Professional Documents
Culture Documents
and Speed
Rated speed (m/sec) Rated capacity (kg) Number of persons 2.0 2.5 3.0 3.5
: Applicable
Control,
Number of elevators in a bank 1 car 2 cars
: Not applicable
Code number
4.0
P 10
750
10
P 12
900
12
P 14
1050
14
P 16
1200
16
P 18
1350
18
7 cars
P 21
1600
21
8 cars
Notes: 1. Capacity and number of persons are based on EN81-1 (1998). 2. Please consult our local subcontractor in the following cases: When the specifications are out of the above table. When the combination of capacity and speed with mark # is required.
Notes: * 1. When the capacity and speed exceed the range shown in the left page, the operation system 2C-2BC should be 2C-AI-22. * 2. Please consult our local subcontractor, when 2C-AI-22 system is required instead of 2C-2BC system.
Notes: 1. Please consult our local subcontractor for specifications outside these ranges. 2. * The minimum floor height 2500mm is for steel structure only.It may become more than 2500mm when car arrival chime is required at each hall (AECH),or depending on sill support height.However, the minimum floor height for RCC is 2800mm with standard type of sill support.
The system consists of call buttons in the car, and a riser of up and down destination floor buttons installed at each elevator hall (single button at terminal floors), which connect electrically with microprocessors supervising floor selection and direction of travel. A car will respond to those car and hall calls that comply with its direction of service. When there are no more calls registered for the car's direction of travel, the car's service direction is reversed.
STANDARD INSTALLATION
Notes
STANDARD INSTALLATION
on Installation Planning
Points Relating to the Hoistway
In steel-reinforced concrete buildings, design the hoistways so that concrete walls are at least 120mm thick. Hoistways must be no more than 30mm out of plumb. No wiring or distribution panels should be built into or mounted on hoistway walls. It is forbidden under most building codes to install any conduit work or piping in hoistways except as required for the elevator itself. Pit-depth and overhead-height dimensions must always be at least the minimum shown in the drawings. If it proves necessary to make use of space below the pit, contact our local subcontractor. When the building is to be of steel construction, our local subcontractor should be brought into the discussion at the earliest possible moment.
Some
Elevator Arrangement
Elevator installations should be properly planned according to such factors as the size and nature or kind of the building, the traffic flow and peak traffic demand or conditions, the location of public transportation facilities and stores. Dispersing elevators in different areas of a building adversely affects their passenger-carrying efficiency. Therefore, elevators should, as far as possible, be concentrated in the center of the building. When two groups of elevators face each other, ample space should be left between the groups. The number of elevators in each group should be decided on the basis of the physical arrangement of the elevators and the floors served. As much as possible, all the floors served by one group of elevators should be functionally and structurally similar. Dissimilarity among the floors served will result in a drop in service level. In residential buildings, hotels, and the like, it is not desirable for the elevator hall to be located farther than 50 meters from any apartment or room.
Desirable Plans
Undesirable Plans
100-125
R1
Car frame height (HB) according to car design and car depth
Car frame height (HB) (mm) 3450 3650 Car designs S10 S20 S30 N10 N20 BB1400 BB1400 N30 N40 N50 N60 N70 N80
AM (min)
BB BH
BM (min)
Note: The dimensions HB are calculated when the ceiling height (HL) is 2300mm and without the emergency exit on ceiling. Please consult our local subcontractor if required the emergency exit.
Vent. window (by owner) Width: 1000 Height: 2000
R2
JJ AA AH
(Unit: mm)
(Unit: mm)
Attachment panel
Control panel
Control panel
Regulation EN81-1
Hoistway
Wall socket (by owner) Power receiving box (by owner) Lighting outlet (by owner)
Intercom (option)
Machine room
3.0
2500
(Unit: kN)
Pit-depth (PD) *2
Travel TR (m) TR100 2.0 100TR120 120TR150 TR100 2080 750
(Unit: mm)
Rated capacity (kg) 900 1050 1200 1350 1600 2080 2800 3000 3020
Overhead-height (OH) *2
Travel TR (m) TR100 2.0 100TR120 120TR150 TR100 5290 5440 5640 5790 Rated capacity (kg) 750 900
(Unit: mm)
Hoisting hook or trolley beam (by owner)
1600
HM (min.) Cinder-concrete finish (by owner)
5360
TC
2.5
2.5
5440
OH (min.) Entrance height: HH=2100
3.0
100TR120 120TR150
3.0
Code number
2-unit 3-unit 4-unit 1-unit installation installation installation installation 4 units Width x Depth Width x Depth Width x Depth Width x Depth Width AM x BM AM x BM AM x BM AM x BM AM 2350 x 3455 4200 x 3455 6200 x 3455 8200 x 3455 2350 x 3455 4400 x 3455 6600 x 3455 8800 x 3455 2350 x 3655 4400 x 3655 6600 x 3655 8800 x 3655 2500 x 3655 4750 x 3655 7150 x 3655 9550 x 3655 4200 4400 4400 4750
Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth AA x BB AH x BH AH x BH AH x BH AH x BH 2.0 2.5 P 10 P 12 2.0 2.5 3.0 P 14 P 16 P 18 P 21 750 900 1050 1200 1350 1600 10 12 14 16 18 21 800 900 900 1000 1100 1100 1400 x 1300 2000 x 2050 3900 x 2050 5900 x 2050 7900 x 2050 1600 x 1300 2300 x 2050 4300 x 2050 6500 x 2050 8700 x 2050 1600 x 1500 2300 x 2250 4300 x 2250 6500 x 2250 8700 x 2250 1800 x 1500 2500 x 2250 4700 x 2250 7100 x 2250 9500 x 2250 2000 x 1500 2700 x 2250 5100 x 2250 7700 x 2250 10300 x 2250 2000 x 1700 2700 x 2450 5100 x 2450 7700 x 2450 10300 x 2450
2700 x 3655 5150 x 3655 7750 x 3655 10350 x 3655 5150 2700 x 3855 5150 x 3855 7750 x 3855 10350 x 3855 5150
Notes: * 1. All the above dimensions are calculated based on EN81-1 (1998). * 2. The dimensions PD, OH and BH are calculated when the counterweight without safety gear is located in back of the car. * 3. These machine room depth BM with a facing arrangement should be (2BH+3500) mm when lobby width is 3.5m. * 4. Refer to page 7 and 8 for hoistway and machine room layouts with a facing arrangement. * 5. The dimensions shown are minimum requirements, particularly in the figures of TC, OH and PD. Necessary tolerance should be separately considered for the building construction errors. * 6. The dimensions TC, OH, PD and reaction load are calculated according to car and hoistway dimensions on the above table and conditions.
Travel TR
Number of persons
HL
P1
Note: The dimensions OH are calculated when the car frame height (HB) is 3450mm.
HB
P2
100TR150
Hoistway section
6
Car frame height (HB) according to car design and car depth
Car frame height (HB) (mm) 3450 Car designs S10 S20 S30 N10 N20 BB1400 BB1400 N30 N40 N50 N60 N70 N80
BB
BH
Control panel
control Group panel
Control panel
Control panel
Attachment panel
Elevator lobby
Control panel
Control panel
Control panel
Attachment panel
Intercom (option)
AH
R2
3650
Note: The dimensions HB are calculated when the ceiling height (HL) is 2300mm and without the emergency exit on ceiling. Please consult our local subcontractor if required the emergency exit.
Wall socket (by owner) Power receiving box (by owner) Lighting outlet (by owner)
(Unit: mm)
(Unit: mm)
BH
Hoistway
Machine room
(Unit: kN)
Pit-depth (PD) *2
Travel TR (m) TR100 3.5 100TR120 120TR150 4.0 TR150 750
(Unit: mm) Rated capacity (kg) 900 1050 1200 1350 1600 3020
Overhead-height (OH) *2
Travel TR (m) TR100 3.5 100TR150 6120 TR150 750
6520
OH (min.)
Highest floor
Width x Depth Width x Depth Width x Depth Width x Depth AA x BB AH x BH AH x BH AH x BH 3.5 P 12 P 14 3.5 4.0 P 16 P 18 P 21 900 1050 1200 1350 1600 12 14 16 18 21 900 900 1000 1100 1100 1600 x 1300 4400 x 2100 6650 x 2100 8900 x 2100 1600 x 1500 4400 x 2300 6650 x 2300 8900 x 2300 1800 x 1500 4800 x 2300 7250 x 2300 9700 x 2300 2000 x 1500 5200 x 2300 7850 x 2300 10500 x 2300 2000 x 1700 5200 x 2500 7850 x 2500 10500 x 2500
Width x Depth Width x Depth Width x Depth Width AM x BM AM x BM AM x BM AM 4500 x 3455 6750 x 3455 9000 x 3455 4500 x 3655 6750 x 3655 9000 x 3655 4800 x 3655 7250 x 3655 9700 x 3655 5200 x 3655 7850 x 3655 10500 x 3655 5200 x 3855 7850 x 3855 10500 x 3855 4500 4500 4800 5200 5200
P2
P1
Travel (TR)
Code number
Number of persons
Total height
HL P1
Notes: * 1. All the above dimensions are calculated based on EN81-1 (1998). * 2. The dimensions PD, OH and BH are calculated when the counterweight without safety gear is located in back of the car. * 3. These machine room depth BM with a facing arrangement should be (2BH+3500) mm when lobby width is 3.5m. * 4. Refer to page 5 and 6 for hoistway and machine room layouts with an in-line arrangement. * 5. The dimensions shown are minimum requirements, particularly in the figures of TC, OH and PD. Necessary tolerance should be separately considered for the building construction errors. * 6. The dimensions TC, OH, PD and reaction load are calculated according to car and hoistway dimensions on the above table and conditions.
Hoistway section
HB P2
TC
Note: The dimensions OH are calculated when the car frame height (HB) is 3450mm.
10
ELECTRICAL INSTALLATION
Electrical
ELECTRICAL INSTALLATION
Power
Speed (m/min)
Feeder Data
Rated load (kg)
750 900 1050 1150 1200 1350 1500 1600 750 900 1050 1150 1200 1350 1500 1600 750 900 1050 1150 1200 1350 1500 1600 750 900 1050 1150 1200 1350 1500 1600 750 900 1050 1150 1200 1350 1500 1600
FLAcc (A)
52 56 61 64 67 72 78 82 64 69 75 79 82 88 96 100 74 81 90 94 98 105 114 119 97 99 113 117 124 131 139 144 110 112 123 128 135 143 159 165
NF in M/R
Ground wire *1
120
150
180 Notes: *1. The minimum size of ground wire is determined according to the ampere rating of the NF breaker installed at the power source side. *2. The ampere rating of the power-source NF breaker should be of one step larger than of the receiving-box NF breaker installed in the elevator machine room.
210
Notes: * 1. If the power supply voltage is other than 400V, the FLU and FLAcc current vary inversely with power supply voltage as follows. (Current at E volts) = (Current at 400 volts) x (400 / E) where, E: power supply voltage
Table 1
Feeder size (mm2)
3.5 5.5 8 14 22 30 38 50
Coefficient K
5.1 8.0 11.6 20.6 32.1 42.5 54.3 70.7
Coefficient K
87.3 115 148 184 225 287 371 473
Lighting Equipment
The machine room should be fitted with good lighting for maintenance work. The light switch should be positioned close to the machine-room entrance.
Ventilation Equipment
A machine-room ventilation device having a sufficient capacity to keep the room temperature below 40C is required. A ventilation window should also be installed at the opposite side of ventilation fan.
Table 2
No. of Diversity factor elevators For FLAcc on common For FLU Without express zone With express zone feeder
2 3 4 5 6 7 8 9 10 2.0 2.7 3.1 3.25 3.3 3.71 4.08 4.45 4.8 1.7 2.4 2.95 3.6 4.1 4.6 5.1 5.6 6.0 1.85 2.7 3.4 4.2 4.9 5.6 6.3 6.9 7.6
11
12
30 floors
5 floors
Selecting
Numb er of
Scale of building
1.0 m/sec
1.5 m/sec
10 floors
2.5 m/sec
3.0 m/sec
20 floors
The following items are not a part of elevator installation work, and are the responsibility of the building owner or general contractor. Construction of the elevator machine room with proper beams and slabs, equipped with a lock, complete with illumination, ventilation and waterproofing. Access to the elevator machine room sufficient to allow passage of the control panel and traction machine. Suspension hook facilities and ladders in the machine room. Finishing of the machine-room floor and the walls and floors in the vicinity of the entrance hall after completion of the installation. Construction of an illuminated, ventilated and waterproofed elevator hoistway. A ladder to the elevator pit. Provision for the cutting of the necessary holes and joists and for making good thereafter as required. Separate beams, when the hoistway dimensions markedly exceed the specifications, and intermediate beams when two or more elevators are installed.
All other work related to building construction. The machine-room power-receiving panel and the electrical wiring for illumination, plus the power from it to the electrical room. The laying of conduit and wiring between the elevator pit and the terminating point for the emergency bell, intercom, etc. The power consumed in installation work and test operation. All the necessary building materials for grouting in of brackets, bolts, etc. The provision and subsequent alteration as required, and eventual removal of the scaffolding as required by the elevator contractor, and any protection of the work as may be required during progress. The provision of a suitable locked space for the storage of elevator equipment and tools during elevator installation.
Ordering Information
Please include the following information when ordering or requesting estimates. The desired number of units, speed, and loading capacity. The number of stops or number of floors to be served. The total elevator travel and floor-to-floor height. Operation system. Selected car design and size. Entrance design. Signal equipment. A sketch of part of the building where the elevators are to be installed. The voltage, phase and frequency of power source for the motor and lighting.
4.0 m/sec
5.0 m/sec
eleva
Operation system
tors
Saving energy and space High-efficiency transport mechanism Environment-conscious industrial waste treatment
1-car selective collective (2BC) 2-car selective collective (2BC) AI-22 group control system AI-2200C group control system Applicable system
Riding and boarding safety Safety in emergencies High reliability Safe service spots
Recommended system
Mitsubishi Electric Inazawa Works has acquired ISO 9001 certification by the International Standards OrganizationISObased on a review of quality management for the System. The plant has also acquired the environmental management system standard ISO 14001 certification.
13
14