SHEET No.

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

12mtr height trolley mounted telescopic tiltable tower


Dimension of Bottom Section in a direction normal to the applied wind force. Dimension of Middle Section in a direction normal to the applied wind force. Dimension of Top Section in a direction normal to the applied wind force. Total number of sections from bottom to top of equipment/structure Breadth of a structure (Average width of the equipment normal to the applied wind force) Total Height of the equipment/structure (including base elevation) Checking the requirement for Dynamic Effect of wind (CL. 7.1): Equipment Height to minimum lateral dimension ratio h/d = 36.36 d1 or b1 = d2 or b2 = d3 or b3 = = d or b = h = 0.46 0.33 0.20 3 0.33 12.00 m m m m m

> 5

The fundamental time period T = 0.09h / d^0.5 T = 1.88 seconds Equipment Natural Frequency (1 / T) fo = 0.532 Hz 1) Equipment Height to minimum lateral dimension ratio > 5, Hence Dynamic effect need to be consider 2) Equipment Natural Frequency < 1 Hz, Hence Dynamic effect need to be consider For either one of the above condition satisfies, then Dynamic effect needs to be considered. Calculation of HMW speed at height z (Vz or Vh) (CL. 8.2.1): Equipment class per IS-875 based on total height (see 5.3.2.2) Terrain Category Base Elevation Vb = regional basic wind speed in m/s (Fig. 1) Vb k1 = probability factor (risk coefficient) (CL. 5.3.1) k1 k2 = terrain and height factor (Table 33) k2 k3 = topography factor (CL. 5.3.3) k3 Hourly meam wind speed at height z Design Wind Pressure Vz = pz = 0.6 * Vz2 = = = = = = = A 1.00 0.00 m 50 m/s 0.90 0.80 1.00 36 m/s 2 777.6 N/m

Vb * k1 * k2 * k3 =

Calculation of Gust Factor (G) (CL. 8): Lateral Correlation constant Longitudinal Correlation constant Peak factor gf times the roughness factor r (Fig. 8) A measure of turbulence length scale (Fig. 8) Lambda for use in Fig. 9 which is Cy/Cz * b/h Abcissa value for use in Fig. 9 which is Czh/L(h) Background Factor from (Fig. 9) which is gfr*sqrt(B)/4 Abcissa value Cz(fo)(h)/Vh used in Fig. 10 Size reduction factor (Fig. 10) Abcissa value (fo) L(h) / Vh used in Fig. 11 Gust Energy factor (Fig. 11) damping coefficient (Table 34) Gust factor (G) = { 1 + gfr * [ B (1 + ) + (SE / ) ] } Cy Cz gfr L(h) B Fo S E G = = = = = = = = = = = = = = 10.00 12.00 1.125 1125 0.023 0.128 0.9 0 2.128 0.62 16.62 0.09 0.01 3.864

SHEET No. 2

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

200 mm top sec.

330 mm middle section

Total height 12 meter

460 mm bottom section

Lighting Tower Geometry details

SHEET No. 1

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

15mtr height trolley mounted telescopic tiltable tower


Dimension of Bottom Section in a direction normal to the applied wind force. Dimension of Middle Section in a direction normal to the applied wind force. Dimension of Top Section in a direction normal to the applied wind force. Total number of sections from bottom to top of equipment/structure Breadth of a structure (Average width of the equipment normal to the applied wind force) Total Height of the equipment/structure (including base elevation) Checking the requirement for Dynamic Effect of wind (CL. 7.1): Equipment Height to minimum lateral dimension ratio h/d = 45.45 d1 or b1 = d2 or b2 = d3 or b3 = = d or b = h = 0.46 0.33 0.20 3 0.33 15.00 m m m m m

> 5

The fundamental time period T = 0.09h / d^0.5 T = 2.35 seconds Equipment Natural Frequency (1 / T) fo = 0.426 Hz 1) Equipment Height to minimum lateral dimension ratio > 5, Hence Dynamic effect need to be consider 2) Equipment Natural Frequency < 1 Hz, Hence Dynamic effect need to be consider For either one of the above condition satisfies, then Dynamic effect needs to be considered. Calculation of HMW speed at height z (Vz or Vh) (CL. 8.2.1): Equipment class per IS-875 based on total height (see 5.3.2.2) Terrain Category Base Elevation Vb = regional basic wind speed in m/s (Fig. 1) Vb k1 = probability factor (risk coefficient) (CL. 5.3.1) k1 k2 = terrain and height factor (Table 33) k2 k3 = topography factor (CL. 5.3.3) k3 Hourly meam wind speed at height z Design Wind Pressure Vz = pz = 0.6 * Vz2 = = = = = = = A 1.00 0.00 m 50 m/s 0.90 0.82 1.00 36.9 m/s 2 817 N/m

Vb * k1 * k2 * k3 =

Calculation of Gust Factor (G) (CL. 8): Lateral Correlation constant Longitudinal Correlation constant Peak factor gf times the roughness factor r (Fig. 8) A measure of turbulence length scale (Fig. 8) Lambda for use in Fig. 9 which is Cy/Cz * b/h Abcissa value for use in Fig. 9 which is Czh/L(h) Background Factor from (Fig. 9) which is gfr*sqrt(B)/4 Abcissa value Cz(fo)(h)/Vh used in Fig. 10 Size reduction factor (Fig. 10) Abcissa value (fo) L(h) / Vh used in Fig. 11 Gust Energy factor (Fig. 11) damping coefficient (Table 34) Gust factor (G) = { 1 + gfr * [ B (1 + ) + (SE / ) ] } Cy Cz gfr L(h) B Fo S E G = = = = = = = = = = = = = = 10.00 12.00 1.125 1125 0.018 0.16 0.9 0 2.076 0.62 12.97 0.095 0.01 3.931

SHEET No. 2

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

200 mm top sec.

330 mm middle section

Total height 15 meter

460 mm bottom section

Lighting Tower Geometry details

SHEET No. 1

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

16mtr height ground mounted telescopic tiltable tower


Dimension of Bottom Section in a direction normal to the applied wind force. Dimension of Middle Section in a direction normal to the applied wind force. Dimension of Top Section in a direction normal to the applied wind force. Total number of sections from bottom to top of equipment/structure Breadth of a structure (Average width of the equipment normal to the applied wind force) Total Height of the equipment/structure (including base elevation) Checking the requirement for Dynamic Effect of wind (CL. 7.1): Equipment Height to minimum lateral dimension ratio h/d = 48.48 d1 or b1 = d2 or b2 = d3 or b3 = = d or b = h = 0.46 0.33 0.20 3 0.33 16.00 m m m m m

> 5

The fundamental time period T = 0.09h / d^0.5 T = 2.507 seconds Equipment Natural Frequency (1 / T) fo = 0.399 Hz 1) Equipment Height to minimum lateral dimension ratio > 5, Hence Dynamic effect need to be consider 2) Equipment Natural Frequency < 1 Hz, Hence Dynamic effect need to be consider For either one of the above condition satisfies, then Dynamic effect needs to be considered. Calculation of HMW speed at height z (Vz or Vh) (CL. 8.2.1): Equipment class per IS-875 based on total height (see 5.3.2.2) Terrain Category Base Elevation Vb = regional basic wind speed in m/s (Fig. 1) Vb k1 = probability factor (risk coefficient) (CL. 5.3.1) k1 k2 = terrain and height factor (Table 33) k2 k3 = topography factor (CL. 5.3.3) k3 Hourly meam wind speed at height z Design Wind Pressure Vz = pz = 0.6 * Vz2 = = = = = = = A 1.00 0.00 m 50 m/s 0.90 0.83 1.00 37.35 m/s 2 837 N/m

Vb * k1 * k2 * k3 =

Calculation of Gust Factor (G) (CL. 8): Lateral Correlation constant Longitudinal Correlation constant Peak factor gf times the roughness factor r (Fig. 8) A measure of turbulence length scale (Fig. 8) Lambda for use in Fig. 9 which is Cy/Cz * b/h Abcissa value for use in Fig. 9 which is Czh/L(h) Background Factor from (Fig. 9) which is gfr*sqrt(B)/4 Abcissa value Cz(fo)(h)/Vh used in Fig. 10 Size reduction factor (Fig. 10) Abcissa value (fo) L(h) / Vh used in Fig. 11 Gust Energy factor (Fig. 11) damping coefficient (Table 34) Gust factor (G) = { 1 + gfr * [ B (1 + ) + (SE / ) ] } Cy Cz gfr L(h) B Fo S E G = = = = = = = = = = = = = = 10.00 12.00 1.125 1125 0.017 0.171 0.9 0 2.051 0.62 12.02 0.100 0.01 3.998

SHEET No. 2

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

200 mm top sec.

330 mm middle section

Total height 16 meter

460 mm bottom section

Lighting Tower Geometry details

SHEET No. 1

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

20mtr height ground mounted telescopic tiltable tower


Dimension of Bottom Section in a direction normal to the applied wind force. Dimension of Middle-1 Section in a direction normal to the applied wind force. Dimension of Middle-2 Section in a direction normal to the applied wind force. Dimension of Top Section in a direction normal to the applied wind force. Total number of sections from bottom to top of equipment/structure Breadth of a structure (Average width of the equipment normal to the applied wind force) Total Height of the equipment/structure (including base elevation) Checking the requirement for Dynamic Effect of wind (CL. 7.1): Equipment Height to minimum lateral dimension ratio h/d = 51.61 d1 or b1 d2 or b2 d3 or b3 d4 or b4 = = = = = d or b = h = 0.56 0.46 0.33 0.20 4 0.39 20.00 m m m m m m

> 5

The fundamental time period T = 0.09h / d^0.5 T = 2.892 seconds Equipment Natural Frequency (1 / T) fo = 0.346 Hz 1) Equipment Height to minimum lateral dimension ratio > 5, Hence Dynamic effect need to be consider 2) Equipment Natural Frequency < 1 Hz, Hence Dynamic effect need to be consider For either one of the above condition satisfies, then Dynamic effect needs to be considered. Calculation of HMW speed at height z (Vz or Vh) (CL. 8.2.1): Equipment class per IS-875 based on total height (see 5.3.2.2) Terrain Category Base Elevation Vb = regional basic wind speed in m/s (Fig. 1) Vb k1 = probability factor (risk coefficient) (CL. 5.3.1) k1 k2 = terrain and height factor (Table 33) k2 k3 = topography factor (CL. 5.3.3) k3 Hourly meam wind speed at height z Design Wind Pressure Vz = pz = 0.6 * Vz2 = = = = = = = A 1.00 0.00 m 50 m/s 0.90 0.85 1.00 38.25 m/s 2 877.8 N/m

Vb * k1 * k2 * k3 =

Calculation of Gust Factor (G) (CL. 8): Lateral Correlation constant Longitudinal Correlation constant Peak factor gf times the roughness factor r (Fig. 8) A measure of turbulence length scale (Fig. 8) Lambda for use in Fig. 9 which is Cy/Cz * b/h Abcissa value for use in Fig. 9 which is Czh/L(h) Background Factor from (Fig. 9) which is gfr*sqrt(B)/4 Abcissa value Cz(fo)(h)/Vh used in Fig. 10 Size reduction factor (Fig. 10) Abcissa value (fo) L(h) / Vh used in Fig. 11 Gust Energy factor (Fig. 11) damping coefficient (Table 34) Gust factor (G) = { 1 + gfr * [ B (1 + ) + (SE / ) ] } Cy Cz gfr L(h) B Fo S E G = = = = = = = = = = = = = = 10.00 12.00 1.100 1050 0.016 0.229 0.9 0 2.17 0.61 9.493 0.120 0.01 4.154

SHEET No. 2

of

STANSONENGINEERS CLENT - SARJAINDIA

REV. No.

200 mm top sec.

330 mm middle-2 section

Total height 20 meter

460 mm middle-1 section

560 mm bottom section

Lighting Tower Geometry details