SESSION II Introduction to FIDIC

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC

Session II Introduction to FIDIC in General FIDIC contract types and major differences Fundamentals of FIDIC Red Book and Yellow Book Hybrid Contracts Main Parties to the Contract and Responsibilities Contract Documents as per FIDIC FIDIC Project Management Tools

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Introduction to FIDIC - 2
This project is co-financed by the European Union and the Republic of Turkey

Stands for Fdration Internationale des

www.fidic.org

Ingnieurs Conseils French acronym for International Federation of Consulting Engineers In Turkish: Mavir Mhendisler Uluslararas Federasyonu

Established in Switzerland in 1913, HQs is in Genve; First contract is printed in 1957; FIDIC represents Engineers and Consultants from various countries; E&C Associations over 60 countries are FIDIC members; Under this umbrella 30,000 firms and over 1,000,000 professionals are represented. REPUBLIC OF TURKEY
MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC - 3

FIDIC is the international Federation of duly elected

associations of consulting engineers, representing the profession in their respective countries.


Membership in the Federation is restricted to one association for

each country; Members comply with a code of ethics guiding their professional standards; FIDIC works to promote the common interests of consulting engineers through seminars, conferences and regular discussions with the national associations and international financial institutions (such as the World Bank) Preparation of standard forms of contract and other documents is a REPUBLIC OF TURKEY major activity MINISTRY OF SCIENCE,
INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC - 4

ATCEA Association of Turkish Consulting Engineers and

Architects (TMMMB - Trk Mavir Mhendisler ve Mimarlar Birlii)


is the only representative body of FIDIC in Turkey;
Established in Ankara in 1980 and has over 200 members; ATCEA is a member of FIDIC since 1987;

Sells and distributes its own publications as well as FIDICs


In EU funded projects, ATCEA is requested to appoint the

DAB www.tmmmb.org.tr / www.atcea.org.tr

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC - 5

Standardisation both in technical and administrative matters is essential for the successful completion of projects of civil engineering constructions; FIDIC is known throughout the world for producing standard forms of contract for civil engineering construction, and mechanical and electrical plant to govern international contracts; In 1999, FIDIC standardised its model contracts, with the publication of first editions of a new family of contracts comprising four new standard forms of contract: Conditions of Contract for Construction (Red Book) Conditions of Contract for Plant and Design-Build (Yellow Book) Conditions of Contract for EPC/Turnkey Projects (Silver Book) Short Form of Contract (Green Book)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC - 6
fair apportioning of risks, rights and obligations

Why FIDICs Standard Forms of Contracts?


BALANCED

between the parties WELL TRIED long case history for earlier contracts ACCEPTED known and recognised; in wide use for international contracts SUPPORTED recommended or required by development banks, International Financial Institutions, large development funds, etc. EFFECTIVE clear and complete conditions; time limits; provisions for adjudication
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to the FIDIC Red Book and Yellow Book


Conditions of Contract for Construction Designed by The Employer Red Book: Employer responsible for detailed design and thus, carries the risk of increased contract amount depending on the quality of design; Partial Contractor design possible Engineer, working for the Employer; Bill of Quantities; Payments based upon measurements of works done based on unit prices; but lump sum could be used; Certification of payments by Engineer;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to the FIDIC Red Book and Yellow Book


Conditions of Contract for Plant and Design Build Yellow Book: Contractor responsible for detailed design in accordance with the Employers requirements, specifying the quality and scope of the completed work; Engineer, working for the Employer; Schedule of Payments with Lump sum pricing, but remeasurement possible; Payments according to progress (when the Contractor has completed defined stages/milestones in the project); Certification of payments by Engineer.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Fundamentals of FIDIC Silver Book


Conditions of Contract for EPC (Engineer, Procure, Construct) Turnkey Projects Silver Book: Contractor takes full design and execution responsibility (Contractor to cover extra risks, so Employer pays more); No Engineer, but Employer may appoint a Representative; Lump sum Contract Price (but adjustments in limited specified cases); Payments according to progress; Employers Requirements usually a performance specification.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Fundamentals of FIDIC Green Book


Short Form of Contract Green Book: Simple and repetitive works ( < US$ 500,000 and twelve months duration); Design by either party; but commonly the Employer takes over the design responsibility; Balanced risk sharing; No Engineer, but Employer may appoint a Representative; Payment on lump sum or any other basis according to value of Works executed and Materials and Plant delivered to site;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

FIDIC Do Not Publish a Cost Reimbursable form of contract

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC

Distinction between the Books is based on: who does the design?

who bears risk for change in quantities?


EPC (Silver Book) provides for the Contractor taking

almost all risks Short Form (Green Book) deals with the wide demand for a simpler form of contract
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Which Format
Max
This project is co-financed by the European Union and the Republic of Turkey

Owners Risk Cost Reimbursable (I Chem. E Green Book) Short Form Contracts and Dayworks

Min Min

Max

Target Cost (I Chem. E Green Book)

Contractor's Risk Owner's Flexibility Admeasurement (FIDIC Red or ICE 6th)

Plant and Design-Build (OB or New FIDIC Yellow)

EPC Turnkey (FIDIC Silver) Min Min Contractors Incentive Max


REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Max

This project is co-financed by the European Union and the Republic of Turkey

Introduction to the FIDIC Red Book and Yellow Book

The 2 Main Contracts Features (Similarities & Differences) Similarities: General Conditions Guidance for the Preparation of the Particular Conditions Letter of Tender (Tender Form) Contract Agreement Dispute Adjudication Agreements (Dispute resolution procedure is: adjudication (DAB) >>> amicable settlement >>> arbitration Twenty main clauses, covering similar matters
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to the FIDIC Red Book and Yellow Book


Exceptions: Clauses 5 and 12:
For Construction (Red Book) Sub-contractors Measurement

Clause
5 12

For Plant and D-B (Yellow Book) Design Tests after Completion
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC
Hybrid Contracts Works designed by the Employer with Partial Design by the Contractor;
Payments: BoQ with Unit Prices and

Lump sum pricing;

Plant and Design-Build (design by

the Contractor) with partial works designed by the Employer;


Payments: combination of Lump

Sum (Schedule of payments) and Unit Prices;


REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

More on Hybrids

Under IPA Contracts needing a mix of Design-Build and Construct-Only format, must be let under a single contract either with Yellow Book or Red Book General Conditions. The ITT must state how bidders are to fill in the necessary BoQ and Schedules of Prices and how these are summated to give an Accepted Contract Amount. Two separate Works Sections should be defined and may have different damages for late delivery, completion times and retention sums
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC

The Conditions of Contract consists of General Conditions,

which form Part I of the Conditions of Contract; and Part II which includes amendments and additions to such General Conditions, referred as Particular Conditions; so that Part I and Part II together comprise the conditions governing the rights and obligations of the Parties (the Employer and the Contractor) to the Contract. and set out the legal/contractual arrangements that will apply to the Contract
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction to FIDIC

Management of FIDIC contracts is a broad and

complicated subject of study; FIDIC knowledge improves by experiences and execution; Studying, Implementation and continuous Monitoring are the keys to success. The Engineer must be a 1st class administrator
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Employer: The first party to the Contract and owner/sponsor of the Works; gives the contractor right of access to, and possession of the Site; makes the advance payment (if any) against a suitable guarantee from the Contractor; makes payments to the Contractor as certified by the Engineer to be due under the contract; takes over the Works following the issue of Certificates by the Engineer;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Employer: may authorise the Works to be completed by others if the Contractor is in default; terminate the Contract in the event of the Contractor failing to perform or in certain other circumstances defined in, and subject to, the law governing the Contract; In our contracts, the Employer also means CA and is IPA Coordination and Implementation Directorate within the MoSIT.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Contractor: The second party to the contract, who has the obligation to execute and complete the Works within the time specified in the contract; provides the securities, guarantees and insurance policies and commences the Works; prepares the construction programme, provides all necessary materials, Contractors Equipment, Temporary Works, management, superintendence and labour and selects the method of carrying out the Works;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Contractor: executes the Works to the specified quality within the defined time for completion and remedy any defects therein in accordance with the Contract; receives and complies with instructions from the Engineer acting on behalf of the Employer; responsible for the quality, adequacy, stability and safety of all Site operations and methods of construction; responsible for the care of the Works throughout the construction period until the Works are officially taken over by the Employer;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Contractor: responsible for his own staff and work force and for taking out social and other insurances in respect of his personnel and taking safety measures; complies with all applicable laws, by-laws and regulations; responsible under the Contract for each sub-contractors work and behaviour; In the event of default by the Employer, the Contractor may suspend progress of the work and claim an appropriate extension of time and/or additional payment.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

The Engineers Power of Determination

The Engineer: Although the Engineer Represents the Employer, under sub-clause 3.5 he/she has the right to act as a judge in the resolution of disputes. If the Contractor does not accept the Engineers determination he can move towards dispute adjudication.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Engineer: Not a party to the Contract between the Employer and the Contractor but his terms of engagement are set out in a Service contract with the Employer who appoints him to administer the Contract. Although the Engineer is not a party to the Contract, he plays an important role in the development process of the Works his job is primarily to supervise and monitor the work in strict accordance with the Contract;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Engineer: issue of information and instructions to the Contractor as the Works proceed; comment on the Contractors proposals for carrying out the works; ensure that quality of materials and workmanship are as specified; agree measurements/percentages of work done; check interim and final payment statements of the Contractor and issue to the Employer the interim and final payment certificates; give instructions relating to management of the Contract and changes in the nature and extend of the work, the cost thereof and the time for completion (subject to the authorisation by the Employer as stated in Part II);
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

The Engineer: give or refuse approval or consent, approve works, issue certificates; make fair determination in accordance with the contract, taking due regard of all relevant circumstances; In administration of the Contract, all communications with the Contractor pass through the Engineer, thus avoiding possible confusion and misunderstanding; His objective is to ensure that the Employer receives the works at completion in accordance with the requirements of the Contract and that the Contractor is suitably rewarded for the work he carries out.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities

Relationships in a EU-funded Project:


Employer Contractor FIDIC Conditions of Contract Employer Engineer Service Contract as per EU Service contract condition (General and Special) Engineer Contractor FIDIC Conditions of Contract

Engineer supervises the construction and administers / manages the project in compliance with FIDIC Conditions of Contract with limited authority
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Main Parties to the Contract and Responsibilities


FIDIC Site Roles

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Contract Agreement (Contract Form) Letter of Tender (Tender Form) Appendix to Tender Conditions of Contract Specifications (Red Book) / Employers Requirements (Yellow Book) Drawings Bill of Quantities (Red Book) / Schedule of Payments (Yellow Book) Any other document forming part of the Contract (Addenda, Q/A)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Contract Agreement (Contract Form):

standard form of contract signed by both parties, properly

recording all the terms agreed, including the documents listed as forming part thereof. Legally binding document, and thus must be carefully prepared to comply with the requirements of the relevant law
Letter of Tender (Tender Form):

standard form of tender completed by the Contractor and includes

the signed offer to the Employer for the Works; tenderer (the Contractor) confirms that he has read and understood the requirements of the tender documents and states his undertaking and fulfilling all his obligations under the Contract.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Appendix to Tender: includes summary of the information originating from the Particular and General Conditions of Contract. prepared as a summary table and Includes Financial, Administrative and Contractual Information, such as:

Contact Details of Parties / Law and Language of the Contract; Contract Duration / Disputes and Arbitration; Amounts for Securities and Guarantees / Delay damages; Advance Payment and repayment amortization; Retention Money (percentages for deductions and limits); Minimum amount of Interim Payments; Insurance provisions / DAB applications
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Conditions of Contract: Part I: General Conditions of Contract (Standard Red or Yellow Book) Part II: Particular Conditions of Contract
Particular Conditions changes / replaces / revises / deletes the Clauses

of the General Conditions; Particular Conditions should be in line with the local law and law of the contract; Particular Conditions of Contract prevail the General Conditions; Clauses in Particular Conditions should not be conflicting with the clauses of the General Conditions; Change only where change is necessary as any revisions / additions / omissions done by the Particular Conditions should be based on rational reasoning.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Conditions of Contract: Clause 1.5 of PCs; Priority of Documents is important and should be re-addressed for every project. Specimens for Performance Security, Advance Payment and Retention Guarantees provided;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Specifications: Defines:
the scope, general and the technical requirements of the

Contract; materials standards and quality of workmanship; details of samples to be provided and tests to be carried out; methods of executing the works; provisions of access or space for other contractors
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Basis of FIDIC Yellow Book

Contractor is responsible for Design Specification of Mechanical and Electrical Equipment (In the cases of water and wastewater works) Process Commissioning Operations & Maintenance Manual Operator training There are two sets of Tests. Tests on completion and Tests After Completion" of the Works Yellow Book can easily be configured in fixed-price format
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Basis of Yellow Book

In the Yellow Book the Contractor bids:


Against a set of performance criteria Against a set of detailed specifications

The Contractor undertakes to meet the performance

criteria and does not get paid fully until he proves the performance criteria have been met Fulfillment of performance measured in preestablished Tests On and Tests After completion. Payment is made against a Schedule of Payments*

* There is no section on measurement and evaluation in FIDC 1999 Yellow Book!


REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

PERFORMANCE GUARANTEES
This project is co-financed by the European Union and the Republic of Turkey

The Yellow Book can be used in conjunction with

guarantee from the Contractor on the performance of his design. The minimum performance will be specified by the Employer. The performance may be tested both in the Test on Completion (9.1) and the Test After Completion 12.4(b) Should the Contractor fail the performance tests penalties shall be applied as specified in the contract. Penalties shall be deducted from payments due.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

1999 FIDIC YELLOW BOOK

In the Foreword of the contract, FIDIC recommends that:

Payments under a 1999 Yellow Book are instalments within a lump sum Contract Price *
* Need not be related to actual progress (14.1 (d))
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Yellow Book & Employers Requirements

In addition to above, Employers Requirements

defining Performance criteria for the works to be designed by the Contractor. The requirements, parameters, functions, scope and the quality of the completed works should be defined; All the existing information, relevant technical & administrative regulations and standards should be listed to enable the Contractor to carry out a proper design Precise instructions on the preparation of design drawings and the standards to which they must comply.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Contract Documents as per FIDIC


This project is co-financed by the European Union and the Republic of Turkey

Drawings (Design documents): sufficiently detailed in conjunction with the Specifications, the BoQ and the nature and scope of works included in the Contract; on most contracts supplementary drawings will be issued as the works proceed. However, it should not delay the progress as planned (Work Programme) In the case of Yellow Book: Draft Layouts and conceptual/indicative design drawings are thought to be sufficient.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Introduction

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Payment Under FIDIC Red Book

1.

2.

Normally against monthly measurement but lump sum payments or mixture of lump sums and remeasurement possible. Contractor does measurement of work to date and plant and materials delivered to site.
(Normal practice for the contractor to do this in conjunction with a representative of the Engineer.)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Advanced Payment
This project is co-financed by the European Union and the Republic of Turkey

1. 2. 3. 4. 5.

This is embedded in the 1999/2005 FIDIC RB and YB, and has to be particularised out if not required. In specified currency and can be different for different Works Sections. Typically paid back over the first 5 or 6 interim payments. Is always bonded. Needs sensible use in combination with retention money!

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

RB Measurement & Payment Basis


This project is co-financed by the European Union and the Republic of Turkey

Normally: 1. Designers produce detailed Bills of Quantities to a standard form. 2. These have a preliminary costing to build up a cost estimate (i.e. A budget price) 3. Bidders complete the Bills of Quantities to get the Accepted Contract Amount 4. The Contractor uses his bid rates for items as a basis for payment for additional items under the contract. 5. Claims for payment are monthly on the basis of work done (and possibly for plant & materials delivered)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Preamble to BoQ
This project is co-financed by the European Union and the Republic of Turkey

In the absence of a standard method of measurement the BoQ must be preceded by a Preamble which sets down how things are to be measured. Note: It has become traditional that the Preamble to BoQ also contains advice on how bidders should fill in the BoQ but this information is more correctly placed in the Instructions to Tenderers.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Payment Cycle
This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Ownership & Acceptance

In FIDIC Works Contracts, the Works is owned by the

Contractor until a defined taking over date and monthly payments do not imply any transfer of assets. possible) can be adjusted in the next interim payment if the previous months payments was found too high or too low. be strictly correct is the final payment. (At 14.6 A Payment Certificate shall not be deemed to indicate the Engineer's acceptance, approval, consent or satisfaction)

It follows that monthly payments (whilst being as accurate as The only Contractor's statement and payment which needs to

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Interim Payment Statements


This project is co-financed by the European Union and the Republic of Turkey

1.

2.
3.

4.

Contractor produces 6 copies of monthly statements (IPS). Submitted together with a progress report. Large number of additions and deductions from statements given in 14.3 (a) to (g) Under 14.5 80% of plant delivered to site but not incorporated can be paid for if items are listed in Appendix to Tender. (Can be particularized) Upon approval by Engineer the IPS becomes an IPC
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Preamble to Schedule of Payments

The Schedule of Payments should be preceded by a Preamble which sets down the scope of works within each payment installment Note: It has become traditional that the Preamble to BoQ also contains advcie on how bidders should fill in the BoQ but this information is more correctly placed in the Instructions to Tenderers.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

1999 FIDIC Yellow Book


This project is co-financed by the European Union and the Republic of Turkey

Normal to pay the Contractor against predefined milestones for all works as set down in the schedule of payments.

Also possible to make advance payments under 14.5 for items either delivered to site or ready for collection at a manufacturer. State Inco terms.

EXW EX WORKS (named place) CIF COST, INSURANCE AND FREIGHT (named port of destination) DDP DELIVERED DUTY PAID (named place of destination)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Payment Basis
This project is co-financed by the European Union and the Republic of Turkey

Alternatively:
1. Tender Preparers make a list of lump sums payments which will become due when certain activities or Works sections are complete. (The % breakdown of the lump-sums is not alterable by bidders) Bidders price these lump sums The successful bidder receives payment when the lumps sum activities are achieved (in any order) No payments are due for semi-completion of lump-sum activities. (e.g. not possible to receive 50% payment for 50% achievement of lump-sum). If target for a lump sum payment is missed the Contractor submits a Catch-up programme
*Has become popular payment method for 1999 Yellow Book

2. 3. 4.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Provisional Sums & Contingency


This project is co-financed by the European Union and the Republic of Turkey

Provisional Sums 1.1.4.10

Funds set aside for use at the Engineers Discretion to undertake pre-defined items of the Works which may become necessary. (Note: Provisional sums are part of the Accepted Contract Amount but do NOT become part of the Contract Price until committed under 13.5) These do not exist in FIDIC, but are commonly given in Tender dossiers to allow funding of variations for Unforeseeable circumstances. In IPA contracts (unusually!) they form part of Accepted Contact amount and unless equated to provisional sums always form part of the Accepted Contract Amount. Generally the contingency sums may exist only within a clients budget line to which contractor is not privy.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Contingency Sums

This project is co-financed by the European Union and the Republic of Turkey

(carried out incidental to Contract Work)


REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Dayworks

Original Definition Works performed at a daily, reimbursable rate for each element of a job (plant, labour, fuel, etc. performed) Common usage Works performed incidental to Contract Work on a cost reimbursable basis, where work elements are broken down into Labour, Plant and Materials. IPA contracts include the sum of a Dayworks Schedule within the tender comparison price but NOT with the Accepted Contract Amount
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Dayworks Clauses in FIDIC


This project is co-financed by the European Union and the Republic of Turkey

Green Book (10.2(e)) 1999 FIDIC Red (13.6)

1999 FIDIC Yellow (13.6)


1999 FIDIC Silver (13.6)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Use in 1999 FIDIC


This project is co-financed by the European Union and the Republic of Turkey

Engineer may instruct that a Variation shall be executed on a daywork basis ... Work shall then be valued in accordance with the daywork schedule in the contract

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Use in 1999 FIDIC


This project is co-financed by the European Union and the Republic of Turkey

Contractor shall submit a quotation before ordering.

. When applying for payment, the Contractor shall submit invoices, vouchers and accounts or receipts for any Goodsand ... names, occupations and time of personnel identification, type and time of equipment the quantities and types of plant and materials used. . Payment to Contractor is with next statement.. (i.e. in next interim payment)
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Bill of Quantities (Red Book): BoQ is a list of items giving descriptions and estimated quantities of Works to be executed under the Contract; The Red Book assumes a remeasurement form of contract, although that does not preclude the inclusion of a number of lump sum items in the BoQ, provided their scope is adequately defined;
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Documents as per FIDIC

Schedule of Payments (Yellow Book): A schedule which contains a Breakdown of the Lump Sum defining the components of the Works, filled in by the Contractor at the tender stage; Interim payments are made on the basis of defined percentages/milestones for the works completed.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before Contract Signature:


Employer gives award notice to the successful tenderer;
Contract Negotiations are done (if necessary); Priority of documents is re-arranged if necessary due to contract

negotiations or clarifications during tender period;


Contract is signed by the Employer (and endorsed by EUD); Contractor submits the required documents (e.g. performance

security) to the Employer together with the signed Contract;


REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 1: Upon the signature of the Contract certain procedures need to completed before the Contractor can commence the works;
Cl. 18.2 Submission of All Risk Insurance; Cl. 20.2 Identification of DAB (Dispute Adjudication Board)

member(s). Sometimes identification is done on Ad hoc bases; Cl. 3.1 If not already in the Contract, the Employers informs the Contractor about the details of the Engineer; Communication lines and rules are established; REPUBLIC OF TURKEY
MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 1:


Cl. 1.8 & Cl. 1.9 Supply of Drawings and Instructions; (RED Book) Drawings should be an integral part of the Contract

and should be provided based on a well structured calendar. Cl. 3.2: The limits of the authority of the Engineer and its staff should be defined The authority of the Engineer is limited in projects funded by EU. The personnel of the Employer, the Contractor and the Engineer to be deployed on the project site are identified. (Cl. 4.3 - Contractors Representative) The limits of authority of each personnel are identified and a line of communication is drafted. REPUBLIC OF TURKEY
MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 2: Clause 2.1 Right of Access to Site
Employer should give the right to access and possession of the site to the

Contractor after the Contract Signature. Employer should complete his responsibilities and should give the possession of the site free of problems. Delays in this task may cause extensions in the contract duration and increases in the contract price. 1.13 Contractor should complete all the necessary local procedures and obtain the necessary permits to start construction works. Clause 8.1 unless otherwise stated in PCs the commencement date is within 42 days after the contract signature (30 days after Signature of Contract in some of the IPA Projects); Engineer shall give the notice not less than 7 days before the Commencement Date.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 2:


Clause 1.3 - Communications: The rules stated in this clause should be followed. Payment certificates, approvals, certifications and similar requests should be processed within the durations stated in the Contract. A copy of the notices should be shared by the Engineer. Clause 1.9 - Delayed Drawings and Instructions Delays which will cause claims should be avoided as much as possible Clause 3.3 - Instructions of the Engineer Engineer should issue instructions in line with its Authority. Instructions can only be issued by the Engineer or its representative. RED Book includes verbal instructions by written confirmations.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 2: Clause 4.21- Progress Reports


Unless otherwise stated, the Contractor should issue progress reports in certain intervals.

Usually as attachments to the interim payment certificates. Reports compare the physical and financial realization with the planned and propose programmes for the remaining duration. Reports should be supported by pictures and test results. Reports should include information about the production, delivery and assembly schedules of the permanent works

Clause 6.10 - Records of Contractors Personnel and Equipment


Contractor should keep daily site records. The records should include site

activities as well as weather conditions. Such information should be summarized in the progress reports.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Before the Construction Works Commence - 2: Clause 2.5 Employers Claims and 20.1 Contractors Claims
Progress reports should list the Claims of both Parties; The contractor should give notice in 28 days after he became aware of the event

or the circumstances. And shall submit a detailed claim in 42 days; Engineer shall respond within 42 days after receiving a claim. If not agreed with the Engineers decision, parties may refer the case to DAB

Dispute resolution procedure is: adjudication (DAB) >>> amicale settlement >>> arbitration

Clause 14 - Contract Price and Payment Progress reports should include sufficient level of information about cash flows, to allow the Employer to make proper planning for funding.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Certificates: Clause 10 Employers Taking Over


Contractor may apply for Taking Over Certificate 14 days

before the works are completed (Notice). Engineer within 28 days after receiving the application (a) issues the certificate or (b) rejects the application.

Clause 11 Defects Liability Upon the full completion of Contractors duties and responsibilities under the contract and within 28 days after the expiry of the Defects Notification Period; Engineer issues the Final Acceptance Certificate.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

Financial Management Tools:


Clause 12 Measurement and Evaluation (RED Book) Clause 13 Variations and Adjustments Clause 14 Contract Price and Payment Clause 12 Measurement and Evaluation (Only valid for RED Book Contracts)
For Clause 12, YELLOW Book has Tests After Completion. The ways and methods of measurement and evaluations for Works are defined; Measurements are done jointly by the Engineer and the Contractor. In certain

circumstances records are used instead of measurements. Payments are usually based on net measurements. Clause 12.3 defines the procedures for defining new rates.

REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

YELLOW Book; Payment Conditions: Usually lump-sum contracts; Sub items are defined for interim payments. Payments are based on completion ratios (percentages); Sub items should be arranged carefully in order not to harm the Contractors cash flow. Unfair or unreasonable payment conditions are always reflected to the work progress; Cl. 14.4 - Schedule of Payments and the Schedule of Payments in Volume 4 should be in line with each other.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

YELLOW Book; Payment Conditions:


Clause 13 - Variations and Adjustments
13.1 Engineer can instruct a variation or request the Contractor to

submit a proposal 13.2 Value Engineering 13.3 Variation Procedure 13.8 Adjustments for Changes in Cost: Formula for price increases based on the costs for material, labour, fuel, energy etc.). Not implemented in EU funded projects.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Project Management, Tools & Milestones

YELLOW Book; Payment Conditions: Clause 14 Contract Price and Payment: 14.1 Contract Price
Procedures for Contract Price variations should be clearly defined.

And relevant clauses should be drafted accordingly.

14.2 Advance Payment


Advance payment and deductions should be in line with the nature

of the works. Payment conditions should not put the Employer under risk, but at the same time should not harm the cash flow of the Contractor.
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

CLAIMS DISPUTES AND ARBITRATION (ARTICLE 20)

20.1 Contractors Claims 20.2 Appointment of the Dispute Adjudications Board 20.3 Failure to Agree Dispute Adjudication Board 20.4 Obtaining Dispute Adjudication Boards Decision 20.5 Amicable Settlement 20.6 Arbitration 20.7 Failure To Comply With Dispute Adjudication Boards Decision 20.8 Expiry of Dispute Adjudication Boards Appointment APPENDIX General Conditions of Dispute Adjudication Agreement ANNEX Procedural Rules
REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

THANKS FOR LISTENING...