You are on page 1of 1

HAMMERSMITH FLYOVER HIGH CHANCE OF DISASTER?

The average number of vehicles the flyover carries a day on the A4, the road between central London and the West, including Heathrow airport

90,000

Pre-cast concrete segments

Pre-stressed 29mm steel cables

Pillars

Deterioration and erosion

1.3m

The cost of building the Hammersmith Flyover which was completed in

1962
A406 M4

Hammersmith flyover
A4

Hyde Park

1 mile

Thames

You might also like