Count of Type Main WorkCtr TB-CELEC TB-CMECH Grand Total

Type T2 2 7 9

T5 2 12 14

Grand Total 4 19 23

Daily Planning List

3/7/2013 8:05 AM

18-Apr'12 (Today) Review Notif. Ite Main Type Notification m WorkCtr No 1 TB-CELEC T2 720016567

Notif.date

FunctLocation

Description of FunctLocation

Defect

Brk- Pr dn 2

Days

27/09/2011 TB00EAC01AT001 MAGNETIC SEPARATOR 1A

MS1A run feed back failure

527

TB-CELEC

T2

720018219

13/04/2012 TB00EAD10AF701 S/R A SLEWING

SR A energy chain cable carrier dropped

328

User Reported by statu s Location : Magnetic separator 1A (JT1). mats RIDHWAN0627 Period : During unloading activity. Event : 1-Alarm MS1A run feedback failure appear from SCADA. 2-Maintenance on shift reset alarm from local panel and try to restart back.Indication lamp for 'Thermic magnet'on at local panel. 3-During restart (maintenance mode),suddenly small spark happen. 4.Immediately MS1A from SCADA and give instruction to maintenance on shift to bypass the MS1A system. 5-Visual inspection, no any abnormal found. Root causes : Unknown Action : -Temporary bypass the system to allow unloading activity. -Instruct to Minarex h/k to clear coal around MS1A area as a precaution action. 29/9- attend today, revw 1week 18/10-Need further discussion for this issue 1/11-looking for technical spec 11/11-PR No.1000057178, RFQ stage 29Nov- Still RFQ stage, waiting procurement to issue PO, revw 1m 10/4-Re-tender iprg, rev 1w revw NAZARUDDIN Location : SR A slewing platform Defect : SR A energy chain cable carrier dropped. Period : During reclaiming Twisdraai Pile A. Event : 1) 12-Apr-2012, 2115hrs, SR A trip on Slew drive VFD run f/back failure. 2) Reset the alarm but another alarm triggered, SRA slew 3) Alarm at VFD panel shows "F11" that means overcurrent. 4) Suspect there is motor power cable leaked/snapped. 5) Further inspection found energy chain cable carrier dropped at slew platform to boom conveyor. Root causes : Open. Action : 1) Found 2 cables nearly snapped. E&I Maint secured the defected cables. 2) Handed over to E&I on shift for rectification job assisted with Maintenance on shift. 13Apr: Required to erect scaffolding (1days), to inform Ops once scaffold completed. Revw next week. iprg MOHDNOOR Location Defect Event : CUL10 : Bucket rear eye broken : 1) During detail inspection on chain & buckets, found 1 bucket rear eye was broken. 2) Carry out temporary welding to allow operation resume. Period : During unloading TB365 at 1945hrs, 11-Apr-12 Root causes : Open Action : 1) Re-welding the broken rear eye bucket only for temporary and need to change with new bucket when there is a window. 12.04.2012 11:59:29 FAIZ D (FAIZ0791) 12/4-Chk & plan to atnd Location : CUL20 FAIZALHASNAN Defect : Bucket rear eye broken Event : 1) Operator inform bucket hanger detached during operation 2) Further inspection by Maintenance in Shift, bucket rear eye broken at bucket no 41. Period : During unloading TB365 Root causes : Wear & tear Action : 1) Stop and parked to CUJ 2) Re-welding back broken rear eye, CUL resume operation 10/4-Work iprg, rev 1w

TB-CMECH T2

720018213

12/04/2012 TB00EAA10

COAL UNLOADER 1

CUL10 bucket rear eye broken

329

TB-CMECH T2

720018198

10/04/2012 TB00EAA20

COAL UNLOADER 2

Bucket rear eye broken

331

iprg

Daily Planning List

3/7/2013 8:05 AM

TB-CMECH T2

720018088

23/03/2012 TB00EAA20AF141 CUL 2 BUCKET ELEVATOR

CUL20 Body punctured at BE area

349

load

TB-CMECH T5

750046403

11/04/2012 TB00EAA10

COAL UNLOADER 1

Alarm BE G/BOX Load Unbalance Warning

330

iprg

TB-CMECH T5

750045284

23/03/2012 TB00EAA20AF171 CUL 2 PORTAL CONVEYOR

CUL20 Rubber skirts worn out at portal

349

load

TB-CMECH T5

750035792

06/07/2011 TB00EAC03AF001MG01 GEAR BOX BC 3A

REL@Vibration

610

load

TB-CMECH T5

750029634

SR 17/12/2010 TB00EAD20AE901 S/R B HPP3 TRIPPER RETRACTING B beam for Tripper need to repaint

811

load

10 TB-CMECH T5

750045336

REL@Oil Analysis - High Particle 29/03/2012 TB00EAD10AF401MG01A BUCKET WHEEL GEARBOX S/R

343

iprg

: CUL20 BUKHARI0746Location Period : During unloading TB360 Defect : Body punctured at bucket elevator area Root causes : Corrosion 26/3- Waiting window CKSHAH0862 Location : CUL10 Defect : Alarm BE G/BOX Load Unbalance Warning Event : 1) Operator informs alarm BE G/BOX Load Unbalance warning triggered. 2) Alarm can be reset but keep on triggered. Period : During unloading TB365 Root causes : Open Action : 1) Control unloading flowrate. 12/4-To chk ampere trending, revw 1w : CUL20 BUKHARI0746Location Period : During unloading TB360 Defect : Rubber skirts worn out causing spillages at that area Root causes : open 26/3- Waiting window ZARUL0753 Latest vibration reading is 8.62mm/s RMS in Alarm level ( Zone DPossible to equipment damage ).High amplitude ( 8.43 mm/s rms) at 11X motor RPM. Suspected due to weak structure at gearbox foundation. Please investigate and rectify this problem. 07.07.2011: Plan to investigate & site inspection with REL 9/9- Waiting REL submit report 13/9- To carry out visual inspection 29/9- Plan to re alignment, revw 1week 4/10-Alignment done, submit request form to REL 7/10-Correction: Plan to alignment 21/10-Vibration spectrum shows GM 11X with sidebands. Suspect gear started to wear 24.11.2011-Plan do during this outage 20/3- Waiting next window NAZARUDDIN SR B beam for Tripper need to repaint. The exposed surface can easily corrode. 18.01.2011: awaiting approval, revw 2week 01.02.2011: waiting proposal from contractor, revw 1month 01.03.2011: Waiting approval from HPSB, revw 1month 15.04.2011 - Waiting approval (under memo process),review 2 week 24.05.2011: Tendering closed 10 june 11 28.06.2011: Waiting proposal from approval contractor, revw 1week 23/9- Under discussion with Dyna Segmen 13/10-Waiting approval TJSBHQ 12/12- Waiting window 22/12- PO Issue SYAHRIR0818SR A BW Gearbox: High particles count @ NAS 11. Recommend to filter oil

Review Notification 18-Apr-12


T2 T5

Main WorkCtr TB-CELEC 5 TB-CMECH Total

T2 2 3 5

T5 0 5 5

Grand Total 5 5 2 8 10

No of Notif

3
3

2
2

0
0
TB-CELEC TB-CMECH Total

Main Wrk Ctr

Daily Planning List

3/7/2013 8:05 AM

TB-CELEC TB-CELEC TB-CMECH TB-CMECH TB-CMECH TB-CMECH TB-CMECH TB-CMECH TB-CMECH TB-CMECH

T2 T2 T2 T2 T2 T5 T5 T5 T5 T5

720016567 720018219 720018213 720018198 720018088 750046403 750045284 750035792 750029634 750045336

27/09/2011 13/04/2012 12/04/2012 10/04/2012 23/03/2012 11/04/2012 23/03/2012 06/07/2011 17/12/2010 29/03/2012

TB00EAC01AT001 MAGNETIC SEPARATOR 1A MS1A run feed back failure 2 TB00EAD10AF701 S/R A SLEWING SR A energy chain cable carrier dropped 2 TB00EAA10 COAL UNLOADER 1 CUL10 bucket rear eye broken 2 TB00EAA20 COAL UNLOADER 2 Bucket rear eye broken 1 TB00EAA20AF141 CUL 2 BUCKET ELEVATOR CUL20 Body punctured at BE area 3 TB00EAA10 COAL UNLOADER 1 Alarm BE G/BOX Load Unbalance Warning 3 TB00EAA20AF171 CUL 2 PORTAL CONVEYOR CUL20 Rubber skirts worn out at portal 2 TB00EAC03AF001MG01 GEAR BOX BC 3A REL@Vibration 3 TB00EAD20AE901 S/R B HPP3 TRIPPER RETRACTING B beam for Tripper need to repaint SR 3 TB00EAD10AF401MG01A BUCKET WHEEL GEARBOX S/R REL@Oil Analysis - High Particle 3

mats revw iprg iprg load iprg load load load iprg

RIDHWAN0627 NAZARUDDIN MOHDNOOR FAIZALHASNAN BUKHARI0746 CKSHAH0862 BUKHARI0746 ZARUL0753 NAZARUDDIN SYAHRIR0818