TO BE FILLED BY INITIATOR FROM : CHIEF. MANAGER ( ELECT) THROUGH : JT. GENERAL MANAGER ( Maintenace) ENGINEERING WORK REQUESTED : WE HAVE REPLACED SDF PAN FEEDER CHUTE WITH DIRECT CHUTE AS TRIAL BASES AND IT IS WORKING PROPERLY.WE HAVE NO FOUND ANY ADVERS EFFECT.HTERE IS POWER SAVING OF AS GIVEN.
RATING OF PAN FEEDER ASSEMBLY IS 12.5 KW
PERCENTAGE LOADING OF PAN FEEDER IS .85 12.5 X .85 = 10.625 KW AVAREGE POWER CONSUMPTION PER DAY IS =10.625 X 24 = 255 KWH PER DAY AVAREGE POWER CONSUMPTION PER MONTH =255 X 30 = 7650 KWH PER MONTH AVERAGE % RUNNING DURING THE MONTH .75 = 7650 X .75 = 5737.5 KWH PER MONTH TOTAL POWER CONSUMPTION OF SIX PAN FEEDER VIBRATOR IS
5737.5 X 6 = 34425 KWH PER MONTH ENERGY UNIT RATE = 5.5 Rs./Unit
ENERGY SAVING IN TERMS OF RUPEES IS 34425 X 5.5 = 189337.5 RS./ MONTH
COST OF COIL REWINDING , INVENTORY AND MAN POWER IS 128000 TOTAL COST SAVING IS 2272050 + 128000 = 2400050 APPR.
MANAGER (ELECT)KII
INITIATOR
Ewr form KIRTIKUMAR
DATE
EWR NO.:
Page 1 of 5
Page 2 of 5
INDIAN FARMERS FERTILISER COOPERATIVE LIMITED, KANDLA UNIT ENGINEERING WORK REQUEST
REMINDER - I TO BE FILLED BY INITIATOR FROM : SR. MANAGER ( ELECT) THROUGH : JT. GENERAL MANAGER ( K-I) ENGINEERING WORK REQUESTED : 1. Suitable approach/lifting arrangement for replacement of Motors at following location is required. a. Conv. 102 C & D b. Conv. 103 C & D c. Conv. 104 C & D d. Conv. 104 E & F e. Conv. 105 C & D f. Conv. 106 C & D g. De-Dusting Fan & Pump at bunker floor new bagging. h. NPK E & F train AHU Motor DATE :07/9/2000 TO : CH. MANAGER ( T/S)
INITIATOR
DATE
EWR NO.:
Page 3 of 5
INDIAN FARMERS FERTILISER COOPERATIVE LIMITED, KANDLA UNIT ENGINEERING WORK REQUEST
TO BE FILLED BY INITIATOR FROM ( T/S) THROUGH : MANAGER ELECTRICAL (KII) : CHIEF MANAGER MAINT (KII) DATE :16/07/2002 TO : CH. MANAGER
ENGINEERING WORK REQUESTED : 1. Electrical Maintenance on following motorised flap gate is not possible and very much inconvinient. Therefore it is proposed to modify the mounting arrangement in such a way that checking of motor terminals and limit switches can be made at local. This is require for doing the preventive maint of equipments and reduce the down time of product handling system. a. b. c. d. e. Conv. 101 C1,C2,C3 Conv. 101 D1,D2,D3 Conv. 123 A1,A2 Conv. 123 B1,B2 Conv. 104 E1& F1