RESOURCE SCHEDULING
One of the most important uses of the technique.
The programme itself is used for forecasting the resources required to undertake the works, or to help to find the minimum resources required to complete the project. CPM offers the facility, when computerised to analyse the effects of alternative allocations at high speed.
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA
RESOURCE AGGREGATION
Resource aggregation is a summation on a time-period basis, in the form of a bar chart, of the resources which are used in order to carry out the programme. The quantity of a resource required in each time unit is written above each bar, and the results aggregated at the foot of the chart. The chart takes the form of a histogram. Resource aggregation can be obtained for the total labour force or for any particular trade (carpenters, steel fixers, ..). Also used for plant and material allocation required to complete each activity.
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA
RESOURCE LEVELLING
Histograms obtained from the resource aggregation process may highlight unacceptable discontinuities and undesirable peaks. Could provide a guide into rearranging certain activities so that time can be saved to complete them. Usually faced with two problems:
Time-limited: minimise the peak resource requirement Resource limited: resources availability is fixed, and the objective is to complete activities in earliest and minimum time.
Resource levelling or smoothing should continue until we get the best acceptable histogram of resources.
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA
AN EXAMPLE
Activity Dependencies Duration Resource in days s
A B C D E F G H J
2 6 3 1 4 3 4 13 8
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA
10
11
12
13
14
15
16
17
18
19
FLOAT
A B
2L
1S 3L
2L
1S 3L 1S 3L 1S 3L 1S 3L 1S 3L FLOAT
1S 1L
1S 1L
1S 1L
FLOAT
D
E
1S 2L 1S 2L 1S 2L
1L
FLOAT 1S 2L
FLOAT 1S 1L 1S 1L 1S 1L FLOAT
F
G H
1S 2L
1S 2L
1S 2L
1S 2L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L
2S 6L FLOAT
2S 4L
2S 4L
2S 4L
2S 4L
2S 4L
2S 4L
2S 4L
2S 4L
0
A B
2L
1S 3L
1
2L
1S 3L
5
FLOAT
10
11
12
13
14
15
16
17
18
19
1S 3L
1S 3L
1S 3L
1S 3L FLOAT
1S 1L
1S 1L
1S 1L
FLOAT
D E
1S 2L 1S 2L 1S 2L
1L
FLOAT 1S 2L
FLOAT 1S 1L 1S 1L 1S 1L FLOAT
F G H
1S 2L 2S 6L
1S 2L 2S 6L
1S 2L 2S 6L
1S 2L 2S 6L 2S 6L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L 2S 4L 2S 6L FLOAT
2S 4L
SKILLED
LABORER
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA
Description of activity
Dependencies
Duration
Resource
A B C D E F G H I J K L M N O P Q R S T U V W
Dig foundation Concrete foundation Make and prime door frame Position door frame Lay bricks Fit rolled steel joists for lintel Cut roof timber Case lintel and build parapets Fit roof timbers Fit fascia boards Fit roof sheets Dig soakaway and drain trench Lay rubble and drain Fill in draintrench Make good concrete over trench Lay floor base Lay floor screed Make doors Prime doors Hang doors Paint Fit gutters and downpipes Seal roof
PRECEDENCE DIAGRAM
E F
DUMMY
G
C H
ES LS
DURATION
EF LF
ACTIVITY DESCRIPTION
DR ASSEM AL-HAJJ, Univation, RGU Project Management and Economics. SITP-SPDC, NIGERIA FLOAT