CEDD Contract no.

:CV/2008/03
()

CF-29

HOT WORK PERMIT


1. ISSUE
Type of Hot Work Date To Position Time Date Location Name of Subcontractor Period From Person-in-charge Issued by Signature

Precautions to be taken Adequate ventilation achieved Emergency exit and route clear Cutting and welding equipment checked in good condition Automatic flashback arrestor installed on gas cylinder Floor swept clean(and wetted down when necessary) Flammable materials separated from hot works areas by screen Non-combustible covers provided to protect nearby combustible material and cover the floor and wall opening Appropriate fire extinguisher provided Appropriate P.P.E should be used by the workers Catch tray with wet sand Standby water hose Fire watchman (to be decided by SO/PM/Subcontractor)
Notes: 1. The location where work is to be done should be examined by area erson-in-charge. 2. Permit shall be issued by Site Agent, Safety Officer, Safety Supervisor and Area person-in-charge

3.

RECEIPT
Position Date Time Signature

Name of Subcontractor Received by

4.

CANCELLATION

The workplace and adjacent areas have been checked and found to be free of fire risks.

Name of Subcontractor Cancelled by Signature

Position Time

Date