SCAFFOLD REGISTER

The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 0 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

1 to 12 117 9-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 10-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. Inspected By Signature

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

10 117 9-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 10-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

9 117 9-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 10-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

8 117 9-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 10-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

7 117 9-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 10-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

6 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

5 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

4 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

3 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

2 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li 2 platforms 1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

1 117 8-Aug-12 Underhung 117 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Aug-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC Sengou li

1.5 1.5

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

30 "C" AVENUE 9-Jun-12 Underhung Corridor Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 9-Jun-12 commisioned Inspected By Signature

Ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

118 "C" AVENUE Underhung Corridor Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order modified to suit needs In Good Order Inspected By Signature

0-Jan-00 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12 17-Apr-12 19-Apr-12

LEE LEE LEE LEE LEE LEE ara

Comment: C: Dismantle: Position

as of april 17, 2012 the scaffold is subject to modification

Name

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou 3 1.2 1.2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

150 "D" avenue access, base supported bridge, corridor 1-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 1-Apr-12 commisioned 8-Apr-12 In Good Order 15-Apr-12 In Good Order Inspected By Signature

LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou 3 1.2 1.2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

oo2 "D" avenue access, base supported bridge, corridor 8-Jan-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

8-Jan-12 15-Jan-12 22-Jan-12 4-Apr-12 11-Apr-12 18-Apr-12

LEE LEE LEE ara ara ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name

Checked gas content before entering

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou 3 1.2 1.2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

oo1 "D" avenue access, base supported bridge, corridor 8-Jan-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

8-Jan-12 15-Jan-12 22-Jan-12 4-Apr-12 11-Apr-12 18-Apr-12

LEE LEE LEE ara ara ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name

Checked gas content before entering

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou

1 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

72 "D" avenue access, base supported bridge, corridor 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order red tag Inspected By Signature

31-Mar-12 6-Apr-12 14-Apr-12 21-Apr-12

ara LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou

1 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

77 "D" avenue access, base supported bridge, corridor 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order tripping hazard Inspected By Signature

31-Mar-12 6-Apr-12 14-Apr-12 21-Apr-12

ara LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou

1 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

139 "D" avenue access, base supported bridge, corridor 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order tripping hazard Inspected By Signature

31-Mar-12 6-Apr-12 14-Apr-12 21-Apr-12

ara LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou

1 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

139 "c" avenue access bridge 29-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order tripping hazard Inspected By Signature

29-Mar-12 6-Apr-12 14-Apr-12 21-Apr-12

ara LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG jiagou 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

59 "c" avenue Underhung Corridor 11-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Deccomisioned Inspected By Signature

18-Feb-12 25-Feb-12 2-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 30-Mar-12 6-Apr-12 13-Apr-12 16-Apr-12

LEE LEE LEE LEE LEE LEE LEE LEE LEE ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name LI Shengou zang yonghua yu sheng qun Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

55 "c" avenue Underhung Corridor 11-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Deccomisioned Inspected By Signature

18-Feb-12 25-Feb-12 3-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 30-Mar-12 6-Apr-12 13-Apr-12 16-Apr-12

LEE LEE LEE LEE LEE LEE LEE LEE ara ara

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name LI Shengou li junyi yu sheng qun Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

52 "c" avenue Underhung Corridor 11-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

18-Feb-12 25-Feb-12 3-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 31-Mar-12

LEE LEE LEE LEE LEE LEE LEE

Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder Name LI Shengou ma luwang ma bahou Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

32 "c" avenue Underhung Corridor 12-Dec-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

12-Dec-12 19-Dec-12 26-Dec-12 2-Jan-13 7-Jan-13 14-Jan-13 21-Jan-13 28-Jan-13 23-Jan-13 24-Jan-13 25-Jan-13 Comment: C: Dismantle: Position Scaffolding Supr Scaffolder Scaffolder

LEE LEE LEE LEE LEE LEE LEE LEE LEE LEE LEE Access only

Name LI Shengou Wang Jiagou Li Junyi

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

92 "c" avenue Underhung Corridor 29-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

29-Feb-12 12-Mar-12 19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE ARA ARA lee

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

90 "c" avenue Underhung Corridor 29-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

29-Feb-12 12-Mar-12 19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE ARA ARA lee

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width, M Base Length, m Checklist

TCC TCC WANG

2 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

83 "c" avenue Underhung Corridor 28-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order dismantled Inspected By Signature

28-Feb-12 9-Mar-12 16-Mar-12 23-Mar-12 30-Mar-12 6-Apr-12 13-Apr-12 20-Apr-12 21-Apr-12

LEE LEE LEE LEE LEE ARA lee ara ara

Comment: C: Dismantle: Position Name

dismantled as of 21/april/2012

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

64 C AVEnue 18-Feb-12 Access, base supported Corridor 19-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

19-Feb-12 26-Feb-12 4-Mar-12 11-Mar-12 18-Mar-12 25-Mar-12 2-Apr-12 7-Apr-12 14-Apr-12

LEE LEE LEE LEE LEE LEE LEE ARA lee

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

126
D avenue, near the bridge, near central warehouse

2m 2m

base supported, access Corridor 5-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. In Good Order Modified In Good Order Scaffolding modified In Good Order In Good Order Subject for dismantling Inspected By Signature

5-Apr-12 12-Apr-12 30-Mar-12 1-Apr-12 4-Apr-12 11-Apr-12 17-Apr-12

LEE ARA ARA ARA ARA ARA ARA

Comment: C: Dismantle: Position Name

RED TAG

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

131
D avenue, near the bridge, near central warehouse

2m 2m

base supported, access Corridor 22-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order Scaffolding modified In Good Order In Good Order Subject for dismantlig Inspected By Signature

22-Mar-12 29-Mar-12 30-Mar-12 1-Apr-12 4-Apr-12 11-Apr-12 17-Apr-12

LEE ARA ARA ARA ARA ARA ARA

Comment: C: Dismantle: Position Name

red

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

132
Near Central Warehouse near the bridge

1m 4m

base supported, access Corridor 22-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order Subject for dismantling Inspected By Signature

22-Mar-12 29-Mar-12 4-Apr-12 11-Apr-12 17-Apr-12

HUSSAIN ALI ARA LEE ARA ARA

Comment: C: Dismantle: Position Name

red

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

133
Near Central Warehouse near the bridge

1m 4m

base supported, access Corridor 22-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order Scaffolding modified In Good Order Subject for dismantling Inspected By Signature

22-Mar-12 29-Mar-12 30-Mar-12 5-Apr-12 10-Apr-12 14-Apr-12 17-Apr-12

LEE ARA ARA ARA lee ARA ARA

Comment: C: Dismantle: Position Name

red

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

138
Near Central Warehouse near the bridge

1m 4m

base supported, access Corridor 29-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 29-Mar-12 commisioned 5-Apr-12 In Good Order 12-Apr-12 In Good Order Inspected By Signature

LEE LEE LEE

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

74 Near Central Warehouse base supported, access Corridor 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

26-Feb-12 4-Mar-12 11-Mar-12 18-Mar-12 24-Mar-12 31-Mar-12 6-Apr-12 13-Apr-12

LEE LEE LEE LEE LEE ARA ARA ARA

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

88 Near Central Warehouse base supported, access Corridor 28-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

28-Feb-12 4-Mar-12 11-Mar-12 18-Mar-12 24-Mar-12 31-Mar-12 6-Apr-12 13-Apr-12

LEE LEE LEE LEE LEE LEE LEE ARA

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

73 Near Central Warehouse base supported, access Corridor 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

26-Feb-12 4-Mar-12 11-Mar-12 18-Mar-12 24-Mar-12 31-Mar-12 6-Apr-12 13-Apr-12

LEE LEE LEE LEE LEE ARA ARA ARA

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

109 "C" AVENUE Underhung Corridor 20-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order Inspected By Signature

20-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE LEE

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

116b "C" AVENUE Underhung Corridor 19-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order Inspected By Signature

19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE LEE

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

110a "C" AVENUE 10-Mar-12 Underhung Corridor 20-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order Inspected By Signature

20-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

110b "C" AVENUE 10-Mar-12 Underhung Corridor 18-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order Inspected By Signature

18-Mar-12 25-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

101 "C" AVENUE 7-Mar-12 Underhung Corridor 8-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

8-Mar-12 15-Mar-12 22-Mar-12 29-Mar-12 4-Apr-12 11-Apr-12

LEE LEE LEE LEE LEE LEE

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

TCC TCC WANG 2 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

100 "C" AVENUE 7-Mar-12 Underhung Corridor 8-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

8-Mar-12 15-Mar-12 22-Mar-12 29-Mar-12 4-Apr-12 11-Apr-12 18-Apr-12

LEE LEE LEE LEE LEE LEE

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

99 "C" AVENUE Underhung Corridor 8-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

8-Mar-12 15-Mar-12 22-Mar-12 29-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

LEE LEE LEE LEE LEE ara LEE

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

TCC TCC WANG

1m 5m

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

89 Near Central Warehouse base supported, access Corridor 28-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

28-Feb-12 4-Mar-12 11-Mar-12 18-Mar-12 24-Mar-12 31-Mar-12 6-Apr-12 13-Apr-12

LEE LEE LEE LEE LEE LEE LEE ARA

Comment: C: Dismantle: Position Name

Access only

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO BIJU KUMAR 5 3 4

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

12 chiller area base supported chiller/ compressor area 17-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 17-Apr-12 commisioned Inspected By Signature

ARA

Comment: C: Dismantle: Position

Access for scafolders and carpenters only, for the foundation slab. USE 100% Full harness

Name

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO BIJU KUMAR

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

16 chiller area base supported chiller/ compressor area 30-Mar-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order Modify to suits condition In Good Order Inspected By Signature

30-Mar-12 6-Apr-12 13-Apr-12 14-Apr-12 16-Apr-12

Biju Biju Biju ARA ARA

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO BIJU KUMAR

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

15 chiller area base supported chiller/ compressor area 28-Jan-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

28-Jan-12 4-Feb-12 11-Feb-12 18-Feb-12 25-Feb-12 3-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 31-Mar-12 7-Apr-12 14-Apr-12 Comment: C: Dismantle: Position

Biju Biju Biju Biju Biju Biju Biju Biju Biju ARA Biju ARA

Name

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width, m Base Length, m Checklist

AICCO AICCO AICCO 3 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

8 SABTANK base supported WATER TANJK 9-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In good Order In good Order In good Order In good Order In good Order In good Order In good Order In good Order Inspected By Signature

9-Feb-12 16-Feb-12 23-Feb-12 6-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 7-Apr-12 14-Apr-12

Biju Biju Biju Biju Biju Biju Biju ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

AICCO AICCO AICCO 2.5 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

7 SABTANK base supported WATER TANJK 24-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In good order In good order In good order In good order In good order In good order In good order Inspected By Signature

24-Feb-12 2-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 31-Mar-12 7-Apr-12 14-Apr-12

Biju Biju Biju Biju Biju Biju ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width, m Base Length, m Checklist

AICCO AICCO AICCO 2.5 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

6b SABTANK base supported WATER TANJK 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. Lost Tag 17-Apr-12 commisioned Inspected By Signature

ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height, m Base Width Base Length Checklist

AICCO AICCO AICCO 2.5 2 2

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

6A SABTANK base supported WATER TANJK 26-Feb-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. commisioned In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order In Good Order Inspected By Signature

26-Feb-12 2-Mar-12 10-Mar-12 17-Mar-12 24-Mar-12 31-Mar-12 7-Apr-12 14-Apr-12 17-Apr-12

biju biju biju biju biju biju biju ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

AICCO AICCO AICCO

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

4 SABTANK base supported ALARM BUILDING 2-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 2-Apr-12 commisioned 9-Apr-12 In Good Order 16-Apr-12 In Good Order Inspected By Signature

ara ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

AICCO AICCO AICCO

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

3 SABTANK base supported ALARM BUILDING 2-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 2-Apr-12 commisioned 9-Apr-12 In Good Order 16-Apr-12 In Good Order Inspected By Signature

ara ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

AICCO AICCO BIJU KUMAR

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

2 SABTANK base supported ALARM BUILDING 2-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 2-Apr-12 commisioned 9-Apr-12 In Good Order 16-Apr-12 In Good Order Inspected By Signature

ara ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

AICCO AICCO BIJU KUMAR

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

1 SABTANK base supported ALARM BUILDING 2-Apr-12 Tube and coupler

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 2-Apr-12 commisioned 9-Apr-12 In Good Order 16-Apr-12 In Good Order Inspected By Signature

ara ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

4 CHILLER BASE SUPPORTED CHILLER 20-Feb-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. Commisioned In good order In good order In good order In good order In good order In good order In good order In good order Inspected By Signature

20-Feb-12 27-Feb-12 5-Mar-12 12-Mar-12 19-Mar-12 26-Mar-12 2-Apr-12 9-Apr-12 16-Apr-12

BIJU BIJU BIJU BIJU BIJU ara ara ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

21 CHILLER BASE SUPPORTED CHILLER 4-Apr-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 4-Apr-12 Commisioned 5-Apr-12 In good order 12-Apr-12 In good order Inspected By Signature

ARA ara ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

20 CHILLER BASE SUPPORTED CHILLER 4-Apr-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 5-Apr-12 Commisioned 12-Apr-12 In good order Inspected By Signature

ARA ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

19 CHILLER BASE SUPPORTED CHILLER 5-Apr-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 5-Apr-12 Commisioned 12-Apr-12 In good order Inspected By Signature

ARA ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU 3.5 3 3

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

17 firefighting area BASE SUPPORTED firefighting area 31-Mar-12 system scaffold

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. In good order In good order Subject to modification In good order Inspected By Signature

1-Apr-12 8-Apr-12 11-Apr-12 16-Apr-12

ARA ara ARA ARA

Comment: C: Dismantle: Position Name

Red Tag

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU 3.5 3 3

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

7 firefighting area access firefighting area 7-Mar-12 system scaffold

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. In good order In good order In good order In good order In good order In good order In good order In good order Inspected By Signature

7-Mar-12 14-Mar-12 21-Mar-12 28-Mar-12 4-Apr-12 11-Apr-12 12-Apr-12 18-Apr-12

biju biju biju biju biju biju biju ara

Comment: C: Dismantle: Position Name

Red Tag

Signature

Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

22 chiller access Firefighting 14-Apr-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 14-Apr-12 In good order 16-Apr-12 modifies to suits actual condition Inspected By Signature

ARA ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist

KAMCO KAMCO MR BIJU

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

18 CHILLER BASE SUPPORTED CHILLER 2-Feb-12 SYSTEM SCAFFOLD

B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. 5-Apr-12 In good order 12-Apr-12 In good order Inspected By Signature

ARA ara

Comment: C: Dismantle: Position Name Signature Date

SCAFFOLD REGISTER
The register scaffold be entered by a Competent Person And shall be kept at the Woprk site for use by Inspector, Pursuant to Regulation of OSHA Requirements 1926, sub Part L A. Erection Name of Contractor Erected By Supervised By Certificate # Scaffold Height Base Width Base Length Checklist B. REPORT OF RESULTS OF INSPECTION Date of Inspection Results of Inspection. Enter Details of Defects. If no defects Enter in Good order. Inspected By Signature

Register No. Site Location Date of Erection Scaffold Type Scaffold Location Date of Completion Type of System used

Comment: C: Dismantle: Position

Name

Signature

Date

STATUS OF SCAFFOLDING
as of April 21, 2012

COMPANY
TCC KAMCO AICCO TAMIMI YANBU STEEL 7 STARS TOTAL Prepared By:

Classification GREEN RED


66 10 4 0 0 0 16 2 5 1 0 0

Dismantled
5 5 0 0 0 0

80
Abraham R. Abracia Scaffolding Inspector SA I 0834

24

10

FULL BODY HARNESS AND LANYARD MONTHLY INSPECTION LOG

Name of Sub Contractor The following symbols shall be used to denote:

KAMCO Satifactory X Defective

s/l #

ID Mark

Certificate # Capacity Webbing Kg

Snaphook Buckles

Sewing

Shock Absorber

N/A

Not applicable

Date of Inspection