You are on page 1of 15

HAZOP Worksheet

Node : 11 Type : Drawing : Design conditions/Parameters


Guidewords No flow Causes FCV is fail to open Consequences Level falling Risk matrix L S R 4 1 4 Safeguards Recommendations Install manual valve (HCV) and level switch Install additional pipe line and level switch Responsibilities Plant builder should check this segment. Plant builder should check this segment. Plant builder should check this segment. Plant builder should check this segment. Install additional pipe line and flow control valve Plant builder should install additional pipe line and pressure control valve.

Pipe is blocked

Level falling

Less flow

Pipe is leaked

Level falling

Install additional pipe line and level switch

More flow

FCV is fail to close

Separator overpressurized, level incleasing

8 Pressure control valve and liquid control valve are already installed 16

Reverse flow

PCV is fail to open and Separator damaged separator overpressurized

Less temperature

Refrigerant is overworking C5+-rich stream increase

3 Liquid control valve is already installed

Install temperature indicator

Plant builder and operator should check on the refrigerator. Plant builder and operator should check on the refrigerator.

More temperature

Refrigerant is fail

NG-rich gas stream increase, efficiency decrease

3 Pressure control valve Install temperature is already installed indicator

Less pressure

PCV is fail to close

Level falling

Install flow back pipe Plant builder line and additional should check this pressure control valve segment. Plant builder should check this segment. Plant builder should install additional flow control valve and additional pipe line.

LCV is fail to close and level falling

Two phase flow

8 Pressure control valve Install additional pipe is already installed line and flow control valve 12 Install additional pipe line and flow control valve

More pressure

PCV is fail to open

Separator overpressurized and reverse flow occurs

Pipe line is blocked

Separator overpressurized and reverse flow occurs

Install additional pipe line and flow control valve

Plant builder should install additional flow control valve and additional pipe line.

Start-up

Feed gas is not cooled Reverse flow occurs at the separator

Efficiency deacrese

3 Flow control valve is already installed Plant builder should check this segment.

Shut down

reverse flow

Maintenance

Refrigerator maintenance Total system failure

You might also like