.843

0.8 1.6 0.016

41.25 78.599 0.386 0 0

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 7 to MH 8 PIPE THICKNESS
LENGTH (C-C): 33.05 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.018


0.8 1.6 0.018

9.2 17.232

10 18.55

10 18.37

2.25 4.113

0.8 1.58

33.05 61.445 0.018 0 0

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 8 to MH 9 PIPE THICKNESS
LENGTH (C-C): 28.10 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.589

9.2 16.983

10 18.43
7.3 13.403

0.8 1.583

28.1 51.988 0 0 0

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 9 to MH 10 PIPE THICKNESS
LENGTH (C-C): 41.10 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.592

9.2 17.057

10 18.54

10 18.52

10.3 18.942

0.8 1.58
41.1 76.231 0 0 0

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33-2 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 47.25 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.139

9.2 18.4 0.23

10 20 0.13

10 20 0.05

10 19.94

6.45 12.771

0.8 1.6 0.097


47.25 94.311 0.646 0 0

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K32 MH 24 to MH 1 PIPE THICKNESS
LENGTH (C-C): 59.30 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.288

9.2 18.4 1.38

10 20 1.18

10 20 0.81

10 20 0.46

10 20 0.16

8.5 16.856

0.8 1.6 0.09


59.3 118.456 4.368 0 0

Approved by:
AREA APO SAPAA PIPE DIA.:
i) LINE k30.3 MH 13 to MH A1 PIPE THICKNESS
LENGTH (C-C): 47.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.6 0.927

9.2 18.4 8.933

10 20 8.94

10 20 8

10 20 6.84

6.8 13.6 3.978

0.8 1.6 0.544

47.6 95.2 38.162 0 0

Approved by:
AREA APO SAPAA PIPE DIA.:
i) LINE K30-3 MHA1 TO A2 PIPE THICKNESS
LENGTH (C-C): 47.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.6 0.537

9.2 18.4 4.545

10 20 4.2

10 20 3.4

10 20 2.59

6.8 13.6 1.278

0.8 1.6 0.244

47.6 95.2 16.794 0 0

Approved by:
AREA APO SAPAA PIPE DIA.:
i) LINE k33.3 MH 5 to MH 1 PIPE THICKNESS
LENGTH (C-C): 61.30 m SLOPE
ROCK EXCAVATION
Length ( m Area 0.00 - Area
2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.6 0.479

9.2 18.4 1.435

10 20 1.27

10 20 0.92

10 20 0.47

10 20 0.05

10 19.75

0.5 0.98

0.8 1.6 0.084

61.3 122.33 4.708

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K30.1-1 MH 1A to MH 1 PIPE THICKNESS
LENGTH (C-C): 51.800 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.557
9.2 16.551

10 17.88

10 17.76

10 17.61

10 17.52

1 1.751

0.8 1.5224

51.8 92.1514 0 0 0

Approved by:
AREA APO SAPAA PIPE DIA.:
i) LINE K31.2 MH 7 to MH 8 PIPE THICKNESS
LENGTH (C-C): 50.20 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.6 1.416

9.2 18.4 13.671

10 20 12.25

10 20 9.64

10 20 7.07
10 20 7.07

9.4 18.8 4.587

0.8 1.6 0.416

50.2 100.4 49.05 0 0

Approved by:
AREA APO SAPAA PIPE DIA.:
i) LINE K30.4 MH 15 to MH 1 PIPE THICKNESS
LENGTH (C-C): 70.20 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Area
- 6.0 ( 6.01 m2 ) Area
- 8.0 ( 8.01 ( m2 )Ave
- 10.0 10.01 - 12.0
Depth )
( m2Length ( m Width ( m

0.8 1.6 0.496

9.2 18.4 4.324

10 20 4.51

10 20 4.32

10 20 4.15

10 20 3.93

10 20 3.65

9.4 18.8 3.083


0.8 1.6 0.362

70.2 140.4 28.825 0 0


ASPHALT THICKNES 70 mm

SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 156.76
2.01 - 4.00 m2 17.48
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 300 mm m 96.20

PIPING
PIPE DIA 300 mm m 96.60

ASPHALT
PIPE DIA 300 mm m 97.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 48.40
2.01 - 4.00 m2 6.76
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 22.60

PIPING
PIPE DIA 200 mm m 23.00

ASPHALT
PIPE DIA 200 mm m 24.20

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 124.93
2.01 - 4.00 m2 8.68
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 61.80

PIPING
PIPE DIA 200 mm m 62.20

ASPHALT
PIPE DIA 200 mm m 63.40

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 81.16
2.01 - 4.00 m2 0.00
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 44.80

PIPING
PIPE DIA 200 mm m 45.20

ASPHALT
PIPE DIA 200 mm m 46.40

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 111.20
2.01 - 4.00 m2 0.00
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 83.50

PIPING
PIPE DIA 200 mm m 83.90

ASPHALT
PIPE DIA 200 mm m 85.10

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 80.29
2.01 - 4.00 m2 0.00
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 55.40

PIPING
PIPE DIA 200 mm m 55.80

ASPHALT
PIPE DIA 200 mm m 57.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 113.92
2.01 - 4.00 m2 5.09
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 60.35

PIPING
PIPE DIA 200 mm m 60.75

ASPHALT
PIPE DIA 200 mm m 61.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 120.00
2.01 - 4.00 m2 16.32
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 250 mm m 58.40

PIPING
PIPE DIA 250 mm m 58.80

ASPHALT
PIPE DIA 250 mm m 60.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 86.00
2.01 - 4.00 m2 25.69
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 250 mm m 41.40

PIPING
PIPE DIA 250 mm m 41.80

ASPHALT
PIPE DIA 250 mm m 43.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 163.20
2.01 - 4.00 m2 68.99
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 250 mm m 80.00

PIPING
PIPE DIA 250 mm m 80.40

ASPHALT
PIPE DIA 250 mm m 81.60

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 71.20
2.01 - 4.00 m2 38.73
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 250 mm m 34.00

PIPING
PIPE DIA 250 mm m 34.40

ASPHALT
PIPE DIA 250 mm m 35.60

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 57.00
2.01 - 4.00 m2 33.61
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 26.90

PIPING
PIPE DIA 200 mm m 27.30

ASPHALT
PIPE DIA 200 mm m 5.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 98.40
2.01 - 4.00 m2 42.24
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 16.68

BEDDING
PIPE DIA 200 mm m 47.60

PIPING
PIPE DIA 200 mm m 48.00

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 58.04
2.01 - 4.00 m2 0.31
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 31.15

PIPING
PIPE DIA 200 mm m 31.55

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 94.50
2.01 - 4.00 m2 0.04
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 0.00

BEDDING
PIPE DIA 200 mm m 48.40

PIPING
PIPE DIA 200 mm m 48.80

ASPHALT
PIPE DIA 200 mm m 50.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 119.60
2.01 - 4.00 m2 79.44
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 126.11

BEDDING
PIPE DIA 600 mm m 58.20

PIPING
PIPE DIA 600 mm m 58.60

ASPHALT
PIPE DIA 600 mm m 59.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.884 0.00 - 2.00 m2 104.200
2.01 - 4.00 m2 54.017
4.01 - 6.00 m2 0.000
6.298
6.01 - 8.00 m2 0.000

6.929
ROCK EXCAVATION m3 35.103

6.773
BEDDING
PIPE DIA 200 mm m 50.10
6.565

PIPING
6.344
PIPE DIA 200 mm m 50.60

0.811
ASPHALT
PIPE DIA 200 mm m 0.00
0.499

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

35.103

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
1.015 0.00 - 2.00 m2 118.800
2.01 - 4.00 m2 37.012
4.01 - 6.00 m2 0.000
11.314
6.01 - 8.00 m2 0.000

11.609
ROCK EXCAVATION m3 62.661

10.914
BEDDING
PIPE DIA 200 mm m 57.80
10.173

PIPING
9.419
PIPE DIA 200 mm m 58.20

7.541
ASPHALT
PIPE DIA 200 mm m 59.40
0.677

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

62.661

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.671 0.00 - 2.00 m2 118.207
2.01 - 4.00 m2 5.661
4.01 - 6.00 m2 0.000
7.487
6.01 - 8.00 m2 0.000
7.670
ROCK EXCAVATION m3 41.573

7.170
BEDDING
PIPE DIA 200 mm m 58.30
6.682

PIPING
6.208
PIPE DIA 200 mm m 58.70

5.269
ASPHALT
PIPE DIA 200 mm m 59.90
0.416

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T

41.573

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
1.473 0.00 - 2.00 m2 105.700
2.01 - 4.00 m2 44.859
4.01 - 6.00 m2 0.000
10.714
6.01 - 8.00 m2 0.000

12.006
ROCK EXCAVATION m3 63.498
12.006
BEDDING
PIPE DIA 200 mm m 50.85
11.999

PIPING
11.908
PIPE DIA 200 mm m 51.35

2.440
ASPHALT
PIPE DIA 200 mm m 52.85
0.954

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

63.498

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.956 0.00 - 2.00 m2 105.500
2.01 - 4.00 m2 41.861
4.01 - 6.00 m2 0.000
10.961
6.01 - 8.00 m2 0.000

11.791
ROCK EXCAVATION m3 61.490

11.681
BEDDING
PIPE DIA 200 mm m 51.15
11.557

PIPING
11.421
PIPE DIA 200 mm m 51.55

2.214
ASPHALT
PIPE DIA 200 mm m 52.75
0.909

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 1

61.490

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.387 0.00 - 2.00 m2 138.100
2.01 - 4.00 m2 31.425
4.01 - 6.00 m2 0.000
4.180
6.01 - 8.00 m2 0.000

4.024
ROCK EXCAVATION m3 20.420

3.491
BEDDING
PIPE DIA 200 mm m 67.45
2.938
PIPING
2.366
PIPE DIA 200 mm m 67.85

1.833
ASPHALT
PIPE DIA 200 mm m 69.05
1.115

CONC. TILES
0.086
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

20.420

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.080 0.00 - 2.00 m2 113.954
2.01 - 4.00 m2 1.966
4.01 - 6.00 m2 0.000
0.724
6.01 - 8.00 m2 0.000

0.429
ROCK EXCAVATION m3 1.232

BEDDING
PIPE DIA 200 mm m 56.90

PIPING
PIPE DIA 200 mm m 57.30
ASPHALT
PIPE DIA 200 mm m 58.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

1.232

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
1.526 0.00 - 2.00 m2 105.680
2.01 - 4.00 m2 48.207
4.01 - 6.00 m2 0.000
11.143
6.01 - 8.00 m2 0.000

12.526
ROCK EXCAVATION m3 65.674

12.422
BEDDING
PIPE DIA 200 mm m 50.84
12.350

PIPING
12.246
PIPE DIA 200 mm m 51.34

2.486
ASPHALT
PIPE DIA 200 mm m 52.84
0.976

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

65.674

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.976 0.00 - 2.00 m2 103.500
2.01 - 4.00 m2 40.524
4.01 - 6.00 m2 0.000
11.117
6.01 - 8.00 m2 0.000

11.863
ROCK EXCAVATION m3 59.978

11.622
BEDDING
PIPE DIA 200 mm m 50.15
11.369

PIPING
11.109
PIPE DIA 200 mm m 50.55

1.044
ASPHALT
PIPE DIA 200 mm m 51.75
0.880
CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

59.978

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.784 0.00 - 2.00 m2 139.200
2.01 - 4.00 m2 25.914
4.01 - 6.00 m2 0.000
8.749
6.01 - 8.00 m2 0.000

9.003
ROCK EXCAVATION m3 53.947

8.177
BEDDING
PIPE DIA 200 mm m 68.00
7.378

PIPING
6.890
PIPE DIA 200 mm m 68.40

6.689
ASPHALT
PIPE DIA 200 mm m 69.60
5.771

CONC. TILES
0.508
PIPE DIA. m
Demolitiion Septic t 1

Const Temp. Sepic T 1

53.947

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.494 0.00 - 2.00 m2 116.849
2.01 - 4.00 m2 1.776
4.01 - 6.00 m2 0.000
5.490
6.01 - 8.00 m2 0.000

5.571
ROCK EXCAVATION m3 29.909

5.148
BEDDING
PIPE DIA 200 mm m 58.90
4.745

PIPING
4.336
PIPE DIA 200 mm m 59.30

3.827
ASPHALT
PIPE DIA 200 mm m 60.50
0.299

CONC. TILES
PIPE DIA. m

Demolitiion Septic t
Const Temp. Sepic T

29.909

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.770 0.00 - 2.00 m2 103.100
2.01 - 4.00 m2 29.511
4.01 - 6.00 m2 0.000
8.844
6.01 - 8.00 m2 0.000

9.568
ROCK EXCAVATION m3 48.858

9.490
BEDDING
PIPE DIA 200 mm m 49.95
9.445

PIPING
9.315
PIPE DIA 200 mm m 50.35

0.690
ASPHALT
PIPE DIA 200 mm m 51.55
0.736

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1


48.858

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.726 0.00 - 2.00 m2 101.600
2.01 - 4.00 m2 62.578
4.01 - 6.00 m2 0.000
8.055
6.01 - 8.00 m2 0.000

8.346
ROCK EXCAVATION m3 40.669

7.982
BEDDING
PIPE DIA 200 mm m 49.20
7.625

PIPING
7.352
PIPE DIA 200 mm m 49.60

0.584
ASPHALT
PIPE DIA 200 mm m 50.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1


40.669

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.580 0.00 - 2.00 m2 137.800
2.01 - 4.00 m 2
50.224
4.01 - 6.00 m2 0.000
6.309
6.01 - 8.00 m2 0.000

6.195
ROCK EXCAVATION m3 32.627

5.499
BEDDING
PIPE DIA 200 mm m 67.30
4.823

PIPING
4.030
PIPE DIA 200 mm m 67.70

3.068
ASPHALT
PIPE DIA 200 mm m 68.90
1.948

CONC. TILES
0.175
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1


32.627

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.173 0.00 - 2.00 m2 110.533
2.01 - 4.00 m2 5.376
4.01 - 6.00 m2 0.000
1.645
6.01 - 8.00 m2 0.000

1.170
ROCK EXCAVATION m3 3.495

0.507
BEDDING
PIPE DIA 200 mm m 55.16

PIPING
PIPE DIA 200 mm m 55.56

ASPHALT
PIPE DIA 200 mm m 56.76

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


3.495

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 95.023
2.01 - 4.00 m2 0.011
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 51.70

PIPING
PIPE DIA 200 mm m 52.10

ASPHALT
PIPE DIA 200 mm m 53.30

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0202
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 47.604
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 28.40

PIPING
PIPE DIA 200 mm m 28.80

ASPHALT
PIPE DIA 200 mm m 30.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

0.000
PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 153.600
2.01 - 4.00 m2 11.514
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 75.20

PIPING
PIPE DIA 200 mm m 75.60

ASPHALT
PIPE DIA 200 mm m 76.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000
PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 156.600
2.01 - 4.00 m2 9.084
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 76.70

PIPING
PIPE DIA 200 mm m 77.10

ASPHALT
PIPE DIA 200 mm m 78.30

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0058
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 138.721
2.01 - 4.00 m2 0.007
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 79.20

PIPING
PIPE DIA 200 mm m 79.60

ASPHALT
PIPE DIA 200 mm m 80.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0061
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 114.754
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 77.40

PIPING
PIPE DIA 200 mm m 77.80

ASPHALT
PIPE DIA 200 mm m 79.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0075
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 176.733
2.01 - 4.00 m2 28.350
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 86.90

PIPING
PIPE DIA 200 mm m 87.30

ASPHALT
PIPE DIA 200 mm m 58.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 119.723
2.01 - 4.00 m2 4.361
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 60.40

PIPING
PIPE DIA 200 mm m 60.80

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO. 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 108.112
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000
ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 59.20

PIPING
PIPE DIA 200 mm m 59.60

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO. 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 110.514
2.01 - 4.00 m2 9.248
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000
ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 54.20

PIPING
PIPE DIA 200 mm m 54.60

ASPHALT
PIPE DIA 200 mm m 55.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 2

Const Temp. Sepic T NO. 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 105.748
2.01 - 4.00 m2 6.516
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000


BEDDING
PIPE DIA 200 mm m 52.90

PIPING
PIPE DIA 200 mm m 53.30

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 3

Const Temp. Sepic T NO. 3

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 119.723
2.01 - 4.00 m2 4.361
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 60.40
PIPING
PIPE DIA 200 mm m 60.80

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO. 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 108.112
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 59.20

PIPING
PIPE DIA 200 mm m 59.60

ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO. 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 110.514
2.01 - 4.00 m2 9.248
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 54.20

PIPING
PIPE DIA 200 mm m 54.60

ASPHALT
PIPE DIA 200 mm m 55.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 2

Const Temp. Sepic T NO. 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 105.748
2.01 - 4.00 m2 6.516
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 52.90

PIPING
PIPE DIA 200 mm m 53.30
ASPHALT
PIPE DIA 200 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 3

Const Temp. Sepic T NO. 3

* EXCAV. DEPTH =a-c+0.45

0.000

ved by:
PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0250
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 67.896
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 38.70

PIPING
PIPE DIA 200 mm m 39.10

ASPHALT
PIPE DIA 200 mm m 40.30
CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO.

Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 33.084
2.01 - 4.00 m2 1.096
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 15.10

PIPING
PIPE DIA 200 mm m 15.50

ASPHALT
PIPE DIA 200 mm m 16.70

CONC. TILES
PIPE DIA. m
Demolitiion Septic t NO.

Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 91.600
2.01 - 4.00 m2 4.333
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 44.20

PIPING
PIPE DIA 200 mm m 44.60

ASPHALT
PIPE DIA 200 mm m 45.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO.


Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 136.400
2.01 - 4.00 m2 7.708
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 200 mm m 66.60

PIPING
PIPE DIA 200 mm m 67.00

ASPHALT
PIPE DIA 200 mm m 68.20

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO. 1


* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 87.104
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 59.90

PIPING
PIPE DIA 250 mm m 60.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 1

Const Temp. Sepic T NO.


* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0188
SUMMARY

Unit Quantity
3
)
Volume ( mDescription
EXCAVATION
0.00 - 2.00 m2 121.3182
2.01 - 4.00 m 2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 86.35

PIPING
PIPE DIA 200 mm m 86.75

ASPHALT
PIPE DIA 200 mm m 87.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0235
SUMMARY

Unit Quantity
3
)
Volume ( mDescription
EXCAVATION
0.00 - 2.00 m2 64.9881
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 42.3

PIPING
PIPE DIA 200 mm m 42.7

ASPHALT
PIPE DIA 200 mm m 43.9

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 2

Const Temp. Sepic Ta NO.


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0144
SUMMARY

Unit Quantity
3
)
Volume ( mDescription
EXCAVATION
0.00 - 2.00 m2 141.2108
2.01 - 4.00 m2 1.5708
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 73.1

PIPING
PIPE DIA 200 mm m 73.5

ASPHALT
PIPE DIA 200 mm m

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45


0

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.033
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 127.6
2.01 - 4.00 m2 10.09
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 62.2

PIPING
PIPE DIA 200 mm m 62.6

ASPHALT
PIPE DIA 200 mm m

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

0
PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0043
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 73.3282
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 40.2

PIPING
PIPE DIA 200 mm m 40.6

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45


PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 86.826
2.01 - 4.00 m2 0.0856
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 56.2

PIPING
PIPE DIA 200 mm m 56.6

ASPHALT
PIPE DIA 200 mm m 57.8

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 16.434
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 7.8

PIPING
PIPE DIA 200 mm m 8.2

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 71.69
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 42.5

PIPING
PIPE DIA 200 mm m 42.9

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 64.1152
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 40

PIPING
PIPE DIA 200 mm m 40.4

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 12.608
2.01 - 4.00 m2 0.169
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 4.8

PIPING
PIPE DIA 200 mm m 5.2

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 44.682
2.01 - 4.00 m2 0.1312
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 21.4

PIPING
PIPE DIA 200 mm m 21.8

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 81.8516
2.01 - 4.00 m2 0.044
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 43.5

PIPING
PIPE DIA 200 mm m 43.9

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 54.7136
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 28.7

PIPING
PIPE DIA 200 mm m 29.1

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 37.2
2.01 - 4.00 m2 1.778
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 17

PIPING
PIPE DIA 200 mm m 17.4

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 95
2.01 - 4.00 m2 5.3698
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 45.9

PIPING
PIPE DIA 250 mm m 46.3

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 25.2
2.01 - 4.00 m2 0.671
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 11

PIPING
PIPE DIA 250 mm m 11.4

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 75.3988
2.01 - 4.00 m2 0.2404
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0
ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 37

PIPING
PIPE DIA 250 mm m 37.4

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 138.9127
2.01 - 4.00 m2 4.7176
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 68.9

PIPING
PIPE DIA 200 mm m 69.3

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 2

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 49.8466
2.01 - 4.00 m2 0.024
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 25

PIPING
PIPE DIA 250 mm m 25.4

ASPHALT
PIPE DIA 250 mm m 0
CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 106.2
2.01 - 4.00 m2 25.8537
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 51.5

PIPING
PIPE DIA 250 mm m 51.9

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 88.4
2.01 - 4.00 m2 43.6726
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 42.6

PIPING
PIPE DIA 250 mm m 43

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 2

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45


PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 81
2.01 - 4.00 m2 60.066
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 38.9

PIPING
PIPE DIA 250 mm m 39.3

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 78.599
2.01 - 4.00 m2 0.386
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 39.65

PIPING
PIPE DIA 250 mm m 40.05

ASPHALT
PIPE DIA 250 mm m 41.25

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 61.445
2.01 - 4.00 m2 0.018
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 31.45

PIPING
PIPE DIA 250 mm m 31.85

ASPHALT
PIPE DIA 250 mm m 33.05

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 51.988
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0
BEDDING
PIPE DIA 250 mm m 26.5

PIPING
PIPE DIA 250 mm m 26.9

ASPHALT
PIPE DIA 250 mm m 28.1

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 76.231
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 39.5

PIPING
PIPE DIA 250 mm m 39.9
ASPHALT
PIPE DIA 250 mm m 41.1

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 94.311
2.01 - 4.00 m2 0.646
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 45.65

PIPING
PIPE DIA 250 mm m 46.05

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m
Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 118.456
2.01 - 4.00 m2 4.368
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 57.7

PIPING
PIPE DIA 250 mm m 58.1

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO.

Const Temp. Sepic Ta NO.


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 95.2
2.01 - 4.00 m2 38.162
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 46

PIPING
PIPE DIA 200 mm m 46.4

ASPHALT
PIPE DIA 200 mm m 47.6

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45


PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 95.2
2.01 - 4.00 m2 16.794
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 46

PIPING
PIPE DIA 200 mm m 46.4

ASPHALT
PIPE DIA 200 mm m 47.6

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY
3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 122.33
2.01 - 4.00 m2 4.708
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 59.7

PIPING
PIPE DIA 200 mm m 60.1

ASPHALT
PIPE DIA 200 mm m 61.3

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 3

Const Temp. Sepic Ta NO. 1

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 92.1514
2.01 - 4.00 m2 0
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 50.2

PIPING
PIPE DIA 200 mm m 50.6

ASPHALT
PIPE DIA 200 mm m 51.8

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 100.4
2.01 - 4.00 m2 49.05
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 48.6
PIPING
PIPE DIA 200 mm m 49

ASPHALT
PIPE DIA 200 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 200 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0052
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 140.4
2.01 - 4.00 m2 28.825
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 200 mm m 68.6

PIPING
PIPE DIA 200 mm m 69

ASPHALT
PIPE DIA 200 mm m 70.2
CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45


prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 752.505 751.855 750.168 750.328 2.337 2.337


2.335 1.20

1.20 752.505 751.855 750.172 750.332 2.333 2.333


2.302 8.80
10.00 752.477 751.827 750.206 750.366 2.271 2.271
2.257 10.00
20.00 752.487 751.837 750.244 750.404 2.243 2.243
2.209 10.00
30.00 752.457 751.807 750.282 750.442 2.175 2.175
2.155 10.00
40.00 752.456 751.806 750.320 750.480 2.136 2.136
2.109 10.20
50.20 752.440 751.790 750.358 750.518 2.082 2.082
2.079 0.80
1 51.00 752.438 751.788 750.362 750.522 2.076 2.076

TOTAL 51.000

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 752.438 751.350 750.362 750.522 2.076 2.076


2.070 0.80

0.80 752.430 751.350 750.365 750.525 2.065 2.065


2.038 9.20
10.00 752.411 750.894 750.400 750.560 2.011 2.011
1.989 10.00
20.00 752.405 751.099 750.438 750.598 1.967 1.967
1.941 10.00
30.00 752.390 751.164 750.476 750.636 1.914 1.914
1.885 10.00
40.00 752.370 750.994 750.514 750.674 1.856 1.856
1.832 8.80
48.80 752.354 751.054 750.547 750.707 1.807 1.807
1.804 0.80
2 49.60 752.350 751.054 750.550 750.710 1.800 1.800

TOTAL 49.600

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 752.350 751.350 750.550 750.710 1.800 1.800


1.799 0.80

0.80 752.350 751.350 750.553 750.713 1.797 1.797


1.775 9.20
10.00 752.340 751.340 750.588 750.748 1.752 1.752
1.734 10.00
20.00 752.341 751.341 750.626 750.786 1.715 1.715
1.702 10.00
30.00 752.352 751.352 750.664 750.824 1.688 1.688
1.658 10.00
40.00 752.330 751.330 750.702 750.862 1.628 1.628
1.600 10.00
50.00 752.311 751.311 750.740 750.900 1.571 1.571
1.540 10.00
60.00 752.287 751.287 750.778 750.938 1.509 1.509
1.487 8.50
68.50 752.275 751.275 750.810 750.970 1.465 1.465
1.462 0.80
3 69.30 752.272 751.272 750.813 750.973 1.459 1.459

TOTAL 69.300

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 753.166 751.396 750.222 750.382 2.944 2.944


2.953 1.20

1.20 753.188 751.418 750.227 750.387 2.961 2.961


3.016 8.80
10.00 753.330 751.560 750.260 750.420 3.070 3.070
3.122 10.00
20.00 753.471 751.701 750.298 750.458 3.173 3.173
3.229 10.00
30.00 753.620 751.850 750.336 750.496 3.284 3.284
3.335 10.00
40.00 753.760 751.990 750.374 750.534 3.386 3.386
3.417 9.60
49.60 753.858 752.088 750.410 750.570 3.448 3.448
3.452 0.80
1 50.40 753.870 752.100 750.413 750.573 3.457 3.457

TOTAL 50.400

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.870 752.230 750.413 750.573 3.457 3.457


3.451 0.80

0.80 753.861 752.221 750.416 750.576 3.445 3.445


3.397 9.20
10.00 753.800 752.160 750.451 750.611 3.349 3.349
3.305 10.00
20.00 753.750 752.110 750.489 750.649 3.261 3.261
3.212 10.00
30.00 753.690 752.050 750.527 750.687 3.163 3.163
3.116 10.00
40.00 753.634 751.994 750.565 750.725 3.069 3.069
3.027 8.30
48.30 753.580 751.940 750.596 750.756 2.984 2.984
2.978 0.80
2 49.10 753.571 751.931 750.599 750.759 2.972 2.972

TOTAL 49.100

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)
2 0.00 753.571 751.571 750.599 750.759 2.972 2.972
2.965 2.965

0.80 753.560 751.560 750.602 750.762 2.958 2.958


2.870 2.869
10.00 753.418 751.418 750.637 750.797 2.781 2.781
2.692 2.691
20.00 753.277 751.277 750.675 750.835 2.602 2.602
2.509 2.509
30.00 753.130 751.130 750.713 750.873 2.417 2.417
2.334 2.334
40.00 753.002 751.002 750.751 750.911 2.251 2.251
2.161 2.161
50.00 752.859 750.859 750.789 750.949 2.070 2.070
1.982 1.982
60.00 752.720 750.720 750.827 750.987 1.893 1.893
1.825 1.825
68.20 752.615 750.615 750.858 751.018 1.757 1.757
1.749 1.749
3 69.00 752.602 750.602 750.861 751.021 1.741 1.741

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 753.255 751.255 750.210 750.370 3.045 3.045


3.033 3.033
3.033 3.033

1.20 753.234 751.234 750.214 750.374 3.020 3.020


3.047 3.047
10.00 753.322 751.322 750.248 750.408 3.074 3.074
3.099 3.099
20.00 753.410 751.410 750.286 750.446 3.124 3.124
3.150 3.150
30.00 753.500 751.500 750.324 750.484 3.176 3.176
3.201 3.201
40.00 753.589 751.589 750.362 750.522 3.227 3.227
3.259 3.259
50.15 753.691 751.691 750.400 750.560 3.291 3.291
3.296 3.296
1 50.95 753.704 751.704 750.403 750.563 3.301 3.301
1.650

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.704 751.704 750.403 750.563 3.301 3.301


3.298 3.298

0.80 753.702 751.702 750.406 750.566 3.296 3.296


3.281 3.281
3.281 3.281
10.00 753.707 751.707 750.441 750.601 3.266 3.266
3.243 3.243
20.00 753.699 751.699 750.479 750.639 3.220 3.220
3.196 3.196
30.00 753.690 751.690 750.517 750.677 3.173 3.173
3.149 3.149
40.00 753.680 751.680 750.555 750.715 3.125 3.125
3.099 3.099
49.93 753.665 751.665 750.592 750.752 3.073 3.073
3.069 3.069
2 50.73 753.661 751.661 750.595 750.755 3.066 3.066
1.533

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.661 751.661 750.595 750.755 3.066 3.066


3.060 3.060

0.80 753.652 751.652 750.598 750.758 3.054 3.054


2.966 2.966
10.00 753.511 751.511 750.633 750.793 2.878 2.878
2.774 2.774
2.774 2.774
20.00 753.342 751.342 750.671 750.831 2.671 2.671
2.579 2.578
30.00 753.195 751.195 750.709 750.869 2.486 2.486
2.391 2.391
40.00 753.044 751.044 750.747 750.907 2.297 2.297
2.206 2.206
50.00 752.900 750.900 750.785 750.945 2.115 2.115
2.019 2.019
60.00 752.746 750.746 750.823 750.983 1.923 1.923
1.869 1.869
66.70 752.662 750.662 750.848 751.008 1.814 1.814
1.807 1.807
3 67.50 752.651 750.651 750.851 751.011 1.800 1.800

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

19 0.00 753.565 751.288 2.727 2.727


2.583 2.583

0.80 753.570 751.291 2.439 2.439


2.444 2.444
10.00 753.614 751.326 2.448 2.448
2.438 2.438
20.00 753.632 751.364 2.428 2.428
2.444 2.444
30.00 753.702 751.402 2.460 2.460
30.00 753.702 751.402 2.460 2.460
2.469 2.469
40.00 753.759 751.440 2.479 2.479
2.454 2.454
50.00 753.747 751.478 2.429 2.429
2.450 2.450
60.00 753.827 751.516 2.471 2.471
2.471 2.471
70.00 753.865 751.554 2.471 2.471
2.472 2.472
80.00 753.905 751.592 2.473 2.473
2.469 2.469
86.20 753.920 751.615 2.465 2.465
2.611 2.611
1 87.00 753.925 751.618 2.757 2.757

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.925 751.618 2.757 2.757


2.613 2.613

0.80 753.930 751.621 2.469 2.469


2.478 2.478
10.00 753.982 751.656 2.486 2.486
2.497 2.497
20.00 754.041 751.694 2.507 2.507
2.437 2.437
30.00 753.939 751.732 2.367 2.367
2.328 2.328
40.00 753.899 751.770 2.289 2.289
40.00 753.899 751.770 2.289 2.289
2.263 2.263
50.00 753.884 751.808 2.236 2.236
2.212 2.212
60.00 753.874 751.846 2.188 2.188
2.137 2.137
67.40 753.800 751.874 2.086 2.086
2.228 2.228
2 68.20 753.797 751.877 2.370 2.370
1.185

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.797 751.877 2.370 2.370


2.230 2.230

0.80 753.810 751.880 2.090 2.090


2.083 2.083
10.00 753.831 751.915 2.076 2.076
2.055 2.055
20.00 753.826 751.953 2.033 2.033
1.999 1.999
30.00 753.796 751.991 1.965 1.965
1.941 1.941
40.00 753.786 752.029 1.917 1.917
1.909 1.909
50.00 753.809 752.067 1.902 1.902
50.00 753.809 752.067 1.902 1.902
1.907 1.907
53.20 753.830 752.079 1.911 1.911
2.060 2.060
3 54.00 753.841 752.082 2.209 2.209
1.105

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

19 0.00 753.574 751.288 2.736 2.736


2.587 2.587

0.80 753.570 751.291 2.439 2.439


2.404 2.404
10.00 753.536 751.326 2.370 2.370
2.326 2.326
20.00 753.487 751.364 2.283 2.283
2.251 2.251
30.00 753.462 751.402 2.220 2.220
2.187 2.187
40.00 753.434 751.440 2.154 2.154
2.137 2.137
50.00 753.438 751.478 2.120 2.120
2.120 2.120
50.95 753.440 751.481 2.119 2.119
50.95 753.440 751.481 2.119 2.119
2.265 2.264
1 51.75 753.444 751.484 2.410 2.410
1.205

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.444 751.484 2.410 2.410


2.256 2.256

0.80 753.430 751.487 2.103 2.103


2.072 2.072
10.00 753.403 751.522 2.041 2.041
2.047 2.047
20.00 753.453 751.560 2.053 2.053
2.007 2.007
30.00 753.398 751.598 1.960 1.960
1.926 1.926
40.00 753.368 751.636 1.892 1.892
1.853 1.853
50.00 753.328 751.674 1.814 1.814
1.819 1.819
58.70 753.370 751.707 1.823 1.823
1.976 1.976
2 59.50 753.388 751.710 2.128 2.128
2 59.50 753.388 751.710 2.128 2.128
1.064

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 753.388 751.710 2.128 2.128


1.978 1.978

0.80 753.380 751.713 1.827 1.827


1.796 1.796
10.00 753.353 751.748 1.765 1.765
1.731 1.731
20.00 753.323 751.786 1.697 1.697
1.678 1.678
30.00 753.323 751.824 1.659 1.659
1.625 1.625
40.00 753.293 751.862 1.591 1.591
1.552 1.552
50.00 753.253 751.900 1.513 1.513
1.544 1.544
60.00 753.353 751.938 1.575 1.575
1.602 1.602
63.50 753.420 751.951 1.629 1.629
1.781 1.781
3 64.30 753.438 751.954 1.934 1.934
3 64.30 753.438 751.954 1.934 1.934
0.967

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 753.438 751.954 1.934 1.934


1.779 1.779

0.80 753.421 751.957 1.624 1.624


1.603 1.603
10.00 753.413 751.992 1.581 1.581
1.690 1.690
20.00 753.668 752.030 1.798 1.798
1.764 1.764
30.00 753.638 752.068 1.730 1.730
1.711 1.711
40.00 753.638 752.106 1.692 1.692
1.688 1.688
50.00 753.668 752.144 1.684 1.684
1.658 1.658
54.20 753.630 752.159 1.631 1.631
1.767 1.767
4 55.00 753.616 752.163 1.903 1.903
0.951

0.000
0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 753.616 752.163 1.903 1.903


1.748 1.748

0.80 753.600 752.166 1.594 1.594


1.562 1.562
10.00 753.571 752.201 1.530 1.530
1.516 1.516
20.00 753.580 752.239 1.501 1.501
1.566 1.566
30.00 753.748 752.277 1.631 1.631
1.584 1.584
40.00 753.693 752.315 1.538 1.538
1.437 1.437
50.00 753.530 752.353 1.337 1.337
1.270 1.270
59.20 753.430 752.387 1.203 1.203
1.351 1.351
5 60.00 753.440 752.391 1.499 1.499
0.750

0.000

0.000
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 753.501 752.391 1.560 1.560


1.418 1.418

0.80 753.510 752.394 1.276 1.276


1.278 1.278
10.00 753.550 752.429 1.281 1.281
1.319 1.319
20.00 753.663 752.467 1.356 1.356
1.322 1.322
30.00 753.633 752.505 1.288 1.288
1.239 1.239
40.00 753.573 752.543 1.190 1.190
1.276 1.276
49.00 753.780 752.577 1.363 1.363
1.518 1.518
6 49.80 753.803 752.580 1.673 1.673
0.836

0.000

0.000

0.000
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 753.444 751.484 2.410 2.410


2.265 2.265

0.80 753.448 751.487 2.121 2.121


2.106 2.106
10.00 753.453 751.522 2.091 2.091
2.129 2.129
20.00 753.568 751.560 2.168 2.168
2.284 2.284
30.00 753.838 751.598 2.400 2.400
2.461 2.461
40.00 753.998 751.636 2.522 2.522
2.561 2.561
50.00 754.113 751.674 2.599 2.599
2.580 2.580
60.00 754.113 751.712 2.561 2.561
2.535 2.535
70.00 754.098 751.750 2.508 2.508
2.489 2.489
80.00 754.098 751.788 2.470 2.470
2.465 2.465
82.70 754.098 751.798 2.460 2.460
2.603 2.603
1 83.50 754.098 751.801 2.747 2.747
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.098 751.801 2.747 2.747


2.601 2.601

0.80 754.100 751.804 2.456 2.456


2.442 2.442
10.00 754.108 751.839 2.429 2.429
2.430 2.430
20.00 754.148 751.877 2.431 2.431
2.415 2.415
30.00 754.153 751.915 2.398 2.398
2.434 2.434
40.00 754.263 751.953 2.470 2.470
2.477 2.477
41.20 754.280 751.957 2.483 2.483
2.634 2.634
2 42.00 754.295 751.960 2.785 2.785
1.392

0.000

0.000

0.000
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.098 751.801 2.747 2.747


2.600 2.600

0.80 754.098 751.804 2.454 2.454


2.433 2.433
10.00 754.091 751.839 2.412 2.412
2.412 2.412
20.00 754.128 751.877 2.411 2.411
2.427 2.427
30.00 754.198 751.915 2.443 2.443
2.428 2.428
40.00 754.206 751.953 2.413 2.413
2.394 2.394
50.00 754.206 751.991 2.375 2.375
2.376 2.376
60.00 754.246 752.029 2.377 2.377
2.365 2.365
70.00 754.261 752.067 2.354 2.354
2.347 2.347
80.00 754.286 752.105 2.341 2.341
2.329 2.328
87.20 754.288 752.132 2.316 2.316
2.460 2.460
1 88.00 754.288 752.135 2.603 2.603
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.288 752.135 2.603 2.603


2.457 2.457

0.80 754.290 752.138 2.312 2.312


2.305 2.305
10.00 754.311 752.173 2.298 2.298
2.280 2.280
20.00 754.313 752.211 2.262 2.262
2.257 2.257
30.00 754.341 752.249 2.252 2.252
2.238 2.238
40.00 754.351 752.287 2.224 2.224
2.202 2.202
50.00 754.346 752.325 2.181 2.181
2.154 2.154
60.00 754.331 752.363 2.128 2.128
2.094 2.094
70.00 754.301 752.401 2.060 2.060
2.051 2.051
80.00 754.321 752.439 2.042 2.042
2.006 2.006
88.20 754.280 752.470 1.970 1.970
2.111 2.111
2 89.00 754.276 752.473 2.253 2.253

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.276 752.473 2.253 2.253


2.106 2.106

0.80 754.276 752.476 1.960 1.960


1.947 1.947
10.00 754.286 752.511 1.935 1.935
1.903 1.903
20.00 754.261 752.549 1.872 1.872
1.848 1.848
30.00 754.251 752.587 1.824 1.824
1.800 1.800
40.00 754.241 752.625 1.776 1.776
1.732 1.732
50.00 754.191 752.663 1.688 1.688
1.664 1.664
60.00 754.181 752.701 1.640 1.640
1.610 1.610
70.00 754.158 752.739 1.579 1.579
1.554 1.554
80.00 754.146 752.777 1.529 1.529
1.495 1.495
88.20 754.110 752.808 1.462 1.462
1.603 1.603
3 89.00 754.106 752.811 1.745 1.745

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.295 751.960 2.785 2.785


2.638 2.638

0.80 754.295 751.963 2.492 2.492


2.469 2.469
10.00 754.285 751.998 2.447 2.447
2.440 2.440
20.00 754.310 752.036 2.434 2.434
2.418 2.418
30.00 754.315 752.074 2.401 2.401
2.377 2.377
40.00 754.305 752.112 2.353 2.353
2.334 2.334
50.00 754.305 752.150 2.315 2.315
2.314 2.314
60.00 754.340 752.188 2.312 2.312
2.296 2.296
70.00 754.345 752.226 2.279 2.279
2.265 2.265
80.00 754.355 752.264 2.251 2.251
2.245 2.244
90.00 754.380 752.302 2.238 2.238
2.220 2.220
99.20 754.380 752.337 2.203 2.203
2.347 2.347
3 100.00 754.381 752.340 2.491 2.491

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 754.381 752.340 2.491 2.491


2.349 2.349

0.80 754.390 752.343 2.207 2.207


2.200 2.200
10.00 754.411 752.378 2.193 2.193
2.160 2.160
20.00 754.383 752.416 2.127 2.127
2.094 2.094
30.00 754.354 752.454 2.060 2.060
2.059 2.059
40.00 754.389 752.492 2.057 2.057
2.038 2.038
50.00 754.389 752.530 2.019 2.019
1.988 1.988
60.00 754.364 752.568 1.956 1.956
1.938 1.938
70.00 754.366 752.606 1.920 1.920
1.916 1.916
72.20 754.366 752.614 1.912 1.912
2.055 2.055
4 73.00 754.366 752.617 2.199 2.199
1.100

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 754.366 752.617 2.199 2.199


2.055 2.055

0.80 754.370 752.620 1.910 1.910


1.898 1.898
10.00 754.381 752.655 1.886 1.886
1.850 1.850
20.00 754.346 752.693 1.813 1.813
1.781 1.780
30.00 754.319 752.731 1.748 1.748
1.735 1.735
40.00 754.331 752.769 1.722 1.722
1.699 1.699
50.00 754.323 752.807 1.676 1.676
1.657 1.657
60.00 754.323 752.845 1.638 1.638
1.598 1.598
70.00 754.281 752.883 1.558 1.558
1.533 1.533
80.00 754.270 752.921 1.509 1.509
1.508 1.508
80.70 754.270 752.923 1.507 1.507
1.651 1.651
5 81.50 754.271 752.926 1.795 1.795

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.671 752.546 2.575 2.575


2.428 2.428

0.80 754.670 752.549 2.281 2.281


2.261 2.261
10.00 754.665 752.584 2.241 2.241
2.220 2.220
20.00 754.660 752.622 2.198 2.198
2.174 2.174
30.00 754.650 752.660 2.150 2.150
2.126 2.126
40.00 754.640 752.698 2.102 2.102
2.078 2.078
50.00 754.630 752.736 2.054 2.054
2.030 2.030
60.00 754.620 752.774 2.006 2.006
1.985 1.985
66.20 754.600 752.797 1.963 1.963
2.107 2.107
3 67.00 754.601 752.800 2.251 2.251

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 754.601 752.800 2.251 2.251


2.104 2.104

0.80 754.600 752.803 1.957 1.957


1.929 1.929
10.00 754.579 752.838 1.901 1.901
1.882 1.882
20.00 754.579 752.876 1.863 1.863
1.824 1.824
30.00 754.539 752.914 1.785 1.785
1.756 1.756
40.00 754.519 752.952 1.727 1.727
1.713 1.713
50.00 754.529 752.990 1.699 1.699
1.670 1.670
60.00 754.509 753.028 1.641 1.641
1.607 1.607
70.00 754.480 753.066 1.574 1.574
1.561 1.561
71.70 754.460 753.072 1.548 1.548
1.691 1.691
4 72.50 754.459 753.075 1.834 1.834

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)
6 0.00 755.385 * 753.830 2.005 2.005
1.863 1.863

0.80 755.395 753.833 1.722 1.722


1.724 1.724
10.00 755.437 753.871 1.726 1.726
1.740 1.740
20.00 755.505 753.912 1.753 1.753
1.744 1.744
30.00 755.527 753.953 1.734 1.734
1.785 1.785
40.00 755.670 753.994 1.836 1.836
1.845 1.845
50.00 755.730 754.035 1.855 1.855
1.845 1.845
60.00 755.750 754.076 1.834 1.834
1.836 1.836
70.00 755.795 754.117 1.838 1.838
1.840 1.840
80.00 755.840 754.158 1.842 1.842
1.845 1.845
90.00 755.887 754.199 1.848 1.848
1.845 1.845
92.20 755.889 754.208 1.841 1.841
1.985 1.985
1 93.00 755.890 * 754.211 2.129 2.129

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 755.385 * 753.820 2.015 2.015


1.863 1.863
1.863 1.863

0.80 755.375 753.823 1.712 1.712


1.692 1.691
10.00 755.379 753.868 1.671 1.671
1.677 1.677
20.00 755.440 753.916 1.684 1.684
1.723 1.723
30.00 755.567 753.964 1.763 1.763
1.773 1.773
40.00 755.635 754.012 1.783 1.783
1.814 1.814
50.00 755.745 754.060 1.845 1.845
1.881 1.881
60.00 755.865 754.108 1.917 1.917
1.913 1.913
61.20 755.862 754.114 1.908 1.908
2.053 2.053
7 62.00 755.865 * 754.117 2.198 2.198

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 755.865 * 754.350 1.965 1.965


1.822 1.822

0.80 755.879 754.359 1.680 1.680


1.684 1.684
1.684 1.684
10.00 755.992 754.463 1.689 1.689
1.668 1.667
20.00 756.062 754.576 1.646 1.646
1.670 1.670
30.00 756.222 754.689 1.693 1.693
1.687 1.687
40.00 756.322 754.802 1.680 1.680
1.704 1.703
50.00 756.482 754.915 1.727 1.727
1.693 1.693
60.00 756.527 755.028 1.659 1.659
1.657 1.657
61.70 756.542 755.047 1.655 1.655
1.799 1.799
8 62.50 756.550 * 755.056 1.944 1.944

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

8 0.00 756.550 * 755.056 1.944 1.944


1.801 1.801

0.80 756.557 755.059 1.658 1.658


1.670 1.670
10.00 756.617 755.094 1.683 1.683
1.739 1.739
1.739 1.739
20.00 756.767 755.132 1.795 1.795
1.771 1.771
30.00 756.757 755.170 1.747 1.747
1.793 1.793
40.00 756.887 755.208 1.839 1.839
1.853 1.853
50.00 756.952 755.246 1.866 1.866
1.870 1.869
60.00 756.997 755.284 1.873 1.873
1.860 1.860
62.70 756.980 755.294 1.846 1.846
1.993 1.993
9 63.50 756.987 * 755.297 2.140 2.140

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 755.385 * 753.830 2.005 2.005


1.863 1.863

0.80 755.395 753.833 1.722 1.722


1.724 1.724
10.00 755.437 753.871 1.726 1.726
1.740 1.740
20.00 755.505 753.912 1.753 1.753
1.744 1.744
30.00 755.527 753.953 1.734 1.734
30.00 755.527 753.953 1.734 1.734
1.785 1.785
40.00 755.670 753.994 1.836 1.836
1.845 1.845
50.00 755.730 754.035 1.855 1.855
1.845 1.845
60.00 755.750 754.076 1.834 1.834
1.836 1.836
70.00 755.795 754.117 1.838 1.838
1.840 1.840
80.00 755.840 754.158 1.842 1.842
1.845 1.845
90.00 755.887 754.199 1.848 1.848
1.845 1.845
92.20 755.889 754.208 1.841 1.841
1.985 1.985
1 93.00 755.890 * 754.211 2.129 2.129

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 755.385 * 753.820 2.015 2.015


1.863 1.863

0.80 755.375 753.823 1.712 1.712


1.692 1.691
10.00 755.379 753.868 1.671 1.671
1.677 1.677
20.00 755.440 753.916 1.684 1.684
1.723 1.723
30.00 755.567 753.964 1.763 1.763
1.773 1.773
40.00 755.635 754.012 1.783 1.783
40.00 755.635 754.012 1.783 1.783
1.814 1.814
50.00 755.745 754.060 1.845 1.845
1.881 1.881
60.00 755.865 754.108 1.917 1.917
1.913 1.913
61.20 755.862 754.114 1.908 1.908
2.053 2.053
7 62.00 755.865 * 754.117 2.198 2.198

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 755.865 * 754.350 1.965 1.965


1.822 1.822

0.80 755.879 754.359 1.680 1.680


1.684 1.684
10.00 755.992 754.463 1.689 1.689
1.668 1.667
20.00 756.062 754.576 1.646 1.646
1.670 1.670
30.00 756.222 754.689 1.693 1.693
1.687 1.687
40.00 756.322 754.802 1.680 1.680
1.704 1.703
50.00 756.482 754.915 1.727 1.727
50.00 756.482 754.915 1.727 1.727
1.693 1.693
60.00 756.527 755.028 1.659 1.659
1.657 1.657
61.70 756.542 755.047 1.655 1.655
1.799 1.799
8 62.50 756.550 * 755.056 1.944 1.944

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

8 0.00 756.550 * 755.056 1.944 1.944


1.801 1.801

0.80 756.557 755.059 1.658 1.658


1.670 1.670
10.00 756.617 755.094 1.683 1.683
1.739 1.739
20.00 756.767 755.132 1.795 1.795
1.771 1.771
30.00 756.757 755.170 1.747 1.747
1.793 1.793
40.00 756.887 755.208 1.839 1.839
1.853 1.853
50.00 756.952 755.246 1.866 1.866
1.870 1.869
60.00 756.997 755.284 1.873 1.873
60.00 756.997 755.284 1.873 1.873
1.860 1.860
62.70 756.980 755.294 1.846 1.846
1.993 1.993
9 63.50 756.987 * 755.297 2.140 2.140

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

22 0.00 754.198 * 752.490 2.158 2.158


2.031 2.031

0.80 754.239 752.494 1.905 1.905


1.883 1.883
10.00 754.241 752.540 1.861 1.861
1.886 1.886
20.00 754.341 752.590 1.911 1.911
1.913 1.913
30.00 754.396 752.640 1.916 1.916
1.902 1.902
40.00 754.419 752.690 1.889 1.889
1.876 1.876
50.00 754.444 752.740 1.864 1.864
1.877 1.877
54.80 754.494 752.764 1.890 1.890
2.035 2.035
1 55.60 754.498 * 752.768 2.180 2.180
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

1 0.00 754.498 * 752.768 2.180 2.180


2.024 2.024

0.80 754.479 752.771 1.868 1.868


1.879 1.879
10.00 754.536 752.806 1.890 1.890
1.914 1.914
20.00 754.622 752.844 1.938 1.938
1.954 1.954
30.00 754.692 752.882 1.970 1.970
1.967 1.967
40.00 754.724 752.920 1.964 1.964
1.963 1.963
42.70 754.731 752.930 1.961 1.961
2.109 2.109
2 43.50 754.739 * 752.933 2.256 2.256
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

2 0.00 754.739 * 752.933 2.256 2.256


2.103 2.103

0.80 754.725 752.936 1.949 1.949


1.949 1.949
10.00 754.760 752.971 1.949 1.949
1.937 1.937
20.00 754.775 753.009 1.926 1.926
1.944 1.944
30.00 754.850 753.047 1.963 1.963
1.934 1.934
40.00 754.830 753.085 1.905 1.905
1.913 1.913
46.50 754.870 753.109 1.921 1.921
2.067 2.067
3 47.30 754.876 * 753.113 2.213 2.213
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
Excav. SOIL EXCAV
Rock Rock
M.H to Station Ground Invert Depth Soil Ave
Level (b) Level (d) Ave Dpth
M.H (m) Level (a) Level (c) D=a-c Depth Depth
TOP Bottm (m)
+0.15+t (m) (m)

3 0.00 754.876 * 753.113 2.213 2.213


2.066 2.066

0.80 754.875 753.116 1.919 1.919


1.883 1.883
10.00 754.837 753.151 1.846 1.846
1.805 1.805
20.00 754.793 753.189 1.764 1.764
1.745 1.745
30.00 754.793 753.227 1.726 1.726
1.707 1.707
40.00 754.793 753.265 1.688 1.688
1.678 1.678
48.00 754.803 753.295 1.668 1.668
1.816 1.816
1 48.80 754.812 * 753.298 1.964 1.964
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

23 0 754.47 * 752.67 2.25 2.25


2.1185 2.119
0.8 754.5 752.673 1.987 1.987
2.04 2.040
10 754.643 752.71 2.093 2.093
2.097 2.097
20 754.691 752.75 2.101 2.101
2.0705 2.071
30 754.67 752.79 2.04 2.04
2.0545 2.054
40 754.739 752.83 2.069 2.069
2.0755 2.076
50 754.792 752.87 2.082 2.082
2.096 2.096
57.7 754.85 752.9 2.11 2.11
2.2675 2.268
1 58.5 754.879 * 752.904 2.425 2.425
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 754.87 * 752.904 2.416 2.416


2.2785 2.279
0.8 754.889 752.908 2.141 2.141
2.135 2.135
10 754.911 752.942 2.129 2.129
2.1185 2.118
20 754.929 752.981 2.108 2.108
2.114 2.114
30 754.98 753.02 2.12 2.12
2.0905 2.091
40 754.96 753.059 2.061 2.061
2.046 2.046
50 754.969 753.098 2.031 2.031
2.0195 2.020
59.2 754.982 753.134 2.008 2.008
2.16 2.160
2 60 755 * 753.138 2.312 2.312
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

2 0 755 * 753.138 2.312 2.312


2.1905 2.190
0.8 755.05 753.141 2.069 2.069
2.076 2.076
10 755.1 753.177 2.083 2.083
2.0665 2.066
20 755.106 753.216 2.05 2.05
2.0625 2.062
30 755.17 753.255 2.075 2.075
2.0695 2.069
40 755.198 753.294 2.064 2.064
2.0695 2.070
50 755.248 753.333 2.075 2.075
2.07 2.070
50.7 755.24 753.335 2.065 2.065
2.2035 2.204
3 51.5 755.23 * 753.338 2.342 2.342
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 755.23 * 753.338 2.342 2.342


2.1995 2.200
0.8 755.238 753.341 2.057 2.057
2.039 2.039
10 755.237 753.376 2.021 2.021
2.0125 2.013
20 755.258 753.414 2.004 2.004
2.006 2.006
30 755.3 753.452 2.008 2.008
1.9985 1.998
40 755.319 753.49 1.989 1.989
1.975 1.975
45 755.31 753.509 1.961 1.961
1.959 1.959
48.7 755.32 753.523 1.957 1.957
2.105 2.105
4 49.5 755.329 * 753.526 2.253 2.253
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

16 0 754.07 752.97 750.58 751.03 3.49 3.49


3.326 3.326
0.8 754.035 752.935 750.873 751.033 3.162 3.162
3.1595 3.159
10 754.063 752.965 750.906 751.066 3.157 3.157
3.18 3.180
20 754.145 753.045 750.942 751.102 3.203 3.203
3.2 3.200
30 754.175 753.075 750.978 751.138 3.197 3.197
3.1585 3.158
40 754.135 753.035 751.015 751.175 3.12 3.12
3.072 3.072
50 754.075 752.975 751.051 751.211 3.024 3.024
3.0235 3.024
51.65 754.08 752.98 751.057 751.217 3.023 3.023
3.164 3.164
1 52.45 754.075 752.975 750.77 751.22 3.305 3.305

TOTAL
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 754.87 * 752.904 2.416 2.416


2.2745 2.274
0.8 754.88 752.907 2.133 2.133
2.151 2.151
10 754.952 752.943 2.169 2.169
2.1765 2.177
17.2 754.995 752.971 2.184 2.184
2.335 2.335
2 18 755.01 * 752.974 2.486 2.486

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

1 0 755 752.974 2.476 2.476


2.3395 2.339
0.8 755.02 752.977 2.203 2.203
2.2265 2.226
10 755.103 753.013 2.25 2.25
2.7595 2.759
20 755.161 752.052 3.269 3.269
2.7695 2.769
22.1 755.17 753.06 2.27 2.27
2.4185 2.418
2 22.9 755.18 753.063 2.567 2.567

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

2 0 755.18 * 753.063 2.567 2.567


2.423 2.423
0.8 755.185 753.066 2.279 2.279
2.279 2.279
10 755.221 753.102 2.279 2.279
2.279 2.279
20 755.26 753.141 2.279 2.279
2.2845 2.285
30 755.31 753.18 2.29 2.29
2.2955 2.295
40 755.36 753.219 2.301 2.301
2.3015 2.301
50 755.4 753.258 2.302 2.302
2.2985 2.298
60 755.432 753.297 2.295 2.295
2.2945 2.295
70 755.47 753.336 2.294 2.294
2.2895 2.290
80 755.5 753.375 2.285 2.285
2.2815 2.282
90 755.532 753.414 2.278 2.278
2.2805 2.280
91.8 755.544 753.421 2.283 2.283
* 2.4295 2.429
3 92.6 755.55 753.424 2.576 2.576

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

4 0 759.11 756.504 3.056 3.056


2.9145 2.915
4 0 759.11 756.504 3.056 3.056
2.9145 2.915
0.8 759.12 756.507 2.773 2.773
2.7705 2.77
10 759.15 756.542 2.768 2.768
2.76 2.760
20 759.172 756.58 2.752 2.752
2.747 2.747
30 759.2 756.618 2.742 2.742
2.7395 2.74
40 759.233 756.656 2.737 2.737
2.737 2.737
40.8 759.236 756.659 2.737 2.737
2.8825 2.883
5 41.6 759.24 756.662 3.028 3.028

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

5 0 759.24 756.662 3.028 3.028


2.8865 2.887
0.8 759.25 756.665 2.745 2.745
2.7445 2.744
10 759.284 756.7 2.744 2.744
2.7385 2.738
20 759.311 756.738 2.733 2.733
2.725 2.725
30 759.333 756.776 2.717 2.717
30 759.333 756.776 2.717 2.717
2.7125 2.713
40 759.362 756.814 2.708 2.708
2.703 2.703
50 759.39 756.852 2.698 2.698
2.696 2.696
56.3 759.41 756.876 2.694 2.694
2.8425 2.842
6 57.1 759.42 756.879 2.991 2.991

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

6 0 759.42 756.879 2.991 2.991


2.8465 2.846
0.8 759.424 756.882 2.702 2.702
2.688 2.688
10 759.431 756.917 2.674 2.674
2.6595 2.660
20 759.44 756.955 2.645 2.645
2.6325 2.632
30 759.453 756.993 2.62 2.62
2.6045 2.605
40 759.46 757.031 2.589 2.589
2.572 2.572
50 759.464 757.069 2.555 2.555
2.554 2.554
51.1 759.466 757.073 2.553 2.553
2.6985 2.699
2.6985 2.699
1A 51.9 759.47 757.076 2.844 2.844

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.: 250 mm
mi) LINE K-1 MH 5 to MH 1 PIPE THICKNESS 9 mm
LENGTH (C-C): 51.00 m SLOPE 0.0038
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m )
3

EXCAVATION
1.687
2.400 0.402 1.685 1.20 0.70 1.415 0.00 - 2.00
2.01 - 4.00
1.683
4.01 - 6.00
17.600 2.658 1.652 8.80 0.70 10.176
6.01 - 8.00
1.621
20.000 2.570 1.607 10.00 0.70 11.249
ROCK EXCAVATION
1.593
20.000 2.090 1.559 10.00 0.70 10.913
BEDDING
1.525
PIPE DIA 250 mm
20.000 1.550 1.505 10.00 0.70 10.535
1.486
PIPING
20.400 1.112 1.459 10.20 0.70 10.417
PIPE DIA 250 mm
1.432
1.600 0.063 1.429 0.80 0.70 0.800
ASPHALT
1.426
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

102.000 10.445 0.000 0.000 55.506

Approved by:
AREA ABU SABAA PIPE DIA.: 250 mm
mi) LINE K-1 MH 1 to MH 2 PIPE THICKNESS 9 mm
LENGTH (C-C): 49.60 m SLOPE 0.0038
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
0.988
1.600 0.056 0.986 0.80 0.70 0.552 0.00 - 2.00
2.01 - 4.00
0.985
4.01 - 6.00
18.400 0.350 0.740 9.20 0.70 4.766
6.01 - 8.00
0.494
19.890 0.578 10.00 0.70 4.046
ROCK EXCAVATION
0.661
19.410 0.675 10.00 0.70 4.725
BEDDING
0.688
PIPE DIA 250 mm
18.850 0.584 10.00 0.70 4.088
0.480
PIPING
16.122 0.493 8.80 0.70 3.037
PIPE DIA 250 mm
0.507
1.443 0.505 0.80 0.70 0.283
ASPHALT
0.504
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

95.715 0.406 0.000 0.000 21.496

Approved by:
AREA ABU SABAA PIPE DIA.: 250 mm
mi) LINE K-1 MH 2 to MH 3 PIPE THICKNESS 9 mm
LENGTH (C-C): 69.30 m SLOPE 0.0038
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
0.800
1.439 0.798 0.80 0.70 0.447 0.00 - 2.00
2.01 - 4.00
0.797
4.01 - 6.00
16.330 0.774 9.20 0.70 4.985
6.01 - 8.00
0.752
17.340 0.733 10.00 0.70 5.131
ROCK EXCAVATION
0.715
17.020 0.702 10.00 0.70 4.914
BEDDING
0.688
PIPE DIA 250 mm
16.580 0.658 10.00 0.70 4.606
0.628
PIPING
16.000 0.600 10.00 0.70 4.200
PIPE DIA 250 mm
0.571
15.400 0.540 10.00 0.70 3.780
ASPHALT
0.509
PIPE DIA 250 mm
12.640 0.487 8.50 0.70 2.898
0.465
CONC. TILES
1.170 0.462 0.80 0.70 0.259
PIPE DIA.
0.459

Demolitiion Septic t

Const Temp. Sepic Ta

113.918 0.000 0.000 0.000 31.219

Approved by:
AREA ABU SABAA PIPE DIA.: 250 mm
mi) LINE K-2 MH 6 to MH 1 PIPE THICKNESS 9 mm
LENGTH (C-C): 50.40 m SLOPE 0.0038
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.174
2.400 1.144 1.183 1.20 0.70 0.994 0.00 - 2.00
2.01 - 4.00
1.191
4.01 - 6.00
17.600 8.941 1.246 8.80 0.70 7.675
6.01 - 8.00
1.300
20.000 11.220 1.352 10.00 0.70 9.464
ROCK EXCAVATION
1.403
20.000 12.290 1.459 10.00 0.70 10.213
BEDDING
1.514
PIPE DIA 250 mm
20.000 13.350 1.565 10.00 0.70 10.955
1.616
PIPING
19.200 13.603 1.647 9.60 0.70 11.068
PIPE DIA 250 mm
1.678
1.600 1.162 1.682 0.80 0.70 0.942
ASPHALT
1.687
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

100.800 61.709 0.000 0.000 51.311

Approved by:
AREA ABU SABAA PIPE DIA.: 250 mm
mi) LINE K-2 MH 1 to MH 2 PIPE THICKNESS 9 mm
LENGTH (C-C): 49.10 m SLOPE 0.0038
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
1.817
1.600 1.161 1.811 0.80 0.70 1.014 0.00 - 2.00
2.01 - 4.00
1.805
4.01 - 6.00
18.400 12.852 1.757 9.20 0.70 11.315
6.01 - 8.00
1.709
20.000 13.050 1.665 10.00 0.70 11.655
ROCK EXCAVATION
1.621
20.000 12.120 1.572 10.00 0.70 11.004
BEDDING
1.523
PIPE DIA 250 mm
20.000 11.160 1.476 10.00 0.70 10.332
1.429
PIPING
16.600 8.524 1.387 8.30 0.70 8.058
PIPE DIA 250 mm
1.344
1.600 0.782 1.338 0.80 0.70 0.749
ASPHALT
1.332
PIPE DIA 250 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

98.200 59.650 0.000 0.000 54.128

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K-2 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 69.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
0.972
0.80 1.600 0.772 0.965 0.965 0.80 0.70

0.958
9.20 18.400 7.995 0.869 0.869 9.20 0.70
0.781
10.00 20.000 6.910 0.691 0.691 10.00 0.70
0.602
10.00 20.000 5.090 0.509 0.509 10.00 0.70
0.417
10.00 20.000 3.340 0.334 0.334 10.00 0.70
0.251
10.00 20.000 1.610 0.161 0.161 10.00 0.70
0.070
10.00 19.820

8.20 14.965

0.80 1.399

69.000 136.184 25.717 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K-4 MH 7 to MH 1 PIPE THICKNESS
LENGTH (C-C): 50.95 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.045
1.20 2.400 1.240 1.032 1.032 1.20 0.70
1.20 2.400 1.240 1.032 1.032 1.20 0.70

1.020
8.80 17.600 9.214 1.047 1.047 8.80 0.70
1.074
10.00 20.000 10.990 1.099 1.099 10.00 0.70
1.124
10.00 20.000 11.500 1.150 1.150 10.00 0.70
1.176
10.00 20.000 12.010 1.201 1.201 10.00 0.70
1.227
10.15 20.300 12.779 1.259 1.259 10.15 0.70
1.291
0.80 1.600 1.037 1.296 1.296 0.80 0.70
1.301

50.950 101.900 58.769 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K-4 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 50.73 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.301
0.80 1.600 1.038 1.298 1.298 0.80 0.70

1.296
9.20 18.400 11.785 1.281 1.281 9.20 0.70
9.20 18.400 11.785 1.281 1.281 9.20 0.70
1.266
10.00 20.000 12.430 1.243 1.243 10.00 0.70
1.220
10.00 20.000 11.960 1.196 1.196 10.00 0.70
1.173
10.00 20.000 11.490 1.149 1.149 10.00 0.70
1.125
9.93 19.860 10.913 1.099 1.099 9.93 0.70
1.073
0.80 1.600 0.855 1.069 1.069 0.80 0.70
1.066

50.730 101.460 60.472 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K-4 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 67.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.066
0.80 1.600 0.848 1.060 1.060 0.80 0.70

1.054
9.20 18.400 8.887 0.966 0.966 9.20 0.70
0.878
10.00 20.000 7.740 0.774 0.774 10.00 0.70
10.00 20.000 7.740 0.774 0.774 10.00 0.70
0.671
10.00 20.000 5.780 0.578 0.578 10.00 0.70
0.486
10.00 20.000 3.910 0.391 0.391 10.00 0.70
0.297
10.00 20.000 2.060 0.206 0.206 10.00 0.70
0.115
10.00 20.000 0.190

6.70 12.522

0.80 1.446

67.500 133.968 29.415 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25 MH 19 to MH 1 PIPE THICKNESS
LENGTH (C-C): 87.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.466 0.000

9.20 18.400 4.085 0.000

10.00 20.000 4.380 0.000

10.00 20.000 4.440 0.000


10.00 20.000 4.690 0.000

10.00 20.000 4.540 0.000

10.00 20.000 4.500 0.000

10.00 20.000 4.710 0.000

10.00 20.000 4.720 0.000

6.20 12.400 2.908

0.80 1.600 0.489

87.00 174.000 39.928 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 68.20 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.490 0.000

9.20 18.400 4.398 0.000

10.00 20.000 4.970 0.000

10.00 20.000 4.370 0.000

10.00 20.000 3.280 0.000


10.00 20.000 2.630 0.000

10.00 20.000 2.120 0.000

7.40 14.800 1.014 0.000

0.80 1.600 0.182 0.000

68.20 136.400 23.454 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 25 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 54.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.184 0.000

9.20 18.400 0.764 0.000

10.00 20.000 0.550 0.000

10.00 19.990 0.000

10.00 19.410 0.000

10.00 19.090 0.000


3.20 6.102 0.000

0.80 1.600 0.048 0.000

0.000

54.00 106.192 1.546 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 19 to MH 1 PIPE THICKNESS
LENGTH (C-C): 51.75 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.470 0.000

9.20 18.400 3.717 0.000

10.00 20.000 3.260 0.000

10.00 20.000 2.510 0.000

10.00 20.000 1.870 0.000

10.00 20.000 1.370 0.000

0.95 1.900 0.114 0.000


0.80 1.600 0.211 0.000

0.000

51.75 103.500 13.522 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 59.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.205 0.000

9.20 18.400 0.662 0.000

10.00 20.000 0.470 0.000

10.00 20.000 0.070 0.000

10.00 19.260 0.000

10.00 18.530 0.000

8.70 15.825 0.000

0.80 1.581 0.000


0.000

59.50 115.196 1.407 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 64.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.582 0.000

9.20 16.523 0.000

10.00 17.310 0.000

10.00 16.780 0.000

10.00 16.250 0.000

10.00 15.520 0.000

10.00 15.440 0.000

3.50 5.607 0.000

0.80 1.425 0.000


64.30 106.437 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 55.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.423 0.000

9.20 14.748 0.000

10.00 16.900 0.000

10.00 17.640 0.000

10.00 17.110 0.000

10.00 16.880 0.000

4.20 6.964 0.000

0.80 1.414 0.000

0.000
55.00 93.078 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 60.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.398 0.000

9.20 14.370 0.000

10.00 15.160 0.000

10.00 15.660 0.000

10.00 15.840 0.000

10.00 14.370 0.000

9.20 11.684 0.000

0.80 1.081 0.000

0.000
60.00 89.564 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 49.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.134 0.000

9.20 11.758 0.000

10.00 13.190 0.000

10.00 13.220 0.000

10.00 12.390 0.000

9.00 11.484 0.000

0.80 1.214 0.000

0.000

0.000
49.80 64.390 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 83.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.212 0.000

9.20 18.400 0.975 0.000

10.00 20.000 1.290 0.000

10.00 20.000 2.840 0.000

10.00 20.000 4.610 0.000

10.00 20.000 5.610 0.000

10.00 20.000 5.800 0.000

10.00 20.000 5.350 0.000

10.00 20.000 4.890 0.000

2.70 5.400 1.256

0.80 1.600 0.482


83.50 167.000 33.315 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 42.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.481 0.000

9.20 18.400 4.066 0.000

10.00 20.000 4.300 0.000

10.00 20.000 4.150 0.000

10.00 20.000 4.340 0.000

1.20 2.400 0.572 0.000

0.80 1.600 0.507 0.000

0.000

0.000
42.00 84.000 18.417 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1-1 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 88.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.480 0.000

9.20 18.400 3.984 0.000

10.00 20.000 4.120 0.000

10.00 20.000 4.270 0.000

10.00 20.000 4.280 0.000

10.00 20.000 3.940 0.000

10.00 20.000 3.760 0.000

10.00 20.000 3.650 0.000

10.00 20.000 3.470 0.000

7.20 14.400 2.362

0.80 1.600 0.368


88.00 176.000 34.683 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1-1 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 89.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.366 0.000

9.20 18.400 2.806 0.000

10.00 20.000 2.800 0.000

10.00 20.000 2.570 0.000

10.00 20.000 2.380 0.000

10.00 20.000 2.020 0.000

10.00 20.000 1.540 0.000

10.00 20.000 0.940 0.000

10.00 20.000 0.510 0.000

8.20 16.400 0.049

0.80 1.600 0.089

89.00 178.000 16.070 0.000 0.000


Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1-1 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 89.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.085 0.000

9.20 17.912 0.000

10.00 19.030 0.000

10.00 18.480 0.000

10.00 18.000 0.000

10.00 17.320 0.000

10.00 16.640 0.000

10.00 16.100 0.000

10.00 15.540 0.000

8.20 12.259

0.80 1.282

89.00 154.164 0.085 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 100.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.510 0.000

9.20 18.400 4.315 0.000

10.00 20.000 4.400 0.000

10.00 20.000 4.180 0.000

10.00 20.000 3.770 0.000

10.00 20.000 3.340 0.000

10.00 20.000 3.140 0.000

10.00 20.000 2.960 0.000

10.00 20.000 2.650 0.000

10.00 20.000 2.440

9.20 18.400 2.024

0.80 1.600 0.278

100.00 200.000 34.007 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 73.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.279 0.000

9.20 18.400 1.840 0.000

10.00 20.000 1.600 0.000

10.00 20.000 0.940 0.000

10.00 20.000 0.590 0.000

10.00 20.000 0.380 0.000

10.00 19.880 0.000

10.00 19.380 0.000

2.20 4.215 0.000

0.80 1.600 0.044

73.00 145.075 5.673 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 26-1 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 81.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.044 0.000

9.20 17.462 0.000

10.00 18.500 0.000

10.00 17.800 0.000

10.00 17.350 0.000

10.00 16.990 0.000

10.00 16.570 0.000

10.00 15.980 0.000

10.00 15.330 0.000

0.70 1.056

0.80 1.321

81.50 139.958 0.044 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 28 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 67.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.342 0.000

9.20 18.400 2.401 0.000

10.00 20.000 2.200 0.000

10.00 20.000 1.740 0.000

10.00 20.000 1.260 0.000

10.00 20.000 0.780 0.000

10.00 20.000 0.300 0.000

6.20 12.307 0.000

0.80 1.600 0.086 0.000

67.00 133.907 9.109 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 28 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 72.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.083 0.000

9.20 17.747 0.000

10.00 18.820 0.000

10.00 18.240 0.000

10.00 17.560 0.000

10.00 17.130 0.000

10.00 16.700 0.000

10.00 16.070 0.000

1.70 2.654 0.000

0.80 1.353

72.50 127.873 0.083 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 6 to MH 1 PIPE THICKNESS
LENGTH (C-C): 93.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
0.80 1.490 0.000

9.20 15.861 0.000

10.00 17.400 0.000

10.00 17.440 0.000

10.00 17.850 0.000

10.00 18.450 0.000

10.00 18.450 0.000

10.00 18.360 0.000

10.00 18.400 0.000

10.00 18.450

2.20 4.059

0.80 1.588

93.000 167.798 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K30 MH 6 to MH 7 PIPE THICKNESS
LENGTH (C-C): 62.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.490 0.000


0.80 1.490 0.000

9.20 15.557 0.000

10.00 16.770 0.000

10.00 17.230 0.000

10.00 17.730 0.000

10.00 18.140 0.000

10.00 18.810 0.000

1.20 2.296 0.000

0.80 1.600 0.042 0.000

62.000 109.623 0.042 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 7 to MH 8 PIPE THICKNESS
LENGTH (C-C): 62.5m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.458 0.000

9.20 15.493 0.000


9.20 15.493 0.000

10.00 16.670 0.000

10.00 16.700 0.000

10.00 16.870 0.000

10.00 17.030 0.000

10.00 16.930 0.000

1.70 2.817 0.000

0.80 1.439 0.000

62.500 105.407 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 8 to MH 9 PIPE THICKNESS
LENGTH (C-C): 63.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.441 0.000

9.20 15.364 0.000

10.00 17.390 0.000


10.00 17.390 0.000

10.00 17.710 0.000

10.00 17.930 0.000

10.00 18.530 0.000

10.00 18.690 0.000

2.70 5.022 0.000

0.80 1.594 0.000

63.500 113.671 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30-1 MH 6 to MH 1 PIPE THICKNESS
LENGTH (C-C): 93.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.490 0.000

9.20 15.861 0.000

10.00 17.400 0.000

10.00 17.440 0.000


10.00 17.850 0.000

10.00 18.450 0.000

10.00 18.450 0.000

10.00 18.360 0.000

10.00 18.400 0.000

10.00 18.450

2.20 4.059

0.80 1.588

93.000 167.798 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K30 MH 6 to MH 7 PIPE THICKNESS
LENGTH (C-C): 62.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.490 0.000

9.20 15.557 0.000

10.00 16.770 0.000

10.00 17.230 0.000

10.00 17.730 0.000


10.00 18.140 0.000

10.00 18.810 0.000

1.20 2.296 0.000

0.80 1.600 0.042 0.000

62.000 109.623 0.042 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 7 to MH 8 PIPE THICKNESS
LENGTH (C-C): 62.5m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.458 0.000

9.20 15.493 0.000

10.00 16.670 0.000

10.00 16.700 0.000

10.00 16.870 0.000

10.00 17.030 0.000


10.00 16.930 0.000

1.70 2.817 0.000

0.80 1.439 0.000

62.500 105.407 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 8 to MH 9 PIPE THICKNESS
LENGTH (C-C): 63.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.441 0.000

9.20 15.364 0.000

10.00 17.390 0.000

10.00 17.710 0.000

10.00 17.930 0.000

10.00 18.530 0.000

10.00 18.690 0.000


2.70 5.022 0.000

0.80 1.594 0.000

63.500 113.671 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 29 MH 22 to MH 1 PIPE THICKNESS
LENGTH (C-C): 55.60 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m )
2
(m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.600 0.025 0.000

9.20 17.324 0.000

10.00 18.860 0.000

10.00 19.130 0.000

10.00 19.020 0.000

10.00 18.760 0.000

4.80 9.010 0.000

0.80 1.600 0.028 0.000

0.000
0.000

55.600 105.304 0.053

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K29 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 43.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth (m Depth
(m) - 2.0 ( m2 ) (m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.600 0.019 0.000

9.20 17.287 0.000

10.00 19.140 0.000

10.00 19.540 0.000

10.00 19.670 0.000

2.70 5.300 0.000

0.80 1.600 0.087 0.000

0.000

0.000
43.500 84.137 0.106 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K29 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 47.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m )
2
(m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.600 0.082 0.000

9.20 17.931 0.000

10.00 19.370 0.000

10.00 19.440 0.000

10.00 19.340 0.000

6.50 12.435 0.000

0.80 1.600 0.054 0.000

0.000

0.000
47.300 91.716 0.136

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K29-1 MH 3 to MH 1 PIPE THICKNESS
LENGTH (C-C): 48.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Area Area Area Rock Ave
Length Area 0.00 Ave Dpth Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth (m Depth
(m) - 2.0 ( m2 ) (m) (m) (m)
(m )2
(m )2
(m )2
) (m)

0.80 1.600 0.053 0.000

9.20 17.324 0.000

10.00 18.050 0.000

10.00 17.450 0.000

10.00 17.070 0.000

8.00 13.424 0.000

0.80 1.453 0.000

0.000

0.000
48.800 86.371 0.053 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 23 to MH 1 PIPE THICKNESS
LENGTH (C-C): 58.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.0952

9.2 18.4 0.368

10 20 0.97

10 20 0.71

10 20 0.54

10 20 0.76

7.7 15.4 0.7392

0.8 1.6 0.2144


58.5 117 4.396

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 60.00 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.2232

9.2 18.4 1.242

10 20 1.18

10 20 1.14

10 20 0.91

10 20 0.46

9.2 18.4 0.184

0.8 1.6 0.128


60 120 5.4672

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 51.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.152

9.2 18.4 0.6992

10 20 0.66

10 20 0.62

10 20 0.69

10 20 0.7

0.7 1.4 0.049

0.8 1.6 0.1632


51.5 103 3.7334

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 49.50 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.16

9.2 18.4 0.3588

10 20 0.13

10 20 0.06

10 19.98 0

5 9.875 0

3.7 7.2483 0

0.8 1.6 0.084


49.5 98.7033 0.7928

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K21 MH 16 to MH 1 PIPE THICKNESS
LENGTH (C-C): 52.45 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

2.39
0.8 1.6 1.0608 2.226 2.226 0.8 0.55
2.062
9.2 18.4 10.6628 2.0605 2.060 9.2 0.55
2.059
10 20 11.8 2.081 2.081 10 0.55
2.103
10 20 12 2.1 2.100 10 0.55
2.097
10 20 11.58 2.0585 2.059 10 0.55
2.02
10 20 10.72 1.972 1.972 10 0.55
1.924
1.65 3.3 1.6896 1.9235 1.923 1.65 0.55
1.923
0.8 1.6 0.9312 2.064 2.064 0.8 0.55
2.205

52.45 104.9 60.445


Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-2 MH 1 to MH 1 PIPE THICKNESS
LENGTH (C-C): 18.00 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.2192

9.2 18.4 1.3892

7.2 14.4 1.2744

0.8 1.6 0.268

18 36 3.15

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K31.2 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 22.90 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.2712

9.2 18.4 2.0792

10 20 7.59

2.1 4.2 1.6149

0.8 1.6 0.3344

22.9 45.8 11.889

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K 31-2 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 92.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.3384

9.2 18.4 2.5668

10 20 2.79

10 20 2.85

10 20 2.95

10 20 3.01

10 20 2.98

10 20 2.95

10 20 2.9

10 20 2.82

1.8 3.6 0.504

0.8 1.6 0.3432

92.6 185.2 27.0024

Approved by:
AREA ABU SABAA PIPE DIA.:
i) LINE K33 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 41.60 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.732


0.8 1.6 0.732

9.2 18.4 7.086

10 20 7.6

10 20 7.47

10 20 7.4

0.8 1.6 0.59

0.8 1.6 0.71

41.6 83.2 31.588

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 57.10 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.71

9.2 18.4 6.845

10 20 7.38

10 20 7.25
10 20 7.13

10 20 7.03

6.3 12.6 4.385

0.8 1.6 0.674

57.1 114.2 41.404

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33-4 MH 6 to MH 1A PIPE THICKNESS
LENGTH (C-C): 51.90 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.677

9.2 18.4 6.33

10 20 6.6

10 20 6.32

10 20 6.05

10 20 5.72

1.1 2.2 0.609

0.8 1.6 0.559


0.8 1.6 0.559

51.9 103.8 32.865


ASPHALT THICKNES 70 mm

SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 102.000
2.01 - 4.00 m2 10.445
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 55.506

BEDDING
PIPE DIA 250 mm m 49.00

PIPING
PIPE DIA 250 mm m 49.50

ASPHALT
PIPE DIA 250 mm m 51.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 95.715
2.01 - 4.00 m2 0.406
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 21.496

BEDDING
PIPE DIA 250 mm m 48.00

PIPING
PIPE DIA 250 mm m 48.40

ASPHALT
PIPE DIA 250 mm m 49.60

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 113.918
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 31.219

BEDDING
PIPE DIA 250 mm m 67.70

PIPING
PIPE DIA 250 mm m 68.10

ASPHALT
PIPE DIA 250 mm m 69.30

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 100.800
2.01 - 4.00 m2 61.709
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 51.311

BEDDING
PIPE DIA 250 mm m 48.40

PIPING
PIPE DIA 250 mm m 48.90

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 98.200
2.01 - 4.00 m2 59.650
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 54.128

BEDDING
PIPE DIA 250 mm m 47.50

PIPING
PIPE DIA 250 mm m 47.90

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 10 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.540 0.00 - 2.00 m2 136.184
2.01 - 4.00 m2 25.717
4.01 - 6.00 m2 0.000
5.596
6.01 - 8.00 m2 0.000

4.837
ROCK EXCAVATION m3 18.002

3.563
BEDDING
PIPE DIA 250 mm m 67.40
2.338

PIPING
1.127
PIPE DIA 250 mm m 67.80

ASPHALT
PIPE DIA 250 mm m 69.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

18.002

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 10 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.867 0.00 - 2.00 m2 101.900
0.867
2.01 - 4.00 m2 58.769
4.01 - 6.00 m2 0.000
6.450
6.01 - 8.00 m2 0.000

7.693
ROCK EXCAVATION m3 41.137

8.050
BEDDING
PIPE DIA 250 mm m 48.95
8.407

PIPING
8.945
PIPE DIA 250 mm m 49.45

0.726
ASPHALT
PIPE DIA 250 mm m 50.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

41.137

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 10 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.727 0.00 - 2.00 m2 101.460
2.01 - 4.00 m2 60.472
4.01 - 6.00 m2 0.000
8.250
8.250
6.01 - 8.00 m2 0.000

8.701
ROCK EXCAVATION m3 42.330

8.372
BEDDING
PIPE DIA 250 mm m 49.13
8.043

PIPING
7.639
PIPE DIA 250 mm m 49.53

0.599
ASPHALT
PIPE DIA 250 mm m 50.73

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

42.330

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 10 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.594 0.00 - 2.00 m2 133.968
2.01 - 4.00 m 2
29.415
4.01 - 6.00 m2 0.000
6.221
6.01 - 8.00 m2 0.000

5.418
5.418
ROCK EXCAVATION m3 20.458

4.046
BEDDING
PIPE DIA 250 mm m 65.90
2.737

PIPING
1.442
PIPE DIA 250 mm m 66.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

20.458

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 174.000
2.01 - 4.00 m2 39.928
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 85.40

PIPING
PIPE DIA 250 mm m 85.80

ASPHALT
PIPE DIA 250 mm m 87.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 136.400
2.01 - 4.00 m2 23.454
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 66.60
PIPING
PIPE DIA 250 mm m 67.00

ASPHALT
PIPE DIA 250 mm m 68.20

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 106.192
2.01 - 4.00 m2 1.546
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 52.40

PIPING
PIPE DIA 250 mm m 52.80
ASPHALT
PIPE DIA 250 mm m 54.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 103.500
2.01 - 4.00 m2 13.522
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 50.15

PIPING
PIPE DIA 250 mm m 50.55

ASPHALT
PIPE DIA 250 mm m 51.75

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 115.196
2.01 - 4.00 m2 1.407
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 57.90

PIPING
PIPE DIA 250 mm m 58.30

ASPHALT
PIPE DIA 250 mm m 59.50
CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 106.437
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 62.70

PIPING
PIPE DIA 250 mm m 63.10

ASPHALT
PIPE DIA 250 mm m 64.30

CONC. TILES
PIPE DIA. m
Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 93.078
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 53.40

PIPING
PIPE DIA 250 mm m 53.80

ASPHALT
PIPE DIA 250 mm m 5.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t
Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 89.564
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 58.40

PIPING
PIPE DIA 250 mm m 58.80

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 64.390
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 48.20

PIPING
PIPE DIA 250 mm m 48.60

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 167.000
2.01 - 4.00 m 2
33.315
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 81.90

PIPING
PIPE DIA 250 mm m 82.30

ASPHALT
PIPE DIA 250 mm m 83.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 84.000
2.01 - 4.00 m2 18.417
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 40.40

PIPING
PIPE DIA 250 mm m 40.80

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 176.000
2.01 - 4.00 m2 34.683
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 86.40

PIPING
PIPE DIA 250 mm m 86.80

ASPHALT
PIPE DIA 250 mm m 88.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T


0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 178.000
2.01 - 4.00 m 2
16.070
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 87.40

PIPING
PIPE DIA 250 mm m 87.80

ASPHALT
PIPE DIA 250 mm m 89.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000
PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 154.164
2.01 - 4.00 m 2
0.085
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 87.40

PIPING
PIPE DIA 250 mm m 87.80

ASPHALT
PIPE DIA 250 mm m 89.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000
PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 200.000
2.01 - 4.00 m2 34.007
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 98.40

PIPING
PIPE DIA 250 mm m 98.80

ASPHALT
PIPE DIA 250 mm m 100.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 145.075
2.01 - 4.00 m2 5.673
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 71.40

PIPING
PIPE DIA 250 mm m 71.80

ASPHALT
PIPE DIA 250 mm m 73.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 139.958
2.01 - 4.00 m2 0.044
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 79.90

PIPING
PIPE DIA 250 mm m 80.30

ASPHALT
PIPE DIA 250 mm m 81.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 133.907
2.01 - 4.00 m2 9.109
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 65.40

PIPING
PIPE DIA 250 mm m 65.80

ASPHALT
PIPE DIA 250 mm m 67.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 127.873
2.01 - 4.00 m2 0.083
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 70.90

PIPING
PIPE DIA 250 mm m 71.30

ASPHALT
PIPE DIA 250 mm m 72.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0041
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 167.798
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 91.40

PIPING
PIPE DIA 250 mm m 91.80

ASPHALT
PIPE DIA 250 mm m 93.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0048
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.00 - 2.00 m2 109.623
2.01 - 4.00 m2 0.042
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 60.40

PIPING
PIPE DIA 250 mm m 60.80

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0113
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 105.407
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 60.90

PIPING
PIPE DIA 250 mm m 61.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 113.671
2.01 - 4.00 m 2
0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000
ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 61.90

PIPING
PIPE DIA 250 mm m 62.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0041
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 167.798
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 91.40

PIPING
PIPE DIA 250 mm m 91.80

ASPHALT
PIPE DIA 250 mm m 93.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0048
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 109.623
2.01 - 4.00 m2 0.042
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 60.40
PIPING
PIPE DIA 250 mm m 60.80

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0113
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 105.407
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 60.90

PIPING
PIPE DIA 250 mm m 61.30
ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 113.671
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 61.90

PIPING
PIPE DIA 250 mm m 62.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0050
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 105.304
2.01 - 4.00 m 2
0.053
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 54.00

PIPING
PIPE DIA 250 mm m 54.40

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 2

Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 84.137
2.01 - 4.00 m2 0.106
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 41.90

PIPING
PIPE DIA 250 mm m 42.30

ASPHALT
PIPE DIA 250 mm m 0.00

CONC. TILES
PIPE DIA. m
Demolitiion Septic t NO. 1

Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 91.716
2.01 - 4.00 m2 0.136
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 45.70

PIPING
PIPE DIA 250 mm m 46.10

ASPHALT
PIPE DIA 250 mm m 47.30

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 3


Const Temp. Sepic T NO.

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

Volume
Description Unit Quantity
( m3 )

EXCAVATION
0.00 - 2.00 m2 86.371
2.01 - 4.00 m2 0.053
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 250 mm m 47.20

PIPING
PIPE DIA 250 mm m 47.60

ASPHALT
PIPE DIA 250 mm m 48.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t NO. 2

Const Temp. Sepic T NO.


* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.004
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 117
2.01 - 4.00 m2 4.396
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 56.9

PIPING
PIPE DIA 250 mm m 57.3

ASPHALT
PIPE DIA 250 mm m 58.5

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0039
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 120
2.01 - 4.00 m2 5.4672
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 58.4

PIPING
PIPE DIA 250 mm m 58.8

ASPHALT
PIPE DIA 250 mm m 60

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0039
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 103
2.01 - 4.00 m2 3.7334
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 49.9

PIPING
PIPE DIA 250 mm m 50.3

ASPHALT
PIPE DIA 250 mm m 51.5

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 98.7033
2.01 - 4.00 m2 0.7928
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 47.9

PIPING
PIPE DIA 250 mm m 48.3

ASPHALT
PIPE DIA 250 mm m 49.5

CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45


PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.00362
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 104.9
0.97944 2.01 - 4.00 m2 60.445
4.01 - 6.00 m2 0
10.4236 6.01 - 8.00 m2 0

11.4455 ROCK EXCAVATION m3 47.3784


=59.223*0.80
11.55 BEDDING
PIPE DIA 250 mm m 50.85
11.3245
PIPING
10.846 PIPE DIA 250 mm m 51.25

1.745123 ASPHALT
PIPE DIA 250 mm m 52.45
0.90816
CONC. TILES
PIPE DIA. m

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

59.223
PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.0039
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 36
2.01 - 4.00 m2 3.15
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 16.4

PIPING
PIPE DIA 250 mm m 16.8

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

0
PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm
PIPE THICKNESS 9 mm
SLOPE 0.00362
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 45.8
2.01 - 4.00 m2 11.889
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 21.3

PIPING
PIPE DIA 250 mm m 21.7

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0039
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 185.2
2.01 - 4.00 m2 27.0024
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 91

PIPING
PIPE DIA 250 mm m 91.4

ASPHALT
PIPE DIA 250 mm m 92.6

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 1

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.00362
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 83.2
2.01 - 4.00 m2 31.588
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 40

PIPING
PIPE DIA 250 mm m 40.4

ASPHALT
PIPE DIA 250 mm m 0

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 114.2
2.01 - 4.00 m2 41.404
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 55.5

PIPING
PIPE DIA 250 mm m 55.9

ASPHALT
PIPE DIA 250 mm m 57.1

CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 0

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 250 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 9 mm
SLOPE 0.0038
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 103.8
2.01 - 4.00 m2 32.865
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 250 mm m 50.3

PIPING
PIPE DIA 250 mm m 50.7

ASPHALT
PIPE DIA 250 mm m 0
CONC. TILES
PIPE DIA. m 0

Demolitiion Septic tanNO. 2

Const Temp. Sepic Ta NO. 0

* EXCAV. DEPTH =a-c+0.45


prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

21 0.00 753.930 752.140 1.950 1.950


1.942 1.941

0.80 753.918 752.145 1.933 1.933


1.934 1.934
10.00 753.978 752.203 1.935 1.935
1.974 1.974
20.00 754.118 752.266 2.012 2.012
1.996 1.996
30.00 754.148 752.329 1.979 1.979
1.973 1.973
40.00 754.198 752.392 1.966 1.966
1.939 1.939
48.60 754.198 752.446 1.912 1.912
1.909 1.909
22 49.40 754.198 752.451 1.907 1.907
0.953

0.000

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

22 0.00 754.198 752.451 1.907 1.907


1.930 1.930

0.80 754.248 752.455 1.953 1.953


1.948 1.948
10.00 754.278 752.496 1.942 1.942
1.965 1.965
20.00 754.368 752.541 1.987 1.987
1.999 1.999
30.00 754.438 752.586 2.012 2.012
2.030 2.030
40.00 754.518 752.631 2.047 2.047
2.043 2.043
44.15 754.528 752.649 2.039 2.039
2.052 2.052
23 44.95 754.558 752.653 2.065 2.065
1.032

0.000

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

23 0.00 754.558 752.653 2.065 2.065


2.074 2.074

0.80 754.578 752.656 2.082 2.082


2.101 2.101
10.00 754.648 752.688 2.120 2.120
2.097 2.097
10.40 754.808 752.894 2.074 2.074
2.170 2.170
24 11.20 754.798 752.692 2.266 2.266
1.133

0.000

0.000

0.000

0.000

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

24 0.00 754.798 752.692 2.266 2.266


2.164 2.164

0.80 754.615 752.713 2.062 2.062


2.022 2.022
10.00 754.780 752.959 1.981 1.981
1.913 1.913
20.00 754.910 753.226 1.844 1.844
1.780 1.780
30.00 755.050 753.493 1.717 1.717
1.678 1.678
40.00 755.240 753.760 1.640 1.640
1.607 1.607
50.00 755.440 754.027 1.573 1.573
1.484 1.484
58.60 755.490 754.256 1.394 1.394
1.347 1.347
25 59.40 755.420 754.280 1.300 1.300
0.650

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)
21 0.00 753.930 752.034 2.346 2.346
2.202 2.202

0.80 753.933 752.036 2.057 2.057


2.068 2.068
10.00 753.983 752.064 2.079 2.079
2.090 2.090
20.00 754.036 752.094 2.102 2.102
2.113 2.113
30.00 754.089 752.124 2.125 2.125
2.137 2.137
40.00 754.142 752.154 2.148 2.148
2.160 2.160
50.00 754.195 752.184 2.171 2.171
2.183 2.183
60.00 754.248 752.214 2.194 2.194
2.206 2.206
70.00 754.301 752.244 2.217 2.217
2.229 2.229
80.00 754.354 752.274 2.240 2.240
2.244 2.244
82.20 754.367 752.280 2.247 2.247
2.392 2.392
1 83.00 754.370 752.283 2.537 2.537

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.370 752.283 2.537 2.537


2.393 2.393
2.393 2.393

0.80 754.373 752.285 2.248 2.248


2.254 2.254
10.00 754.412 752.313 2.259 2.259
2.266 2.266
20.00 754.455 752.343 2.272 2.272
2.278 2.278
30.00 754.497 752.373 2.284 2.284
2.290 2.290
40.00 754.539 752.403 2.296 2.296
2.302 2.302
50.00 754.582 752.433 2.309 2.309
2.315 2.315
60.00 754.624 752.463 2.321 2.321
2.328 2.328
70.20 754.667 752.493 2.334 2.334
2.480 2.480
2 71.00 754.671 752.496 2.625 2.625

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

22 0.00 754.198 752.451 2.197 2.197


2.055 2.055

0.80 754.205 752.453 1.912 1.912


1.918 1.918
1.918 1.918
10.00 754.245 752.481 1.924 1.924
1.933 1.933
20.00 754.292 752.511 1.941 1.941
1.950 1.950
30.00 754.339 752.541 1.958 1.958
1.966 1.966
40.00 754.386 752.571 1.975 1.975
1.980 1.980
50.00 754.426 752.601 1.985 1.985
1.995 1.995
60.00 754.476 752.631 2.005 2.005
2.014 2.014
70.00 754.523 752.661 2.022 2.022
2.033 2.033
78.10 754.568 752.685 2.043 2.043
2.190 2.190
1 78.90 754.574 752.687 2.337 2.337

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1 0.00 754.574 752.687 2.337 2.337


2.194 2.194

0.80 754.580 752.689 2.051 2.051


2.057 2.057
10.00 754.619 752.717 2.062 2.062
2.070 2.070
2.070 2.070
20.00 754.664 752.747 2.077 2.077
2.096 2.096
30.00 754.732 752.777 2.115 2.115
2.082 2.082
40.00 754.696 752.807 2.049 2.049
2.066 2.066
50.00 754.759 752.837 2.082 2.082
2.070 2.070
60.00 754.764 752.867 2.057 2.057
2.091 2.091
69.20 754.860 752.896 2.124 2.124
2.272 2.272
2 70.60 754.867 752.898 2.419 2.419
1.209

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 754.867 752.898 2.419 2.419


2.267 2.267

0.80 754.855 752.900 2.115 2.115


2.119 2.119
10.00 754.890 752.928 2.122 2.122
2.116 2.116
20.00 754.908 752.958 2.110 2.110
2.114 2.114
2.114 2.114
30.00 754.945 752.988 2.117 2.117
2.105 2.105
40.00 754.950 753.018 2.092 2.092
2.078 2.078
50.00 754.952 753.048 2.064 2.064
2.055 2.055
55.70 754.952 753.065 2.047 2.047
2.169 2.169
3 56.50 754.909 753.067 2.292 2.292
1.146

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 754.909 753.067 2.292 2.292


2.135 2.135

0.80 754.887 753.069 1.978 1.978


1.949 1.949
10.00 754.857 753.097 1.920 1.920
1.883 1.883
20.00 754.812 753.127 1.845 1.845
1.818 1.818
30.00 754.787 753.157 1.790 1.790
1.765 1.765
1.765 1.765
40.00 754.767 753.187 1.740 1.740
1.715 1.715
50.00 754.747 753.217 1.690 1.690
1.670 1.670
60.00 754.737 753.247 1.650 1.650
1.617 1.617
70.00 754.702 753.277 1.585 1.585
1.555 1.555
80.00 754.672 753.307 1.525 1.525
1.543 1.542
90.00 754.737 753.337 1.560 1.560
1.701 1.701
4 90.80 754.732 753.339 1.843 1.843

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 754.732 * 753.339 1.843 1.843


1.658 1.658

0.80 754.654 753.341 1.473 1.473


1.472 1.472
10.00 754.680 753.369 1.471 1.471
1.482 1.482
20.00 754.732 753.399 1.493 1.493
1.511 1.511
30.00 754.797 753.429 1.528 1.528
1.536 1.536
40.00 754.842 753.459 1.543 1.543
1.558 1.558
50.00 754.902 753.489 1.573 1.573
50.00 754.902 753.489 1.573 1.573
1.578 1.578
60.00 754.942 753.519 1.583 1.583
1.571 1.571
70.00 754.947 753.549 1.558 1.558
1.557 1.557
71.20 754.947 753.552 1.555 1.555
1.701 1.701
5 72.00 754.952 * 753.555 1.847 1.847
0.924

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 754.952 * 753.555 1.847 1.847


1.7145 1.715

0.80 754.979 753.557 1.582 1.582


1.604 1.604
10.00 755.051 753.585 1.626 1.626
1.622 1.622
20.00 755.072 753.615 1.617 1.617
1.629 1.629
30.00 755.127 753.645 1.642 1.642
1.643 1.643
40.00 755.159 753.675 1.644 1.644
1.638 1.638
50.00 755.176 753.705 1.631 1.631
1.644 1.643
60.00 755.231 753.735 1.656 1.656
60.00 755.231 753.735 1.656 1.656
1.660 1.660
70.00 755.269 753.765 1.664 1.664
1.689 1.689
80.00 755.349 753.795 1.714 1.714
1.717 1.717
87.10 755.375 753.816 1.719 1.719
1.868 1.868
6 87.90 755.385 * 753.818 2.017 2.017

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 754.732 * 753.339 1.843 1.843


1.658 1.658

0.80 754.654 753.341 1.473 1.473


1.472 1.472
10.00 754.680 753.369 1.471 1.471
1.482 1.482
20.00 754.732 753.399 1.493 1.493
1.511 1.511
30.00 754.797 753.429 1.528 1.528
1.536 1.536
40.00 754.842 753.459 1.543 1.543
1.558 1.558
50.00 754.902 753.489 1.573 1.573
1.578 1.578
60.00 754.942 753.519 1.583 1.583
1.571 1.571
70.00 754.947 753.549 1.558 1.558
1.557 1.557
1.557 1.557
71.20 754.947 753.552 1.555 1.555
1.701 1.701
5 72.00 754.952 * 753.555 1.847 1.847
0.924

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 754.952 * 753.555 1.847 1.847


1.7145 1.715

0.80 754.979 753.557 1.582 1.582


1.604 1.604
10.00 755.051 753.585 1.626 1.626
1.622 1.622
20.00 755.072 753.615 1.617 1.617
1.629 1.629
30.00 755.127 753.645 1.642 1.642
1.643 1.643
40.00 755.159 753.675 1.644 1.644
1.638 1.638
50.00 755.176 753.705 1.631 1.631
1.644 1.643
60.00 755.231 753.735 1.656 1.656
1.660 1.660
70.00 755.269 753.765 1.664 1.664
1.689 1.689
80.00 755.349 753.795 1.714 1.714
1.717 1.717
1.717 1.717
87.10 755.375 753.816 1.719 1.719
1.868 1.868
6 87.90 755.385 * 753.818 2.017 2.017

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

26 0 758.91 * 755.776 3.584 3.584


3.448 3.448
0.8 758.93 755.778 3.312 3.312
3.3285 3.328
10 758.991 755.806 3.345 3.345
3.3695 3.369
20 759.07 755.836 3.394 3.394
3.4215 3.422
30 759.155 755.866 3.449 3.449
3.4565 3.457
40 759.2 755.896 3.464 3.464
3.464 3.464
50 759.23 755.926 3.464 3.464
3.4625 3.462
54.6 759.241 755.94 3.461 3.461
3.6095 3.609
1 55.4 759.25 * 755.942 3.758 3.758
TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

2 0 759.52 * 756.059 3.911 3.911


3.755 3.755
0.8 759.5 756.061 3.599 3.599
3.545 3.545
10 759.42 756.089 3.491 3.491
3.4365 3.437
20 759.341 756.119 3.382 3.382
3.3225 3.323
30 759.252 756.149 3.263 3.263
3.207 3.207
40 759.17 756.179 3.151 3.151
3.0915 3.092
50 759.081 756.209 3.032 3.032
2.9775 2.978
60 759.002 756.239 2.923 2.923
2.8625 2.862
70 758.911 756.269 2.802 2.802
70 758.911 756.269 2.802 2.802
2.758 2.758
79 758.85 756.296 2.714 2.714
2.853 2.853
3 79.8 758.84 * 756.298 2.992 2.992

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
SOIL EXCAVATION

M.H to M. Station (m)Ground LevRock Level Rock Level Invert LevelExcav. Dep Soil Depth Ave Dpth (Ave Depth

3 0 758.84 * 756.298 2.992 2.992


2.851 2.851
0.8 758.85 756.3 2.71 2.71
2.721 2.721
10 758.9 756.328 2.732 2.732
2.7425 2.743
20 758.951 756.358 2.753 2.753
2.7575 2.758
30 758.99 756.388 2.762 2.762
2.777 2.777
40 759.05 756.418 2.792 2.792
2.7975 2.797
50 759.091 756.448 2.803 2.803
2.8065 2.807
2.8065 2.807
51.2 759.102 756.452 2.81 2.81
2.958 2.958
4 52 759.11 * 756.454 3.106 3.106

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 21 to MH 22 PIPE THICKNESS
LENGTH (C-C): 49.40 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.553

9.20 17.793

10.00 19.740

10.00 19.960

10.00 19.730

8.60 16.675

0.80 1.527

49.400 96.978 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 22 to MH 23 PIPE THICKNESS
LENGTH (C-C): 44.95 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.544

9.20 17.922

10.00 19.650

10.00 19.990

10.00 20.000 0.300

4.15 8.300 0.178

0.80 1.600 0.042

44.950 89.006 0.520 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 23 to MH 24 PIPE THICKNESS
LENGTH (C-C): 11.20 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.059

9.20 18.400 0.929

0.40 0.800 0.039

0.80 1.600 0.136

11.200 22.400 1.163 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 24 to MH 25 PIPE THICKNESS
LENGTH (C-C): 59.40 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.131

9.20 18.400 0.202

10.00 19.130

10.00 17.800

10.00 16.780

10.00 16.070

8.60 12.762

0.80 1.078

59.400 103.620 0.334 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 28 MH 21 to MH 1 PIPE THICKNESS
LENGTH (C-C): 83.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
0.80 1.600 0.162

9.20 18.400 0.626

10.00 20.000 0.900

10.00 20.000 1.130

10.00 20.000 1.370

10.00 20.000 1.600

10.00 20.000 1.830

10.00 20.000 2.060

10.00 20.000 2.290

2.20 4.400 0.537

0.80 1.600 0.314

83.000 166.000 12.818 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 28 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 71.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.314


0.80 1.600 0.314

9.20 18.400 2.337

10.00 20.000 2.660

10.00 20.000 2.780

10.00 20.000 2.900

10.00 20.000 3.020

10.00 20.000 3.150

10.20 20.400 3.346

0.80 1.600 0.384

71.000 142.000 20.891 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 22 to MH 1 PIPE THICKNESS
LENGTH (C-C): 78.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.044

9.20 17.646
9.20 17.646

10.00 19.330

10.00 19.500

10.00 19.660

10.00 19.800

10.00 19.950

10.00 20.000 0.140

8.10 16.200 0.267

0.80 1.600 0.152

78.900 155.286 0.603 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 1 to MH 2 PIPE THICKNESS
LENGTH (C-C): 70.60 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.155

9.20 18.400 0.524

10.00 20.000 0.700


10.00 20.000 0.700

10.00 20.000 0.960

10.00 20.000 0.820

10.00 20.000 0.660

10.00 20.000 0.700

9.20 18.400 0.837

1.40 2.800 0.381

70.600 141.200 5.738 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 56.50 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.214

9.20 18.400 1.095

10.00 20.000 1.160

10.00 20.000 1.140


10.00 20.000 1.140

10.00 20.000 1.050

10.00 20.000 0.780

5.70 11.400 0.314

0.80 1.600 0.135

56.500 113.000 5.887 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 90.80 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.108

9.20 17.931

10.00 18.830

10.00 18.180

10.00 17.650
10.00 17.650

10.00 17.150

10.00 16.700

10.00 16.170

10.00 15.550

10.00 15.420

0.80 1.361

90.800 156.542 0.108 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 72.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.326

9.20 13.542

10.00 14.820

10.00 15.110

10.00 15.360

10.00 15.580
10.00 15.780

10.00 15.710

1.20 1.868

0.80 1.361

72.000 110.457 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 87.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.372

9.20 14.757

10.00 16.220

10.00 16.290

10.00 16.430

10.00 16.380

10.00 16.430
10.00 16.600

10.00 16.890

7.10 12.191

0.80 1.494

87.900 145.054 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 4 to MH 5 PIPE THICKNESS
LENGTH (C-C): 72.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.326

9.20 13.542

10.00 14.820

10.00 15.110

10.00 15.360

10.00 15.580

10.00 15.780

10.00 15.710

1.20 1.868
1.20 1.868

0.80 1.361

72.000 110.457 0.000 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE K 30 MH 5 to MH 6 PIPE THICKNESS
LENGTH (C-C): 87.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.372

9.20 14.757

10.00 16.220

10.00 16.290

10.00 16.430

10.00 16.380

10.00 16.430

10.00 16.600

10.00 16.890

7.10 12.191
7.10 12.191

0.80 1.494

87.900 145.054 0.000 0.000 0.000

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 26 to MH 1 PIPE THICKNESS
LENGTH (C-C): 55.40 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 1.1584

9.2 18.4 12.2176

10 20 13.69

10 20 14.22

10 20 14.57

10 20 14.64

4.6 9.2 6.7252

0.8 1.6 1.2872


55.4 110.8 78.5084

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 2 to MH 3 PIPE THICKNESS
LENGTH (C-C): 79.80 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 1.404

9.2 18.4 14.214

10 20 14.37

10 20 13.23

10 20 12.07

10 20 10.92

10 20 9.78

10 20 8.62
9 18 6.822

0.8 1.6 0.6824

79.8 159.6 92.1124

Approved by:
AREA ABO SAPAA PIPE DIA.:
i) LINE K33 MH 3 to MH 4 PIPE THICKNESS
LENGTH (C-C): 52.00 m SLOPE
ROCK EXCAVATION

Length ( m Area 0.00 - Area


2.0 ( m 2
2.01) -Area
4.0 ( m 2
4.01) Area m2 ) Rock
- 6.0 ( 6.01 m2 )
- 8.0 (DepthAve Dpth (Ave Depth Length ( m Width ( m

0.8 1.6 0.6808

9.2 18.4 6.6332

10 20 7.43

10 20 7.58

10 20 7.77

10 20 7.97

1.2 2.4 0.9684


1.2 2.4 0.9684

0.8 1.6 0.7664

52 104 39.798
PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 11 mm
SLOPE 0.0063
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.00 - 2.00 m2 96.978
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 47.80

PIPING
PIPE DIA 300 mm m 48.20

ASPHALT
PIPE DIA 300 mm m 49.40

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0045
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 89.006
2.01 - 4.00 m2 0.520
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 43.35

PIPING
PIPE DIA 300 mm m 43.75

ASPHALT
PIPE DIA 300 mm m 44.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0035
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 22.400
2.01 - 4.00 m2 1.163
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 9.60

PIPING
PIPE DIA 300 mm m 10.00

ASPHALT
PIPE DIA 300 mm m 11.20

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0267
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 103.620
2.01 - 4.00 m2 0.334
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 57.80

PIPING
PIPE DIA 300 mm m 58.20

ASPHALT
PIPE DIA 300 mm m 59.40

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 166.000
2.01 - 4.00 m2 12.818
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 81.40

PIPING
PIPE DIA 300 mm m 81.80

ASPHALT
PIPE DIA 300 mm m 83.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.00 - 2.00 m2 142.000
2.01 - 4.00 m2 20.891
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 69.40

PIPING
PIPE DIA 300 mm m 69.80

ASPHALT
PIPE DIA 300 mm m 71.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 155.286
2.01 - 4.00 m2 0.603
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 77.30

PIPING
PIPE DIA 300 mm m 77.70

ASPHALT
PIPE DIA 300 mm m 78.90

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 3

Const Temp. Sepic T 3

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 141.200
2.01 - 4.00 m 2
5.738
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000
ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 69.00

PIPING
PIPE DIA 300 mm m 69.40

ASPHALT
PIPE DIA 300 mm m 70.60

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 4

Const Temp. Sepic T 4

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 113.000
2.01 - 4.00 m2 5.887
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000


BEDDING
PIPE DIA 300 mm m 54.90

PIPING
PIPE DIA 300 mm m 55.30

ASPHALT
PIPE DIA 300 mm m 56.50

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 3

Const Temp. Sepic T 3

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 156.542
2.01 - 4.00 m2 0.108
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 89.20
PIPING
PIPE DIA 300 mm m 89.60

ASPHALT
PIPE DIA 300 mm m 90.80

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 110.457
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 70.40

PIPING
PIPE DIA 300 mm m 70.80
ASPHALT
PIPE DIA 300 mm m 72.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 145.054
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 86.30

PIPING
PIPE DIA 300 mm m 86.70

ASPHALT
PIPE DIA 300 mm m 87.90

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.00 - 2.00 m2 110.457
2.01 - 4.00 m 2
0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 70.40

PIPING
PIPE DIA 300 mm m 70.80

ASPHALT
PIPE DIA 300 mm m 72.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 300 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0030
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 145.054
2.01 - 4.00 m2 0.000
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 300 mm m 86.30

PIPING
PIPE DIA 300 mm m 86.70

ASPHALT
PIPE DIA 300 mm m 87.90

CONC. TILES
PIPE DIA. m
Demolitiion Septic t 1

Const Temp. Sepic T 1

* EXCAV. DEPTH =a-c+0.45

0.000

PIPE DIA.: 300 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.003
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 110.8
2.01 - 4.00 m2 78.5084
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 300 mm m 53.8

PIPING
PIPE DIA 300 mm m 54.2

ASPHALT
PIPE DIA 300 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tan 0

Const Temp. Sepic Ta 0


* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 300 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.003
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 159.6
2.01 - 4.00 m2 92.1124
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 300 mm m 78.2

PIPING
PIPE DIA 300 mm m 78.6

ASPHALT
PIPE DIA 300 mm m 0
CONC. TILES
PIPE DIA. m

Demolitiion Septic tan 0

Const Temp. Sepic Ta 0

* EXCAV. DEPTH =a-c+0.45

PIPE DIA.: 300 mm ASPHALT THICKNESS 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.003
SUMMARY

3
)
Volume ( mDescription Unit Quantity
EXCAVATION
0.00 - 2.00 m2 104
2.01 - 4.00 m2 39.798
4.01 - 6.00 m2 0
6.01 - 8.00 m2 0

ROCK EXCAVATION m3 0

BEDDING
PIPE DIA 300 mm m 50.4

PIPING
PIPE DIA 300 mm m 50.8
ASPHALT
PIPE DIA 300 mm m 0

CONC. TILES
PIPE DIA. m

Demolitiion Septic tan 2

Const Temp. Sepic Ta 0

* EXCAV. DEPTH =a-c+0.45


prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

17 0.00 754.130 752.130 750.830 750.990 3.300 3.300


3.294 3.294

0.80 754.120 752.120 750.832 750.992 3.288 3.288


3.224 3.224
10.00 754.010 752.010 750.851 751.011 3.159 3.159
3.093 3.093
20.00 753.900 751.900 750.872 751.032 3.028 3.028
2.957 2.957
30.00 753.780 751.780 750.893 751.053 2.887 2.887
2.821 2.821
40.00 753.670 751.670 750.914 751.074 2.756 2.756
2.733 2.732
48.15 753.640 751.640 750.931 751.091 2.709 2.709
2.703 2.703
18 48.95 753.630 751.630 750.933 751.093 2.697 2.697
1.349

0.000

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

18 0.00 753.630 751.630 750.933 751.093 2.697 2.697


2.691 2.691

0.80 753.620 751.620 750.935 751.095 2.685 2.685


2.665 2.665
10.00 753.600 751.600 750.954 751.114 2.646 2.646
2.621 2.621
20.00 753.570 751.570 750.975 751.135 2.595 2.595
2.593 2.593
20.75 753.567 751.567 750.977 751.137 2.590 2.590
2.589 2.589
19 21.55 753.565 751.565 750.978 751.138 2.587 2.587
1.294

0.000

0.000

0.000

0.000

0.000

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

19 0.00 753.565 751.620 2.105 2.105


2.125 2.125

0.80 753.605 751.621 2.144 2.144


2.149 2.149
10.00 753.635 751.641 2.154 2.154
2.163 2.163
20.00 753.675 751.662 2.173 2.173
2.177 2.177
30.00 753.705 751.683 2.182 2.182
2.192 2.192
40.00 753.745 751.704 2.201 2.201
2.206 2.206
50.00 753.775 751.725 2.210 2.210
2.220 2.220
60.00 753.815 751.746 2.229 2.229
2.234 2.234
70.00 753.845 751.767 2.238 2.238
2.245 2.244
73.12 753.865 751.774 2.251 2.251
2.256 2.256
20 73.92 753.876 751.775 2.261 2.261
1.131

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

20 0.00 753.876 751.774 2.262 2.262


2.261 2.261

0.80 753.877 751.776 2.261 2.261


2.253 2.253
10.00 753.880 751.795 2.245 2.245
2.239 2.239
20.00 753.888 751.816 2.232 2.232
2.220 2.220
30.00 753.885 751.837 2.208 2.208
2.200 2.200
40.00 753.890 751.858 2.192 2.192
2.187 2.187
50.00 753.900 751.879 2.181 2.181
2.175 2.175
60.00 753.910 751.900 2.170 2.170
2.165 2.165
70.00 753.921 751.921 2.160 2.160
2.156 2.156
75.20 753.925 751.932 2.153 2.153
2.154 2.154
21 76.00 753.930 751.934 2.156 2.156
1.078

0.000

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 17 to MH 18 PIPE THICKNESS
LENGTH (C-C): 48.95 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.300
0.80 1.600 1.035 1.294 1.294 0.80 0.85

1.288
9.20 18.400 11.261 1.224 1.224 9.20 0.85
1.159
10.00 20.000 10.930 1.093 1.093 10.00 0.85
1.028
10.00 20.000 9.570 0.957 0.957 10.00 0.85
0.887
10.00 20.000 8.210 0.821 0.821 10.00 0.85
0.756
8.15 16.300 5.966 0.732 0.732 8.15 0.85
0.709
0.80 1.600 0.562 0.703 0.703 0.80 0.85
0.697
0.349

0.000

0.000

0.000

0.000

48.950 97.900 47.534 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 18 to MH 19 PIPE THICKNESS
LENGTH (C-C): 21.55 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.697
0.80 1.600 0.553 0.691 0.691 0.80 0.85

0.685
9.20 18.400 6.118 0.665 0.665 9.20 0.85
0.646
10.00 20.000 6.210 0.620 0.620 10.00 0.85
0.595
0.75 1.500 0.445 0.593 0.593 0.75 0.85
0.590
0.80 1.600 0.471 0.589 0.589 0.80 0.85
0.587
0.293

0.000

0.000

0.000

0.000

0.000

0.000

21.550 43.100 13.797 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 19 to MH 20 PIPE THICKNESS
LENGTH (C-C): 73.92 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.100 0.000

9.20 18.400 1.371 0.000

10.00 20.000 1.630 0.000

10.00 20.000 1.770 0.000

10.00 20.000 1.920 0.000

10.00 20.000 2.060 0.000

10.00 20.000 2.200 0.000

10.00 20.000 2.340 0.000

3.12 6.240 0.761 0.000

0.80 1.600 0.205 0.000

0.000

0.000

73.920 147.840 14.357 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 20 to MH 21 PIPE THICKNESS
LENGTH (C-C): 76.00 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

0.80 1.600 0.209 0.000

9.20 18.400 2.328 0.000

10.00 20.000 2.390 0.000

10.00 20.000 2.200 0.000

10.00 20.000 2.000 0.000

10.00 20.000 1.870 0.000

10.00 20.000 1.750 0.000

10.00 20.000 1.650 0.000

5.20 10.400 0.811 0.000

0.80 1.600 0.123 0.000

0.000

0.000

76.000 152.000 15.331 0.000 0.000


PIPE DIA.: 400 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 11 mm
SLOPE 0.0021
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.880 0.00 - 2.00 m2 97.900
2.01 - 4.00 m2 47.534
4.01 - 6.00 m2 0.000
9.572
6.01 - 8.00 m2 0.000

9.291
ROCK EXCAVATION m3 40.404

8.135
BEDDING
PIPE DIA 400 mm m 47.35
6.979

PIPING
5.071
PIPE DIA 400 mm m 47.75

0.478
ASPHALT
PIPE DIA 400 mm m 48.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

40.404

PIPE DIA.: 400 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0021
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.470 0.00 - 2.00 m2 43.100
2.01 - 4.00 m2 13.797
4.01 - 6.00 m2 0.000
5.200
6.01 - 8.00 m2 0.000

5.270
ROCK EXCAVATION m3 11.719

0.378
BEDDING
PIPE DIA 400 mm m 19.95
0.401

PIPING
PIPE DIA 400 mm m 20.35

ASPHALT
PIPE DIA 400 mm m 21.55

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

11.719

PIPE DIA.: 400 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0021
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 147.840
2.01 - 4.00 m2 14.357
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 400 mm m 72.32

PIPING
PIPE DIA 400 mm m 72.72

ASPHALT
PIPE DIA 400 mm m 73.92

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000

PIPE DIA.: 400 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0021
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 152.000
2.01 - 4.00 m2 15.331
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 400 mm m 74.40

PIPING
PIPE DIA 400 mm m 74.80

ASPHALT
PIPE DIA 400 mm m 76.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

0.000
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

10 0.00 754.533 750.283 4.410 4.410


4.420 4.420

1.20 754.555 750.284 4.431 4.431


4.478 4.478
10.00 754.662 750.298 4.524 4.524
4.568 4.568
20.00 754.765 750.313 4.612 4.612
4.659 4.659
30.00 754.873 750.328 4.705 4.705
4.750 4.750
40.00 754.977 750.343 4.794 4.794
4.820 4.820
47.65 755.040 750.354 4.846 4.846
4.852 4.852
11 48.45 755.053 750.355 4.858 4.858

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

11 0.00 755.053 750.355 4.858 4.858


4.871 4.871

1.20 755.080 750.356 4.884 4.884


4.942 4.942
10.00 755.210 750.371 4.999 4.999
5.053 5.053
20.00 755.333 750.387 5.106 5.106
5.145 5.145
28.65 755.424 750.401 5.183 5.183
5.194 5.194
12 29.45 755.448 750.402 5.206 5.206
2.603

0.000

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

12 0.00 755.448 753.448 750.242 750.402 5.206 5.206


5.208 5.208

0.80 755.454 753.454 750.243 750.403 5.211 5.211


5.221 5.221
10.00 755.490 753.490 750.258 750.418 5.232 5.232
5.245 5.245
20.00 755.532 753.532 750.274 750.434 5.258 5.258
5.261 5.261
30.00 755.555 753.555 750.290 750.450 5.265 5.265
5.273 5.273
40.00 755.588 753.588 750.306 750.466 5.282 5.282
5.281 5.280
50.00 755.601 753.601 750.322 750.482 5.279 5.279
5.286 5.286
59.50 755.630 753.630 750.337 750.497 5.293 5.293
5.297 5.297
13 60.30 755.640 753.640 750.338 750.498 5.302 5.302

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

13 0.00 755.640 754.640 750.338 750.498 5.302 5.302


5.291 5.291

0.80 755.620 754.620 750.339 750.499 5.281 5.281


5.125 5.125
10.00 755.323 754.323 750.354 750.514 4.969 4.969
4.900 4.900
20.00 755.200 754.200 750.370 750.530 4.830 4.830
4.763 4.763
30.00 755.082 754.082 750.386 750.546 4.696 4.696
4.617 4.617
40.00 754.940 753.940 750.402 750.562 4.538 4.538
4.466 4.466
49.15 754.811 753.811 750.417 750.577 4.394 4.394
4.388 4.388
14 49.95 754.800 753.800 750.418 750.578 4.382 4.382

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

14 0.00 754.800 754.100 750.418 750.578 4.382 4.382


4.377 4.377

0.80 754.790 754.090 750.419 750.579 4.371 4.371


4.269 4.268
10.00 754.600 753.900 750.434 750.594 4.166 4.166
4.081 4.081
20.00 754.445 753.745 750.450 750.610 3.995 3.995
3.915 3.915
30.00 754.300 753.600 750.466 750.626 3.834 3.834
3.756 3.756
40.00 754.160 753.460 750.482 750.642 3.678 3.678
3.599 3.599
50.53 754.020 753.320 750.499 750.659 3.521 3.521
3.513 3.513
15 51.33 754.005 753.305 750.500 750.660 3.505 3.505

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

15 0.00 754.005 752.005 750.500 750.660 3.505 3.505


3.506 3.506

0.80 754.007 752.007 750.501 750.661 3.506 3.506


3.507 3.507
10.00 754.025 752.025 750.516 750.676 3.509 3.509
3.489 3.489
20.00 754.002 752.002 750.532 750.692 3.470 3.470
3.465 3.465
30.00 754.008 752.008 750.548 750.708 3.460 3.460
3.463 3.463
40.00 754.030 752.030 750.564 750.724 3.466 3.466
3.470 3.470
49.95 754.055 752.055 750.580 750.740 3.475 3.475
3.478 3.478
16 50.75 754.061 752.061 750.581 750.741 3.480 3.480

TOTAL

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

16 0.00 754.061 752.061 750.581 750.741 3.480 3.480


3.482 3.482

0.80 754.065 752.065 750.582 750.742 3.483 3.483


3.477 3.477
10.00 754.068 752.068 750.597 750.757 3.471 3.471
3.467 3.467
20.00 754.075 752.075 750.613 750.773 3.462 3.462
3.457 3.457
30.00 754.080 752.080 750.629 750.789 3.451 3.451
3.446 3.446
40.00 754.086 752.086 750.645 750.805 3.441 3.441
3.435 3.435
50.00 754.090 752.090 750.661 750.821 3.429 3.429
3.423 3.423
60.00 754.094 752.094 750.677 750.837 3.417 3.417
3.412 3.412
70.00 754.099 752.099 750.693 750.853 3.406 3.406
3.401 3.401
80.00 754.105 752.105 750.709 750.869 3.396 3.396
3.391 3.391
90.00 754.111 752.111 750.725 750.885 3.386 3.386
3.387 3.387
98.10 754.126 752.126 750.738 750.898 3.388 3.388
3.389 3.389
17 98.90 754.130 752.130 750.739 750.899 3.391 3.391

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 10 to MH 11 PIPE THICKNESS
LENGTH (C-C): 48.45 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.20 2.400 2.400 0.504

8.80 17.600 17.600 4.206

10.00 20.000 20.000 5.680

10.00 20.000 20.000 6.590

10.00 20.000 20.000 7.500

7.65 15.300 15.300 6.273

0.80 1.600 1.600 0.682

48.450 96.900 96.900 31.435 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 11 to MH 12 PIPE THICKNESS
LENGTH (C-C): 29.45 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.20 2.400 2.400 1.045

8.80 17.600 17.600 8.290

10.00 20.000 20.000 10.530

8.65 17.300 17.300 9.904

0.80 1.600 1.600 0.955

29.450 58.900 58.900 30.724 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 12 to MH 13 PIPE THICKNESS
LENGTH (C-C): 60.30 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

3.206
0.80 1.600 1.600 0.966 3.208 3.208 0.80 0.95

3.211
9.20 18.400 18.400 11.233 3.221 3.221 9.20 0.95
3.232
10.00 20.000 20.000 12.450 3.245 3.245 10.00 0.95
3.258
10.00 20.000 20.000 12.610 3.261 3.261 10.00 0.95
3.265
10.00 20.000 20.000 12.730 3.273 3.273 10.00 0.95
3.282
10.00 20.000 20.000 12.800 3.280 3.280 10.00 0.95
3.279
9.50 19.000 19.000 12.217 3.286 3.286 9.50 0.95
3.293
0.80 1.600 1.600 1.038 3.297 3.297 0.80 0.95
3.302

60.300 120.600 120.600 76.044 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 13 to MH 14 PIPE THICKNESS
LENGTH (C-C): 49.95 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

4.302
0.80 1.600 1.600 1.033 4.291 4.291 0.80 0.95

4.281
9.20 18.400 18.400 10.350 4.125 4.125 9.20 0.95
3.969
10.00 20.000 20.000 9.000 3.899 3.899 10.00 0.95
3.830
10.00 20.000 20.000 7.630 3.763 3.763 10.00 0.95
3.696
10.00 20.000 20.000 6.170 3.617 3.617 10.00 0.95
3.538
9.15 18.300 18.300 4.264 3.466 3.466 9.15 0.95
3.394
0.80 1.600 1.600 0.310 3.388 3.388 0.80 0.95
3.382

49.950 99.900 99.900 38.757 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 14 to MH 15 PIPE THICKNESS
LENGTH (C-C): 51.33 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

3.682
0.80 1.600 1.600 0.302 3.676 3.676 0.80 0.95

3.671
9.20 18.400 18.400 2.466 3.568 3.568 9.20 0.95
3.466
10.00 20.000 20.000 0.810 3.380 3.380 10.00 0.95
3.295
10.00 20.000 19.150 3.214 3.214 10.00 0.95
3.134
10.00 20.000 17.560 3.056 3.056 10.00 0.95
2.978
10.53 21.060 16.837 2.899 2.899 10.53 0.95
2.821
0.80 1.600 1.210 2.813 2.813 0.80 0.95
2.805

51.330 102.660 94.758 3.577 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 15 to MH 16 PIPE THICKNESS
LENGTH (C-C): 50.75 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.505
0.80 1.600 1.205 1.505 1.505 0.80 0.95

1.506
9.20 18.400 13.864 1.507 1.507 9.20 0.95
1.509
10.00 20.000 14.890 1.489 1.489 10.00 0.95
1.470
10.00 20.000 14.650 1.465 1.465 10.00 0.95
1.460
10.00 20.000 14.630 1.463 1.463 10.00 0.95
1.466
9.95 19.900 14.627 1.470 1.470 9.95 0.95
1.475
0.80 1.600 1.182 1.477 1.477 0.80 0.95
1.480

50.750 101.500 75.048 0.000 0.000

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 16 to MH 17 PIPE THICKNESS
LENGTH (C-C): 98.90 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.00 Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) - 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)

1.480
0.80 1.600 1.186 1.482 1.482 0.80 0.95

1.483
9.20 18.400 13.588 1.477 1.477 9.20 0.95
1.471
10.00 20.000 14.670 1.467 1.467 10.00 0.95
1.462
10.00 20.000 14.570 1.457 1.457 10.00 0.95
1.451
10.00 20.000 14.460 1.446 1.446 10.00 0.95
1.441
10.00 20.000 14.350 1.435 1.435 10.00 0.95
1.429
10.00 20.000 14.230 1.423 1.423 10.00 0.95
1.417
10.00 20.000 14.120 1.412 1.412 10.00 0.95
1.406
10.00 20.000 14.010 1.401 1.401 10.00 0.95
1.396
10.00 20.000 13.910 1.391 1.391 10.00 0.95
1.386
8.10 16.200 11.235 1.387 1.387 8.10 0.95
1.388

0.80 1.600 1.111 1.389 1.389 0.80 0.95


1.391

98.900 197.800 141.440 0.000 0.000


PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm
PIPE THICKNESS 11 mm
SLOPE 0.0015
SUMMARY
Volume
Description Unit Quantity
(m )
3

EXCAVATION
0.00 - 2.00 m2 96.900
2.01 - 4.00 m2 96.900
4.01 - 6.00 m2 31.435
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 500 mm m 46.45

PIPING
PIPE DIA 500 mm m 46.95

ASPHALT
PIPE DIA 500 mm m 48.45

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

0.000

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
0.00 - 2.00 m2 58.900
2.01 - 4.00 m2 58.900
4.01 - 6.00 m2 30.724
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 0.000

BEDDING
PIPE DIA 500 mm m 27.85

PIPING
PIPE DIA 500 mm m 28.25

ASPHALT
PIPE DIA 500 mm m 29.45

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

0.000

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
2.438 0.00 - 2.00 m2 120.600
2.01 - 4.00 m2 120.600
4.01 - 6.00 m2 76.044
28.152
6.01 - 8.00 m2 0.000

30.828
ROCK EXCAVATION m3 186.812

30.980
BEDDING
PIPE DIA 500 mm m 58.70
31.094

PIPING
31.160
PIPE DIA 500 mm m 59.10

29.656
ASPHALT
PIPE DIA 500 mm m 60.30
2.506

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

186.812

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
3.261 0.00 - 2.00 m2 99.900
2.01 - 4.00 m2 99.900
4.01 - 6.00 m2 38.757
36.053
6.01 - 8.00 m2 0.000

37.041
ROCK EXCAVATION m3 179.167

35.749
BEDDING
PIPE DIA 500 mm m 48.35
34.362

PIPING
30.128
PIPE DIA 500 mm m 48.75

2.575
ASPHALT
PIPE DIA 500 mm m 49.95

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic T

179.167

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
2.794 0.00 - 2.00 m2 102.660
2.01 - 4.00 m2 94.758
4.01 - 6.00 m2 3.577
31.184
6.01 - 8.00 m2 0.000

32.110
ROCK EXCAVATION m3 156.791

30.533
BEDDING
PIPE DIA 500 mm m 49.73
29.032

PIPING
29.000
PIPE DIA 500 mm m 50.13

2.138
ASPHALT
PIPE DIA 500 mm m 51.33

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 2

Const Temp. Sepic T 2

156.791

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
1.144 0.00 - 2.00 m2 101.500
2.01 - 4.00 m2 75.048
4.01 - 6.00 m2 0.000
13.171
6.01 - 8.00 m2 0.000

14.146
ROCK EXCAVATION m3 71.294

13.918
BEDDING
PIPE DIA 500 mm m 49.15
13.899

PIPING
13.895
PIPE DIA 500 mm m 49.55

1.123
ASPHALT
PIPE DIA 500 mm m 50.75

CONC. TILES
PIPE DIA. m

Demolitiion Septic t 1

Const Temp. Sepic T 1

71.294

PIPE DIA.: 500 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 11 mm
SLOPE 0.0016
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
1.126 0.00 - 2.00 m2 197.800
2.01 - 4.00 m2 141.440
4.01 - 6.00 m2 0.000
12.909
6.01 - 8.00 m2 0.000

13.937
ROCK EXCAVATION m3 134.368

13.842
BEDDING
PIPE DIA 500 mm m 97.30
13.737

PIPING
13.633
PIPE DIA 500 mm m 97.70

13.519
ASPHALT
PIPE DIA 500 mm m 98.90
13.414

CONC. TILES
13.310
PIPE DIA. m

13.215
Demolitiion Septic t 1

10.673
Const Temp. Sepic T 1

1.056

134.368
prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

2 0.00 752.957 751.087 749.962 749.802 3.315 3.315


3.329 1.20

1.20 752.987 751.087 749.963 749.803 3.344 3.344


3.314 8.80
10.00 752.937 751.477 749.972 749.812 3.285 3.285
3.230 10.00
20.00 752.837 751.797 749.982 749.822 3.175 3.175
3.175 10.00
30.00 752.847 752.067 749.992 749.832 3.175 3.175
3.140 10.00
40.00 752.787 752.057 750.002 749.842 3.105 3.105
3.110 10.00
50.00 752.807 752.107 750.012 749.852 3.115 3.115
3.135 10.00
60.00 752.857 752.157 750.022 749.862 3.155 3.155
3.170 10.00
70.00 752.897 752.197 750.032 749.872 3.185 3.185
3.184 1.20
71.20 752.897 752.397 750.033 749.873 3.184 3.184
3.183 1.20
3 72.40 752.897 752.587 750.034 749.874 3.183 3.183

TOTAL 72.40

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

3 0.00 752.897 752.597 749.713 749.873 3.184 3.184


3.187 1.20

1.20 752.903 752.603 749.714 749.874 3.189 3.189


3.171 8.80
10.00 752.876 752.576 749.723 749.883 3.153 3.153
3.164 10.00
20.00 752.908 752.608 749.733 749.893 3.175 3.175
3.192 10.00
30.00 752.953 752.653 749.743 749.903 3.210 3.210
3.212 10.00
40.00 752.968 752.668 749.753 749.913 3.215 3.215
3.195 9.90
49.90 752.938 752.638 749.763 749.923 3.175 3.175
3.170 1.20
4 51.10 752.930 752.630 749.764 749.924 3.166 3.166

TOTAL 51.100

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

4 0.00 752.930 752.280 749.764 749.924 3.166 3.166


3.151 1.20

1.20 752.900 752.250 749.765 749.925 3.135 3.135


3.132 8.80
10.00 752.902 752.252 749.774 749.934 3.128 3.128
3.107 10.00
20.00 752.870 752.220 749.784 749.944 3.086 3.086
3.030 10.00
30.00 752.767 752.117 749.794 749.954 2.973 2.973
2.926 10.00
40.00 752.682 752.032 749.804 749.964 2.878 2.878
2.809 10.00
50.00 752.555 751.905 749.814 749.974 2.741 2.741
2.724 2.80
52.80 752.525 751.875 749.817 749.977 2.708 2.708
2.698 1.20
5 54.00 752.505 751.855 749.818 749.978 2.687 2.687

TOTAL 54.000

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

18 0.00 752.985 751.925 749.465 749.625 3.520 3.520


3.518 1.20

1.20 752.982 751.922 749.465 749.625 3.517 3.517


3.517 8.80
10.00 752.988 751.928 749.471 749.631 3.517 3.517
3.518 10.00
20.00 752.995 751.935 749.477 749.637 3.518 3.518
3.508 10.00
30.00 752.980 751.920 749.483 749.643 3.497 3.497
3.489 10.00
40.00 752.970 751.910 749.489 749.649 3.481 3.481
3.475 10.00
50.00 752.963 751.903 749.495 749.655 3.468 3.468
3.459 10.00
60.00 752.950 751.890 749.501 749.661 3.449 3.449
3.443 10.00
70.00 752.944 751.884 749.508 749.668 3.436 3.436
3.426 10.00
80.00 752.930 751.870 749.514 749.674 3.416 3.416
3.414 10.00
90.00 752.932 751.872 749.520 749.680 3.412 3.412
3.404 7.70
97.70 752.920 751.860 749.524 749.684 3.396 3.396
3.391 1.20
1A 98.90 752.910 751.850 749.525 749.685 3.385 3.385

TOTAL 98.900

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

1A 0.00 752.910 752.160 749.525 749.685 3.385 3.385


3.384 1.20

1.20 752.908 752.158 749.525 749.685 3.383 3.383


3.381 8.80
10.00 752.910 752.160 749.531 749.691 3.379 3.379
3.371 10.00
20.00 752.900 752.150 749.537 749.697 3.363 3.363
3.362 10.00
30.00 752.904 752.154 749.543 749.703 3.361 3.361
3.366 10.00
40.00 752.920 752.170 749.549 749.709 3.371 3.371
3.363 10.00
50.00 752.911 752.161 749.555 749.715 3.356 3.356
3.348 10.00
60.00 752.902 752.152 749.561 749.721 3.341 3.341
3.332 10.00
70.00 752.890 752.140 749.567 749.727 3.323 3.323
3.321 0.40
70.40 752.885 752.135 749.567 749.727 3.318 3.318
3.315 1.20
1 71.60 752.879 752.129 749.568 749.728 3.311 3.311

TOTAL 71.600

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

5 0.00 752.505 751.865 749.818 749.978 2.687 2.687


2.696 1.20

1.20 752.524 751.884 749.819 749.979 2.705 2.705


2.762 8.80
10.00 752.647 752.007 749.828 749.988 2.819 2.819
2.875 10.00
20.00 752.770 752.130 749.838 749.998 2.932 2.932
2.989 10.00
30.00 752.895 752.255 749.848 750.008 3.047 3.047
3.102 10.00
40.00 753.015 752.375 749.858 750.018 3.157 3.157
3.203 10.00
50.00 753.118 752.478 749.868 750.028 3.250 3.250
3.262 2.60
52.60 753.144 752.504 749.870 750.030 3.274 3.274
3.284 1.20
6 53.80 753.166 752.526 749.872 750.032 3.294 3.294

TOTAL 53.800

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

6 0.00 753.166 751.906 749.872 750.032 3.294 3.294


3.295 1.20

1.20 753.170 751.910 749.873 750.033 3.297 3.297


3.307 11.70
12.90 753.202 751.942 749.885 750.045 3.317 3.317
3.333 6.60
19.50 753.240 751.980 749.892 750.052 3.348 3.348
3.355 1.20
7 20.70 753.255 751.995 749.893 750.053 3.362 3.362

TOTAL 20.700

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

7 0.00 753.255 751.945 749.893 750.053 3.362 3.362


3.385 1.20

1.20 753.301 751.991 749.894 750.054 3.407 3.407


3.463 8.80
10.00 753.422 752.112 749.903 750.063 3.519 3.519
3.576 10.00
20.00 753.545 752.235 749.913 750.073 3.632 3.632
3.660 9.70
29.70 753.610 752.300 749.923 750.083 3.687 3.687
3.697 1.20
8 30.90 753.630 752.320 749.924 750.084 3.706 3.706

TOTAL 30.900

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAVATION
Depth
Level (b) Level (d)
D=a-c
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t
M.H to Station Ground Rock Rock Invert Excav.
Depth Soil Ave Dpth Length
Level (b) Level (d)
D=a-c Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.15+t (m) (m) (m)

8 0.00 753.630 752.018 749.924 750.084 3.706 3.706


3.713 1.20

1.20 753.644 752.028 749.925 750.085 3.719 3.719


3.747 8.80
10.00 753.710 752.098 749.934 750.094 3.776 3.776
3.801 10.00
20.00 753.770 752.158 749.944 750.104 3.826 3.826
3.858 10.00
30.00 753.844 752.232 749.954 750.114 3.890 3.890
3.929 10.00
40.00 753.932 752.320 749.964 750.124 3.968 3.968
3.997 7.75
47.75 753.998 752.386 749.972 750.132 4.026 4.026
4.032 1.20
9 48.95 754.011 752.399 749.973 750.133 4.038 4.038

TOTAL 48.950

prepared by:
Project: TABUK SEWAGE NETWORK (SIXTH STAGE)
Consultant: Saudi Consolidated Engineering Co. (Khatib&Alami)
Contractor: AL-HARBI CO.
M.H to Station Ground Rock Rock Invert Excav. SOIL EXCAV
Depth Soil Ave Dpth Ave
Level (b) Level (d)
D=a-c Depth Depth
M.H (m) Level (a) TOP Bottm Level (c) +0.20+t (m) (m) (m)
9 0.00 754.011 752.011 749.973 750.133 4.088 4.088
4.093 4.093

1.20 754.022 752.022 749.974 750.134 4.098 4.098


4.138 4.138
10.00 754.112 752.112 749.983 750.143 4.179 4.179
4.220 4.220
20.00 754.205 752.205 749.993 750.153 4.262 4.262
4.309 4.309
30.00 754.310 752.310 750.003 750.163 4.357 4.357
4.408 4.408
40.00 754.422 752.422 750.013 750.173 4.459 4.459
4.504 4.504
49.50 754.521 752.521 750.022 750.182 4.549 4.549
4.554 4.554
10 50.70 754.533 752.533 750.023 750.183 4.560 4.560

TOTAL
Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 2 to MH 3 PIPE THICKNESS 16 mm
LENGTH (C-C): 72.40 m SLOPE 0.0010
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m )
3

EXCAVATION
1.125
2.400 1.595 1.1244 1.20 1.05 1.417 0.00 - 2.00
2.01 - 4.00
1.124
4.01 - 6.00
17.600 11.567 1.3144 8.80 1.05 12.145
6.01 - 8.00
1.505
20.000 12.300 1.66 10.00 1.05 17.430
ROCK EXCAVATION
1.815
20.000 11.750 1.945 10.00 1.05 20.423
BEDDING
2.075
PIPE DIA 600 mm
20.000 11.400 2.065 10.00 1.05 21.683
2.055
PIPING
20.000 11.100 2.075 10.00 1.05 21.788
PIPE DIA 600 mm
2.095
20.000 11.350 2.115 10.00 1.05 22.208
ASPHALT
2.135
PIPE DIA 600 mm
20.000 11.700 2.15 10.00 1.05 22.575
2.165
CONC. TILES
2.400 1.421 2.2644 1.20 1.05 2.853
PIPE DIA.
2.364
2.400 1.420 2.4582 1.20 1.05 3.097
Demolitiion Septic t
2.553

Const Temp. Sepic Ta

144.80 85.60 0.00 0.00 145.617

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 3 to MH 4 PIPE THICKNESS 16 mm
LENGTH (C-C): 51.10 m SLOPE 0.0010
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.884
2.400 1.424 2.887 1.20 1.20 4.157 0.00 - 2.00
2.01 - 4.00
2.889
4.01 - 6.00
17.600 10.305 2.871 8.80 1.20 30.318
6.01 - 8.00
2.853
20.000 11.640 2.864 10.00 1.20 34.368
ROCK EXCAVATION
2.875
20.000 11.920 2.892 10.00 1.20 34.704
BEDDING
2.910
PIPE DIA 600 mm
20.000 12.120 2.912 10.00 1.20 34.944
2.915
PIPING
19.800 11.831 2.895 9.90 1.20 34.393
PIPE DIA 600 mm
2.875
2.400 1.404 2.870 1.20 1.20 4.133
ASPHALT
2.866
PIPE DIA 600 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

102.200 60.644 0.000 0.000 177.016

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 4 to MH 5 PIPE THICKNESS 16 mm
LENGTH (C-C): 54.00 m SLOPE 0.0010
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.516
2.400 1.381 2.500 1.20 1.20 3.600 0.00 - 2.00
2.01 - 4.00
2.485
4.01 - 6.00
17.600 9.962 2.482 8.80 1.20 26.210
6.01 - 8.00
2.478
20.000 11.070 2.457 10.00 1.20 29.484
ROCK EXCAVATION
2.436
20.000 10.300 2.380 10.00 1.20 28.560
BEDDING
2.323
PIPE DIA 600 mm
20.000 9.260 2.276 10.00 1.20 27.312
2.228
PIPING
20.000 8.090 2.159 10.00 1.20 25.908
PIPE DIA 600 mm
2.091
5.600 2.027 2.074 2.80 1.20 6.969
ASPHALT
2.058
PIPE DIA 600 mm
2.400 0.838 2.048 1.20 1.20 2.949
2.037
CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

108.000 52.928 0.000 0.000 150.992

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 18 to MH 1A PIPE THICKNESS 16 mm
LENGTH (C-C): 98.90 m SLOPE 0.00061
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.460
2.400 1.822 2.459 1.20 1.20 3.541 0.00 - 2.00
2.01 - 4.00
2.457
4.01 - 6.00
17.600 13.350 2.457 8.80 1.20 25.946
6.01 - 8.00
2.457
20.000 15.180 2.458 10.00 1.20 29.496
ROCK EXCAVATION
2.458
20.000 15.080 2.448 10.00 1.20 29.376
BEDDING
2.437
PIPE DIA 600 mm
20.000 14.890 2.429 10.00 1.20 29.148
2.421
PIPING
20.000 14.750 2.415 10.00 1.20 28.980
PIPE DIA 600 mm
2.408
20.000 14.590 2.399 10.00 1.20 28.788
ASPHALT
2.389
PIPE DIA 600 mm
20.000 14.430 2.383 10.00 1.20 28.596
2.376
CONC. TILES
20.000 14.260 2.366 10.00 1.20 28.392
PIPE DIA.
2.356
20.000 14.140 2.354 10.00 1.20 28.248
Demolitiion Septic t
2.352
15.400 10.811 2.344 7.70 1.20 21.659
2.336 Const Temp. Sepic Ta

2.400 1.669 2.331 1.20 1.20 3.357


2.325

197.800 144.971 0.000 0.000 285.526

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 1A to MH 1 PIPE THICKNESS 16 mm
LENGTH (C-C): 71.60 m SLOPE 0.00061
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.635
2.400 1.661 2.634 1.20 1.20 3.793 0.00 - 2.00
2.01 - 4.00
2.633
4.01 - 6.00
17.600 12.153 2.631 8.80 1.20 27.783
6.01 - 8.00
2.629
20.000 13.710 2.621 10.00 1.20 31.452
ROCK EXCAVATION
2.613
20.000 13.620 2.612 10.00 1.20 31.344
BEDDING
2.611
PIPE DIA 600 mm
20.000 13.660 2.616 10.00 1.20 31.392
2.621
PIPING
20.000 13.630 2.613 10.00 1.20 31.356
PIPE DIA 600 mm
2.606
20.000 13.480 2.598 10.00 1.20 31.176
ASPHALT
2.591
PIPE DIA 600 mm
20.000 13.320 2.582 10.00 1.20 30.984
2.573
CONC. TILES
0.800 0.528 2.570 0.40 1.20 1.234
PIPE DIA.
2.568
2.400 1.578 2.565 1.20 1.20 3.694
Demolitiion Septic t
2.561

Const Temp. Sepic Ta

143.200 97.340 0.000 0.000 224.208

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 5 to MH 6 PIPE THICKNESS 16 mm
LENGTH (C-C): 53.80 m SLOPE 0.001
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.047
2.400 0.835 2.056 1.20 1.20 2.961 0.00 - 2.00
2.01 - 4.00
2.065
4.01 - 6.00
17.600 6.706 2.122 8.80 1.20 22.408
6.01 - 8.00
2.179
20.000 8.750 2.235 10.00 1.20 26.820
ROCK EXCAVATION
2.292
20.000 9.890 2.349 10.00 1.20 28.188
BEDDING
2.407
PIPE DIA 600 mm
20.000 11.020 2.462 10.00 1.20 29.544
2.517
PIPING
20.000 12.030 2.563 10.00 1.20 30.756
PIPE DIA 600 mm
2.610
5.200 3.281 2.622 2.60 1.20 8.181
ASPHALT
2.634
PIPE DIA 600 mm
2.400 1.541 2.644 1.20 1.20 3.807
2.654
CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

107.600 54.053 0.000 0.000 152.665

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 6 to MH 7 PIPE THICKNESS 16 mm
LENGTH (C-C): 20.70 m SLOPE 0.001
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.034
2.400 1.554 2.035 1.20 1.20 2.930 0.00 - 2.00
2.01 - 4.00
2.037
4.01 - 6.00
23.400 15.292 2.047 11.70 1.20 28.740
6.01 - 8.00
2.057
13.200 8.798 2.072 6.60 1.20 16.410
ROCK EXCAVATION
2.088
2.400 1.626 2.095 1.20 1.20 3.017
BEDDING
2.102
PIPE DIA 600 mm

PIPING
PIPE DIA 600 mm

ASPHALT
PIPE DIA 600 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

41.400 27.270 0.000 0.000 51.097

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 7 to MH 8 PIPE THICKNESS 16 mm
LENGTH (C-C): 30.90 m SLOPE 0.001
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.052
2.400 1.662 2.075 1.20 1.20 2.988 0.00 - 2.00
2.01 - 4.00
2.097
4.01 - 6.00
17.600 12.874 2.153 8.80 1.20 22.736
6.01 - 8.00
2.209
20.000 15.760 2.266 10.00 1.20 27.192
ROCK EXCAVATION
2.322
19.400 16.102 2.350 9.70 1.20 27.354
BEDDING
2.377
PIPE DIA 600 mm
2.400 2.036 2.387 1.20 1.20 3.437
2.396
PIPING
PIPE DIA 600 mm

ASPHALT
PIPE DIA 600 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

61.800 48.435 0.000 0.000 83.707

Approved by:
AREA ABU SABAA PIPE DIA.: 600 mm
mi) LINE TRUNK-K MH 8 to MH 9 PIPE THICKNESS 16 mm
LENGTH (C-C): 48.95 m SLOPE 0.001
SOIL EXCAVATION ROCK EXCAVATION SUMMARY
Area 0.0 - Area Area Area Rock Ave Dpth Length Width Volume
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Description
2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) ( m3 )
EXCAVATION
2.094
2.400 2.056 2.099 1.20 1.20 3.023 0.00 - 2.00
2.01 - 4.00
2.103
4.01 - 6.00
17.600 15.374 2.133 8.80 1.20 22.524
6.01 - 8.00
2.164
20.000 18.010 2.189 10.00 1.20 26.268
ROCK EXCAVATION
2.214
20.000 18.580 2.246 10.00 1.20 26.952
BEDDING
2.278
PIPE DIA 600 mm
20.000 19.290 2.317 10.00 1.20 27.804
2.356
PIPING
15.500 15.477 2.385 7.75 1.20 22.181
PIPE DIA 600 mm
2.414
2.400 2.400 0.038 2.420 1.20 1.20 3.485
ASPHALT
2.426
PIPE DIA 600 mm

CONC. TILES
PIPE DIA.

Demolitiion Septic t

Const Temp. Sepic Ta

97.900 91.186 0.038 0.000 132.236

Approved by:
AREA ABU SABAA PIPE DIA.:
mi) LINE TRUNK-K MH 9 to MH 10 PIPE THICKNESS
LENGTH (C-C): 50.70 m SLOPE
SOIL EXCAVATION ROCK EXCAVATION
Length Area 0.0 - Area Area Area Rock Ave Dpth Ave Length Width
2.01 - 4.0 4.01 - 6.0 6.01 - 8.0 Depth ( m Depth
(m) 2.0 ( m2 ) ( m2 ) ( m2 ) ( m2 ) ) (m) (m) (m) (m)
2.038
1.20 2.400 2.400 0.112 2.043 2.043 1.20 1.20

2.048
8.80 17.600 17.600 1.214 2.088 2.088 8.80 1.20
2.129
10.00 20.000 20.000 2.200 2.170 2.170 10.00 1.20
2.212
10.00 20.000 20.000 3.090 2.259 2.259 10.00 1.20
2.307
10.00 20.000 20.000 4.080 2.358 2.358 10.00 1.20
2.409
9.50 19.000 19.000 4.788 2.454 2.454 9.50 1.20
2.499
1.20 2.400 2.400 0.665 2.504 2.504 1.20 1.20
2.510

50.700 101.400 101.400 16.149 0.000


ASPHALT THICKNES 70 mm

SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 144.80
2.01 - 4.00 m2 85.60
4.01 - 6.00 m2 0.00
6.01 - 8.00 m2 0.00

ROCK EXCAVATION m3 145.62

BEDDING
PIPE DIA 600 mm m 70.80

PIPING
PIPE DIA 600 mm m 71.20

ASPHALT
PIPE DIA 600 mm m 72.40

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 102.200
2.01 - 4.00 m2 60.644
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 177.016

BEDDING
PIPE DIA 600 mm m 48.70

PIPING
PIPE DIA 600 mm m 49.30

ASPHALT
PIPE DIA 600 mm m 51.10

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm
SUMMARY

Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 108.000
2.01 - 4.00 m2 52.928
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 150.992

BEDDING
PIPE DIA 600 mm m 51.60

PIPING
PIPE DIA 600 mm m 52.20

ASPHALT
PIPE DIA 600 mm m 54.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 197.800
2.01 - 4.00 m2 144.971
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 285.526

BEDDING
PIPE DIA 600 mm m 96.50

PIPING
PIPE DIA 600 mm m 97.10

ASPHALT
PIPE DIA 600 mm m 98.90

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 143.200
2.01 - 4.00 m2 97.340
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 224.208

BEDDING
PIPE DIA 600 mm m 69.20

PIPING
PIPE DIA 600 mm m 69.80

ASPHALT
PIPE DIA 600 mm m 71.60

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 107.600
2.01 - 4.00 m2 54.053
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 152.665

BEDDING
PIPE DIA 600 mm m 51.40

PIPING
PIPE DIA 600 mm m 52.00

ASPHALT
PIPE DIA 600 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 41.400
2.01 - 4.00 m2 27.270
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 51.097

BEDDING
PIPE DIA 600 mm m 18.30

PIPING
PIPE DIA 600 mm m 18.90

ASPHALT
PIPE DIA 600 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 61.800
2.01 - 4.00 m2 48.435
4.01 - 6.00 m2 0.000
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 83.707

BEDDING
PIPE DIA 600 mm m 28.50

PIPING
PIPE DIA 600 mm m 29.10

ASPHALT
PIPE DIA 600 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

ASPHALT THICKNES 70 mm

SUMMARY
Description Unit Quantity

EXCAVATION
0.00 - 2.00 m2 97.900
2.01 - 4.00 m2 91.186
4.01 - 6.00 m2 0.038
6.01 - 8.00 m2 0.000

ROCK EXCAVATION m3 132.236

BEDDING
PIPE DIA 600 mm m 46.55

PIPING
PIPE DIA 600 mm m 47.15

ASPHALT
PIPE DIA 600 mm m 0.00

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

PIPE DIA.: 600 mm ASPHALT THICKNES 70 mm


PIPE THICKNESS 16 mm
SLOPE 0.0010
SUMMARY
Volume
Description Unit Quantity
( m3 )
EXCAVATION
2.942 0.00 - 2.00 m2 101.400
2.01 - 4.00 m2 101.400
4.01 - 6.00 m2 16.149
22.049
6.01 - 8.00 m2 0.000

26.040
ROCK EXCAVATION m3 138.017

27.108
BEDDING
PIPE DIA 600 mm m 48.30
28.296

PIPING
27.976
PIPE DIA 600 mm m 48.90

3.606
ASPHALT
PIPE DIA 600 mm m 50.70

CONC. TILES
PIPE DIA. m

Demolitiion Septic t

Const Temp. Sepic Ta

138.017

You might also like