You are on page 1of 5

SAP PP Questionnaire

The following are some SAP PP Questionnaires which you can try:
1. During material master creation iI you select "ND" in MRP type Iield.
a. None oI the MRP dependent Iields need be Iilled.
b. Schedule Margin Key is Must.
c. Strategy group Iiled is must
2. Work center can have
a. More than one cost center
b. As many Iormulas as cost centers
c. Only one cost center
3. Lot sizing procedure Ior `lot-Ior-lot order quantity'
a. MB
b. FX
c. EX
d. WB
4. The planning time Ience speciIies:
a. A period within which changes to the master plan are made automatically
b. A period within which MRP should be run without Iail
c. Is only Ior inIormation purpose to the MRP controller
d. A period within which no automatic changes are to be made to the master plan
5.Alternate unit oI measure can be maintained.
a. In only basic data view
b. In MRP screen only
c. In any oI the views.
6.Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center
D. Routing
7. Planned order can be converted
a. Production order /Process order
b. Run schedule Header
c. Sales order
8. Availability check in PP can consider
a. Only settled production orders
b. Only released production orders
c. Only Production orders with TECO status.
9. While creating the routing
a. By deIault standard sequence will be created
b. System will prompt the user whether to create parallel or alternate sequence
c. System will create only alternate sequence.
10. II two similar materials are to be produced in the same production line
a. a single routing can do the purpose
b. Two separate routings are must
11. Sales order is just Ior display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
b. Strategy group 20
c. Strategy group 40
12. Settlement proIile is assigned to
a, Production order Type
b. Production scheduler.
c. MRP parameters
13. Product cost collectors in REM
a.,. To be created manually with reIerence to Production version
b. They will be created automatically in back ground
c. They will be by deIault in the system.
14. In REM Movement type used Ior goods receipt is
a. 131
b. 101
c. 561
15. II a material is to be used in quota arrangement, the Iirst prerequisite is
a. Setting in Material master
b. Creation oI quota arrangement
c. Settings in MM module
16. II a material has MRP type manual reorder point &used as a component oI a product BOM.
a. In MRP run dependent requirement Ior this materials will be considered Ior planning.
b. In MRP run dependent requirement Ior this materials will not be considered Ior planning.

17. The planning time Ience speciIies:
a. A period within which changes to the master plan are made automatically
b. A period within which MRP should be run without Iail
c. Is only Ior inIormation purpose to the MRP controller
d. A period within which no automatic changes are to be made to the master plan.

18. For creation oI reIerence operation set
a. Material code is a must
b. Material code is not required
c. A routing is must.
19. While creation oI material master
a. Plant & storage location stock view will be a deIault
b. You have to select plant & storage location stock view iI you want
20. Planning horizon is a setting
a. a setting in Customizing
b. a setting in Material master
c. a setting in MRP control parameters.
21, in standard SAP
a. you can conIirm the production order with out making GI Ior production order.
b. Ior conIirming the production order GI is must.
22. Transaction codes relevant Ior Product costing
a.CO11n
b.CK11N
c.Co02
d.CK01
23. To create the production order Irom the planned order Tcode is
a. CO40
b. CO 01
c. CO 02
24. Production order can be released automatically while creation
a. by conIiguring Production scheduler proIile & making input in work scheduling view
b. can not be done
c. By conIiguring the MRP Group
25. .To have phantom assembly Iunctionality
a. Setting in material master is required
b. Only BOM setting is required
c. Setting in both BOM & Material master required.

Answers for the above SAP PP Questionnaire:
1. During material master creation iI you select "ND" in MRP type Iield.
a. None oI the MRP dependent Iields need be Iilled.
2. Work center can have
c. Only one cost center
3. Lot sizing procedure Ior `lot-Ior-lot order quantity'
c. EX
4. The planning time Ience speciIies:
d. A period within which no automatic changes are to be made to the master plan
5. Alternate unit oI measure can be maintained.
c. In any oI the views.
6. Assembly scrap can be maintained in
a. BOM
b. Material master
c. Work center
7. Planned order can be converted
a. Production order /Process order
8. Availability check in PP can consider
b. Only released production orders
9. While creating the routing
a. By deIault standard sequence will be created
10. II two similar materials are to be produced in the same production line
a. a single routing can do the purpose
11. Sales order is just Ior display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
c. Strategy group 40
12. Settlement proIile is assigned to
a. Production order Type
13. Product cost collectors in REM
a. To be created manually with reIerence to Production version
14. In REM Movement type used Ior goods receipt is
a. 131
15. II a material is to be used in quota arrangement, the Iirst prerequisite is
a. Setting in Material master
16. II a material has MRP type manual reorder point &used as a component oI a product BOM.
a. In MRP run dependent requirement Ior this materials will be considered Ior planning.
17. The planning time Ience speciIies:
d. A period within which no automatic changes are to be made to the master plan.
18. For creation oI reIerence operation set
b. Material code is not required
19. While creation oI material master
a. Plant & storage location stock view will be a deIault
20. Planning horizon is a setting
a. a setting in Customizing
c. a setting in MRP control parameters.
21. in standard SAP
b. Ior conIirming the production order GI is must.
22. Transaction codes relevant Ior Product costing
b. CK11N
23. To create the production order Irom the planned order Tcode is
a. CO40
24. Production order can be released automatically while creation
a. by conIiguring Production scheduler proIile & making input in work scheduling view
25. .To have phantom assembly Iunctionality
c. Setting in both BOM & Material master required.
hLLp//wwwscrlbdcom/doc/33704113/CuesLlonnalre

You might also like