CORON ENGINEERS

Ref. No.: Dated

Subject Dear Sir

: Offer for FRP Cooling Tower

We thank you very much for showing your interest on our products. As discussed with you please find detailed description as per Annexure. Annexure 1 Technical Description Annexure 2 Material of Construction Annexure 3 Commercial Offers Annexure 4 Terms & Condition

Hope you find the above in order. Should you desire any further information / Clarification please feel free to contact us. Thanking you and looking forward for your valuable orders. Yours faithfully For Coron Engineers

Corp. Office: W-50, SECTOR-11, NOIDA 201301, Delhi NCR, INDIA Ph. No.: +91-120-4590000, 4310477, Fax: +91-120-4335001 E-mail: info@coron.co.in ; sales@coron.co.in Website: www.coron.co.in

Annexure 1

Round Bottle Shape FRP Cooling Tower 30 TR 1. 2. 3. 4. 5. 6. 7. 8. 9. Type of Cooling Tower Shape Dia Height of cooling tower No of fan & motor Motor capacity Make of motor Size of Fan Flow rate FRP Induced Draft Counter flow Round Bottle Type 1650 mm 2300 mm 01 nos 2 H.P./960RPM/415V/3Ph./50Hz Sabar/New India/Equivalent 850 MM 300 LPM 2.0 meter PVC Fills 42C 32C 28C 1.800 % of water circulation 0.005 % of water circulation 50 mm

10. Pumping Head 11. Type of distribution media 12. Water Inlet Temperature 13. Water Outlet Temperature 14. Wet Bulb 15. Evaporation Losses 16. Drift Losses 17. Inlet/Outlet Connection

Annexure 2 Material Construction

1.

Motor

IP55 TEFC/415V/3PH/50HZ/Flange Mounted /Weather proof.

2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

Type of drive Fan Assembly Fan guard Stand Post Fill support Fill Jali Motor base Ladder Fills Eliminator Air Intake Mesh Brach pipe Sprinkler Casing Water Basin Hardware

Top mounted direct drive. Aluminum Alloys Hot Dip Galvanized steel Hot Dip Galvanized steel Hot Dip Galvanized steel Hot Dip Galvanized steel Hot Dip Galvanized steel Hot Dip Galvanized steel Honeycomb type PVC PVC PVC PVC Aluminum alloys Fiber Glass Reinforced Plastic. Fiber Glass Reinforced Plastic. Electro Plated

Annexure 3 Commercial Offers S.No. 01 Price Description of Unit Qty 01 Price (Rs.) Total Amount (Rs.)

Cooling tower Set

Installation Items Installation charges Total Unit 1 Job


Annexure: -4 - Terms & Condition 1. Sales Tax 2. Service Tax 3. Freight& Octroi 4. Delivery 5. Payment : : : : : @2% against C Form/ 13.5 % full tax. 10.3% on installation charge. To Pay Extra 10-15 days from date of confirm of order along with advance 40% Advance with Purchase order, Balance payment against Performa Invoice before dispatch

Amount

Total Amount

Exclusions of work: All civil work including ,RCC Pillars, Foundations Bolts, , Electrical Connection, External Pipeline, Cabling, Pump, Valves, Starter, Drain & Water Makeup Arrangement etc. Thanking you and looking forward for your valuable orders. Yours faithfully For Coron Engineers