You are on page 1of 1

RECESS SLAB ALUMINUM FRAME

Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job. OB+Architecture Inc. must be notified immediately in writing of any variation from the dimensions and conditions shown on these drawings. Field verify all conditions prior to laying out or fabricating associated work. Bring to the architect's attention any deviation from designed conditions and field conditions prior to ordering

5'-438" PER MFR. SERRATED FILLER AS REQUIRED


materials and installing work, and cooperate with architect to modify such conditions at no additional cost to the owner, architect or architect's consultants. Shop details must be submitted to the architect's office and reviewed by the architect prior to ordering materials, fabrication and delivery to the job site, unless otherwise provided for under the specific contractual agreement between the architect and client. OB+Architecture Inc. expressly reserves its common law copyright and other

TO INSIDE OF DOG RUN CMU WALL 6.25" HARDIBOARD SIDING (5" EXPOSED) 6'-0" @ DOOR D100 VINYL ABRASIVE TREAD
THERMOPLASTIC DRAIN COVER
LATEX SCREED
6" CL
CARLISLE CCW-525 LIQUID-APPLIED WATERPROOF 2" O.C.
TRENCH BEYOND; ON DOORS
MEMBRANE BARRIER
SLOPES DOWN 1 2" TRENCH START -1/2" BFF
FINISH FLOOR
0'-0" FIN. FLR. MIN. 3" HIGH MESH OR BAFFLED CAVITY-BLOCKING
BARRIER MATERIAL IN BETWEEN EACH 2X4 VERTICAL 0'-0" (REFERENCE)
SLEEPER. INSTALL FLUSH WITH BOTTOM OF
-4.5" @ SUMP SLEEPERS
B.O. TRENCH
STARTER COURSE; RIP PIECE OF HARDIEBOARD AS
STARTER STRIP TO SET INITIAL ANGLE (APPROX 6°)

3'-0"
1'-0"
FLASHING GRADE MIN. 6" BELOW FINISHED FLOOR CONC. SLAB MASONRY ANCHORS @ 24" 0.C.
MIN. 6" BETWEEN TOP OF GRADE & START OF SIDING B A
property rights in these documents. These documents are not to be reproduced, changed, or copied in any form or manner whatsoever, nor are they to be assigned to a third party without first obtaining the written permission and written consent of OB+Architecture Inc. In the event of unauthorized use of these documents by a third party, the third party shall hold OB+Architecture Inc. harmless and agrees to remunerate OB+Architecture Inc.

PERFORATED, ACID-RESISTANT
SEDIMENT BASKET A SCALE: N.T.S.
3/A3.3 3/A3.3

4"
4"Ø CHANNEL FOR DRAIN

4" 1'-0"
GRADE; VARIES
10" 1'-0"
ALUMINUM FRAME PEDIGRID AS DESIGN B
CL
SERRATED FILLER AS REQUIRED 1" Ø PVC DRAIN SLEEVE
1"Ø PVC DRAIN SLEEVES @ 12" O.C. B.W.

DETAIL AT SEDIMENT BASKET BASE TRIM DETAIL DETAIL AT ENTRY MAT B SCALE: N.T.S.

1 SCALE: 1" = 1'-0" 2 SCALE: 1 1/2" = 1'-0" 3 SCALE: 3/4" = 1'-0"

12
6
PRE-ENGINEERED LIGHT-GAUGE STEEL FRAMING

STANDING SEAM METAL ROOFING OVER


1-1/2" 22-GAUGE TYPE B STEEL DECKING
MTSM16 TRUSS STRAP AT EACH issued: ADVANCE REVIEW 21 JULY 2008
TRUSS; SEE DETAILS 11/S3.1 & 2/A3.5
revised:

14'-8" 1 17 OCT 2008


BLDG DEPT COMMENTS
TRUSS BEARING
HARDIETRIM XLD 8" FASCIA
CLOSED-CELL SPRAY FOAM INSULATION PRE-ENGINEERED LIGHT-GAUGE STEEL
UNDER DECK; ICYNENE DESIGN BASIS TRUSSES @ 4'-0" O.C.
12 1'-0"
HARDIE SOFFIT VENTED PANEL
PRE-ENGINEERED LIGHT-GAUGE STEEL
TRUSSES @ 4'-0" O.C. 6 STUCCO ON METAL LATH
OVER MOISTURE BARRIER 12
STANDING SEAM METAL ROOFING OVER OVER 5/8" DENSGLAS
22-GAUGE TYPE B STEEL DECKING OVER LT GAUGE METAL 6
FRAMING
DENSGLAS BLOCKING FOR SPRAY-FOAM INSULATION 7
8", 25 GAUGE HAT CHANNELS
CLOSED-CELL SPRAY FOAM INSULATION
@ 24" O.C. UNDER DECK; ICYNENE DESIGN BASIS
7
8", 25 GAUGE HAT CHANNELS
DRIP @ 24" O.C.

CENTRAL

10'-4" AFF
11'-8" AFF

VARIES @
ARCH
STUCCO ON METAL LATH

to
OVER MOISTURE BARRIER

FLORIDA
10'-8" 10-8" TRUSS BRG
OVER 12" DENSGLAS OVER
TOP OF MASONRY / TRUSS BEARING LT GAUGE METAL FRAMING TOP OF MASONRY
SUPPORT ANGLE; SEE
CAULK ALL JOINTS STRUCTURAL 13/S3.1 1
2" SAG-RESISTANT GYP BOARD:
1
2"
SAG-RESISTANT GYP BOARD: CONTINUE GYP BRD & INSULATION PROVIDES THERMAL BARRIER
EMBED PLATE; SEE PROVIDES THERMAL BARRIER TO BOTTOM OF DECK PER FBC 2603.4
STRUCTURAL 12/S3.1 PER FBC 2603.4 1
ALUMINUM GUTTERS &
3
DOWNSPOUTS 4" STUCCO OVER 8" CMU 5

2'-4"
8" GYP BOARD OVER 1-1/2" METAL
ACOUSTIC TILE CEILING FURRING CHANNELS @ 24" OC 1
(SEE FINISH SCHEDULE) FYPON TRIM; SEE DOOR &
HARDIETRIM XLD 1.5" (R-10) SPRAY FOAM INSULATION;
WINDOW SHEETS FOR
8" FASCIA ICYNENE DESIGN BASIS
DETAILS & SPECIFICATIONS 8'-4"
HARDIE SOFFIT VENTED PANEL BOTTOM OF
HEADER BLOCK ANIMAL
STUCCO TRIM

HOSPITAL

8"

14'-8"
ACOUSTIC TILE CEILING

8" CMU
SEE STRUCTURAL FOR 6" 2" 2'-0"
VERTICAL & HORIZONTAL address: 1201 ALAFAYA TRAIL
REINFORCING, TYP
• HARDIEBOARD HORIZONTAL LAP SIDING
• 6.25" SIZE, 5" EXPOSED OVIEDO, FLORIDA
• APPLIED OVER 2x4 PTL SLEEPERS @ 24" O.C. METAL STOREFRONT DOOR
• NON-TEXTURED, SMOOTH FINISH 32765

10'-8"
• CARLISLE CCW-525 LIQUID-APPLIED

10'-4"
5
8" GYP BOARD OVER
WATERPROOF MEMBRANE BARRIER (NOT SHOWN 112" METAL FURRING CHANNELS
FOR CLARITY) OVER CMU

9'-6"
@ 24" OC TO BOTTOM OF DECK
• REFER TO HARDIBOARD INSTALLATION project
number: 2007-12
INSTRUCTIONS FOR FASTENER TYPES & SPACING

6'-0"
8'-6"

1.5" (R-10) SPRAY FOAM INSULATION;


ICYNENE DESIGN BASIS

• TAILORED FOAM INSULATION


for such use in an amount equal to the original fee for the original documents, plus legal fees, court costs, collection fees and other costs.

• FILL ALL NON-GROUTED CELLS


• CORE-FILL 500

2"

EXPANSION JOINT
• 1
2" WIDE, CONTINUOUS ALONG CMU WALL
• FILL WITH EXPANSION MATERIAL RECESSED WALK-OFF MAT;
SEE DETAIL 2/A3.3 • DEPRESS MATERIAL 1 4" BELOW FINISHED SEE DETAIL 3/A3.3 3'-0" 4"
FLOOR

1'-4"
• CAULK WITH SILICONE SEALANT AGAINST
WATER SLOPE DOWN
title:
FINISH FLOOR FINISH FLOOR
0'-0" (REFERENCE) 0'-0" (REFERENCE)
MIN. 6" BETWEEN GRADE &
START OF SIDING WALL SECTIONS
GRADE; VARIES
-1'-4" -1'-4"
drawn:
TOP OF FOOTING TOP OF FOOTING JLP
reviewed:
OB / RG
6 MM POLY VAPOR BARRIER
date:
21 JULY 2008
TERMITE-TREATED FILL
lman:
NONE
CONCRETE SLAB
sheet setup:
SECTIONS
sheet
number:

WS1 WALL SECTION AT EXTERIOR WALLS


SCALE: 3/4" = 1'-0"
WS2 WALL SECTION AT ENTRY
SCALE: 3/4" = 1'-0" A3.3

You might also like