EIFPL/2011/1985 M/s. Krishna Metals & Moulds Kind Attn.: Mr.

Dharmesh Lakra Ref: - Your Visit and discussion at our works.

Dated:- 22/02/2011

Sub:- Offer for 1. Dross Melting Rotary Furnace Cap 3 Tons/Batch. 2. C.I. Mould Chain Conveyor Suitable for 176-180 Moulds 3. 4. 5. Dear Sir, Pollution Control System. Oil Heating & Handling Equipments. Chimney of Hoods & flue gas ducting.

1.

TECHNICAL SPECIFICATIONS OF 3000 KG CAPACITY CONTINEOUS ROTARY TYPE DROSS MELTING FURNACE.

1 2 3
4 5

Equipment Design Capacity Max. Operating Temperature Fuel


Type Of Burner

: : : :
:

Continues Rotary Furnace 3000 Kg / Batch 1000 C F.O./L.D.O oil Fired Size 4 A Manual. 10 H.P. /28 W.G. 1200 Cfm At 28 W.G.

6 7 8

Burner Control Blower Capacity Air Capacity

: : :

9 10

Oil Heating & Pumping Unit Rotating Mechanisms

: :

6 K.W. Model Duplex I Electro Mech. Driven With Reduction Gearbox Coupled With Electric Motor
1 - 1.5

11

Furnace R.P.M

SCOPE OF SUPPLY The scope of supply will cover design engineering, manufacture, and supply of the furnace. FURNACE SHELL The proposed furnace shell will be of circular type and will be fabricated out of 10 mm thick mild steel plates. The furnace ends will be of conical shape with flange joint smade out of 14-16 mm thick plates. The M.S. shell will be provided with 2 Nos. solid M.S. guide rings made out of Square bar for its smooth rotating operation. 1 no. Burner will be fixed on one side of the conical end & the opposite conical end will have max. 500 mm dia opening for charging the Dross material. The charge opening will be provided with H.R. Cast Iron Ring. After fabrication the complete furnace shell will be machined for the proper alignment for a long period & to avoid the wear and tear & the maintains of the wheels & bearings. REFRACTORY LINING The furnace circular shell will be lined with 115 mm thick 70% H/Al. based refractory bricks and will be further backed up by a layer of 115-mm thick Mica insulation bricks. Apart of this additional 6 mm thick insulating sheet will be provided. The furnacecharging end will have clear opening of 450-500 mm Dia after refractory lining. ROTARY MECHANISM The furnace shell be placed on 4 Nos. of alloy steel EN-8 Machined wheels mounted on rigid fabricated steel structural base. The furnace rotary motion will be achieved through Electro-mechanical drive system comprising of main driven shaft coupled with reduction gear box & motor assembly.

COMBUSTION EQUIPMENTS BURNER The furnace will be provided with 1 no. Oil Fired Burner Size- 4 A along with accessories. BLOWER 1 No. High-pressure blower of 10 H.P. & 28 w.g. pressure will be provided. The blower will have capacity of 1200 cfm at 28 w.g. The blower impeller will be directly coupled on motor shaft of reputed make such as KIRLOSKAR/ NGEF/Crompton/ABB . OIL HEATING & PUMPING UNIT To supply adequate quantity of oil to the burner at desired temperature and pressure. We will be supplying 1 no. Oil H & P unit model duplex-I, 6 K.W. cap. Comprising of 2 oil pumps coupled with 2 nos. motors, 1 No. oil pre-heater with standard accessories like pressure regulator, filters, pressure gauge, temp. Gauge & inter connecting piping along with gate valves etc. The whole unit will be mounted on a steel fabricated tray. AIR & OIL LINE Our scope of supply shall also include complete air & oil pipe connections from blower to recuperator to burner & oil line from oil h & p unit to burner along with return oil main ring system. ELECTRICAL CONTROL PANNEL The furnace will be equipped with one no. Centralized electrical control panel with standard accessories. 1. 2. 3. 4. Main on/off switch. Suitable contactors & relays for the motors & heaters (All Siemens/ L&T Make). Suitable fuses ( All EE) Push button indicating lamps etc. Suitable Ampere meter & voltmeter.

2. TECHNICAL SPECIFICATIONS OF MOTOIRISED C.I. MOULD CHAIN CONVEYOR SUITABLE FOR 176-180 MOULDS 1. 2. 3. 4. 5. 6. 7. 8. Length C/C Charging Height Level Discharging Height Max. Temp. Chain Pitch Standard Roller Chain Link Gearbox Greaves/Elecon Sprockets Pitch : : : : : : : 14500 Mm (Approx.) + 00 From Ground 900 - 1000 Mm 750 C - 800 C 150 Mm Double 60 Dia 8 Mm Thick

:Nu- 5 Standard Make : 10 Teeth 150 Mm Suitable For 5 Hp Motor Variable Speed 176-180 Nos. Max.

9.

10. Drive ABB/Bosch 11. Frequency 12. No. Of C.I. Mould

: : :

Scope of supply will cover design, engineering, manufacture &. Supply of C.I. mould chain conveyor. The proposed chain rollers will be made from alloy steel, chain links will be made out of M.S. flat 8 mm thick and sprockets from mild steel with suitable hardness to withstand 800 C temps. Complete conveyor with head sprocket and tail sprocket assembled with bearing pedestal sleeve & shaft with structure support. Chain tension arrangement & gearbox coupled with electric motor, C.I. metal distributor and water cooling arrangement complete in all respect.

3. TECHNICAL SPECIFICATION OF AIR POLLUTION CONTROL SYSTEM SUITABLE FOR 2 NOS. FURNACES (3 TONS+ 5 TONS.) WET SCRUBBER 1. 2. 3. 4. 5. 6. Diameter Height of Scrubber Shell Sheet Thickness Inlet & Outlet Clear water re circulation pump HP : : : : : : 1200 mm 2500 mm 3 - 3.5 mm 350mm-400mm 1 No. 1 HP

I.D. FAN
1. 2. 3. 4. 5. Fan R.P.M Fan Vol. Type Motor HP Static pressure
(including duct friction losses, wet scrubber.) General Description Supply of Air Pollution Control Unit Consisting of wet Scrubber, with I. D. Fan 30 HP motor , venturi of S.S. 304 with water spray Nozzles,water circulation pump with inter Connecting ducting form wet scrubber inlet & wet scrubber outlet to ID fan to chimney Qty 1 Set.

: : : : :

2000 6000 Cfm V belt drive 30 Hp 400 mm

4. OIL HEATING & HANDLING EQUIPMENTS


1. OUT FLOW OIL HEATERS FOR MAIN OIL STORAGE TANK. 1 No. Rs.26,500/-

Supply of 1 No. Out flow heater of capacity 18 kw. Suitable for 25 K.L. capacity main furnace oil storage tank. The out flow heater will be of indirect heating type & each heater will be installed in a separate heavy duty steel tube of suitable Dia and length will be assembled a one unit with thermostat temperature control complete with internal electric connection. 2. OUT FLOW HEATER FOR OIL SERVICE TANK

Supply of 1 No. 6 k.w. out flow heater suitable for 1.5 K.L. capacity furnace oil day service tank. The out flow heater will be of indirect heating type & will be assembled as a one unit with thermostat temperature control complete with internal electric connection 3. OIL FILTER

1 No.

Rs. 9,750/-

Supply of. duplex type oil filter suitable for furnace oil to be installed in the mainline between out flow heater & oil pumping system with 2 inlet and out let connection along with interconnecting pipe line & valves 4. OIL PUMPING SYSTEM (FURNACE OIL)

1 No.

Rs.25,500/-

Supply of oil pumping system to off load the oil tankers and to supply the oil from main oil tank to day service tank. The oil pumping system consists of 2 gear pump coupled with 5 HP motor on common fabricated structural base frame with 1 No. Stand by unit..

2 Units Rs. 64,000/-

Total=

___________ 1,25,750/___________

5. FLUE GAS DUCTING & HOOD

SUPPLY Of M.S. Fabricated hood & flue gas ducting of suitable Size fabricated out of M.S. plates for interconnecting furnaces to pollution control system to main chimney (for 1 No. furnace) M.S. CHIMNEY(SUITABLE FOR 2 NOS. FURNACES)

1 Lot Rs. 1,80,000/-

Supply, assembly. M.S fabricated self- Supported chimney of 1 No Rs . 4,75,000/30 mtrs. Height x 750 mm the conical Portion of the chimney will be fabricated Out of 8mm thick M.S Plates & rest of the chimney will be fabricated out of 5mm Thick M.S Plates. The chimney height 7 mtrs along with main foundation Bolts (Erection of Chimney in Client

Scope)

PRICES
1. PRICE FOR DROSS MELTING ROTARY FURNACE CAP 3 TONS/BATCH.

: : :

( ) 13,75,000/( ) 11,65,000/( ) 5,50,000/-

2. PRICE FOR C. I. MOULDS CONVEYOR 3. PRICES FOR AIR POLLUTION CONTROL SYSTEM

4. PRICES FOR OIL HEATING & HANDLING EQUIPMENTS

( ) 1,25,750/-

5. PRICES FOR CHIMNEY OF HOODS & FLUE GAS DUCTING.

( ) 6,55,000/( ) 1,50,000/-

6. PRICE FOR LABOUR CHARGES ERECTION & COMMISSIING.

TERMS & CONDITION:Price Payment : : Ex-works Faridabad 30% advance along with confirmed order 65% against Performa invoice. 5 % after Erection & Commissioning. 50% Advance & 50% after Completion of work. As applicable at the time of dispatch. shall be charged extra at the time of dispatch 6-8 weeks from the date of confirmed order along with advance All civil & electrical cabling & field wiring shall be done by client. All equipment such as welding machine, Gas Cutter, grinding machine & consumables, welding rod to be provided by client at site. Lodging & Boarding of Erection team shall be done by client.

Erection Charges Taxes Excise Duty Delivery Excluded

: : : : :

Note: Any Other Addition Beyond Our Above Scope Of Supply Will Be Charged Extra.

For Entec Industrial Furnaces (P) Ltd.

Vinay Agnihotri (Technical Director)