Hamad International Airport

2004

50% Land Reclamation

QCAA Lands the first plane 29 November 2012 12h30

29km2 Site

January 2013

Interesting Statistics

Laborers in 2007 Laborers in 2011 Contractors Contracts Engineering, Project, Construction and Cost Personnel Crushed Rock Reclamation Fill Concrete Piles Airfield Asphalt Steel Electrical Cable Fiber Optic Cable Fuel Pipes Curtain Wall Telephones Fencing

13,800 47,000 47 100 900 87,600 tonnes 60,200,000 m3 2,300,000 m3 8,900 2,000,000 m3 140,000 tonnes 17,000,000 m 330,000 m 37,000 m 86, 000 m2 Interesting Statistics 9,000 88,000 m

Master Plan completed in 2003 Runways: 4.8km long 60m wide 2km apart Midfield concept for maximum efficiency 100% A380 Compatibility 100% International Civil Aviation code compliant State-of-the-Art Technology

Landscaping and Infrastructure


Terminal Approach Road

600,000m2 Terminal 41 Contact Gates 3 Central Utility Plants 29ha Lagoon Iconic Roof Form: Echoes Waves in Gulf 3450 Car Parking System 6900m2 Transportation Facility 100 Limousine Staging Mosque Plaza Landscaped Gardens

Passenger Terminal Complex

Passenger Terminal Complex

Passenger Terminal Complex

88 Passenger Loading Bridges


Passenger Terminal Complex

Open Vistas High Vaulted Ceilings

Passenger Terminal Complex

25,000m2 Column-Free Space 24m High Ceiling 150 Check-In Stations 5 Islands 14 First Class Check-In Booths 16 Business Class Check-In Desks Information Kiosks Currency Exchange Retail and F&B

Departures Hall
Passenger Terminal Complex

First & Buisness Class Check-In


Passenger Terminal Complex

Sunken Gardens
Passenger Terminal Complex

Mirror Image Concourse B 20 Gates with Hold Rooms 270 Seats per Hold Room Code E Aircraft Secondary Screening 30mins Minimum Connect Time Activity Nodes Quiet Rooms Flight Information Displays

Departures Concourses A & B


Passenger Terminal Complex

Naturally Lit Focal Point Access to Qatar Airways: 1st & Business Lounges Gold & Silver Lounges Al Maha Lounges

Retail Gallery
Passenger Terminal Complex

13 Gates with Hold Rooms 270 Seats per Hold Room Unobstructed Views of the Airfield

Departures Concourse C
Passenger Terminal Complex

Landmark Feature 2100m2 Mosque 35m Minaret

Mosque Plaza
Passenger Terminal Complex

Intricate Caligraphy Artwork


Passenger Terminal Complex

Silhouette of Sails 12000m2 Terminal Separate Aircraft Apron 5 Large Aircraft 2 Airbus A380 Positions

Emiri Terminal

Podium for Reception of State Visitors


Emiri Terminal

Bespoke Interiors
Emiri Terminal

Arrivals Plaza
Emiri Terminal

90m High Visible from Central Doha Tower Cab 75m Above Ground Air Navigation Radar 360 degree Tower Simulator for Advanced Operational Safety and Efficiency

Air Traffic Control Tower

150,000m2 Enclosed Hangar Simultaneous Capacity for: 8 Wide Body Aircraft Maximum 13 Aircraft Including Airbus A380 Safe Access to all Level of Aircraft Flexibility of Tail-First or Nose-First Configuration

Aircraft Maintenance Hangar

Widest Free-Span Opening in the World


Aircraft Maintenance Hangar

Moveable Docking Structures


Aircraft Maintenance Hangar

50,000m2 1.4 Million tons Annual Capacity Separate Aircraft Parking Apron 11 Wide Body Aircraft Automated Container Storage System 1,200 unit Consignment Handling System Accommodates 5,300 Separate Shipments

Cargo Terminal

Cargo Terminal

65,000m2 Facility 90,000 Meals per Day State-of-the-Art Automated Operations Production capability for Off-Airport Venues Direct Airside Loading

Catering Building

Catering Building

Next Phases of Development

50 Million Passengers
Phase 3A

AVIATION SERVICES AIR TRAFFIC CONTROL TOWER CATERING BUILDING CARGO TERMINAL EMIRI HANGARS AIRCRAFT MAINTENANCE HANGAR RUNWAYS PASSENGER TERMINAL BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

AVIATION SERVICES AIR TRAFFIC CONTROL TOWER CATERING BUILDING CARGO TERMINAL EMIRI HANGARS T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

AVIATION SERVICES AIR TRAFFIC CONTROL TOWER CATERING BUILDING CARGO TERMINAL EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

AVIATION SERVICES AIR TRAFFIC CONTROL TOWER CATERING BUILDING NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

AVIATION SERVICES AIR TRAFFIC CONTROL TOWER CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

AVIATION SERVICES SEA RESCUE CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

MULTI-STOREY PARKING SEA RESCUE CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION T1 EXPANSION BACK-UP APPROACH & TRAINING CENTER

2012 - 2017
Phase 3A

2012 - 2020
Phase 3B

MULTI-STOREY PARKING SEA RESCUE CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION T1 RAIL STATION VISA BUILDING LAND RECLAMATION

2012 - 2020
Phase 3B

MULTI-STOREY PARKING SEA RESCUE CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES T1 APRON EXPANSION WESTERN TAXIWAY & APRON VISA BUILDING LAND RECLAMATION

2012 - 2020
Phase 3B

MULTI-STOREY PARKING SEA RESCUE CAR RENTAL FACILITY NORTH CROSS TAXIWAY EMIRI FLIGHT FACILITIES AVIATION CAMPUS / LAW ENFORCEMENT WESTERN TAXIWAY & APRON VISA BUILDING LAND RECLAMATION

2012 - 2020
Phase 3B

MULTI-STOREY PARKING SEA RESCUE RAIL STATION CAR RENTAL FACILITY PLAZA NORTH CROSS TAXIWAY TERMINAL 2 EMIRI FLIGHT FACILITIES AVIATION CAMPUS / LAW ENFORCEMENT WESTERN TAXIWAY & APRON VISA BUILDING LAND RECLAMATION

2012 - 2020
Phase 3B

2020